Search NASA⌕ Search

SEARCH · Search NASA

Results for “Complex Space Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Environmental Control Subsystem Development

Kennedy Space Center's Launch Pad 39B, part of Launch Complex 39, is currently undergoing construction to prepare it for NASA's Space Launch System missions. The Environmental Control Subsystem, which provides the vehicle with an air or nitrogen gas environment, required development of its local and remote display screens. The remote displays, developed by NASA contractors and previous interns, were developed without complete functionality; the remote displays were revised, adding functionality to over 90 displays. For the local displays, multiple test procedures were developed to assess the functionality of the screens, as well as verify requirements. One local display screen was also developed.

ECS↗

Automating Deep Space Network scheduling and conflict resolution

The Deep Space Network (DSN) is a central part of NASA's infrastructure for communicating with active space missions, from earth orbit to beyond the solar system. We describe our recent work in modeling the complexities of user requirements, and then scheduling and resolving conflicts on that basis. We emphasize our innovative use of background 'intelligent' assistants' that carry out search asynchrnously while the user is focusing on various aspects of the schedule.

conflict resolution↗

Mathematical Modeling of Food Supply for Long Term Space Missions Using Advanced Life Support

A habitat for long duration missions which utilizes Advanced Life Support (ALS), the Bioregenerative Planetary Life Support Systems Test Complex (BIO-Plex), is currently being built at JSC. In this system all consumables will be recycled and reused. In support of this effort, a menu is being planned utilizing ALS crops that will meet nutritional and psychological requirements. The need exists in the food system to identify specific physical quantities that define life support systems from an analysis and modeling perspective. Once these quantities are defined, they need to be fed into a mathematical model that takes into consideration other systems in the BIO-Plex. This model, if successful, will be used to understand the impacts of changes in the food system on the other systems and vice versa. The Equivalent System Mass (ESM) metric has been used to describe systems and subsystems, including the food system options, in terms of the single parameter, mass. There is concern that this approach might not adequately address the important issues of food quality and psychological impact on crew morale of a supply of fiesh food items. In fact, the mass of food can also depend on the quality of the food. This summer faculty fellow project will involve creating an appropriate mathematical model for the food plan developed by the Food Processing System for BIO-Plex. The desired outcome of this work will be a quantitative model that can be applied to the various options of supplying food on long-term space missions.

Cruthirds, John E.↗

Evaluation of COSTAR mass handling characteristics in an environment. A simulation of the Hubble Space Telescope service mission

The STS-61 Shuttle mission, which took place in December 1993, was solely aimed at servicing the Hubble Space Telescope (HST). Successful completion of this mission was critical to NASA since it was necessary to rectify a flaw in the HST mirror. In addition, NASA had never scheduled a mission with such a high quantity of complex extravehicular activity. To meet the challenge of this mission, the STS-61 crew trained extensively in the Weightless Environment Test Facility at the Johnson Space Center and in the Neutral Buoyancy Simulator at the Marshall Space Flight Center. However, it was suspected that neutral buoyancy training might induce negative training by virtue of the viscous damping effect present in water. The mockups built for this training also did not have the mass properties of the actual orbital replacement units (ORUs). It was felt that the crew should be further trained on mockups with similar mass characteristics. A comprehensive study was designed to address these issues. The study was quantitative, and instrumentation was set up to measure and quantify the forces and moments experienced during ORU mass handling and remote manipulator system run conditions.

Rajulu, Sudhakar L.↗

Experimental Design for Pre-Clinical Animal Model Study in Microgravity

The Rodent Research program at NASAs Ames Research Center (ARC) has pioneered a new research capability on the International Space Station in less than four years and has progressed toward translating research to the ISS utilizing commercial rockets, collaborating with academia and science industry, and training crew for research purposes on-orbit. Animal models are the foundation of pre-clinical research to understand human diseases and evaluate new therapeutics. Advancement in alleviating ground diseases such as muscle atrophy and osteoporosis can come from the study of similar conditions that are known to occur as a result of exposure to the spaceflight environment. During the completion of the flight phase of two missions, our practices, hardware and operations evolved from tested to developed standards, which successfully translated the studies from ground to space. Results from these studies contribute to the science community via both the primary investigation and banked samples that are shared in publicly available data repository such as GeneLab. Every completed mission sets a foundation to build and design greater complexity into future research and answer questions about common human diseases on ground and in space. Here, we present methods developed for the translation of a rodent experiment to the ISS including a description of hardware and kits available for investigators and a discussion of operational constraints.

Rodent Research↗

Integrated Human-Robotic Missions to the Moon and Mars: Mission Operations Design Implications

For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

Korth, David↗

Integrated Human-Robotic Missions to the Moon and Mars: Mission Operations Design Implications

For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

human robotic missions↗

Integrated human-robotic missions to the Moon and Mars : mission operations design implications

For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

Lee, Young↗

Hardware Autonomy for Space Infrastructure

NASA prioritizes autonomous systems development with the expectation that it will continue to drive significant improvements in human and science exploration capability. Crew operations benefit from a spectrum of machine assistance to complete replacement of dangerous or highly repetitive tasks. Many science operations have a teleoperation component, and similarly benefit from a range of autonomy implementations that make long distance applications feasible. As we consider longer duration deep space missions, we also consider higher levels of autonomy in order meet emergent safety, maintenance, and logistics needs. One of the challenges within this scope is installation and maintenance of infrastructure, such as large scale instrumentation and communications equipment, crew habitats, and operational facilities. We describe how a programmable meta-material architecture may shift the paradigm of how we design, build, and operate future space infrastructure and assets. A primary objective of this strategy is to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted. This integrates advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Engineering systems that utilize a modular and reconfiguration building block approach, such as digital communication and computation systems, currently lead in terms of size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials life-cycle management and expand our space exploration mission capabilities to meet long duration and deep space infrastructure needs, in accordance with long term NASA goals of "in-space reliance" and "mass-less exploration."

In space assembly↗

Conceptual Design and Analysis of a Deep Space Habitat with a Venus Flyby

Within the mission trade space for crewed Mars missions, opposition missions are considered as fast transit options to minimize the crewed duration in the deep space radiation environment. However, they tend to have much higher in energy requirements than conjunction class missions, and Venus flybys are often leveraged to lower the total V as much as possible. While the conceptual design of deep space habitats is already a complex problem, the Venus flyby introduces a new environment of operation that adds layers of difficulty. A design point is presented that is capable of performing the crewed Mars mission and ensure the crew is safe flying in proximity to Venus and the Sun. Detailed thermal analysis of the design point is done to show the sensitivity of the thermal control systems to changes in mission parameters.

Akshay Prasad↗

Spitzer Space Telescope Sequencing Operations Software, Strategies, and Lessons Learned

The Space Infrared Telescope Facility (SIRTF) was launched in August, 2003, and renamed to the Spitzer Space Telescope in 2004. Two years of observing the universe in the wavelength range from 3 to 180 microns has yielded enormous scientific discoveries. Since this magnificent observatory has a limited lifetime, maximizing science viewing efficiency (ie, maximizing time spent executing activities directly related to science observations) was the key operational objective. The strategy employed for maximizing science viewing efficiency was to optimize spacecraft flexibility, adaptability, and use of observation time. The selected approach involved implementation of a multi-engine sequencing architecture coupled with nondeterministic spacecraft and science execution times. This approach, though effective, added much complexity to uplink operations and sequence development. The Jet Propulsion Laboratory (JPL) manages Spitzer s operations. As part of the uplink process, Spitzer s Mission Sequence Team (MST) was tasked with processing observatory inputs from the Spitzer Science Center (SSC) into efficiently integrated, constraint-checked, and modeled review and command products which accommodated the complexity of non-deterministic spacecraft and science event executions without increasing operations costs. The MST developed processes, scripts, and participated in the adaptation of multi-mission core software to enable rapid processing of complex sequences. The MST was also tasked with developing a Downlink Keyword File (DKF) which could instruct Deep Space Network (DSN) stations on how and when to configure themselves to receive Spitzer science data. As MST and uplink operations developed, important lessons were learned that should be applied to future missions, especially those missions which employ command-intensive operations via a multi-engine sequence architecture.

missions operations↗

Space Mission Operations Ground Systems Integration Customer Service

The facility, which is now the Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center in Huntsville, AL, has provided continuous space mission and related services for the space industry since 1961, from Mercury Redstone through the International Space Station (ISS). Throughout the long history of the facility and mission support teams, the HOSC has developed a stellar customer support and service process. In this era, of cost cutting, and providing more capability and results with fewer resources, space missions are looking for the most efficient way to accomplish their objectives. One of the first services provided by the facility was fax transmission of documents to, then, Cape Canaveral in Florida. The headline in the Marshall Star, the newspaper for the newly formed Marshall Space Flight Center, read "Exact copies of Documents sent to Cape in 4 minutes." The customer was Dr. Wernher von Braun. Currently at the HOSC we are supporting, or have recently supported, missions ranging from simple ISS payloads requiring little more than "bentpipe" telemetry access, to a low cost free-flyer Fast, Affordable, Science and Technology Satellite (FASTSAT), to a full service ISS payload Alpha Magnetic Spectrometer 2 (AMS2) supporting 24/7 operations at three operations centers around the world with an investment of over 2 billion dollars. The HOSC has more need and desire than ever to provide fast and efficient customer service to support these missions. Here we will outline how our customer-centric service approach reduces the cost of providing services, makes it faster and easier than ever for new customers to get started with HOSC services, and show what the future holds for our space mission operations customers. We will discuss our philosophy concerning our responsibility and accessibility to a mission customer as well as how we deal with the following issues: initial contact with a customer, reducing customer cost, changing regulations and security, and cultural differences, to ensure an efficient response to customer issues using a small Customer Service Team (CST) and adaptability, constant communication with customers, technical expertise and knowledge of services, and dedication to customer service. The HOSC Customer Support Team has implemented a variety of processes, and procedures that help to mitigate the potential problems that arise when integrating ground system services for a variety of complex missions and the lessons learned from this experience will lead the future of customer service in the space operations industry.

Roth, Karl↗

NASA/ESA CV-990 airborne simulation of Spacelab

The paper describes the joint NASA/ESA extensive Spacelab simulation using the NASA CV-990 airborne laboratory. The scientific payload was selected to conduct studies in upper atmospheric physics and infrared astronomy. Two experiment operators from Europe and two from the U.S. were selected to live aboard the aircraft along with a mission manager for a six-day period and operate the experiments in behalf of the principal scientists. The mission was successful and provided extensive data relevant to Spacelab objectives on overall management of a complex international payload; experiment preparation, testing, and integration; training for proxy operation in space; data handling; multiexperimenter use of common experimenter facilities (telescopes); and schedule requirements to prepare for such a Spacelab mission.

Mulholland, D.↗

Scheduling the NASA Deep Space Network with Deep Reinforcement Learning

With three complexes spread evenly across the Earth, NASA’s Deep Space Network (DSN) is the primary means of communications as well as a significant scientific instrument for dozens of active missions around the world. A rapidly rising number of spacecraft and increasingly complex scientific instruments with higher bandwidth requirements have resulted in demand that exceeds the network’s capacity across its 12 antennae. The existing DSN scheduling process operates on a rolling weekly basis and is time-consuming; for a given week, generation of the final baseline schedule of spacecraft tracking passes takes roughly 5 months from the initial requirements submission deadline, with several weeks of peer-to-peer negotiations in between. This paper proposes a deep reinforcement learning (RL) approach to generate candidate DSN schedules from mission requests and spacecraft ephemeris data with demonstrated capability to address real-world operational constraints. A deep RL agent is developed that takes mission requests for a given week as input, and interacts with a DSN scheduling environment to allocate tracks such that its reward signal is maximized. A comparison is made between an agent trained using Proximal Policy Optimization and its random, untrained counterpart. The results represent a proof-of-concept that, given a well-shaped reward signal, a deep RL agent can learn the complex heuristics used by experts to schedule the DSN. A trained agent can potentially be used to generate candidate schedules to bootstrap the scheduling process and thus reduce the turnaround cycle for DSN scheduling.

Wilson, Brian↗

An Augmented Ground Station Architecture for Spacecraft-Initiated Communication Service Requests

Spacecraft performing science and exploration missions have increasingly complex and event-driven objectives, making communication needs difficult to predict in advance. Additional flexibility is required in space communication provider networks to effectively meet time-varying demand. We envision a framework for automated resource allocation in which requests for communications service are initiated by spacecraft based on current mission needs. We propose an augmented ground station configuration featuring a wide field-of-view antenna to receive transmissions from spacecraft requesting high-rate communications. A software suite to automate the service fulfillment process, including interfacing with external scheduling systems such as NASA’s Near Space Network, is described. Experimental results characterizing the physical-layer link between the wide field-of-view antenna and a software-defined radio testbed on the International Space Station are presented. We also discuss long-duration software testing on a ground-based testbed. Taken together, these proof-of-concept results demonstrate the feasibility of the concept to improve the responsiveness of space communications.

user-initiated service↗

Investigating Mercury’s environment with the Two-Spacecraft BepiColombo Mission

The ESA-JAXA BepiColombo mission will provide simultaneous measurements from two spacecraft, offering an unprecedented opportunity to investigate magnetosphericand exospheric dynamics at Mercury as well as their interactions with the solar wind, radiation, and interplanetary dust. Many scientific instruments onboard the two spacecraft will be completely, or partially devoted to study the near-space environment of Mercury as well as the complex processes that govern it. Many issues remain unsolved even after the MESSENGER mission that ended in 2015. The specific orbits of the two spacecraft, MPO and Mio, and the comprehensive scientific payload allow a wider range of scientific questions to be addressed than those that could be achieved by the individual instruments acting alone, or by previous missions. These joint observations are of key importance because many phenomena in Mercury’s environment are highly temporally and spatially variable. Examples of possible coordinated observations are described in this article, analysing the required geometrical conditions, pointing, resolutions and operation timing of different BepiColombo instruments sensors.

A Milillo↗

Investigating Mercury’s Environment with the Two-Spacecraft BepiColombo Mission

The ESA-JAXA BepiColombo mission will provide simultaneous measurements from two spacecraft, offering an unprecedented opportunity to investigate magnetospheric and exospheric dynamics at Mercury as well as their interactions with the solar wind, radiation, and interplanetary dust. Many scientific instruments onboard the two spacecraft will be completely, or partially devoted to study the near-space environment of Mercury as well as the complex processes that govern it. Many issues remain unsolved even after the MESSENGER mission that ended in 2015. The specific orbits of the two spacecraft, MPO and Mio, and the comprehensive scientific payload allow a wider range of scientific questions to be addressed than those that could be achieved by the individual instruments acting alone, or by previous missions. These joint observations are of key importance because many phenomena in Mercury’s environment are highly temporally and spatially variable. Finally, examples of possible coordinated observations are described in this article, analysing the required geometrical conditions, pointing, resolutions and operation timing of different BepiColombo instruments sensors.

79 ASTRONOMY AND ASTROPHYSICS↗

On-orbit prelaunch processing and refurbishment

As the capabilities of the operational Space Station increase, emphasis will be placed on use of the Station for final development of missions, including the launch of large, complex, and reusable launch vehicles with destinations to geosynchronous orbit; lunar exploration or lunar development bases; and planetary exploration. This paper identifies and discusses the capabilities that would be needed to support the on-orbit prelaunch processing and refurbishing of a manned Mars vehicle launched from Space Station. The on-orbit launch vehicle prelaunch and refurbishment resource requirements needed to perform processing operations are projected from experience and data developed by the actual preparation of payloads for launch at the National Space Transportation System (NSTS) launch and landing site.

Glaab, A. K.↗