Search NASA⌕ Search

SEARCH · Search NASA

Results for “Expansion Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Estimating the impacts of natural gas power generation growth on solar electricity development: PJM's evolving resource mix and ramping capability

Abstract Expansion of distributed solar photovoltaic (PV) and natural gas‐fired generation capacity in the United States has put a renewed spotlight on methods and tools for power system planning and grid modernization. This article investigates the impact of increasing natural gas‐fired electricity generation assets on installed distributed solar PV systems in the Pennsylvania–New Jersey–Maryland (PJM) Interconnection in the United States over the period 2008–2018. We developed an empirical dynamic panel data model using the system‐generalized method of moments (system‐GMM) estimation approach. The model accounts for the impact of past and current technical, market and policy changes over time, forecasting errors, and business cycles by controlling for PJM jurisdictions‐level effects and year fixed effects. Using an instrumental variable to control for endogeneity, we concluded that natural gas does not crowd out renewables like solar PV in the PJM capacity market; however, we also found considerable heterogeneity. Such heterogeneity was displayed in the relationship between solar PV systems and electricity prices. More interestingly, we found no evidence suggesting any relationship between distributed solar PV development and nuclear, coal, hydro, or electricity consumption. In addition, considering policy effects of state renewable portfolio standards, net energy metering, differences in the PJM market structure, and other demand and cost‐related factors proved important in assessing their impacts on solar PV generation capacity, including energy storage as a non‐wire alternative policy technique. This article is categorized under: Photovoltaics > Economics and Policy Fossil Fuels > Climate and Environment Energy Systems Economics > Economics and Policy

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

GLAST Large Area Telescope Multiwavelength Planning

Because gamma-ray astrophysics depends in many ways on multiwavelength studies, the GLAST Large Area Telescope (LAT) Collaboration has started multiwavelength planning well before the scheduled 2007 launch of the observatory. Some of the high-priority needs include: (1) radio and X-ray timing of pulsars; (2) expansion of blazar catalogs, including redshift measurements (3) improved observations of molecular clouds, especially at high galactic latitudes; (4) simultaneous broad-spectrum blazar flare measurements; (5) characterization of gamma-ray transients, including gamma ray bursts; (6) radio, optical, X-ray and TeV counterpart searches for unidentified gamma-ray sources. Work on the first three of these activities is needed before launch. The GLAST Large Area Telescope is an international effort, with U.S. funding provided by the Department of Energy and NASA.

Thompson, D. J.↗

Nuclear Energy Model Intercomparison Project

This document summarizes the current status and future plans of the Nuclear Model Intercomparison Project. The objectives of this project are to understand how issues central to nuclear energy are modeled in long-term capacity expansion models, to investigate how model structures and input assumptions impact projections for nuclear’s role, to refine model representations of nuclear energy, and to communicate findings to the research community and decision-makers. High-level goals are discussed for each of the four participating model groups: the U.S. Energy Information Administration (EIA), U.S. Environmental Protection Agency (EPA), Electric Power Research Institute (EPRI), and National Renewable Energy Laboratory (NREL). This document summarizes scenarios and assumptions for the model comparison, outcomes from the first workshop, and next steps.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Strategies for Flood Resilience and Grid Investment Among Iowa's Electric Distribution Utilities

Flooding poses a growing threat to Iowa's electric distribution system, yet utilities face significant data and modeling challenges in planning effective resilience investments. This report provides a foundational assessment of how distribution utilities in Iowa, investor-owned, municipal, and cooperative, approach resilience planning, with a focus on flood risk. It combines hazard characterization, review of state and utility practices, and application of NLR's Energy Resilience Analysis for Distribution Systems (ERAD) and Capacity Expansion Decision Support for Distribution Networks (CADET) tools. Using FEMA floodplains, Iowa Flood Center depth grids, and utility infrastructure data, the analysis quantifies asset exposure, simulates outage risks, and evaluates resilience strategies such as pole hardening, undergrounding, and substation protection. Results indicate that while feeder-level upgrades provide incremental benefits, the most significant reductions in outage risk are achieved through targeted substation interventions. The report highlights key data gaps, such as limited elevation data and fragility functions, and underscores the need for probability-weighted investment frameworks to address both frequent and catastrophic flood events. These insights aim to support utilities, state agencies, and federal partners in prioritizing resilience investments that safeguard Iowa's electric grid against future flooding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Representing the Future Role of Hydropower and Pumped Storage Hydropower (PSH) in Electricity Planning Tools

Existing tools for long-term electric sector planning struggle to represent hydropower's nuanced site-specific technical and operating characteristics, which depend on technical specifications as well as water management practices and regulations. As a result, long-term planning models and tools insufficiently characterize hydropower value and incentives, and they cannot fully represent the role hydropower can play in a future electricity system that could include a high penetration of variable wind and solar generation, battery storage, and other low-carbon technologies. This presentation demonstrates the culmination of a multi-year effort to enhance hydropower representations in electricity planning models at the National Renewable Energy Laboratory (NREL), as part of the U.S. Department of Energy (USDOE) HydroWIRES Initiative. New modeling techniques are demonstrated using the NREL Regional Energy Deployment System (ReEDS), an open-access electric sector capacity expansion model used extensively in a wide range of technology deployment and integration analysis, including the 2016 USDOE Hydropower Vision. ReEDS uses a least-cost optimization approach to understand investment and operation of electricity generation, storage, and transmission technologies under future scenarios of electricity technology innovation, demand, policy, and other sectoral drivers. ReEDS was modified to better represent value and opportunities for both pumped storage hydropower (PSH) and hydropower systems without pumping. We incorporated a new national closed-loop PSH resource and cost assessment to explore new PSH deployment opportunities and added plant-level data to better represent the existing PSH fleet. New upgrade pathways enable opportunities for enhanced hydropower flexibility by adding pumps, upgrading dispatchability, increasing capacity, or increasing energy availability. The model was also modified to better represent the value of long-duration energy storage beyond diurnal time scales, allowing both hydropower and PSH to better balance energy supply and demand variations in high-renewable systems. These new features are demonstrated under reference and high-renewable futures and a range of sensitivity scenarios to understand which hydropower and PSH deployment and upgrade opportunities are the most attractive. These scenarios indicate potential for new closed-loop PSH deployment and for hydropower flexibility improvements to have important impacts on long-term electricity system emissions and economic outcomes. Increasing flexibility of the existing hydropower fleet can reduce the need to invest in new flexible grid technologies and help achieve decarbonization goals. Systems with sufficient energy storage could also be valuable for balancing seasonal differences in renewable energy availability, particularly from solar energy. The methods developed for ReEDS and subsequent scenario results reveal important considerations for future hydropower and grid system planning, and all data and code is freely available in a public code repository for use throughout the hydropower industry.

capacity expansion↗

Climate and air pollution implications of potential energy infrastructure and policy measures in India

India is a rapidly developing economy with interrelated air quality, sustainable development, and climate change mitigation goals. There are unique challenges to achieving each of these goals as well as potential tradeoffs among them. This study examines the implications of possible future energy, climate, and air pollution control policies and measures in India through 2050. We take a scenario approach using the GCAM global energy-climate-land model combined with the Hector simple climate model and the TM5-FASST air quality source-receptor model to examine energy, climate and air quality outcomes. Reducing use of traditional biomass in buildings can reduce primary carbonaceous particulate emissions well below 2015 levels. However, policies that are more ambitious than current plans would likely be required to reduce SO 2 and NO x emissions well below 2015 levels. Among single policy cases considered, pricing of greenhouse gas (GHG) emissions and expansion of natural gas infrastructure have the largest impacts on overall energy system changes relative to the reference scenario. Ambitious air pollution control and GHG policies lead to the largest reductions in air pollution concentrations and radiative forcing, respectively. However, ambitious air pollution control and GHG policies differ in the extent to which they support or impede other policy objectives. Forcing increases due to reduced aerosols from ambitious air pollution policies can be mitigated, at least in part, by applying air pollution control and GHG policies together.

India↗

Development of a health monitoring framework: Application to a supercritical pulverized coal-fired boiler

In this study, this work details the development of a physics-based equipment health monitoring framework for a supercritical boiler, using first-principles models to estimate the remaining useful life (RUL) of its components. The framework accounts for fatigue and creep life consumption, generating spatio-temporal variations in mechanical and thermal stress. Analysis of the stress profile throughout the boiler highlights the finishing superheater inlet steam header as a vulnerable location susceptible to damage from cycling operation. The framework also yields quantified uncertainty in the RUL projection for specific locations, accounting for uncertainties in material properties and boiler operation. Results indicate that operational uncertainties (e.g., seasonal variation and operational strategy) and material properties (e.g., rupture time coefficients, Young’s modulus, yield strength, and coefficient of thermal expansion) significantly impact the RUL of the finishing superheater inlet steam header. Additionally, case studies demonstrate the use of the health monitoring framework as a predictive tool for operational planning under uncertainty, including scenarios with and without updates on the operation of the boiler.

20 FOSSIL-FUELED POWER PLANTS↗

Reaching new peaks for the future of the CMS HTCondor Global Pool

The CMS experiment at CERN employs a distributed computing infrastructure to satisfy its data processing and simulation needs. The CMS Submission Infrastructure team manages a dynamic HTCondor pool, aggregating mainly Grid clusters worldwide, but also HPC, Cloud and opportunistic resources. This CMS Global Pool, which currently involves over 70 computing sites worldwide and peaks at 350k CPU cores, is employed to successfully manage the simultaneous execution of up to 150k tasks. While the present infrastructure is sufficient to harness the current computing power scales, CMS latest estimates predict a noticeable expansion in the amount of CPU that will be required in order to cope with the massive data increase of the High-Luminosity LHC (HL-LHC) era, planned to start in 2027. This contribution presents the latest results of the CMS Submission Infrastructure team in exploring and expanding the scalability reach of our Global Pool, in order to preventively detect and overcome any barriers in relation to the HL-LHC goals, while maintaining high effciency in our workload scheduling and resource utilization.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Thermoelectric converter for SP-100 space reactor power system

Conductively coupling the thermoelectric converter to the heat source and the radiator maximizes the utilization of the reactor and radiator temperatures and thereby minimizes the power system weight. This paper presents the design for the converter and the individual thermoelectric cells that are the building block modules for the converter. It also summarizes progress on the fabrication of initial cells and the results obtained from the preparation of a manufacturing plan. The design developed for the SP-100 system utilizes thermally conductive compliant pads that can absorb the displacement and distortion caused by the combinations of temperatures and thermal expansion coefficients. The converter and cell designs provided a 100 kWe system which met the system requirements. Initial cells were fabricated and tested.

Terrill, W. R.↗

Quantifying the Value of Technology and Policy Innovation in Water Resource Portfolios

Abstract Recent water infrastructure planning models demonstrate that explicitly accounting for hydrological changes in long‐term water planning reduces costs and increases system robustness. However, current models do not consider the effects of other changes occurring in the system over long time horizons, namely technology and policy innovation. By leveraging state‐of‐the‐art dynamic control techniques, we propose a suite of tools that explicitly relate hydrologic change, technology innovation, and policy interventions to system‐level water costs. We design robust and cost‐optimal strategies for water supply expansion under hydrological variability and hundreds of plausible innovation states, for example, treatment cost and diversification improvements, deployment times, and demand reduction campaigns. Our approach circumvents the need to pre‐assign probabilities to innovation scenarios and, instead, directly calculates the effects of technology, policy, and hydrology variations on system cost and planning strategies to identify avenues of impactful innovation. These tools can support technology development hubs, urban, state, and federal water planners in anticipating cost implications of technology and policy innovation at the local level, and prioritizing high‐impact innovation goals based on quantitative targets. Results for the case study of Santa Barbara, California identify high‐value innovation attributes for the city as well as combinations of innovation attributes across technologies and policies, and quantify their potential utility cost reductions.

13 HYDRO ENERGY↗

Comminty Geothermal: Planning and Design of a Heating and Cooling System in Framingham, Massachusetts

These reports, plans, and drawings review the achievements of Home Energy Efficiency Team (HEET) and its partners to plan and design a network of interconnected ground-source heat pump systems, or geothermal network, in an area encompassing multiple environmental justice (EJ) neighborhoods in the City of Framingham, MA. The materials provided in this dataset include, a) stakeholder and design best practices, b) study on optimal method to interconnect geothermal loops, c) guidelines for monitoring and metering, d) operations and maintenance plans, e) permitting guidelines and f) 10-day driller tutorial curriculum. These materials can guide the efficient and ethical design of future geothermal networks nationwide. The capacity of the system is estimated at 217 tons and is designed to provide 100% of heating and cooling needs for the buildings connected to the loop. In this project, 80 boreholes are used as the main thermal resources, the distribution system (or loop) consists of 0.61 miles of an 8-inch single-pipe at ambient temperature, with the capacity to connect 44 buildings, including 13 apartment buildings from the Framingham Housing Authority, one transitional home, one school building and 29 single family homes. While Framingham already has a geothermal network loop that is currently in the commissioning stage, our proposed project is unique because it is the first utility-led expansion loop (2nd loop) project that will connect to an adjacent existing geothermal loop (1st loop) in a pre-existing neighborhood. Both the 1st and 2nd loops are being installed, owned and operated by Eversource Energy, the utility Deployment Partner.

15 GEOTHERMAL ENERGY↗

Check the Storage Stack: Comparing Behind-the-Meter Energy Storage State Policy Stacks in the United States

A variety of studies and disparate datasets track state energy storage polices, but these datasets do not cover all BTM-related storage policy. Moreover, these databases do not align these policies with the policy stacking framework. Thus, it is unclear what BTM storage policies are adopted across the country, what should comprise a complete storage policy framework or stack, and how states policies compare against that stack. This report addresses this gap in the literature by developing a state policy stack for BTM battery storage that we compare across all fifty states. This first-of-its-kind BTM storage policy stack includes 11 parent policy categories, and 31 associated policies divided across the market preparation, creation, and expansion policy components.

25 ENERGY STORAGE↗

A Framework for the Cross-Sectoral Integration of Multi-Model Impact Projections: Land Use Decisions Under Climate Impacts Uncertainties

Climate change and its impacts already pose considerable challenges for societies that will further increase with global warming (IPCC, 2014a, b). Uncertainties of the climatic response to greenhouse gas emissions include the potential passing of large-scale tipping points (e.g. Lenton et al., 2008; Levermann et al., 2012; Schellnhuber, 2010) and changes in extreme meteorological events (Field et al., 2012) with complex impacts on societies (Hallegatte et al., 2013). Thus climate change mitigation is considered a necessary societal response for avoiding uncontrollable impacts (Conference of the Parties, 2010). On the other hand, large-scale climate change mitigation itself implies fundamental changes in, for example, the global energy system. The associated challenges come on top of others that derive from equally important ethical imperatives like the fulfilment of increasing food demand that may draw on the same resources. For example, ensuring food security for a growing population may require an expansion of cropland, thereby reducing natural carbon sinks or the area available for bio-energy production. So far, available studies addressing this problem have relied on individual impact models, ignoring uncertainty in crop model and biome model projections. Here, we propose a probabilistic decision framework that allows for an evaluation of agricultural management and mitigation options in a multi-impactmodel setting. Based on simulations generated within the Inter-Sectoral Impact Model Intercomparison Project (ISI-MIP), we outline how cross-sectorally consistent multi-model impact simulations could be used to generate the information required for robust decision making. Using an illustrative future land use pattern, we discuss the trade-off between potential gains in crop production and associated losses in natural carbon sinks in the new multiple crop- and biome-model setting. In addition, crop and water model simulations are combined to explore irrigation increases as one possible measure of agricultural intensification that could limit the expansion of cropland required in response to climate change and growing food demand. This example shows that current impact model uncertainties pose an important challenge to long-term mitigation planning and must not be ignored in long-term strategic decision making

farmlands↗

Spaceflight Biospecimen Sharing in Support of Science Discovery and Exploration

For decades, NASA and international partners have flown non-human biological experiments in space to understand the effects of spaceflight and address potential biological hazards. Sending organisms into space is a costly endeavor which makes space-flown biological specimens a valuable resource. To enable maximum scientific return, samples not required by the Principal Investigators are harvested and collected mostly by NASA’s Space Biology Biospecimen Sharing Program. These specimens are collected according to well-established SOPs that maintain quality and integrity. The specimens are then preserved, archived, and made available to the international scientific community through NASA’s Institutional Scientific Collection (ISC) at Ames Research Center (ARC). The ISC-ARC biospecimens and descriptive metadata are findable and accessible for request through the Life Sciences Data Archive (LSDA). The NASA ISC-ARC currently stores over 32,000 specimens from Shuttle, International Space Station, and ground-based investigations (spaceflight analog experiments involving either hindlimb unloading, centrifugation, or partial weight-bearing study designs). Tissues are predominantly from mice and rats, though samples are also available from bacteria and quail. The specimens include tissues from many physiological systems including musculoskeletal, neurosensory, reproductive, respiratory, circulatory, and digestive. Tissues are stored at -80°C, -20°C, +4°C, or ambient and preserved in various fixatives. Descriptive metadata is available for all samples. Historically, these tissues have been used for a wide range of analyses, including histology, genomics, and transcriptomics. Plans are underway to expand the ISC-ARC beyond the mostly-rodent contents, to include a space-relevant microbial culture collection including bacteria, fungi, and yeast. This expansion of the ISC-ARC will now involve identifying and standardizing best practices for microbial curations. To ensure safe long-term storage of microbial isolates, a microbiology laboratory will be dedicated for identification, cell culture, and lyophilization. Awarding of tissue to public science investigators has resulted in 33 publications since 2011, with 48 requests being submitted since 2016. Of note, NASA GeneLab has been awarded ISC-ARC biospecimens in the past few years. GeneLab processes the biospecimens to generate various levels of ‘omics’ data, which are published on GeneLab’s open access online platform for bioinformatics analysis and visualization. This has helped a systems biology community grow around the processed-biospecimens’ datasets, resulting in many new publications and insights. Websites: https://www.nasa.gov/ames/research/space-biosciences/isc-bsp ; https://lsda.jsc.nasa.gov/Biospecimen

Ryan T. Scott↗

Robotic tape library system level testing at NSA: Present and planned

In the present of declining Defense budgets, increased pressure has been placed on the DOD to utilize Commercial Off the Shelf (COTS) solutions to incrementally solve a wide variety of our computer processing requirements. With the rapid growth in processing power, significant expansion of high performance networking, and the increased complexity of applications data sets, the requirement for high performance, large capacity, reliable and secure, and most of all affordable robotic tape storage libraries has greatly increased. Additionally, the migration to a heterogeneous, distributed computing environment has further complicated the problem. With today's open system compute servers approaching yesterday's supercomputer capabilities, the need for affordable, reliable secure Mass Storage Systems (MSS) has taken on an ever increasing importance to our processing center's ability to satisfy operational mission requirements. To that end, NSA has established an in-house capability to acquire, test, and evaluate COTS products. Its goal is to qualify a set of COTS MSS libraries, thereby achieving a modicum of standardization for robotic tape libraries which can satisfy our low, medium, and high performance file and volume serving requirements. In addition, NSA has established relations with other Government Agencies to complete this in-house effort and to maximize our research, testing, and evaluation work. While the preponderance of the effort is focused at the high end of the storage ladder, considerable effort will be extended this year and next at the server class or mid range storage systems.

Shields, Michael F.↗

Visual‐Analytics Bridge Complexity and Accessibility for Robust Urban Water Planning

Urban water resources planning is complicated by unprecedented uncertainty in supply and demand. Real‐world planning often simplifies the full range of uncertainty faced by a system into a limited set of deterministic scenarios to enhance accessibility for decision‐makers and the public. However, overlooking uncertainty can expose the system to failures. On the other end of the spectrum, academically developed tools for scenario analysis rigorously quantify the combined effects of multiple sources of uncertainty, but the practical application of these models is limited by the challenges of information visualization and communication of results. In short, municipal water supply planners lack access to planning frameworks that effectively integrate a rigorous treatment of uncertainty with accessible, user‐friendly visual and interactive tools to enhance user accessibility. In this work, we fill this gap by proposing Visual‐Robust Decision Making, and demonstrate an application for the city of Santa Barbara (SB), CA. Santa Barbara faces multiple uncertainties from pending state and federal regulations to changing hydrology and water demand. The city seeks to increase its water portfolio robustness by expanding its seawater desalination plant, but must decide how much capacity to add. We introduce computational tools that assess uncertainty across nine uncertain drivers identified with the help of water planners in SB. To allow public participation in the desalination expansion decision, we develop interactive visual‐analytics to aid decision‐makers and stakeholders in navigating complex scenario analysis outcomes. Our results quantify the tradeoffs between increased capacity and system robustness and aim to enhance participation and uncertainty characterization of urban water planning efforts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distributed Wind and Impacts of FERC Order No. 2222 Implementation

In September of 2020, FERC issued Order No. 2222, directing ISOs to adjust their long-standing tariffs and participation models to enable the operation of distributed energy resource (DER) aggregators in wholesale energy markets. The rule sought to bring wholesale markets under its jurisdiction up to speed with existing expansion of DERs across the United States and to capture the potential benefits that these technologies can provide. This report describes the implementation of FERC Order No. 2222 and the compliance plans that have been submitted so far, attempt to understand the potential impact the rule may have on distributed wind, and provide opportunities for future work to analyze and encourage deployment under these policy conditions. There is an information gap for the type of market interactions distributed wind may have or how it could be best deployed in DER aggregations under future market conditions. There is significant potential for profitable deployment of distributed wind in states that are served by ISOs and covered under Order No. 2222. Distributed wind and other DERs provide local energy that does not need to travel those distances and avoids the losses typically associated with long-distance energy transmission. Deployment of distributed wind can benefit communities that exist away from large load centers by providing local, clean, and affordable energy. Aggregating DERs that include distributed wind could provide these benefits across multiple far-ranging communities if they have access to participate in wholesale markets. A new baseline valuation of distributed wind in areas covered by Order No. 2222 is required to accurately gauge where it is profitable and how it can compete or complement existing or future DER deployment, including as part of an aggregate.

17 WIND ENERGY↗