At least 433 records · Page 24

Identifying Potential Sub-Synchronous Oscillations Using Impedance Scan Approach: Preprint

This paper presents an impedance scan study on the real-world power system in Australia that has observed 17 to 20 Hz intermittent subsynchronous oscillations. Through the impedance scan of each of the IBRs, both individually and collectively, potential resonance modes are identified. The impedance scans were carried out using electromagnetic transient PSCAD models of the network. The network comprises of site-specific, black-boxed models of IBRs supplied by the generators. The impedance scan approach was divided in three major steps: (1) the first step is to identify IBRs where impedance analysis needs to be performed based on the magnitude of oscillations observed at their points of interconnection (POIs); (2) the second step focuses on performing impedance scans at selected IBRs in single-machine infinite-bus (SMIB) configuration to identify internal resonance modes of an IBR and to evaluate if any of these modes become unstable under certain grid conditions; (3) the third step performs impedance scans at a few selected IBRs while connected to the wider network model to obtain the impedance response of both the IBR and the grid - this step evaluates control interactions among IBRs. The impedance scan study found that a few IBRs have an underdamped resonance mode at around 17 Hz, which becomes unstable under a certain operating condition. Another interesting finding was that certain IBRs increase the effective grid impedance seen by another IBR in proximity for a particular operating condition. Under this operating condition, the resulting subsynchronous oscillation mode is more pronounced due to a combination of control interactions among IBRs through the transmission network under study and a resonance mode inside the IBRs.

control interactions↗

Maximising the investment returns of a grid‐connected battery considering degradation cost

Energy storage systems (ESSs) are being deployed widely due to numerous benefits including operational flexibility, high ramping capability, and decreasing costs. This study investigates the economic benefits provided by battery ESSs when they are deployed for market‐related applications, considering the battery degradation cost. A comprehensive investment planning framework is presented, which estimates the maximum revenue that the ESS can generate over its lifetime and provides the necessary tools to investors for aiding the decision making process regarding an ESS project. The applications chosen for this study are energy arbitrage and frequency regulation. Lithium‐ion batteries are considered due to their wide popularity arising from high efficiency, high energy density, and declining costs. A new degradation cost model based on energy throughput and cycle count is developed for Lithium‐ion batteries participating in electricity markets. The lifetime revenue of ESS is calculated considering battery degradation and a cost–benefit analysis is performed to provide investors with an estimate of the net present value, return on investment and payback period. The effect of considering the degradation cost on the estimated revenue is also studied. The proposed approach is demonstrated on the IEEE Reliability Test System and historical data from PJM Interconnection.

25 ENERGY STORAGE↗

Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART)

This report contains key findings from a project titled Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART), which was carried out through a collaborative effort of a team of researchers from Texas A&M Engineering Experiment Station, Temple University, and Quanta Technology, LLC. The in-kind support came from OSIsoft (acquired by AVEVA), which provided their PI Historian software to demonstrate the use case of streaming PMU data. The first section of the report describes the project goals and objectives related to the development of Machine Learning (ML) models capable of detecting and classifying events by processing phasor measurements captured in the field by Phasor Measurement Units (PMUs). The data for this study was contributed by the utilities/ISOs from the Western and Eastern interconnects and ERCOT, further referred to as Interconnect B (IC B), Interconnect A (IC A), and Interconnect C (IC C), respectively. The approach that the BDSMART Research Team proposed and the key research tasks defined by the team are outlined in this section. The next section describes the technical approach. We first discuss the data constraints related to the PMU measurements and data interpretation constraints imposed by the data contributors. They provided neither the topological information of the grid nor PMU placement locations and captured recorded data at very few locations in the system with the reporting rate of either 30 or 60 fps. The recordings are mostly positive sequence voltage, frequency, and ROCOF, and in some limited cases, three-phase voltages and currents. We then reflect on the bad data issues that stem from poor recording practices and vague definitions of the PMU status bits to supposedly be used for bad data identification. Finally, the data discovery points to imprecise time stamps with incomplete event start/end time, as well as inconsistent and incomplete event labeling, which combined make the implementation of the data models using supervising learning quite challenging. Following the data discovery study, we hypothesize that because the IC B data has the most complete labels, we should focus our model development on that data and then test it on data from other interconnects. We also define the common metrics used to evaluate the results from the ML algorithm tests. We concluded this section by summarizing the common ML models we used and explaining how we implemented and tested them. The issues from this section are expanded in the Training Dataset Report from this project. The final section of this report deals with the accomplishments and conclusions. As the accomplishments, we formulate the problem we are solving and what is achieved by solving the problem. We then reflect on each of the analytics tools we developed and point out the performance of each tool when applied to solving the mentioned problems. We reference this work for further details to the papers we published on each tool. In the conclusions, we give recommendations on how to improve future PMU recording practices to facilitate the ML algorithm implementation and guidance for the future standardization work aimed at clarifying the ambiguities associated with the PMU status bits. We finally list future tasks that can bring about further improvements in the proposed algorithms. The issues from this section are expanded in the Training, and Test Dataset Report filed at the project completion date.

97 MATHEMATICS AND COMPUTING↗

Speed to Power: Solutions for Accelerating Large Load Connections

Rapid growth in demand from data centers and other large loads is creating a range of new challenges for electricity planners, investors, system operators, and regulators, leading to bottlenecks that have slowed connection of large loads to the electric grid. In response, innovative solutions for accelerating large load connections are beginning to emerge across the U.S. Drawing on an extensive document and literature review, this report identifies more than 40 potential solutions for accelerating large load connections, organized into five functional areas: load forecasting, interconnection, resource planning and procurement, markets and operations, and cost allocation and ratemaking. The five functional areas provide a framework for organizing challenges and solutions to large load connection bottlenecks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Average and Marginal Capacity Credit Values of Renewable Energy and Battery Storage in the United States Power System

As deployment of renewable resources and storage continue to significantly grow in the coming decades, these technologies will play increasingly important roles in maintaining power systems' resource adequacy. Few analyses so far offer comprehensive comparisons of forward-looking average and marginal capacity credits of variable renewable energy and storage in the U.S. interconnections across a wide range of possible futures. To fill this research gap, we quantify the average and marginal capacity credits of solar PV, onshore and offshore wind, and batteries between 2026 and 2050 across the U.S power systems to examine the temporal trends, spatial patterns, and trade-offs between these two capacity accreditation approaches. Across technologies, capacity credits of solar PV most clearly follow downward trends over time, reflecting the significant rise in solar PV generation share as the grid decarbonizes. While battery storages' generation shares also rise significantly over time, their capacity credits always remain stably high due to their capabilities to be dispatched strategically during critical periods to maintain reliability. On the other hand, capacity credits of wind technologies in general follow slight upward trends as their generation shares level off. There are strong spatial variabilities of both average and marginal capacity credits across technologies, but capacity credits of solar PV displaying the most obvious spatial patterns with high capacity credits concentrating in wind-rich, solar-poor regions in SPP, PJM, and MISO, suggesting potential reliability benefits of interconnection-wide planning for renewable energy deployments. Additionally, except for offshore wind, average capacity credits of all other renewable technologies tend to be higher than their marginal capacity credits, indicating that existing renewable resources tend to be accredited higher than new resources at almost any time.

25 ENERGY STORAGE↗

Sensitivity analysis of the technical and economic feasibility of converter-interfaced CHP System

The adoption of small-to-medium sized (1MW~20MW) combined heat and power (CHP) system is lagging, especially in industrial and commercial applications. Our prior research has proved that interfacing CHP with grid-ready converters can increase its economic value and technical benefits; this paper is focused on investigating the critical parameters impacting profitability of converter-interfaced CHP, including CHP sizing scenario, energy price, generator cost, converter cost, voltage support price, converter to engine size ratio and interconnection delay. An automatic toolkit for evaluating CHP return on investment (ROI) is developed to enhance the computation capability and efficiency. Based on varying the value of critical parameters, 975 use cases are analyzed. Results show that the profitability of converter-interfaced CHP over directly-coupled CHP is more sensitive to energy price, delays in interconnection process, converter cost and much less to generator cost or voltage support price.

converter, CHP, ROI, economic feasibility, sensiti↗

Storage Effectiveness in Enabling Variable Generation and Avoiding Fossil Emissions

In this paper, we investigate the relationship between storage and variable generation (VG) and how they can be used to replace fossil-fired technologies and their associated emissions. Unlike fossil generation, VG relies on variable resources (wind, solar, etc.), and the timing of these resources does not always match system needs, creating challenges both in terms of when energy is delivered and the reliability of that delivery. These challenges are typically addressed in one of two ways: paring VG with storage to provide firmed, time-shiftable energy or by building additional VG throughout an interconnection so that adequate amounts of VG are always available. The choice of how much to build of each (storage and VG) is typically an economic one. In this work, we focus on the former case - investigating the role of storage in bringing renewables onto the grid.

13 HYDRO ENERGY↗

Bulk Power System Flow Control

On July 28, 2023, the Federal Energy Regulatory Commission (FERC) issued Order Number 2023, targeting an improved generation-interconnection process in the United States. FERC Order No. 2023 requires transmission providers to evaluate transmission technologies, other than network expansion, that could provide system improvements and help expand bulk-power system capacity. Transmission providers must consider technologies that would fall under the category of Grid Enhancing Technologies (GETs), which provide capacity-expansion options other than conventional transmission expansion.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Explicit quantification of residence and flushing times in the Salish Sea using a sub-basin scale shoreline resolving model

The Salish Sea, located in the Pacific Northwest region of North America has complex currents and circulation features distributed over numerous interconnected deep basins with islands. Increased risk of exposure to oil spills and untreated wastewater from maritime emergencies and treatment plant failures have led to a need for quantifying residence and flushing characteristics at a sub-basin scale using a shoreline resolving hydrodynamic model. An unstructured grid model of the Salish Sea was developed using FVCOM with a ≈75-100m shoreline resolution. In addition to 7 tides and 23 salinity and temperature monitoring stations, an extensive currents data set from 135 stations collected over a span of three years was used for skill assessment and validation. Explicit forward computations were then conducted to define and quantify residence and flushing times in various sub-basins of interest using (a) Lagrangian particles and (b) Numerical/virtual dye experiments. The results in most basins show expected seasonal variability with longer flushing time associated with summer lower tides and lower freshwater inflows. However, contrary to expectation, flushing time is significantly longer in wintertime in large fjord-like basins such as Hood Canal (≈138 days), likely due to increased stratification and reduced mixing. The flushing time for the Puget Sound region of the Salish Sea is ≈115 days, while Georgia Basin is 240 days when analyzed as stand-alone basins with zero background concentrations. When examined as part of the flushing of the entire Puget Sound filled with virtual dye, the compounded flushing times for embedded sub-basins can be significantly longer in order of magnitudes and largely dictated by the flushing time of Puget Sound. The computed residence and flushing time scales tabulated over 36 sub-basins provide an improved understanding of water renewal in the system, informing pollution management actions.

54 ENVIRONMENTAL SCIENCES↗

Managing Solar Photovoltaic Integration in the Western United States Appendix: Reference and High Solar Photovoltaic Scenarios for Three Regions [Slides]

This slide deck is an appendix to a paper series that examines potential challenges related to planning future power systems with higher solar photovoltaic (PV) penetrations. The series uses the western U.S. power system for these investigations because it is a region the authors and their colleagues have already extensively studied. We are therefore well-suited to analyze even higher PV penetrations and then examine the results in multiple models to determine whether our current approaches are missing key details that only emerge at higher PV penetrations. This deck details the systems underlying those analyses and how they were modeled using the Resource Planning Model (RPM), a capacity expansion modeling tool. We examine both Western Interconnection-wide and regional results for three regions in the Western U.S. with significantly different existing power systems and connections to neighboring regions; this provides a more balanced picture as to how power systems with high PV penetration might emerge in different contexts and what the resulting grid challenges, if any, might be.

14 SOLAR ENERGY↗

Variability in Wind Energy Generation across the Contiguous United States

ERA5 provides high-resolution, high-quality hourly wind speeds at 100 m and is a unique resource for quantifying temporal variability in likely wind-derived power production across the United States. Gross capacity factors (CF) in seven independent system operators (ISOs) are estimated using the location and rated power of each wind turbine, a simplified power curve, and ERA5 output from 1979 to 2018. Excluding the California ISO, the marginal probability of a calm (zero power production) is less than 0.1 in any ERA5 grid cell. When a calm occurs, the mean co-occurrence across wind-turbine-containing grid cells ranges from 0.38 to 0.39 for ISOs in the Midwest and central plains [Midcontinent (or Midwest) ISO (MISO), Southwest Power Pool (SPP), and the Electric Reliability Council of Texas (ERCOT) region], increasing to 0.54–0.58 for ISOs in the eastern United States [Pennsylvania–New Jersey–Maryland interconnection (PJM), New York ISO (NYISO), and New England ISO (NEISO)]. Periods with low gross CF have a median duration of ≤6 h, except in California, and are most likely during summer. Additionally, gross CF exhibit highest variance at periods of 1 day in ERCOT and SPP; on synoptic scales in MISO, NEISO, and NYISO; and on interannual time scales in PJM. This implies differences in optimal strategies for ensuring resilience of supply. Theoretical scenarios show adding wind energy capacity near existing wind farms is advantageous even in areas with high existing installed capacity (IC), while expanding into areas with lower IC is more beneficial to reducing ramps and the probability of gross CF falling below 20%. These results emphasize the benefits of large balancing areas and aggregation in reducing wind power variability and the likelihood of wind droughts.

17 WIND ENERGY↗

A Review on Protection Challenges on Transmission Lines Connected to Inverter Based Resources

The increased penetration of inverter-based resources (IBRs) connected to transmission grids is challenging how traditional electric power systems operate. Such systems were originally designed based on the dominant presence of synchronous generators. Some main challenges include the increased concerns about system stability due to the reduced system inertia caused by IBRs and the reduced protection reliability caused by the non-deterministic fault current response of IBRs. The protection relays’ algorithms have been designed and validated based on well-known fault current characteristics of synchronous generations, while the short-circuit responses of IBRs heavily depend on their vendor-specific control schemes, which are mainly set to protect inverter semiconductor switches and DC components. The magnitude of short current that IBRs contribute is typically between 1.1–1.5 times the rated current that may behave unstably and incoherently with the voltages. The control scheme of the IBRs also controls the active (P) and reactive (Q) support during system voltage sag and swell conditions. These characteristics challenge not only protective relay schemes but also existing short-circuit software tools to correctly model IBRs for fault studies and protection coordination analyses. Utilities, university researchers, research institutes, and relay manufacturers have performed studies to investigate different aspects of high IBR penetration. Almost all studies support 1) creating international and national standards to regulate the IBRs, 2) revising engineering tools to address shortcomings, and 3) adjusting the protective relay settings to resolve protection problems. This paper summarizes the studies and research conducted in recent years to quantify the impact of IBR penetration on transmission line protection and to identify potential solutions to improve the dependability and reliability of grid protection systems.

14 SOLAR ENERGY↗

Inputs to GCAM-USA: IM3 Phase 2 Experiments

Overview This dataset contains XML input files for the IM3 Phase 2 version of GCAM-USA. The files are organized into two categories: Scenario-specific inputs represent hydroclimate and socioeconomic effects on water availability, heating and cooling degree-hours, and agricultural productivity. They support eight IM3 canonical scenarios: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Model-improvement inputs extend GCAM-USA v5.3 with updated representations of coal and nuclear power plant retirements, electricity trade among U.S. interconnections, offshore carbon storage costs, and groundwater depletion constraints. Data structure Scenario-specific inputs rcp45_runoff/ and rcp85_runoff/XML files describing water availability by HUC2 basin under the RCP 4.5 and RCP 8.5 scenarios. rcp45_hdcd/ and rcp85_hdcd/XML files containing monthly-day and monthly-night heating and cooling degree-hours at the U.S. state level for different RCP-SSP combinations. rcp45_agyields/ and rcp85_agyields/XML files describing changes in agricultural productivity at the intersection of GCAM regions and HUC2 water basins for different RCP-SSP combinations. rcp45_emissions_pathway/The emissions-constraint XML file used to represent the RCP 4.5 pathway. Model-improvement inputs core_retire/Updates coal-fired power plant retirement schedules based on New England ISO. GCAMUSA_IM3_elec_trade_interconnect.xmlRestricts electricity trade to occur within the ERCOT, WECC, and IE interconnections. nuclear_USA.xmlUpdates the retirement schedules of the Diablo Canyon and Palisades nuclear power plants. high_cost_offshore_carbon.xmlUpdates the assumed cost of offshore carbon storage. water_supply_constrained_gleeson_5pct.xmlReplaces WaterGAP historical groundwater-depletion estimates with data from the Gleeson dataset and limits groundwater extraction to 5% of the available groundwater in each Superwell grid cell. How to use the data This dataset is designed for use with the IM3 version of GCAM-USA. Download or clone GCAM-USA from the IM3 GCAM GitHub repository at https://github.com/IMMM-SFA/gcam-core and check out the gcam-usa-im3 branch. Place the downloaded folder im3scenarios in the gcam-core/input directory while preserving the provided folder structure.

Energy↗

A Review on Protection Challenges of Transmission Lines Connected to Inverter-Based Resources

Utilities, university researchers, research institutes, and relay manufacturers have performed studies to investigate different aspects of high IBR penetration. Almost all studies support 1) creating international and national standards to regulate the IBRs, 2) revising engineering tools to address shortcomings, and 3) adjusting the protective relay settings to resolve protection problems. This paper summarizes the studies and research conducted in recent years to quantify the impact of IBR penetration on transmission line protection and to identify potential solutions to improve the dependability and reliability of grid protection systems.

14 SOLAR ENERGY↗

Testing Asoleyo Decorative Solar Cell and Modules: Cooperative Research and Development, CRADA Number CRD-20-16732 (Final Report)

Team Asoleyo is transforming the utilitarian rectangular grid that dominates the visual style of standard solar panels by re-designing solar cells’ silver contact grid using principles of symmetry, rhythm, and line. Our designs use well-established manufacturing equipment, techniques, and materials, achieving similar manufacturing costs but far superior aesthetic effect- without the need for additional layers or occlusion. This project will test new decorative PV Cell front contact designs, individually and interconnected within modules, for their performance characteristics.

14 SOLAR ENERGY↗

National Electric Vehicle Infrastructure Formula Program (NEVI) Brief for State Public Utility Commissions

The National Electric Vehicle Infrastructure (NEVI) Formula Program (NEVI program) is a funding opportunity for all 50 U.S. states, the District of Columbia, and Puerto Rico, established by the Bipartisan Infrastructure Law (BIL). The NEVI program instructs states to “strategically deploy electric vehicle (EV) charging infrastructure and to establish an interconnected network to facilitate data collection, access, and reliability.” The NEVI program allocates more than $\$$5 billion to states from Fiscal Year (FY) 2022 to 2026 on a formula basis. NEVI funds are available to private entities, including utilities, to build EV Supply Equipment (EVSE)1 and associated EV grid infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced-Research-on-Integrated-Energy-Systems-Based Analysis to Support Resilient System Upgrades: Energy to Communities Energyshed In-Depth Partnership with Molokai, Hawaii

The Molokai, Hawaii, Energy to Communities (E2C) Energyshed project represents a collaborative effort between the National Laboratory of the Rockies, Shake Energy Collaborative, the Molokai Clean Energy Hui, Sustainable Molokai, and Ho'ahu Energy Cooperative Molokai to advance Molokai's Community Energy Resilience Action Plan (CERAP). Supported by Hawaiian Electric Company and the Hawaii State Energy Office, the initiative aims to develop a community-defined portfolio of renewable energy solutions that enhance energy resilience while aligning with the Hawaiian Electric Integrated Grid Plan (IGP) and Molokai's energy goals. Phase 1 focused on technical analyses and community engagement to co-design feasible energy scenarios. Challenges such as grid upgrades, storage sizing, and inverter ride-through standards were addressed to align technical and operational requirements with community preferences. The project equips Molokai with actionable data and insights to implement energy initiatives while ensuring resilient and culturally informed solutions. Future efforts aim to finalize project designs, secure interconnection agreements, and deploy energy projects that reflect community priorities and technical feasibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗