Search NASA⌕ Search

SEARCH · Search NASA

Results for “Communication costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

432 records · Page 24

NEAMS Burnup Extension Accomplishments and Remaining Modeling Gaps

The economic viability of light-water reactors (LWRs) in the United States is declining in heavily subsidized markets, and as a result, the nuclear industry is looking for opportunities to enhance the economic competitiveness of nuclear power. This is not a foreign concept to the nuclear industry: in the mid-2000s, the nuclear industry set out to achieve zero fuel failures by 2010. The goal in this effort was to drive down the cost of reactor shut down by replacing a pin or bundle in response to fuel rod failure. 2010 brought about the initiative to deliver the nuclear promise to reduce operating cost by 30% to improve nuclear energy’s economic competitiveness before 2020. The emergence of accident-tolerant fuel also offers the nuclear industry an opportunity to build on these past successes and deliver affordable, clean energy. Accident-tolerant fuel has been shown to provide superior performance compared to traditional Zircaloy/UO2 fuel concepts, offering the unique ability to remove operational limitations that inhibit the economic viability of nuclear power. This has led the industry to begin building a technical case to extend the peak rod average burnup beyond 62 GWd/tU to extend pressurized water reactor cycle lengths to 24 months and to develop more efficient boiling water reactor core designs. The Nuclear Energy Advanced Modeling and Simulation (NEAMS) program mission is to develop advanced modeling and simulation tools and capabilities to accelerate the deployment of advanced nuclear energy technologies. The primary safety concern inhibiting the nuclear industry from extending burnup is related to high-burnup fuel fragmentation, relocation, and dispersal. Therefore, the NEAMS program developed a targeted 5-year plan to support the industry’s efforts to extend burnup. This milestone report summarizes the 5-year plan that was enacted in FY20, followed by a discussion of the ongoing activates required to fulfill the 5-year plan, as well as the approach to address the current modeling gaps. Additionally, an LWR stakeholder meeting was held to communicate work performed in the NEAMS program over the past three years, to assess the LWR community’s perspective on the impact of the program, and to identify remaining significant gaps in the NEAMS suite of capabilities. This engagement will be documented by the Electric Power Research Institute and used by NEAMS to redirect current LWR scope as needed and to develop the next phase for LWR research and development.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated photonic molecule Brillouin laser with a high-power sub-100-mHz fundamental linewidth

Photonic integrated lasers with an ultra-low fundamental linewidth and a high output power are important for precision atomic and quantum applications, high-capacity communications, and fiber sensing, yet wafer-scale solutions have remained elusive. Here we report an integrated stimulated Brillouin laser (SBL), based on a photonic molecule coupled resonator design, that achieves a sub-100-mHz fundamental linewidth with greater than 10-mW output power in the C band, fabricated on a 200-mm silicon nitride (Si 3 N 4 ) CMOS-foundry compatible wafer-scale platform. The photonic molecule design is used to suppress the second-order Stokes (S2) emission, allowing the primary lasing mode to increase with the pump power without phase noise feedback from higher Stokes orders. The nested waveguide resonators have a 184 million intrinsic and 92 million loaded Q, over an order of magnitude improvement over prior photonic molecules, enabling precision resonance splitting of 198 MHz at the S2 frequency. We demonstrate S2-suppressed single-mode SBL with a minimum fundamental linewidth of 71±18 mHz, corresponding to a 23±6-mHz 2 /Hz white-frequency-noise floor, over an order of magnitude lower than prior integrated SBLs, with an ∼11-mW output power and 2.3-mW threshold power. The frequency noise reaches the resonator-intrinsic thermo-refractive noise from 2-kHz to 1-MHz offset. The laser phase noise reaches −155 dBc/Hz at 10-MHz offset. The performance of this chip-scale SBL shows promise not only to improve the reliability and reduce size and cost but also to enable new precision experiments that require the high-speed manipulation, control, and interrogation of atoms and qubits. Realization in the silicon nitride ultra-low loss platform is adaptable to a wide range of wavelengths from the visible to infrared and enables integration with other components for systems-on-chip solutions for a wide range of precision scientific and engineering applications including quantum sensing, gravitometers, atom interferometers, precision metrology, optical atomic clocks, and ultra-low noise microwave generation.

Liu, Kaikai (ORCID:0000000213609646)↗

Technology Maturation of Wireless Harsh Environment Sensors For Improved Condition Based Monitoring Of Coal Fired Power Generation

The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.

20 FOSSIL-FUELED POWER PLANTS↗

Autonomous Tools for Attack Surface Reduction (Final Report)

The electric power grid is a complex critical infrastructure that forms the lifeline of modern society, and its secure and reliable operation is of paramount importance to national security and economic wellbeing. However, recent findings documented in authoritative sources indicate the threat of cyber-based attacks growing in numbers and sophistication. However, securing the grid against stealthy cyberattacks is a challenging task due to legacy nature of the infrastructure coupled with dynamic nature of threat landscape and ever-growing sophistication of the adversaries. Additionally, the grid’s attack surface continues to grow with the increased dependence on digital communications and control that now extends to each consumer through smart meters and distributed energy resources. Unfortunately, this expansive surface increases the grid’s vulnerability and further exposes critical control systems in both substations and control centers. To respond to this emerging need, we had successfully assembled an interdisciplinary team with academic- industry partnership to successfully conduct research, development, evaluation, demonstration, and commercialization of attack surface reduction tools, whose goal was to significantly reduce the cyber attack surface in the North American power grid. Our proposed project was a synergistic collaborative effort leveraging the synergistic expertise of the team members across power systems, cyber security and CPS security, testbeds, field deployments and demonstration, and successful commercialization. The following are the specific tasks that have been successfully completed two phases (2016-2020). Phase I: Task 1: Developed and implemented a robust Project Management and Data Management Plan, coupled with a well thought out Risk Mitigation Plan. Task 2.1: Developed a comprehensive framework that continually assesses and autonomously reduces the attack surface for the power grid control environment spanning across substations, control center and the SCADA network to significantly reduce the risks of cyber attacks. Task 2.2: Developed attack surface analysis techniques, metrics, and tools that assess the attack surface at multiple levels including the control center, substations, and the SCADA network. Task 2.3: Developed attack surface reduction techniques and tools that dynamically reduce attack surface and hence increase attacker’s cost without interfering in the critical functions of the system. Task 2.4: Prototyped, implemented, and quantitatively evaluated/validated the techniques and tools on a realistic industrial CPS security testbed environment by leveraging the unique resources of the team. Task 3: Developed Commercialization plan to transition the developed tools into power system industry stakeholders for a broader adoption by leveraging the expertise of our industrial members. Phase II: Task 4: Successfully completed field demonstration, verification, and evaluation of the effectiveness of the attack surface analysis and reduction techniques on a realistic utility testbed environment. This also involved the development of realistic scenarios, sound metrics, data sets, evaluation criteria, and documentation. Technology integration & Field demonstration: The project had significantly advanced the state-of-the-art research and practice in improving the cybersecurity of our nation’s power grid infrastructure against cyber threats. In particular, the proposed, designed, and deployed attack surface analysis and reduction algorithms and tools have contributed to significantly reducing the exposure and risk of the devices, substations, and the integrated SCADA/EMS/ DMS grid environment to cyber threat. Strong demonstration and evaluation techniques have verified the feasibility of the developed techniques on realistic cyber-physical testbeds and utility partner's real grid environment, and collaborative research and evaluation of attack surface reduction techniques (for wide-are monitoring and control) within a vendor (GE) EMS platform. The Attack Host Analyzer (AHA) tool that was developed through this project was made available through GitHub.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A use-case-driven approach for demonstrating the added value of digitalisation in wind energy

Digitalisation is one of the key drivers for reducing the costs and risks of wind energy. When considering whether to embark on a digitalisation initiative, two key questions arise. The first is what business or operational opportunities might feasibly be addressed and the second is which of the many potential aspects of digitalisation are relevant to those opportunities. In this work, we show how these questions can be answered with a use-case-driven approach, based around a survey aiming to collect and collate the main "pain points" (or everyday challenges) of people in the wind energy sector. Although the relatively low number of participants of the survey (46) means that the results should only be used indicatively, it is still possible to make some general recommendations for priorities for digitalisation efforts in the wind energy sector. Firstly, digitalisation efforts should focus both on supporting people carrying out cross-lifecycle tasks, in particular sharing data, managing data, undertaking general data analyses and accessing data. Tools to do this should deal with varying data formats and naming conventions, make metadata more accessible, define data and metadata standards, make more data publicly available and improve the quality of data. Secondly, efforts should also focus on supporting people in the wind farm operational phase, in particular with failure detection, fault diagnosis, failure rate modelling and predictive maintenance. Solutions to do this should focus on accessible and validated tools for fault detection, cloud or other data pipeline solutions for SCADA data and tools for exhaustive data documentation. Finally, digitalisation efforts should focus on better communicating and helping people become aware of existing solutions and tools, as well as on helping people to exert a stronger influence on possible solutions.

17 WIND ENERGY↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cyber risk assessment and investment optimization using game theory and ML-based anomaly detection and mitigation for wide-area control in smart grids

The electric power grid is increasingly becoming susceptible to cyber attacks that exploit vulnerabilities in the smart grid control, information, and physical layers. Successful cyber attacks can have catastrophic impacts on the social and economic well-being of any nation all over the globe. It has, thus, become imperative to secure the smart grid against such adversarial actions to ensure stable, secure, and reliable operation of the grid. The existing research and industry practices prove to be inadequate in terms of providing pragmatic and effective defense methodologies and measures for long-term cybersecurity planning and real-time cybersecurity for grid operation. For example, existing works lack models that incorporate uncertain behavior of cyber-attackers and pragmatic defense measures for cyber risk assessment and cybersecurity investment optimization which often provide unreliable and strictly qualitative solutions to these problems. At the same time, with the growing number of cyber incidents in the grid, there still exists a need to develop attack-resilient algorithms for wide-area monitoring, protection, and control (WAMPAC) applications like the wide-area voltage control systems (WAVCS) for Flexible AC Transmissions Systems (FACTS) that lack in scalable and feasible solutions from the cybersecurity perspective. This dissertation proposes novel models and methodologies for: (1) Cybersecurity planning, and (2) Cybersecurity for system operation. The cybersecurity planning is achieved through cyber risk assessment and cybersecurity resource investment optimization for long-term cybersecurity of the grid using game theory and attack-defense trees. Cybersecurity for system operation consists of development of cyber anomaly detection and mitigation algorithms for flexible AC transmission system (FACTS) controller-based wide-area voltage control systems (WAVCS) using machine learning (ML), and software defined networking-based moving target defense network routing for achieving real-time cyber-physical security for grid operations. This is followed by hardware-in-the-loop (HIL) implementation and evaluation of these attack prevention, detection, and mitigation algorithms and methodologies showcasing their feasibility in a close to real-world environment. For cybersecurity planning, a novel approach involving a combination of game theory and attack defense trees (ADT) for optimal cybersecurity resource allocation in the smart grid is proposed. This methodology involves modeling of the cyber-physical smart grid substations as ADTs, defining attacker costs, defense costs, and attack probabilities for attack access points. Using game theoretical formulation, optimal defense strategies for the defender of the system to invest cybersecurity resources in the grid are obtained. Additionally, a game-theoretic framework is developed for quantitative cyber-physical risk assessment of the grid under a dynamically changing cyber threat space and uncertain behavior of cyber attackers which is further used to optimize investments in the smart grid's cybersecurity resources. The attacker, defender, and the smart grid system are modeled while incorporating attacker-stochasticity and federal guidelines for smart grid cybersecurity. This allows quantification of threat, vulnerabilities, and attack impact of the grid for quantitative risk assessment. The defender's budget to invest in the security resources in the grid is optimized based on the strategies leading to minimum system risk. The evaluation of the proposed solutions highlight the feasibility for practical implementation of these methodologies and algorithms in the smart grid, while taking the federal requirements and guidelines for smart grid security into consideration. For achieving cybersecurity for system operation, attack prevention, detection, and mitigation algorithms and methodologies are developed specifically for FACTS-based WAVCS. Anomaly detection and mitigation in the WAVCS are achieved using algorithms based on machine learning which involves offline training and testing of ML models with CPS datasets incorporating physics-based features that allow accurate distinction between system faults and cyber attacks. For attack prevention, a methodology based on software defined network (SDN)-based moving target defense (MTD) network routing is proposed that enables prevention of Denial of Service (DoS) type attacks on the smart grid communication system. Subsequently, these methodologies and algorithms are implemented and evaluated on an HIL testbed that allows for real-time attack prevention, detection, and mitigation of emulated cyber attacks on the WAVCS in a close to real-world environment. The results show highly accurate and efficient performance of the implemented algorithms and methodologies with the smart grid system operating within the NERC's system operation limits even in the presence of DoS and data integrity cyber attacks. This work opens up future research opportunities in other directions such as (1) Expanding cybersecurity planning methodologies to real-time cyber contingency analysis with different game formulations; and (2) Applying the cybersecurity for system operation algorithms to broader categories of wide-area control applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Demonstration of the Brick Ontology to Scale up the Deployment of ASHRAE Guideline 36 Control Sequences

Many commercial buildings have a vast network of sensors as part of their building automation systems (BAS) that allows opportunities for energy consumption and cost savings by deploying advanced control sequences. However, this resource is often underutilized since BAS are typically programmed with simple control sequences with limited potential to deliver on these opportunities. The recent availability of ASHRAE Guideline 36 (G36) with advanced HVAC control sequences supports control retrofits in existing buildings to unlock much of the savings potential. However, barriers such as the lack of standard naming convention of building assets and data points, proprietary equipment and BAS, and the inherent uniqueness of buildings and their systems prevent building stakeholders from adopting any “plug-and-play” implementation of G36. Instead, control vendors must often undertake the manual and labor-intensive point mapping process to identify a data stream’s functional and spatial relationship within the HVAC system along with other relevant contexts and map it to the new control sequences. The vendor must carry out the point mapping process in each individual building since the mapping is unlikely to port over to another building. Even for the same building, the point mapping process can occur multiple times if various control vendors implement different control retrofits and/or multiple control retrofits happen over the lifecycle of the building. Then, there is the likelihood that G36 control sequences are programmed uniquely to the building, preventing the same implementation from being reused in another. Therefore, this paper presents a field demonstration of how we leveraged the Brick ontology with BACnet, OpenBuildingControl’s Control Description Language (CDL), and open-source support tools to implement scalable and portable advanced building controls. These tools provide standardized semantic descriptions and relationships of the building’s assets and data points (Brick), standardized communication protocol to read from and write to the building’s BAS (BACnet), and standardized code implementations (CDL) of standardized advanced control strategies (G36). We implemented G36’s hot water supply temperature setpoint reset in a Berkeley, CA building for this field demonstration. This field demonstration aims to show how integrating these tools may streamline the deployment of advanced control sequences such as G36 in a consistent manner regardless of differences found across buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dynamic Building Load Control to Facilitate High Penetration of Solar Photovoltaic Generation (Final Technical Report)

Solar photovoltaic (PV) resources are the most common form of distributed generation in residential and commercial customer premises within electric distribution networks. A higher penetration of PV generation in distribution circuits will impose challenges on maintaining service voltages within the range of industry standards, power quality, and power flow. Buildings consume 74% of the electricity produced in the United States, and a significant portion of the building load is dispatchable, making them responsive to electrical grid needs. Oak Ridge National Laboratory—in collaboration with Southern Company; the University of Tennessee, Knoxville; and the Georgia Institute of Technology—is examining the PV integration issues in distribution-level electrical grids and developing integrated demand-side control and communication systems to enable responsive loads. The proposed responsive loads mechanism performs renewable generation following to increase the penetration of solar PV within each feeder. The specific objectives of this project are to (1) examine distribution-level PV integration scenarios to understand requirements, (2) undertake an end-to-end simulation-based design of a distributed control strategy of loads geographically near the PV generation asset to minimize the effect on the distribution feeder, (3) deploy and demonstrate the control technology developed in partnership with utilities, and (4) perform a scalability analysis at the utility scale. This 3-year integrated project aims to develop, demonstrate, and validate demand-side control technology to enable increased the penetration of renewables while mitigating challenges that arise due to their intermittency. Activities in Budget Period (BP) 1 focused on a literature review and the formal design of a control system for integrating local distribution with generation and loads. The team used modeling and simulation to evaluate the impact of varying buildings loads, variable PV generation, and power flow dynamics on the distribution circuit. The dynamic models developed in BP 1 were used in BP 2 to develop a model-based control design and a test bed. The test bed has enabled the simulation-based testing and comparison of different control designs and formulations applied to different configurations of the distribution grid, PVs, and building loads. The control approaches developed in BP 2 were implemented in BP 3 in the form of hardware deployed at the Central Baptist Church (CBC) in Knoxville, Tennessee, for testing and evaluation. The outcome of this project was the development and demonstration of open-source, low-cost, low-touch sensing and control retrofits to distributed PV generation and building loads that, in a coordinated fashion, provide the load-shaping response needed to integrate high levels of renewable penetration. This research addresses the target metrics by dynamically controlling a load with solar generation variability to minimize the extent of two-way power flow, enhance reliability, facilitate high PV penetration (>100% of peak load in a line segment), and generate scalable software and hardware solutions adaptable to any penetration levels. The research and development activities are focused and designed to be impactful within the relevant 2020 targets time frame.An accurate open-source integration simulation framework for end-to-end control design was developed and deployed at the CBC facility for testing and evaluation. This final report provides a detailed review of the technical results achieved during this 3-year integrated project. A novel spectral analysis of PV data is demonstrated to derive the requirements of the control design. A detailed simulation-based analysis of PV integration at increasing penetration levels is presented using 1 year of PV data to demonstrate the impact on the distribution circuits. Two different control strategies were developed and demonstrated via simulation to track variable PV generation with adaptive load dispatch. The report concludes with a summary of accomplishments and recommendations for a path forward.

14 SOLAR ENERGY↗

Performance Evaluation of Intelligent Solar Control Software Through Hardware-in-the-Loop (CRADA Final Report)

Recent research has highlighted the potential for solar to act as a zero-marginal-cost and zero-emission flexibility resource on the bulk power system when operated with advanced control systems. To increase the performance of these systems, leading technologies, including machine learning (ML) and hierarchical inverter set point allocation, have been developed by Latimer Controls, Inc. to estimate the headroom of large PV plants for grid operation and control; however, these technologies lack comprehensive validation under real-world application scenarios. Latimer Controls, Inc. received two voucher awards for research at a national laboratory from the Department of Energy American Made Solar Prize Round 6. The National Renewable Energy Laboratory (NREL) was selected to collaborate with Latimer staff to conduct a performance evaluation of Latimer PV control software. The NREL team will develop a hardware-in-the-loop (HIL) testbed to perform testing and validation of the Latimer PV control technology in a de-risked yet realistic testbed environment. Latimer and NREL worked together to analyze the test data, draw conclusions from the results, and disseminate the resulting scientific findings. In this CRADA work, we propose to test and validate the real-world application of the Latimer Control solution in an HIL environment. We evaluate the performance of different flexible solar technologies in responding to automatic generation control signals in a closed-loop fashion. In particular, a data-driven potential high limit (PHL) estimation is developed for large solar plants to accurately estimate their headroom so that they have fast and short-time regulation and control capability to participate in grid services and respond to grid signals in real time (e.g., AGC). This PHL estimation algorithm is embedded in a hardware power plant controller (PPC) and tested with an IEEE-39 bus system model developed in RTDS. To account for the varying cloud conditions and diverse inverter dispatches, we developed a 135-MW PV plant with detailed modeling of 27 individual PV modules and inverters using RTDS. The real-world communications used in such big plants, such as ModBus TCP/IP for inverter level and DNP3 for plant level, were developed to emulate the real-world applications in big PV plants. The ML-based PHL estimation method is tested under nine separate weather scenarios against the ‘reference-control’ solution, hereafter referred to as the baseline solution. The baseline method reserves a subset of inverters (reference group) to operate at their PHL at all times and dispatches only the remaining inverters (control group) at curtailed levels to fulfill the flexibility need. Despite being successfully piloted by NREL in California in 2017 and Chile in 2020, there exist two gaps in the state of the art to fully unlock the flexibility of PV plants: a. There is a trade-off between the PHL estimation accuracy and the flexibility range. b. There lacks granularity in the PHL estimation to capture the variation across inverters. The Latimer solution seeks to address these gaps by applying machine learning methods to improve PHL estimation accuracy while accounting for variability at every inverter. Performance metrics were taken from the 2023 Georgia Power CARES utility-scale RFP. The results demonstrate that the ML-based approach outperforms the traditional baseline method in PHL estimation accuracy for 7 of 9 scenarios. The average PHL error across the nine scenarios was 7.40% for the ML-based method, 2.06% less than the 9.46% PHL error average across scenarios that was exhibited by the baseline method. Additionally, the PHL error was below 5% for at least 95% of the testing interval for 3 of 9 tested intervals with the ML approach, whereas it did not achieve this metric for any of the baseline tests. Overall, simulation results indicate the superior performance of an ML-based approach compared to the conventional baseline reference-control approach, showcasing its potential to support grid stability and operational efficiency. This laboratory HIL testing using real PPC, representative power system simulation models in real-time with detailed PV plant and inverter models, and real-world communication protocols gives us confidence that this machine learning based PHL estimation algorithm works well in the hardware PPC and therefore de-risks future field commissioning. The end goal of this project is to advance grid technology to address the grid operation challenges brought by solar plant’s variability and uncertainties in power generation.

14 SOLAR ENERGY↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Photovoltaic Analysis and Response Support (PARS) Platform for Solar Situational Awareness and Resiliency Services

The project's primary objective is to develop a digital-twin based Photovoltaic (PV) Analysis and Response Support (PARS) platform, which aims to provide real-time situational awareness and optimal response plans. This platform is designed to enhance the performance of hybrid PV systems, making them competitive with or even superior to conventional generation resources. The PARS platform enabled the project team to develop and evaluate an extensive suite of grid support functionalities for the hybrid PV systems to enhance grid performance, across key areas including visibility, dispatchability, security, resilience, and reliability. Given the global push toward achieving 100% clean energy by 2035, there is a significant increase in the integration of inverter-based resources (IBRs) throughout the energy grid. Effectively managing the inherent variability and uncertainty associated with IBRs is crucial for ensuring cost-effectiveness, reliability, and security in both the main grid and islanded microgrids. Constrained to a limited array of IEEE test systems or standard feeder models, traditional IBR modeling struggles to assimilate new field data, accurately reflect system dynamics, and adapt to the evolving energy landscape. In our project, we embraced a Digital Twin (DT) strategy for crafting the PARS platform. A digital twin acts as a precise virtual counterpart of a physical system, built on historical data and continuously honed with real-time insights. This enables the high-fidelity DT to accurately mirror current system operations and forecast future scenarios. Consequently, the PARS platform becomes an ideal environment for testing and refining monitoring, control, power, and energy management algorithms designed to boost hybrid PV system performance. The defining feature of the PARS platform, distinguishing it from other advanced simulation tools, is its exceptional adaptability. This is achieved by employing actual network topologies and utilizing real-time field data for fine-tuning and calibration, ensuring a close emulation of real-world conditions. The project deliverables include: 1) High-fidelity IBR models and tools for real-time parameterization, utilizing real-time field measurements to refine IBR models for enhanced accuracy and performance; 2) Grid-forming and Grid-following capabilities to deliver resilience services, including blackstart, voltage and frequency support, cold-load pick-up, power reserves, and three-phase load balancing across grid-connected and microgrid settings; 3) Machine learning-based forecasting tools and methods for generating synthetic data and topologies, creating diverse and realistic simulation environments for evaluating varied operational scenarios; 4) Advanced microgrid power and energy management algorithms for optimizing the integration and operation of PV, storage, and demand response resources within both feeder and community scales. The power grid data sets are provided by four utility companies in North Carolina and the New York Power Administration. Acting as industry advisors, our industry partners communicated stakeholder needs and regulatory standards to the research teams, aiding technology transfer by incorporating the developed methodologies into their daily operations. This collaboration ensures that the PARS platform, functioning as a power system digital twin, enhances our understanding of IBR dynamic behaviors and enables the development and evaluation of IBR control functions that match or exceed the capabilities of conventional synchronous generators.

14 SOLAR ENERGY↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Mixed precision s –step Lanczos and conjugate gradient algorithms

Compared to the classical Lanczos algorithm, the s-step Lanczos variant has the potential to improve performance by asymptotically decreasing the synchronization cost per iteration. However, this comes at a price; despite being mathematically equivalent, the s-step variant may behave quite differently in finite precision, potentially exhibiting greater loss of accuracy and slower convergence relative to the classical algorithm. It has previously been shown that the errors in the s-step version follow the same structure as the errors in the classical algorithm, but are amplified by a factor depending on the square of the condition number of the O(s)-dimensional Krylov bases computed in each outer loop. As the condition number of these s-step bases grows (in some cases very quickly) with s, this limits the s values that can be chosen and thus can limit the attainable performance. In this work, we show that if a select few computations in s-step Lanczos are performed in double the working precision, the error terms then depend only linearly on the conditioning of the s-step bases. This has the potential for drastically improving the numerical behavior of the algorithm with little impact on per-iteration performance. Our numerical experiments demonstrate the improved numerical behavior possible with the mixed precision approach, and also show that this improved behavior extends to mixed precision s-step CG. Here, we present preliminary performance results on NVIDIA V100 GPUs that show that the overhead of extra precision is minimal if one uses precisions implemented in hardware.

97 MATHEMATICS AND COMPUTING↗

Science Uses Deployment Operations-Advanced Wireless: Exploring Open Radio Access Network Technologies for Energy Science

Open Radio Access Network is emerging as a solution to the increasing demand for more flexible, cost-effective, and advanced mobile network infrastructures. This evolution is driven by advancements in wireless technologies and the growing complexity of deploying and managing these networks. O-RAN represents a significant shift in wireless technology, building upon the 3rd Generation Partnership Project framework to foster openness, flexibility, and interoperability. By decoupling hardware and software components, Open Radio Access Network enables a multi-vendor ecosystem that encourages innovation and diverse solutions. Open Radio Access Network's potential extends beyond traditional wireless applications, with growing interest in its role in advancing energy systems, particularly in the context of smart grids, microgrids, and the integration of renewable energy sources. While the role of open-wireless technologies in driving energy transformation is increasingly recognized, further exploration is needed. Vendors and utilities are investigating how Open Radio Access Network technologies can optimize energy use cases and improve the performance of 5G and beyond applications. This report outlines efforts under the Science Uses Deployment Operations Advance Wireless project, a collaboration between the National Laboratory of the Rockies' Cybersecurity Research Center, Argonne National Laboratory, Lawrence Berkeley National Laboratory, and the Department of Energy's Energy Science Network research and operations staff. The focus of this project is on due diligence, through testing and evaluation, preparing for the deployment of advanced wireless infrastructure for scientific use cases, with an emphasis on Open Radio Access Network technology, its components, integrations, and its ability to support vertical stack application across the energy sector. Additionally, the report highlights the value cases for utilities, underscoring how adopting open wireless standards can accelerate the evolution of energy systems, foster innovation, and improve the integration of critical energy technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Global Geo-processed Data of Aquifer Properties by 0.5° Grid, Country and Water Basins

This repository of global hydrogeologic datasets contains aquifer properties on 0.5° scale, including depth to groundwater (Fan et al., 2013), aquifer thickness (de Graaf et al., 2015), WHYMap aquifer classes (Richts et al., 2011), recharge (Döll and Fiedler, 2008; Gleeson et al., 2016), lakes (Messager et al., 2016), porosity and permeability (Gleeson et al., 2014), digitized and geo-processed from their respective sources. Globally gridded aquifer properties could be used independently to estimate global groundwater availability or used as critical inputs to the superwell model to simulate groundwater extraction and provide estimates of pumped volumes and unit costs under user-specific scenarios. Key resources related to this data are: Niazi, H., Ferencz, S. B., Graham, N. T., Yoon, J., Wild, T. B., Hejazi, M., Watson, D. J., & Vernon, C. R. (2025). Long-term hydro-economic analysis tool for evaluating global groundwater cost and supply: Superwell v1.1. Geoscientific Model Development, 18(5), 1737-1767. https://doi.org/10.5194/gmd-18-1737-2025 superwell model repository which uses this data to simulate groundwater extraction and provides estimates of the global extractable volumes and unit-costs ($/km3) of accessible groundwater production under user-specified extraction scenarios. Repository Overview Main output: aquifer_properties_rec.csv contains all processed outputs, including aquifer properties like porosity, permeability, recharge, lake areas, aquifer thickness, and depth to groundwater. shapefiles.zip: contains all digitized GIS databases and shapefile for all aquifer properties prep_inputs.R and prep_inputs_recharge_lakes.R: R scripts that process the shapefiles to produce the aquifer_properties_rec.csv file plot_inputs.R: R script for plotting the maps and conducting preliminary analysis on the available groundwater volume basin_to_country_mapping.csv, basin_country_region_mapping.csv and continent_county_mapping.csv provide the mapping between continents, 32 energy-economic macro regions, countries, and water basins for post-processing aquifer_properties_rec.csv Maps: Each map visualizes the spatial distribution of one of the aquifer properties across the globe map_in_Porosity.png map_in_Permeability.png map_in_Aquifer_thickness.png map_in_Depth_to_water.png map_in_Recharge.png map_in_Grid_area_km.png map_in_Lake_area_km.png map_in_WHYClass.png Sample inputs sample_inputs.py: this script samples inputs from the aquifer_properties_rec dataset, ensuring the sampled and original inputs maintain the same distributions sampled_data_100.csv contains 100 sampled data points and sampled_data_100.png compares their distributions Dataset Overview The main outputs are consolidated in a comprehensive aquifer_properties_rec.csv file and include the following fields: GridCellID: Unique identifier for each (roughly 0.5°) grid cell Continent: Continent name Country: Country name GCAM_basin_ID: Identifier for GCAM hydrologic basin Basin_long_name: Full name of the basin WHYClass: Hydrogeologic classification based on WHYMap aquifer classes (Richts et al., 2011) Porosity: Soil porosity (%) (Gleeson et al., 2014) Permeability: Soil permeability (in square meters; Gleeson et al., 2014) Aquifer_thickness: Thickness of the aquifer (in meters; de Graaf et al., 2015) Depth_to_water: Depth to groundwater (in meters; Fan et al., 2013) Recharge: long-term annual averaged recharge rates (in m/yr; Döll and Fiedler, 2008; Gleeson et al., 2016) Grid_area: Area of the grid cell (in square meters) Lakes_area: Area of inland lakes (in square meters; Messager et al., 2016) Key References The datasets are digitized versions of global hydrogeologic properties from the following key literature sources: Depth to Groundwater: Fan, Y., Li, H., & Miguez-Macho, G. (2013). Global Patterns of Groundwater Table Depth. Science, 339(6122), 940-943. https://doi.org/10.1126/science.1229881 Aquifer Thickness: de Graaf, I. E. M., Sutanudjaja, E. H., van Beek, L. P. H., & Bierkens, M. F. P. (2015). A high-resolution global-scale groundwater model. Hydrol. Earth Syst. Sci., 19(2), 823-837. https://doi.org/10.5194/hess-19-823-2015 Porosity and Permeability: Gleeson, T., Moosdorf, N., Hartmann, J., & van Beek, L. P. H. (2014). A glimpse beneath earth's surface: GLobal HYdrogeology MaPS (GLHYMPS) of permeability and porosity. Geophysical Research Letters, 41(11), 3891-3898. https://doi.org/10.1002/2014GL059856 Aquifer classes: Richts, A., Struckmeier, W. F., & Zaepke, M. (2011). WHYMAP and the Groundwater Resources Map of the World 1:25,000,000. In J. A. A. Jones (Ed.), Sustaining Groundwater Resources: A Critical Element in the Global Water Crisis (pp. 159-173). Springer Netherlands. https://doi.org/10.1007/978-90-481-3426-7_10 Recharge: Döll, P., & Fiedler, K. (2008). Global-scale modeling of groundwater recharge. Hydrol. Earth Syst. Sci., 12(3), 863-885. https://doi.org/10.5194/hess-12-863-2008; Gleeson, T., Befus, K. M., Jasechko, S., Luijendijk, E., & Cardenas, M. B. (2016). The global volume and distribution of modern groundwater. Nature Geoscience, 9(2), 161-167. https://doi.org/10.1038/ngeo2590 Inland Lakes: Messager, M. L., Lehner, B., Grill, G., Nedeva, I., & Schmitt, O. (2016). Estimating the volume and age of water stored in global lakes using a geo-statistical approach. Nature Communications, 7(1), 13603. https://doi.org/10.1038/ncomms13603 Cite as Niazi, H., Watson, D., Hejazi, M., Yonkofski, C., Ferencz, S., Vernon, C., Graham, N., Wild, T., & Yoon, J. (2024). Global Geo-processed Data of Aquifer Properties by 0.5° Grid, Country and Water Basins. MultiSector Dynamics-Living, Intuitive, Value-adding, Environment. https://doi.org/10.57931/2484226 Contact Reach out to Hassan Niazi or open an issue in the superwell repository for questions or suggestions.

aquifer thickness↗