Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Melter Downtime Impacts on DFLAW Glass Production and Process Efficiency - 17117

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) pilot studies found that semi-volatile elements started to leave the molten glass pool and enter the offgas stream when the melter became idle. The rate at which the semi-volatile elements leave the molten glass pool follows a typical half-life decay curve. The WTP Direct Feed Low-Activity Waste (DFLAW) program is using existing LAW offgas treatment systems to capture semi-volatile elements leaving the melters. A new building, Effluent Management Facility (EMF), will be built to process effluents generated by the offgas treatment equipment. The effluents are concentrated by evaporation and are recycled to the melter feed streams. Computer modeling studies show that increased amounts of semi-volatile elements in the recycles due to melter downtime adversely impact the DFLAW operations. The extent to which glass productions and process efficiencies are hampered depends upon the frequency, duration, and pattern of the downtime events. Various scenarios were investigated using randomly generated and operator-anticipated downtime schedules. This paper discusses 1) derivation of the volatility half-life curves, 2) downtime schedules, 3) increased amount of semi-volatile elements in recycled material as a result of melter shut down, 4) impacts to glass production and process efficiency, and 5) comparison of scenario results. This study concludes that plant operators can mitigate much of the negative effects of semi-volatile element recycles by managing melter downtime and idle time when possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Data Management System in Support of Remedial Actions for Legacy Radioactive Contamination - 17280

The Port Hope Area Initiative (PHAI) is a project mandated and funded by the Government of Canada to remove contamination from properties with legacy low-level radioactive waste (LLRW) contamination arising from a crown-owned radium and, later, uranium refinery in the Town of Port Hope, Ontario. From 1976 to 1981, a community clean-up project was undertaken, with the specific purpose to decrease the level of historic LLRW contamination within Port Hope. Since then, residual LLRW has been managed by the Low Level Radioactive Waste Management Office (LLRWMO) (and its predecessors). The PHAI and the Port Hope Project (PHP) were initiated in 2001 with a formal agreement between affected municipalities and the federal government to develop a safe, long-term management solution for the historic LLRW remaining within Port Hope. An important activity of the PHP is the survey of about 4,800 'small scale sites' (SSS) throughout the community to confirm the presence or absence of LLRW. This involves surveys of properties based on the measurement of exterior gamma, contaminated objects and surfaces, soil concentrations and indoor radon and classification to Port Hope project specific criteria. A very large amount of information is involved in the project including; scheduling individual field visits to the properties, capture of field data and comments, laboratory sample tracking, QA/QC, report generation and internal and client project reporting at regular schedules. Field data collection of exterior gamma radiation surveys includes direct (real time) and interactive loading of data into the Information Management (IM) system to support initial QA/QC and reporting back to the field on radiation levels. Screening soil measurements including X-ray fluorescence (XRF) and gamma radiation are collected from all 20 cm increments in each borehole in addition to down-hole gamma radiation measurements and logging of soil characteristics which are used in documentation and interpretation of the property condition. The IM system outlined in this paper was developed to respond to the requirements for radiological surveys in Port Hope. The IM system continues to evolve as a part of continuing review and improvement. The IM system incorporates Web-enabled field tools and cloud hosted data and applications, provides increased field efficiency, timeliness in reporting, real time QA/QC analysis, and consistency in tracking project advances and changes made to the data for decision-making and reporting on an ongoing basis. Examples of specific applications are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Detecting Drawdowns Masked by Environmental Stresses with Water-Level Models

Detecting and quantifying small drawdown at observation wells distant from the pumping well greatly expands the characterized aquifer volume. However, this detection is often obscured by water level fluctuations such as barometric and tidal effects. A reliable analytical approach for distinguishing drawdown from nonpumping water-level fluctuations is presented and tested here. Drawdown is distinguished by analytically simulating all pumping and nonpumping water-level stresses simultaneously during the period of record. Pumping signals are generated with Theis models, where the pumping schedule is translated into water-level change with the Theis solution. This approach closely matched drawdowns simulated with a complex three-dimensional, hypothetical model and reasonably estimated drawdowns from an aquifer test conducted in a complex hydrogeologic system. Pumping-induced changes generated with a numerical model and analytical Theis model agreed (RMS as low as 0.007 m) in cases where pumping signals traveled more than 1 km across confining units and fault structures. Maximum drawdowns of about 0.05 m were analytically estimated from field investigations where environmental fluctuations approached 0.2m during the analysis period.

58 GEOSCIENCES↗

Automated Planning for a Deep Space Communications Station

This paper describes the application of Artificial Intelligence planning techniques to the problem of antenna track plan generation for a NASA Deep Space Communications Station. Me described system enables an antenna communications station to automatically respond to a set of tracking goals by correctly configuring the appropriate hardware and software to provide the requested communication services. To perform this task, the Automated Scheduling and Planning Environment (ASPEN) has been applied to automatically produce antenna trucking plans that are tailored to support a set of input goals. In this paper, we describe the antenna automation problem, the ASPEN planning and scheduling system, how ASPEN is used to generate antenna track plans, the results of several technology demonstrations, and future work utilizing dynamic planning technology.

Estlin, Tara↗

Solar energy thermally powered electrical generating system

A thermally powered electrical generating system for use in a space vehicle is disclosed. The rate of storage in a thermal energy storage medium is controlled by varying the rate of generation and dissipation of electrical energy in a thermally powered electrical generating system which is powered from heat stored in the thermal energy storage medium without exceeding a maximum quantity of heat. A control system (10) varies the rate at which electrical energy is generated by the electrical generating system and the rate at which electrical energy is consumed by a variable parasitic electrical load to cause storage of an amount of thermal energy in the thermal energy storage system at the end of a period of insolation which is sufficient to satisfy the scheduled demand for electrical power to be generated during the next period of eclipse. The control system is based upon Kalman filter theory.

Owens, William R.↗

Strengthened MILP formulation for certain gas turbine unit commitment problems

In this study, we derive a strengthened MILP formulation for certain gas turbine unit commitment problems, in which the ramping rates are no smaller than the minimum generation amounts. This type of gas turbines can usually start-up faster and have a larger ramping rate, as compared to the traditional coal-fired power plants. Recently, the number of this type of gas turbines increases significantly due to affordable gas prices and their scheduling flexibilities to accommodate intermittent renewable energy generation. In this study, several new families of strong valid inequalities are developed to help reduce the computational time to solve these types of problems. Meanwhile, the validity and facet-defining proofs are provided for certain inequalities. Finally, numerical experiments on a modified IEEE 118-bus system and the power system data based on recent studies verify the effectiveness of applying our formulation to model and solve this type of gas turbine unit commitment problems, including reducing the computational time to obtain an optimal solution or obtaining a much smaller optimality gap, as compared to the default CPLEX, when the time limit is reached with no optimal solutions obtained.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Software for Planning Scientific Activities on Mars

Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.

Ai-Chang, Mitchell↗

Toward the fully capable AI space mission planner

The necessity of expending numerous ground-side manhours to write extremely concise command codes for deep-space probes in-flight, which carry limited on-board processing capabilities, is encouraging the development of AI modules to perform the same task. An experimental automated sequence planner, Deviser, has proven successful enough, when used on a mainframe computer, to continue with the next generation of the concept, PLAN-IT, an expert scheduler for spacecraft observation targets. The new system will provide the ground-based user with interactive graphic displays for choosing targets and generates an expected time-line. An updated Deviser, using the new modules, will be tested after the Voyager Uranus encounter, and PLAN-IT will be employed to formulate Spacelab activity schedules.

Grenander, S.↗

Metrics for Flight Operations: Application to Europa Clipper Tour Selection

Objective measures are ubiquitous in the formulation, design and implementation of deep space missions. Tour durations, flyby altitudes, propellant budgets, power consumption, and other metrics are essential to developing and managing NASA missions. But beyond the simple metrics of cost and workforce, it has been difficult to identify objective, quantitative measures that assist in evaluating choices made during formulation or implementation phases in terms of their impact on flight operations. As part of the development of the Europa Clipper Mission system, a set of operations metrics have been defined along with the necessary design information and software tooling to calculate them. We have applied these methods and metrics to help assess the impact to the flight team on the six options for the Clipper Tour that are currently being vetted for selection in the fall of 2021. To generate these metrics, the Clipper MOS team first designed the set of essential processes by which flight operations will be conducted, using a standard approach and template to identify (among other aspects) timelines for each process, along with their time constraints (e.g., uplinks for sequence execution). Each of the resulting 50 processes is documented in a common format and concurred by stakeholders. Process timelines were converted into generic schedules and workforce-loaded using COTS scheduling software, based on the inputs of the process authors and domain experts. Custom code was generated to create an operations schedule for a specific portion of Clipper's prime mission, with instances of a given process scheduled based on specific timing rules (e.g., process X starts once per week on Thursdays) or relative to mission events (e.g., sequence generation process begins on a Monday, at least three weeks before each Europa closest approach). Over a 5-month period, and for each of six Clipper candidate tours, the result was a 20,000+ line, workforce-loaded schedule that documents all of the process-driven work effort at the level of individual roles, along with a significant portion of the level-of-effort work. Post-processing code calculated the absolute and relative number of work hours during a nominal 5 day / 40 hour work week, the work effort during 2nd and 3rd shift, as well as 1st shift on weekends. The resultant schedules and shift tables were used to generate objective measures that can be related to both human factors and to operational risk and showed that Clipper tours which utilize 6:1 resonant (21.25 day) orbits instead of 4:1 resonant (14.17 day) orbits during the first dozen or so Europa flybys are advantageous to flight operations. A similar approach can be extended to assist missions in more objective assessments of a number of mission issues and trades, including tour selection and spacecraft design for operability.

Sarrel, Marc↗

STADAN and data relay satellite simulation (emphasis on the scheduler)

A set of computer programs was developed which can be used to simulate the operation of NASA's Satellite Tracking and Data Acquisition Network (STADAN). The simulation consists of two major modules, a computerized algorithmic satellite scheduler (CASS) and a generalized evaluation model simulator (GEMS). CASS generates in-view time intervals of satellites over ground stations, and using these candidate passes, produces a schedule of service times for specific satellites to be serviced by specific ground stations in an attempt to fulfill certain inputted service requirements. GEMS than examines how well STADAN fulfills this schedule in terms of the availability and dependability of different (inputted) complements of equipment at the ground stations. The simulation was modified to allow for the introduction of one or more tracking and data relay satellites, which can serve as orbital receiving and command stations.

Kerne, B.↗

NREL Energy Models Examine the Potential for Wind and Solar Grid Integration (Fact Sheet)

As renewable energy generating sources, such as wind turbines and solar power systems, reach high levels of penetration in parts of the United States, the National Renewable Energy Laboratory (NREL) is helping the utility industry to peer into the future. Using software modeling tools that the lab developed, NREL is examining the future operation of the electrical grid as renewable energy continues to grow.

14 SOLAR ENERGY↗

Multi-Timescale Three-Phase Unbalanced Distribution System Operation With Variable Renewable Generations

This paper proposes a multi-timescale operational approach for a three-phase unbalanced distribution system, which contains hourly scheduling at substation level and minutes power flow operation at feeder level. In the substation scheduling model, the objective is to minimize the system cost with variable renewable generations. The given error distribution model of renewable generation is formulated as a chance constraint, and derived into a deterministic form by Gaussian mixture model (GMM) with genetic algorithm-based expectation-maximization (GAEM). In the feeder scheduling model, the system cost is further reduced with the optimal power flow (OPF) at a timescale of minutes. Considering the nonconvexity of the three-phase unbalanced OPF problem in distribution systems, the semidefinite programming (SDP) is used to relax the problem into a convex problem, and a distributed computation approach is built based on alternating direction method of multiplier (ADMM). The IEEE 123-bus distribution system, DU (University of Denver) campus distribution system, and the IEEE 8500-bus distribution system are used as the test bench for the proposed approach. And the numerical results demonstrate the effectiveness and validity of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) for Transportation Hubs (Final Report)

This report summarizes the work performed under the award number EE0008524. The project develops the Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) platform as the next-generation transportation solution based on autonomous electric vehicles (AEV) serving passenger trips from and to urban transportation hubs, to substantially reduce transportation energy consumption. Extensive data collection and analyses were first conducted to understand the demand patterns and energy consumption of hub-based on-road trips. Then, a data-driven framework that consists of an analytical module and a simulation module was proposed. For the analytical module, five planning + operation tools were developed to support the planning and energy-efficient operations of urban AEV services: the charging station planning that robotically allocates charging supplies based on the stationary charging demand distribution; the transit planning and demand adaptive scheduling model that efficiently generates\ candidate transit routes from hubs to other places and dynamically adjusts the transit time table to fit the current demand; the online energy-efficient routing that learns the energy-optimal paths from observations of link-level energy consumption in real-time; the hub-based ridesharing that matches trip requests together with account for the uncertainty of future trip demand and vehicle supply; and finally, the integrated demand prediction and anomaly detection pipeline that leverages the flight/train time table and support other planning/operation tools. To demonstrate the performance of these tools, a scalable high-performance agent-based simulator was built. We divided the urban space into multiple service zones where each zone was considered as an agent for passenger generation and vehicle charging. Two types of AEV agents were coded to model two types of mobility services: AEV taxi and AEV transit. For the AEV taxi, the team implemented the functions of pickup/drop-off passengers, energy-efficient routing, ridesharing, fleet rebalancing, and recharging. For the AEV bus, the team implemented the functions of demand-adaptive route scheduling, passenger boarding, and recharging. A high-performance computing framework was introduced to receive various profiling information (such as link energy updates, vehicle speed) from the simulator instances and communicate the operational commands back to the instances. The numerical experiments show that each of the proposed operational algorithms can reduce energy consumption and improve system efficiency. Furthermore, there exists the need to collectively consider multiple planning + operational strategies as multiple strategies can influence each other in terms of performance impacts. Recommendations for future work related to AEV planning and simulation are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhancing Reliability of the Weapons Material Waste Disposition Process in the Assembly/Disassembly Operations Facility

High quality weapons material waste dispositioning at Y-12 is crucial to the overall public perception of meeting the CNS government missions. Weapons material waste disposition requirements are an after-thought as perceived by Production personnel. Building waste dispositioning activities in the production system at the point of generation will increase the reliability of meeting requirements daily. The ultimate goal is to build in easy to understand processes at the point of generation in the production work without negatively impacting schedules. Measurements to evaluate sustainability of production processes and ensure reliable information will be suggested. Ultimately, this project is an effort to protect the environment by creating highly reliable weapons material waste dispositioning processes at the point of generation. Defining the process at the point of generation ultimately decreases variation and increases reliability of correctly dispositioning waste. Utilization of an effective and improved weapons material waste dispositioning process will ensure decrease in defective product dispositioning, decrease incorrect disposition of waste, increase set-up times for disposition work, decrease cost of production due to less down time and increase the percentage of waste dispositioning jobs completed in a timely manner.

99 GENERAL AND MISCELLANEOUS↗

Production and quality assurance automation in the Goddard Space Flight Center Flight Dynamics Facility

The Flight Dynamics Facility (FDF) at the NASA Goddard Space Flight Center (GSFC) generates numerous products for NASA-supported spacecraft, including the Tracking and Data Relay Satellites (TDRS's), the Hubble Space Telescope (HST), the Extreme Ultraviolet Explorer (EUVE), and the space shuttle. These products include orbit determination data, acquisition data, event scheduling data, and attitude data. In most cases, product generation involves repetitive execution of many programs. The increasing number of missions supported by the FDF has necessitated the use of automated systems to schedule, execute, and quality assure these products. This automation allows the delivery of accurate products in a timely and cost-efficient manner. To be effective, these systems must automate as many repetitive operations as possible and must be flexible enough to meet changing support requirements. The FDF Orbit Determination Task (ODT) has implemented several systems that automate product generation and quality assurance (QA). These systems include the Orbit Production Automation System (OPAS), the New Enhanced Operations Log (NEOLOG), and the Quality Assurance Automation Software (QA Tool). Implementation of these systems has resulted in a significant reduction in required manpower, elimination of shift work and most weekend support, and improved support quality, while incurring minimal development cost. This paper will present an overview of the concepts used and experiences gained from the implementation of these automation systems.

Chapman, K. B.↗

Transportation and Systems Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. An analyst using NGSAM has the ability to define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions on and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams had been working closely for several years before formalizing this collaboration. START provides the SNF routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM, as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗