Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

MISSE Materials Results for Applications in the Vision for Space Exploration

Marshall Space Flight Center has a role in the development of the Crew Launch Vehicle and Crew Exploration Vehicle, as well as the Robotic Lunar Exploration Program (RLEP-2) and In-Space Propulsion. The success of these programs depends upon understanding the space environment, the requirements imposed on the spacecraft materials, and data gleaned from materials returned from space. Station Experiment (MISSE) were analyzed at the Marshall Space Flight Center. Changes in mass, optical properties, and mechanical integrity for these samples can indicate which materials may be suitable for use on exploration spacecraft, which materials need further testing, and which materials should not be recommended for long term missions. A number of materials for in-space propulsion were flown on MISSE. These include the conductive, insulative, and non-conductive tether materials selected for the ProSEDS mission. Also included were candidate solar sail materials. The solar sail materials were flown underneath a magnesium fluoride window that allowed ultraviolet radiation through to the sample but blocked any atomic oxygen. Over two hundred materials samples from the Materials on International Space

Source record↗

Multigenerational Independent Colony for Extraterrestrial Habitation, Autonomy, and Behavior Health (MICEHAB): An Investigation of a Long Duration, Partial Gravity, Autonomous Rodent Colony

The path from Earth to Mars requires exploration missions to be increasingly Earth-independent as the foundation is laid for a sustained human presence in the following decades. NASA pioneering of Mars will expand the boundaries of human exploration, as a sustainable presence on the surface requires humans to successfully reproduce in a partial gravity environment independent from Earth intervention. Before significant investment is made in capabilities leading to such pioneering efforts, the challenges of multigenerational mammalian reproduction in a partial gravity environment need be investigated. The Multi-generational Independent Colony for Extraterrestrial Habitation, Autonomy, and Behavior health is designed to study these challenges. The proposed concept is a conceptual, long duration, autonomous habitat designed to house rodents in a partial gravity environment with the goal of understanding the effects of partial gravity on mammalian reproduction over multiple generations and how to effectively design such a facility to operate autonomously while keeping the rodents healthy in order to achieve multiple generations. All systems are designed to feed forward directly to full-scale human missions to Mars. This paper presents the baseline design concept formulated after considering challenges in the mission and vehicle architectures such as: vehicle automation, automated crew health management/medical care, unique automated waste disposal and hygiene, handling of deceased crew members, reliable long-duration crew support systems, and radiation protection. This concept was selected from an architectural trade space considering the balance between mission science return and robotic and autonomy capabilities. The baseline design is described in detail including: transportation and facility operation constraints, artificial gravity system design, habitat design, and a full-scale mock-up demonstration of autonomous rodent care facilities. The proposed concept has the potential to integrate into existing mission architectures in order to achieve exploration objectives, and to demonstrate and mature common capabilities that enable a range of destinations and missions.

Rodgers, Erica M.↗

NASA Crew Launch Vehicle Overview

The US. Vision for Space Exploration, announced January 2004, outlines the National Aeronautics and Space Administration s (NASA) strategic goals and objectives. These include: 1) Flying the Shuttle as safely as possible until its retirement, not later than 2010. 2) Bringing a new Crew Exploration Vehicle (CEV) into service as soon as possible after Shuttle retirement. 3) Developing a balanced overall program of science, exploration, and aeronautics at NASA, consistent with the redirection of the human spaceflight program to focus on exploration. 4) Completing the International Space Station (ISS) in a manner consistent with international partner commitments and the needs of human exploration. 5) Encouraging the pursuit of appropriate partnerships with the emerging commercial space sector. 6) Establishing a lunar return program having the maximum possible utility for later missions to Mars and other destinations. Following the confirmation of the new NASA Administrator in April 2005, the Agency commissioned a team of aerospace subject matter experts from government and industry to perform the Exploration Systems Architecture Study (ESAS), which provided in-depth information for selecting the follow-on launch vehicle designs to enable these goals, The ESAS team analyzed a number of potential launch systems, with a focus on: (1) a human-rated launch vehicle for crew transport and (2) a heavy lift launch vehicle (HLLV) to carry cargo. After several months of intense study utilizing technical performance, budget, and schedule objectives, the results showed that the optimum architecture to meet the challenge of safe, reliable crew transport is a two-stage variant of the Space Shuttle propulsion system - utilizing the reusable Solid Rocket Booster (SRB) as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit. The CEV that this new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. The HLLV system will utilize the Shuttle External Tank combined with SRBs. The focus of this paper is on the CLV system, giving an overview of plans and progress to date.

Dumbacher, Daniel L.↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

Visualization of Upcoming ISS Changes - Featuring MLM Install

The MAGIK Robotic analysis team provides kinematic feasibility assessments and robotic visualizations for the ISS. The latest visualization displays ISS planned operations in increments 65 and 66 as of the 7/6/21 flight plan. Featured events include the arrival of the Multipurpose Laboratory Module (MLM) and surrounding visiting vehicle actions. The complete list of actions shown include: Repeated ISS attitude adjustment maneuvers from: starting position with positive X Velocity Vector (+XVV), yaw to -XVV, and pitch to final position with -ZVV. Then subsequent return to -XVV and nominal position +XVV. Crew-2 relocation from Node 2 Forward (N2F) to Node 2 Zenith (N2Z). 77 Progress with Docking Compartment 1 (DC1) undock and departure. MLM install. Boe-OFT2 arrival and departure at N2F. NG-16 arrival and berth at Node 1 Nadir (N1N). SpX-23 arrival at N2F. 64 Soyuz relocation and fly-around. SpX-23 departure from N2F. 65 Soyuz approach and dock to MRM-1. 64 Soyuz undock and departure. 78 Progress relocation.

ISS↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Stephen D.↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Steve↗

A Year of Progress: NASA's Space Launch System Approaches Critical Design Review

NASA's Space Launch System (SLS) made significant progress on the manufacturing floor and on the test stand in 2014 and positioned itself for a successful Critical Design Review in mid-2015. SLS, the world's only exploration-class heavy lift rocket, has the capability to dramatically increase the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique high-value national payloads. Development now is focused on configuration with 70 metric tons (t) of payload to low Earth orbit (LEO), more than double the payload of the retired Space Shuttle program or current operational vehicles. This "Block 1" design will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the Moon and back and the first crewed flight around the Moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has successfully completed its Critical Design Review and now has hardware in production or testing. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. The SLS Program is currently working toward vehicle Critical Design Review in mid-2015. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

NASA's Space Launch System Marks Critical Design Review

With completion of its Critical Design Review (CDR) in 2015, NASA is deep into the manufacturing and testing phases of its new Space Launch System (SLS) for beyond-Earth exploration. This CDR was the first in almost 40 years for a NASA human launch vehicle and marked another successful milestone on the road to the launch of a new era of deep space exploration. The review marked the 90-percent design-complete, a final look at the design and development plan of the integrated vehicle before full-scale fabrications begins and the prelude to the next milestone, design certification. Specifically, the review looked at the first of three increasingly capable configurations planned for SLS. This "Block I" design will stand 98.2 meters (m) (322 feet) tall and provide 39.1 million Newtons (8.8 million pounds) of thrust at liftoff to lift a payload of approximately 70 metric tons (154,000 pounds). This payload is more than double that of the retired space shuttle program or other current launch vehicles. It dramatically increases the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique, high-value national payloads. The Block 1 SLS will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the moon and back and the first crewed flight around the moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has hardware in production or testing, including flight hardware for the Exploration 1 (EM-1) test flight. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Singer, Chris↗

Columbia Crew Survival Investigation Report

NASA commissioned the Columbia Accident Investigation Board (CAIB) to conduct a thorough review of both the technical and the organizational causes of the loss of the Space Shuttle Columbia and her crew on February 1, 2003. The accident investigation that followed determined that a large piece of insulating foam from Columbia s external tank (ET) had come off during ascent and struck the leading edge of the left wing, causing critical damage. The damage was undetected during the mission. The CAIB's findings and recommendations were published in 2003 and are available on the web at http://caib.nasa.gov/. NASA responded to the CAIB findings and recommendations with the Space Shuttle Return to Flight Implementation Plan. Significant enhancements were made to NASA's organizational structure, technical rigor, and understanding of the flight environment. The ET was redesigned to reduce foam shedding and eliminate critical debris. In 2005, NASA succeeded in returning the space shuttle to flight. In 2010, the space shuttle will complete its mission of assembling the International Space Station and will be retired to make way for the next generation of human space flight vehicles: the Constellation Program. The Space Shuttle Program recognized the importance of capturing the lessons learned from the loss of Columbia and her crew to benefit future human exploration, particularly future vehicle design. The program commissioned the Spacecraft Crew Survival Integrated Investigation Team (SCSIIT). The SCSIIT was asked to perform a comprehensive analysis of the accident, focusing on factors and events affecting crew survival, and to develop recommendations for improving crew survival for all future human space flight vehicles. To do this, the SCSIIT investigated all elements of crew survival, including the design features, equipment, training, and procedures intended to protect the crew. This report documents the SCSIIT findings, conclusions, and recommendations.

Source record↗

NASA Agency Overview Briefing

The briefing opened with Dean Acosta (NASA Press Secretary) introducing Michael Griffin (NASA Administrator) and Bill Gerstenmaier (Associate Administrator for Space Operations). Bill Griffin stated that they would resume the Shuttle Fight to Return process, that the vehicle was remarkably clean and if the weather was good, the Shuttle would be ready to launch as scheduled. Bill Gerstenmaier stated that the preparations and processing of the vehicle went extremely well and they are looking forward to increasing the crew size to three. Then the floor was open to questions from the press.

Source record↗

Crew Transfer Options for Servicing of Geostationary Satellites

In 2011, NASA and DARPA undertook a study to examine capabilities and system architecture options which could be used to provide manned servicing of satellites in Geostationary Earth Orbit (GEO). The study focused on understanding the generic nature of the problem and examining technology requirements, it was not for the purpose of proposing or justifying particular solutions. A portion of this study focused on assessing possible capabilities to efficiently transfer crew between Earth, Low Earth Orbit (LEO), and GEO satellite servicing locations. This report summarizes the crew transfer aspects of manned GEO satellite servicing. Direct placement of crew via capsule vehicles was compared to concepts of operation which divided crew transfer into multiple legs, first between earth and LEO and second between LEO and GEO. In space maneuvering via purely propulsive means was compared to in-space maneuvering which utilized aerobraking maneuvers for return to LEO from GEO. LEO waypoint locations such as equatorial, Kennedy Space Center, and International Space Station inclinations were compared. A discussion of operational concepts is followed by a discussion of appropriate areas for technology development.

Cerro, Jeffrey A.↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars.

exploration↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

[Note: this is the presentation for a companion paper with the following abstract] The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars. Note: Slide 9 contains a ~2 min video, best viewed when downloaded. Once downloaded to begin video you may be requested to hit options and Trust this document.

Long-duration spaceflight↗

SAE Mil-1394 For Military and Aerospace Vehicle Applications

Unique opportunity to utilize new technology while increasing vehicle and crew member safety. Demonstration of new technology that can be utilized for Crew Exploration Vehicle and other future manned vehicles. Future work for other cameras in the vehicle that can be IEEE1394 based without major vehicle modifications. Demonstrates that LM can share information and knowledge between internal groups and NASA to assist in providing a product in support of the NASA Return to Flight Activities. This upgrade will provide a flight active data bus that is 100 times faster than any similar bus on the vehicle.

Dunga, Larry↗

Assessment of Postflight Locomotor Performance Utilizing a Test of Functional Mobility: Strategic and Adaptive Responses

Space flight induces adaptive modification in sensorimotor function, allowing crewmembers to operate in the unique microgravity environment. This adaptive state, however, is inappropriate for a terrestrial environment. During a re-adaptation period upon their return to Earth, crewmembers experience alterations in sensorimotor function, causing various disturbances in perception, spatial orientation, posture, gait, and eye-head coordination. Following long duration space flight, sensorimotor dysfunction would prevent or extend the time required to make an emergency egress from the vehicle; compromising crew safety and mission objectives. We are investigating two types of motor learning that may interact with each other and influence a crewmember's ability to re-adapt to Earth's gravity environment. In strategic learning, crewmembers make rapid modifications in their motor control strategy emphasizing error reduction. This type of learning may be critical during the first minutes and hours after landing. In adaptive learning, long-term plastic transformations occur, involving morphological changes and synaptic modification. In recent literature these two behavioral components have been associated with separate brain structures that control the execution of motor strategies: the strategic component was linked to the posterior parietal cortex and the adaptive component was linked to the cerebellum (Pisella, et al. 2004). The goal of this paper was to demonstrate the relative contributions of the strategic and adaptive components to the re-adaptation process in locomotor control after long duration space flight missions on the International Space Station (ISS). The Functional Mobility Test (FMT) was developed to assess crewmember s ability to ambulate postflight from an operational and functional perspective. Sixteen crewmembers were tested preflight (3 sessions) and postflight (days 1, 2, 4, 7, 25) following a long duration space flight (approx 6 months) on the ISS. We have further analyzed the FMT data to characterize strategic and adaptive components during the postflight readaptation period. Crewmembers walked at a preferred pace through an obstacle course set up on a base of 10 cm thick medium density foam (Sunmate Foam, Dynamic Systems, Inc., Leicester, NC). The 6.0m X 4.0m course consisted of several pylons made of foam; a Styrofoam barrier 46.0cm high that crewmembers stepped over; and a portal constructed of two Styrofoam blocks, each 31cm high, with a horizontal bar covered by foam and suspended from the ceiling which was adjusted to the height of the crewmember s shoulder. The portal required crewmembers to bend at the waist and step over a barrier simultaneously. All obstacles were lightweight, soft and easily knocked over. Crewmembers were instructed to walk through the course as quickly and as safely as possible without touching any of the objects on the course. This task was performed three times in the clockwise direction and three times in the counterclockwise direction that was randomly chosen. The dependent measures for each trial were: time to complete the course (seconds) and the number of obstacles touched or knocked down. For each crewmember, the time to complete each FMT trial from postflight days 1, 2, 4, 7 and 25 were further analyzed. A single logarithmic curve using a least squares calculation was fit through these data to produce a single comprehensive curve (macro). This macro curve composed of data spanning 25 days, illustrates the re-adaptive learning function over the longer time scale term. Additionally, logarithmic curves were fit to the 6 data trials within each individual post flight test day to produce 5 separate daily curves. These micro curves, produced from data obtained over the course of minutes, illustrates the strategic learning function exhibited over a relative shorter time scale. The macro curve for all subjects exhibited adaptive motor learning patterns over the 25 day period. Howev, 9/16 crewmembers exhibited significant strategic motor learning patterns in their micro curves, as defined by m > 1 in the equation of the line y=m*LN(x) +b. These data indicate that postflight recovery in locomotor function involves both strategic and adaptive mechanisms. Future countermeasures will be designed to enhance both recovery processes.

Warren, L. E.↗

Advanced transportation system study: Manned launch vehicle concepts for two way transportation system payloads to LEO

The purpose of the Advanced Transportation System Study (ATSS) task area 1 study effort is to examine manned launch vehicle booster concepts and two-way cargo transfer and return vehicle concepts to determine which of the many proposed concepts best meets NASA's needs for two-way transportation to low earth orbit. The study identified specific configurations of the normally unmanned, expendable launch vehicles (such as the National Launch System family) necessary to fly manned payloads. These launch vehicle configurations were then analyzed to determine the integrated booster/spacecraft performance, operations, reliability, and cost characteristics for the payload delivery and return mission. Design impacts to the expendable launch vehicles which would be required to perform the manned payload delivery mission were also identified. These impacts included the implications of applying NASA's man-rating requirements, as well as any mission or payload unique impacts. The booster concepts evaluated included the National Launch System (NLS) family of expendable vehicles and several variations of the NLS reference configurations to deliver larger manned payload concepts (such as the crew logistics vehicle (CLV) proposed by NASA JSC). Advanced, clean sheet concepts such as an F-1A engine derived liquid rocket booster (LRB), the single stage to orbit rocket, and a NASP-derived aerospace plane were also included in the study effort. Existing expendable launch vehicles such as the Titan 4, Ariane 5, Energia, and Proton were also examined. Although several manned payload concepts were considered in the analyses, the reference manned payload was the NASA Langley Research Center's HL-20 version of the personnel launch system (PLS). A scaled up version of the PLS for combined crew/cargo delivery capability, the HL-42 configuration, was also included in the analyses of cargo transfer and return vehicle (CTRV) booster concepts. In addition to strictly manned payloads, two-way cargo transportation systems (CTRV's) were also examined. The study provided detailed design and analysis of the performance, reliability, and operations of these concepts. The study analyzed these concepts as unique systems and also analyzed several combined CTRV/booster configurations as integrated launch systems (such as for launch abort analyses). Included in the set of CTRV concepts analyzed were the medium CTRV, the integral CTRV (in both a pressurized and unpressurized configuration), the winged CTRV, and an attached cargo carrier for the PLS system known as the PLS caboose.

Duffy, James B.↗

Reusable Manned Lunar Vehicle

Report presents concept for reusable manned spacecraft to fly to and from Moon. Concept calls for lunar lander based in low orbit around Moon and transfer stage that shuttles between orbiting lander and Earth. Lander would deliver 30 tons of cargo to surface of Moon robotically and return to low orbit around Moon. Alternatively, lands eight crew-members and supplies for 165 days and return them to orbit. Transfer stage carries propellant for lander from Earth. Upon return to atmosphere of Earth slows itself by aerobraking.

Sherwood, Brent↗