Search NASA⌕ Search

SEARCH · Search NASA

Results for “Completion Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Design of the NIF Cryogenic Target System

The United States Department of Energy has embarked on a campaign to conduct credible fusion ignition experiments on the National Ignition Facility (NIF) at the Lawrence Livermore National Laboratory in 2010. The target assembly specified for this campaign requires the formation of a deuterium/tritium (DT) fuel ice layer in a 2 mm diameter capsule at the center of a 9 mm long by 5 mm diameter cylinder, called a hohlraum. The ice layer must be formed and maintained at temperatures below 20 K. At laser shot time, the target is positioned at the center of the NIF target chamber, aligned to the laser beams and held stable to less than 7 {micro}m rms. We have completed the final design of the Cryogenic Target System and are integrating the devices necessary to create, characterize and position the cryogenic target for ignition experiments. These designs, with supporting analysis and prototype test results, will be presented.

42 ENGINEERING↗

Thermal and Structural Analysis of Beamline Components in the Mu2e Experiment

Fermi National Accelerator Laboratory will be conducting the high energy particle physics experiment Muons to Electrons (Mu2e). In this experiment, physicists will attempt to witness and understand an ultra-rare process which is the conversion of a muon into the lighter mass electron, without creating additional neutrinos. The experiment is conducted by first generating a proton beam which will be collided into a target within the production solenoid (PS). This creates a high-intensity muon beam which passes through a transport solenoid (TS) and into the detector solenoid (DS). In the detector solenoid the muons will be stopped in an aluminum target and a series of detectors will measure the electrons produced. These components have been named the DS train since they are coupled and travel on a rail system when being inserted or extracted from the DS. To facilitate the installation and removal of the DS train, a set of external stands and a support stand for the instrumentation feed-through bulkhead (IFB) have been designed. Full analysis of safety factors and performance of these two designs has been completed. The detector solenoid itself will need to be maintained to a temperature of 22°C ± 10°C. This will minimize thermal strain and ensure the accurate position of the components is maintained to the tolerance of 2 mm. To reduce the thermal gradient, a passive heating system has been developed and reported.

43 PARTICLE ACCELERATORS↗

Geotechnical Seismic Hazard Evaluation At Sellano (Umbria, Italy) Using The GIS Technique

A tool that has been widely-used in civil engineering in recent years is the geographic information system (GIS). Geographic Information systems (GIS) are powerful tools for organizing, analyzing, and presenting spatial data. The GIS can be used by geotechnical engineers to aid preliminary assessment through to the final geotechnical design. The aim of this work is to provide some indications for the use of the GIS technique in the field of seismic geotechnical engineering, particularly as regards the problems of seismic hazard zonation maps. The study area is the village of Sellano located in the Umbrian Apennines in central Italy, about 45 km east of Perugia and 120 km north-east of Rome The increasing importance attributed to microzonation derives from the spatial variability of ground motion due to particular local conditions. The use of GIS tools can lead to an early identification of potential barriers to project completion during the design process that may help avoid later costly redesign.

58 GEOSCIENCES↗

U.S. Domestic Small Modular Reactor Security by Design

U.S. nuclear power facilities face increasing challenges in meeting evolving security requirements caused by evolving and expanding threats while keeping cost reasonable to make nuclear energy competitive. The addition of security features after a facility has been designed and without attention to optimization (the past approach) can lead to cost overruns. Incorporating security in the design process can provide robust, cost effective, and sufficient physical protection systems. The purpose of this work is to develop a framework for the integration of security into the design phase of Small Modular Reactors (SMRs) and the use of modeling and simulation tools to optimize the design of physical protection systems. This effort will intend to integrate security into the design phase of a model SMR that meets current NRC physical protection requirements and provide advanced solutions to improve physical protection and decrease costs. A suite of tools, including SCRIBE3D, PATHTRACE and Blender were used to model a hypothetical generic domestic SMR facility. Physical protection elements such as sensors, cameras, portal monitors, barriers, and guard forces were added to the model based on best practices for physical protection systems. One outsider sabotage scenario was examined with 4-8 adversaries to determine security metrics. This work will influence physical protection system designs and facility designs for U.S. domestic SMRs. The purpose of this project is to demonstrate how a series of experimental and modeling capabilities across the Department of Energy Complex can impact the design of U.S. domestic SMRs and the complete Safeguards and Security by Design (SSBD) for SMRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Time dependent mechanical modeling for polymers based on network theory

Despite of a lot of attempts during recent years, complex mechanical behaviour of polymers remains incompletely modelled, making industrial design of structures under complex, cyclic and hard loadings not totally reliable. The non linear and dissipative viscoelastic, viscoplastic behaviour of those materials impose to take into account non linear and combined effects of mechanical and thermal phenomena. In this view, a visco-hyperelastic, viscoplastic model, based on network description of the material has recently been developed and designed in a complete thermodynamic frame in order to take into account those main thermo-mechanical couplings. Also, a way to account for coupled effects of strain-rate and temperature was suggested. First experimental validations conducted in the 1D limit on amorphous rubbery like PMMA in isothermal conditions led to pretty goods results. In this paper a more complete formalism is presented and validated in the case of a semi crystalline polymer, a PA66 and a PET (either amorphous or semi crystalline) are used. Protocol for identification of constitutive parameters is described. It is concluded that this new approach should be the route to accurately model thermo-mechanical behaviour of polymers using a reduced number of parameters of some physical meaning.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Systems Innovation: Modernization & Efficiencies for ESH&Q Reviews

Environmental compliance reviews at INL have traditionally been managed through fragmented systems, relying on multiple spreadsheets and manual processes. This inefficiency led to time-consuming status updates and redundant tasks, such as manually sending reminder emails and transferring data from Excel to the Environmental Review Process (ERP). Initial attempts to streamline these processes using Power Automate and Excel revealed significant limitations, necessitating a more comprehensive solution. To address these immediate inefficiencies, automated workflows were developed using Power Automate. These workflows were designed to send scheduled status update reminders and capture responses through standardized forms, with submitted data flowing directly into centralized Excel trackers. This automation reduced the administrative burden, improved data accuracy, and enabled faster, more consistent reporting. Specifically, email automation achieved a 65% efficiency gain, while data integration saw a 48% improvement, resulting in 91% of project statuses being updated within two months. Despite the improvements brought by Power Automate, the fragmented nature of the review processes persisted. To further enhance efficiency and accuracy, the Integrated Review Tool (IRT) was developed. The IRT aims to centralize review initiation and connect team systems, creating an interconnected data infrastructure that preserves team autonomy while enhancing overall efficiency. This tool automates email reminders, centralizes reviews, and streamlines data integration, significantly improving the accuracy and efficiency of environmental compliance reviews. The design and development of the IRT involved advanced systems methodology, process mapping, project management, and collaboration with subject matter experts. The minimum viable product design is 100% complete, and system development is currently underway, with expected outcomes including a centralized entry point for all ESH&Q reviews, automated routing, real-time tracking and analytics, AI integration, and a user-friendly interface. This project demonstrates the potential of leveraging automation and integrated systems to enhance efficiency, accuracy, and decision-making in environmental reporting and compliance processes at INL.

99 - GENERAL AND MISCELLANEOUS↗

Draft Summary Report on Irradiated Fuel Handling and Management for LOTUS

The National Reactor Innovation Center (NRIC) has conceptualized the design of the Laboratory for Operation and Testing in the United States (LOTUS) test bed to provide the United States Department of Energy (DOE) with the infrastructure necessary to make advanced reactor designs available for commercial developers. LOTUS will provide a test bed to developers with the capabilities of supporting a wide range of experiment design possibilities. Upon completion of the developers’ operations and experiments within the test bed, the irradiated fuel, reactor components, and other experiment materials must be removed. Idaho National Laboratory (INL) possesses significant capabilities for radioactive material handling such as casks, carts, and forklifts. However, given the unique environment presented by the NRIC-LOTUS test bed, located inside the Zero Power Physics Reactor (ZPPR) Perimeter Intrusion Detection and Assessment System (PIDAS) area at the Materials and Fuels Complex (MFC) and the complexity of novel removal activities of recently operated reactor experiments through the new proposed access tunnel. The efficacy was not apparent for existing equipment to provide all the needed capability. To bridge the potential gaps in cask designs, storage, and transportation, NRIC requested the development of trade studies for the transfer, handling, and storage requirements of irradiated fuel salts and other radioactive materials. NRIC directed Boston Government Services, LLC (BGS) to perform the trade studies and develop a report analyzing alternatives. In addition to the BGS reports, the Idaho National Lab’s (INL), provided by the first potential user’s Advanced Reactor Development (ARD) team, prepared a feasibility study for the storage of specific irradiated fuel within the existing ZPPR vault.This summary report is intended to present the trade studies, options, and alternatives that were investigated. The maturity level of LOTUS, the reactor, fuel salt containers, gloveboxes, and reactor testing campaign and concept of operations were not at a level sufficient to base critical decisions on. This report is not intended to present a final recommendation. The final recommendations for fuel storage location, transport, handling equipment, and operations will be made in FY 2024 and will be based on known materials, test campaign requirements, funding, and final analysis of the fuel and equipment to be used.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A complete dosimetry experimental program in support to the core characterization and to the power calibration of the CABRI reactor. A complete dosimetry experimental program in support of the core characterization and of the power calibration of the CABRI reactor

CABRI is an experimental pulse reactor operated by CEA at the Cadarache research center. Since 1978 the experimental programs have aimed at studying the fuel behavior under Reactivity Initiated Accident (RIA) conditions. Since 2003, it has been refurbished in order to be able to provide RIA and LOCA (Loss Of Coolant Accident) experiments in prototypical PWR conditions (155 bar, 300 deg. C). This project is part of a broader scope including an overall facility refurbishment and a safety review. The global modification is conducted by the CEA project team. It is funded by IRSN, which is conducting the CIP experimental program, in the framework of the OECD/NEA project CIP. It is financed in the framework of an international collaboration. During the reactor restart, commissioning tests are realized for all equipment, systems and circuits of the reactor. In particular neutronics and power commissioning tests will be performed respectively in 2015 and 2016. This paper focuses on the design of a complete and original dosimetry program that was built in support to the CABRI core characterization and to the power calibration. Each one of the above experimental goals will be fully described, as well as the target uncertainties and the forecasted experimental techniques and data treatment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Energy Design Guides for Army Barracks

The Energy Policy Act of 2005 requires federal facilities to be built to achieve 30% energy savings over the 2004 International Energy Code or American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Standard 90.1-2004, as appropriate. The Engineer Research and Development Center of the U.S. Army Corps of Engineers and the National Renewable Energy Laboratory (NREL) are developing target energy budgets and design guides with a prescriptive path to achieve 30% energy savings over a baseline built to the minimum requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004. This project covers eight building types in 15 U.S. climate zones. The building types include barracks, administrative buildings, a maintenance facility, a dining facility, a child development center, and an Army reserve center. All the design guides will be completed by the end of 2008. This paper focuses on the design guide for one type of barracks called unaccompanied enlisted personal housing (UEPH). The UEPH buildings are similar to apartment buildings with double occupancy units. For each building type, a baseline was established following typical Army construction and ASHRAE Standard 90.1 Appendix G modeling rules. Improvements in energy performance were achieved for the envelope using the NREL optimization platform for commercial buildings and previous ASHRAE design guides. Credit was also taken for tightening the building envelope by using proposed envelope leakage rates from ASHRAE and the Army. Two HVAC systems, including a dedicated outdoor air system, were considered. The final results achieved 29% site energy savings in two climates and greater than 30% site energy savings in all other climates. Results of this study were implemented in the Army's standard RFP process for new UEPH barracks construction in late 2007. New UEPH design/construction begun in 2008 and beyond will require the contractor to design and construct a UEPH facility that meets the target energy budget developed in this study using either a custom design or the design guide's prescriptive path developed as part of this study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

Technical Basis for Certification of Seismic Design Criteria for the Waste Treatment Plant, Hanford, Washington

In August 2007, Secretary of Energy Samuel W. Bodman approved the final seismic and ground motion criteria for the Waste Treatment and Immobilization Plant (WTP) at the Department of Energy's (DOE) Hanford Site. Construction of the WTP began in 2002 based on seismic design criteria established in 1999 and a probabilistic seismic hazard analysis completed in 1996. The design criteria were reevaluated in 2005 to address questions from the Defense Nuclear Facilities Safety Board (DNFSB), resulting in an increase by up to 40% in the seismic design basis. DOE announced in 2006 the suspension of construction on the pretreatment and high-level waste vitrification facilities within the WTP to validate the design with more stringent seismic criteria. In 2007, the U.S. Congress mandated that the Secretary of Energy certify the final seismic and ground motion criteria prior to expenditure of funds on construction of these two facilities. With the Secretary's approval of the final seismic criteria in the summer of 2007, DOE authorized restart of construction of the pretreatment and high-level waste vitrification facilities. The technical basis for the certification of seismic design criteria resulted from a two-year Seismic Boreholes Project that planned, collected, and analyzed geological data from four new boreholes drilled to depths of approximately 1400 feet below ground surface on the WTP site. A key uncertainty identified in the 2005 analyses was the velocity contrasts between the basalt flows and sedimentary interbeds below the WTP. The absence of directly-measured seismic shear wave velocities in the sedimentary interbeds resulted in the use of a wider and more conservative range of velocities in the 2005 analyses. The Seismic Boreholes Project was designed to directly measure the velocities and velocity contrasts in the basalts and sediments below the WTP, reanalyze the ground motion response, and assess the level of conservatism in the 2005 seismic design criteria. The characterization and analysis effort included 1) downhole measurements of the velocity properties (including uncertainties) of the basalt/interbed sequences, 2) confirmation of the geometry of the contact between the various basalt and interbedded sediments through examination of retrieved core from the core-hole and data collected through geophysical logging of each borehole, and 3) prediction of ground motion response to an earthquake using newly acquired and historic data. The data and analyses reflect a significant reduction in the uncertainty in shear wave velocities below the WTP and result in a significantly lower spectral acceleration (i.e., ground motion). The updated ground motion response analyses and corresponding design response spectra reflect a 25% lower peak horizontal acceleration than reflected in the 2005 design criteria. These results provide confidence that the WTP seismic design criteria are conservative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Basis for Certification of Seismic Design Criteria for the Waste Treatment Plant, Hanford, Washington

In August 2007, Secretary of Energy Samuel W. Bodman approved the final seismic and ground motion criteria for the Waste Treatment and Immobilization Plant (WTP) at the Department of Energy’s (DOE) Hanford Site. Construction of the WTP began in 2002 based on seismic design criteria established in 1999 and a probabilistic seismic hazard analysis completed in 1996. The design criteria were re-evaluated in 2005 to address questions from the Defense Nuclear Facilities Safety Board (DNFSB), resulting in an increase by up to 40% in the seismic design basis. DOE announced in 2006 the suspension of construction on the pretreatment and high-level waste vitrification facilities within the WTP to validate the design with more stringent seismic criteria. In 2007, the U.S. Congress mandated that the Secretary of Energy certify the final seismic and ground motion criteria prior to expenditure of funds on construction of these two facilities. With the Secretary’s approval of the final seismic criteria this past summer, DOE authorized restart of construction of the pretreatment and high-level waste vitrification facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An optically accessible pyrolysis microreactor

We report an optically accessible pyrolysis micro-reactor suitable for in situ laser spectroscopic measurements. A radiative heating design allows for completely unobstructed views of the micro-reactor along two axes. The maximum temperature demonstrated here is only 1300 K (as opposed to 1700 K for the usual SiC micro-reactor) because of the melting point of fused silica, but alternative transparent materials will allow for higher temperatures. Laser induced fluorescence measurements on nitric oxide are presented as a proof of principle for spectroscopic characterization of pyrolysis conditions.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Progress on the CUORE Cryogenic System

We give here an update on the CUORE cryogenic system. It consists of a large cryogen-free cryostat cooled by five pulse tubes and one high-power specially designed dilution refrigerator built by Leiden Cryogenics. The cryostat design has been completed and it is presently under construction. The site at the Gran Sasso Underground Laboratory is ready for the installation of the cryostat which is expected to begin by the end of 2009. We discuss here the preliminary results obtained on the performance of the mechanical cryorefrigerators. We also present a measurement of the residual heat leak of the copper which has been selected for the cryostat fabrication.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Feasibility Study for a Subcritical Assembly at the Oak Ridge National Laboratory

A conceptual design has been completed for a new subcritical assembly at Oak Ridge National Laboratory (ORNL). This subcritical assembly will support the Nuclear Criticality Safety Program (NCSP) training and education program to augment current subcritical assembly capabilities at Sandia National Laboratories (SNL) and at the National Criticality Experiments Research Center (NCERC). The proposed subcritical assembly uses legacy AGN-201M research reactor fuel plates that are available at the Y-12 National Security Complex. This subcritical assembly contains approximately 620 grams of 235 U as UO 2 particulates distributed homogeneously in radiation-stabilized polyethylene. The fuel plates will have a graphite neutron reflector to obtain a core multiplication, $M$, from 10 to 50, corresponding to a k eff of 0.9 to 0.95, respectively. The subcritical assembly will be able to support at least four experiments for the training courses: the addition of fissile material to increase neutron multiplication (mass), a core separation experiment (interaction), the effect of adding moderators to the core (moderation), and the effect of adding neutron absorbers to the core (poison/absorption). The proposed ORNL subcritical assembly will provide additional student bandwidth to support NCSP training courses and to provide for some backup capacity in the event that nuclear facility operations are disrupted at SNL or NCERC due to some unforeseen issue. The subcritical assembly will be designed to be an inherently safe subcritical assembly—subcritical under all normal and abnormal conditions—and it will provide the capability to conduct hands-on training to support NCSP and general nuclear criticality safety (NCS) staff training and qualification goals.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Subcritical Assembly for Training and Education Use at the Oak Ridge National Laboratory

A near-final design has been completed for a new subcritical assembly at Oak Ridge National Laboratory (ORNL). This subcritical assembly will support the Nuclear Criticality Safety Program (NCSP) training and education program to augment current subcritical assembly capabilities at Sandia National Laboratories (SNL) and at the National Criticality Experiments Research Center (NCERC). Other collaborations have been proposed with the Sunrise Consortium and others. This proposed subcritical assembly uses legacy AGN-201M research reactor fuel plates that are available from the Y-12 National Security Complex. This subcritical assembly contains approximately 620 grams of 235 U as UO 2 particulates distributed homogeneously in radiation-stabilized polyethylene. The fuel plates will have a graphite neutron reflector to obtain a core multiplication, M, from 10 to 50, corresponding to a k eff of 0.9 to 0.95, respectively. The subcritical assembly will be able to support at least four experiments for the training courses: (1) the addition of fissile material to increase neutron multiplication (mass), (2) a core separation experiment (interaction), (3) the effect of adding moderators to the core (moderation), and (4) the effect of adding neutron absorbers to the core (poison/absorption). The proposed ORNL subcritical assembly will provide additional student bandwidth to support NCSP training courses and to provide for some backup capacity if nuclear facility operations are disrupted at SNL or NCERC due to some unforeseen issue. The subcritical assembly will be designed to be an inherently safe subcritical assembly—subcritical under all normal and abnormal conditions—and it will provide the capability to conduct hands-on training to support NCSP and general nuclear criticality safety (NCS) staff training and qualification goals.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Subcritical Assembly for Training and Education Use at the Oak Ridge National Laboratory [Abstract]

A near-final design has been completed for a new subcritical assembly at Oak Ridge National Laboratory (ORNL). This subcritical assembly will support the Nuclear Criticality Safety Program (NCSP) training and education program to augment current subcritical assembly capabilities at Sandia National Laboratories (SNL) and at the National Criticality Experiments Research Center (NCERC). Other collaborations have been proposed with the Sunrise Consortium and others. This proposed subcritical assembly uses legacy AGN-201M research reactor fuel plates that are available from the Y-12 National Security Complex. This subcritical assembly contains approximately 620 grams of 235 U as UO 2 particulates distributed homogeneously in radiation-stabilized polyethylene. The fuel plates will have a graphite neutron reflector to obtain a core multiplication, M, from 10 to 50, corresponding to a k eff of 0.9 to 0.95, respectively. The subcritical assembly will be able to support at least four experiments for the training courses: (1) the addition of fissile material to increase neutron multiplication (mass), (2) a core separation experiment (interaction), (3) the effect of adding moderators to the core (moderation), and (4) the effect of adding neutron absorbers to the core (poison/absorption). The proposed ORNL subcritical assembly will provide additional student bandwidth to support NCSP training courses and to provide for some backup capacity if nuclear facility operations are disrupted at SNL or NCERC due to some unforeseen issue. The subcritical assembly will be designed to be an inherently safe subcritical assembly—subcritical under all normal and abnormal conditions—and it will provide the capability to conduct hands-on training to support NCSP and general nuclear criticality safety (NCS) staff training and qualification goals.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Addressing Excess Contaminated Facilities and Mercury Cleanup At the Department of Energy's Oak Ridge Reservation - 18408

The U.S. Department of Energy's Oak Ridge Office of Environmental Management (OREM) and its prime cleanup contractor, URS | CH2M Oak Ridge LLC (UCOR) are executing an aggressive program of cleanup and risk reduction in excess contaminated facilities on the Oak Ridge Reservation (ORR). Across the complex, DOE has designated more than 2,300 of its facilities 'excess'. Excess means 'nonoperational' and refers to a facility for which DOE no longer has a mission need. Many of these facilities pose high risk to workers and/or the environment. Delayed cleanup increases risk as well as cost. OREM and UCOR initiated a Working Group on Excess Facilities to identify and prioritize activities that are needed to enhance worker safety, minimize further degradation of the facilities, and reduce the environmental risk. Six Excess Contaminated Facilities projects on the ORR were identified as priorities. Three of the projects are located at ORNL - the Building 7500 Homogenous Reactor Experiment, the Building 3026 Radioisotope Development Laboratory and Buildings 3028/3029 Isotope Facilities. At Y-12, priority excess facilities include the Column Exchange Equipment (COLEX), the Alpha-4 Lithium Enrichment Facility and the Biology Complex Research Facilities. Work on these projects is aimed at stabilization of degraded higher risk facilities, characterization of conditions and hazards, removal of hazardous materials and placement of the facility in the lowest risk condition possible pending demolition. At the same time, DOE and UCOR are preparing to undertake a comprehensive program to remediate the presence of mercury in the water stemming from historical operations at the Y-12 National Security Complex. Over decades of operations, mercury migrated into the environment. Deteriorating conditions of large post-operation mercury-use buildings may be contributing to additional releases. Mercury cleanup is a high priority for Y-12 and the Oak Ridge Reservation. UCOR is completing the final design on a new Mercury Treatment Facility with construction expected to begin in late 2017. When constructed the treatment facility will reduce the amount of mercury in local waters, lower environmental contamination levels and serve as a guard against future releases. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗