Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCH TIME”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Final Environmental Impact Statement for the Galileo Mission (Tier 2)

This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The Tier 1 (program level) EIS (NASA 1988a) considered the Titan IV launch vehicle as an alternative booster stage for launch in May 1991 or later. The May 1991 Venus launch opportunity is considered a planetary back-up for the Magellan (Venus Radar Mapper) mission, the Galileo mission, and the Ulysses mission. Plans were underway to enable the use of a Titan IV launch vehicle for the planetary back-up. However, in November 1988, the U.S. Air Force, which procures the Titan IV for NASA, notified NASA that it could not provide a Titan IV vehicle for the May 1991 launch opportunity due to high priority Department of Defense requirements. Consequently, NASA terminated all mission planning for the Titan IV planetary back-up. A minimum of 3 years is required to implement mission-specific modifications to the basic Titan IV launch configuration; therefore, insufficient time is available to use a Titan IV vehicle in May 1991. Thus, the Titan IV launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS) for the May 1991 launch opportunity.

Source record↗

From Napkin to Orbit in 9 Months; The TechEdSat Spacecraft Mission

The TechEdSat spacecraft mission saw one of the fastest turn around times for concept through launch of a CubeSat. On 26 October 2011, John Hines sketched on a brown paper napkin the outline for which components would be in this 1U CubeSat, and how they would be stacked; 269 days later that spacecraft launched from Tanegashima Space Center aboard the HTV-3 ISS resupply mission, with a total development time of only eight months. TechEdSat was among the first of five CubeSats deployed from the ISS. The goals of the TechEdSat mission were to explore the use of the Space Plug-n-Play Architecture (SPA) in a CubeSat, and to evaluate Commercial Off The Shelf (COTS) space-to-space communication solutions. TechEdSat featured an array of processors from ÅAC Microtec including four NanoRTU's and the RTULite main processor, all communicating using the SPA-1 protocol. TechEdSat featured two primary payloads: an Iridium 9602 Modem, and a Quake Global Q1000 OrbComm modem. After a successful deployment on 4 October 2012 from the ISS, over 2000 packets of 122 bytes each (250 kB total) were received in the first four months of the mission. In this paper we discuss the challenges to rapid CubeSat development, the experience of having a CubeSat approved for deployment from the ISS, the ongoing results of the mission and lessons learned.

CUBESAT↗

Space Launch System Payload Stage Capability for Ultra-High Characteristic Energy Missions

The Space Launch System (SLS) vehicle is NASA’s cornerstone capability for a new era of human and robotic exploration of deep space. The unrivalled performance of SLS provides the capability to launch the first woman and next man to walk on the lunar surface and to support development of a sustained human presence in cislunar space, and ultimately human missions to Mars. As an evolvable capability with unique launch performance, the opportunities enabled by SLS also include game-changing benefits for science missions, including probes to the outer solar system and beyond. For the last two years, the SLS Program has worked with the Interstellar Probe team at the Johns Hopkins University Applied Physics Laboratory(APL) to provide data that describe how SLS could support a mission that would break through the boundary of the heliosphere and into pristine interstellar space only a decade after launch, enabling earlier science return and greatly increasing spacecraft life in the interstellar medium. In record-breaking time, the ISP as launched on SLS may answer questions raised by the extended mission of NASA’s Voyager spacecraft. While SLS and its efficient Exploration Upper Stage (EUS) offer benefits for exploration of the outer planets, adding one or more additional stages to this architecture makes it even more capable for missions beyond our solar system, offering more realistically appealing flight times that would allow the mission scientists to reap the rewards of exploration. During the time the SLS Program has been working with the Interstellar Probe team, it has identified an expedited path to the Block 2 capability planned for the Interstellar Probe mission, and further matured performance numbers for diverse multi-stage configurations using a combination of commercially available liquid hydrogen (LH2)/liquid oxygen (LOX) upper stages and solid motor kick stages. That work has demonstrated the SLS payload stage capability provides significant benefits and opens trade space for multiple missions in consideration during planning for the next Planetary Science and Astrobiology Decadal Survey. This presentation details the significant benefits SLS can provides for very high characteristic (C3) energy missions by coupling the capabilities of SLS to current commercial rocket propulsion stage systems. These capabilities are explored specifically in the context of an Interstellar Probe architecture in which a small, capable science probe, coupled with carefully tailored mission design trajectories, could be used to explore the outer solar system and the interstellar medium. The presentation will also address the operational logistics of integrating such a mission, explaining the options available for “non-standard” SLS payloads, including processing those with radioisotope power generators or additional propulsion stages. An SLS system overview and capabilities will be presented, along with vehicle configuration and orbit performance capability studies, explaining how SLS is enabling for a variety of high-energy science mission profiles, including launching an exploratory probe bound for interstellar space only a decade after launch.

Rob Stough↗

Time management displays for shuttle countdown

The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.

Beller, Arthur E.↗

Digital events evaluator

Real time digital event evaluator description for Saturn launch vehicle checkout

SATURN LAUNCH VEHICLE↗

Variability in equatorial Pacific sea surface topography during the verification phase of the TOPEX/POSEIDON mission

As part of the verification phase of the TOPEX/POSEIDON mission, 10-day gridded fields of altimeter data derived from TOPEX geophysical data records are compared with 10-day gridded fields of dynamic height derived from more than 60 moorings of the Tropical Ocean and Global Atmosphere-Tropical Atmosphere Ocean (TOGA-TAO) array in the equatorial Pacific Ocean. Access to TAO data in real time permits the first 500 days of the TOPEX/POSEIDON mission to be placed in the context of complementary, in-situ measurements of surface winds, sea surface temperatures, and upper ocean thermal structure, as well as the time history of these variables prior to launch. Analysis of the space-time structure in the TOPEX and TAO surface topography data increases sea level variability primarily due to equatorial Kelvin wave activity generated by intense wind bursts west of the date line in association with the 1991-1993 El Nino. Cross correlations between the two data sets are generally greater than 0.7, with root mean square (RMS) differences less than 4 cm. However, for reasons not fully understood, correlations drop to less than 0.5 in certain regions off the equator in the eastern Pacific and RMS differences can be greater than 5 cm north of the equator in the central and eastern Pacific.

Busalacchi, Antonio J.↗

Electric Propulsion for Low Earth Orbit Constellations

Hall Effect electric propulsion was evaluated for orbit insertion, satellite repositioning, orbit maintenance and de-orbit applications for a sample low earth orbit satellite constellation. Since the low masses of these satellites enable multiple spacecraft per launch, the ability to add spacecraft to a given launch was used as a figure of merit. When compared to chemical propulsion, the Hall thruster system can add additional spacecraft per launch using planned payload power levels. One satellite can be added to the assumed four satellite baseline chemical launch without additional mission times. Two or three satellites may be added by providing part of the orbit insertion with the Hall system. In these cases orbit insertion times were found to be 35 and 62 days. Depending on the electric propulsion scenario, the resulting launch vehicle savings is nearly two, three or four Delta 7920 launch vehicles out of the chemical baseline scenarios eight Delta 7920 launch vehicles.

Oleson, Steven R.↗

Electric Propulsion for Low Earth Orbit Constellations

Hall effect electric propulsion was evaluated for orbit insertion, satellite repositioning, orbit maintenance and de-orbit applications for a sample low earth orbit satellite constellation. Since the low masses of these satellites enable multiple spacecraft per launch, the ability to add spacecraft to a given launch was used as a figure of merit. When compared to chemical propulsion, the Hall thruster system can add additional spacecraft per launch using planned payload power levels. One satellite can be added to the assumed four satellite baseline chemical launch without additional mission times. Two or three satellites may be added by providing part of the orbit insertion with the Hall system. In these cases orbit insertion times were found to be 35 and 62 days. Depending, on the electric propulsion scenario, the resulting launch vehicle savings is nearly two, three or four Delta 7920 launch vehicles out of the chemical baseline scenario's eight Delta 7920 launch vehicles.

Oleson, Steven R.↗

A Multi-Disciplinary Analysis Framework for the Design of Small Launch Vehicles

Between the years of 1995 and 2014 the number of small satellites (1-500 kg) went up from 20 to 180. [1] Out of the 180 launched in 2014 66% were Nano satellites (1-10 kg). [1] With this trend of smaller satellites, one would expect a rise in number of small launch vehicles (SLVs are defined by capability to carry 1-100 kg to orbit), but this has not happened: [3] only 8% of all small satellites are launched on SLVs and the others become secondary payloads on regular launch vehicles. [1] This results in small satellites being placed into either suboptimal orbits or waiting for launch schedules to align with bigger launches, resulting in long waiting times. Dedicated SLVs could improve the responsiveness of small satellite launches, but SLV design is complicated by the large architecture space needed to be explored in order to find efficient and affordable designs. The SLV architecture trade space contains many discrete options, e.g. solid vs. liquid fuels, air launch vs. ground launch, number of stages, etc. [2][3] Performing detailed analysis for all the options at once would be prohibitive. Thus, a sizing environment/framework that is capable of providing necessary information for conceptual-level trade studies and can rapidly explore the vast SLV architecture space is necessary. The framework, illustrated in Figure 1, consists of four disciplines central to the sizing and synthesis of launch vehicles: propulsion, aerodynamics, structures, and trajectory. For the aerodynamics and trajectory disciplines, Missile DATCOM and POST2 are used, respectively. The propulsion and structures disciplines are represented in the framework with tools developed at ASDL Georgia Tech. For propulsion, the Solid Motor Analysis Code (SMAC) is a physics-based conceptual design tool for solid rocket motors. SMAC is capable of geometric burn simulation, ballistic analysis, and prediction of thrust performance. [4] For structures, Launch Vehicle Structural Analysis (LVSA) tool is a physics-based tool that focuses on structural dynamic analysis with sizing capability. These tools are integrated into the framework illustrated in Figure 1 with the corresponding connections described in Table 1. The process flow is as follows: first, SMAC sizes insulation and calculates maximum operating pressures for each vehicle stage. The MEOP and insulation thickness values from SMAC are fed to LVSA which then utilizes this information to size the motor casing. This creates a feedback loop between LVSA and SMAC that converges on the radius available for fuel, casing, and insulation thickness. Once the stage sizing is converged on SMAC creates an engine deck that is passed to POST2. Next, the data from SMAC and LVSA goes into Missile DATCOM which generates an aerodynamics database for POST2. Finally, POST2 performs a targeting optimization while maximizing the payload mass to orbit. Within the framework, POST2 is automated in order to be robust to a wide variety of possible designs by performing a Monte Carlo simulation over the initialization vector of the POST2 optimization variables. To demonstrate the capability of this framework, a sample problem of exploring the design space of an SLV capable of placing satellites into a low Earth orbit (inclination=47 deg, 196.5 by 211.3 nm) is used. This sample problem is a ground-launched SLV consisting of four in-line SRM stages. The multidisciplinary design analysis (MDA) environment is utilized to explore a design space consisting of 22 continuous and 12 discrete variables, shown by Table 1 by blocks 1,2,3. Running a full factorial design of experiments (DOE) would have been prohibitively expensive even with this reduced design space, thus a space filling design with 3,502 and then additional expansion of 2,602 cases was used. The first DOE consisted of 3,502 cases, and all of the variables were varied. These input variables are listed in blocks 1, 2, and 3 in Table 1. Most of the variables are propulsion related with stage lengths determining the delta-V split of the SLV. The expansion consisted of 2,602 cases, and the continuous variables were set to be equal to the most promising designs from the sizing of first DOE. For each set of continuous variables, the discrete variables (grain type, star points, and propellant) were to varied. The results of the DOE can be seen in Figure 2; each of the points in this plot represents a closed launch vehicle that reaches the targeted orbit. For each of the cases, there is information on flown trajectory, structural, and propulsion properties of the SLV. For example, Figure 3 shows changes in altitude and velocity with time for a particular case. The right side of Figure 3 clearly shows the coasting (slow decrease) and burning phases (sharp increase) of the SLV mission. LV mass is positively correlated with the optimized payload mass to orbit because heavier LVs carry more fuel and thus have more stored chemical energy. Furthermore, for any given payload mass to orbit, the most efficient design would result in the smallest LV. The results as visualized in Figure 2 shows this tradeoff, and the Pareto frontier of the efficient designs can be seen along the dotted line. Figure 2 can be divided into regions with the lowest mass vehicles corresponding to the minimum bound on radius, and the highest mass vehicles corresponding to the maximum bound on radius. Within a mass region, the discrete variables, such as propellant type and propellant grain arrangement, have the most effect on payload mass. This paper presents an MDA framework that can perform an automated physics-based sizing of SLV designs and a corresponding methodology to utilize the MDA to explore the design space of SLVs. The proposed methodology was applied to a perform a design space exploration for a four stage SLV. The outputs show the expected pareto frontier forming and provide detailed information about the SLV performance and staging. Using the produced data, it will be possible to select a set of pareto optimal designs that can then be further explored in subsequent design cycles. This demonstration shows that automated design space exploration should be used in the early phase design of future SLV concepts.

Nikita S Birbasov↗

The US/USSR Biological Satellite Program: COSMOS 936 Mission Overview

On August 3, 1977, the Soviet Union launched Cosmos 936, an unmanned spacecraft carrying biology and physics experiments from 9 countries, including both the Soviet Union and U.S. The launch marked the second time the Soviet Union has flown U.S. experiments aboard one of its spacecraft, the first being Cosmos 782 launched Nov. 25, 1975, which remained in orbit 19.5 days. Aboard Cosmos 936 were: 30 young male Wistar SPF rats, 20 of which was exposed to hypogravity during flight while the remainder were subjected to a l x g acceleration by continuous configuration; 2) experiments with plants and fruit flies; 3) radiation physics experiments; and 4) a heat convection experiment. After 18.5 days in orbit, the spacecraft landed in central Asia where a Soviet recovery team began experiment operations, including animal autopsies, within 4.5 hr of landing. Half of the animals were autopsied at the recovery site and the remainder returned to Moscow and allowed to readapt to terrestrial gravity for 25 days after which they, too, were autopsied. Specimens for U.S. were initially prepared at the recovery site or Soviet laboratories and transferred to U.S. laboratories for complete analyses. An overview of the mission focusing on preflight, on-orbit, and postflight activities pertinent to the seven U.S. experiments aboard Cosmos 936 will be presented.

Souza, K. A.↗

Comparison of Echo 7 field line length measurements to magnetospheric model predictions

The Echo 7 sounding rocket experiment injected electron beams on central tail field lines near L = 6.5. Numerous injections returned to the payload as 'conjugate echoes' after mirroring in the southern hemisphere. Field line lengths calculated from measured conjugate echo bounce times and energies are compared to predictions made by integrating electron trajectories through various magnetospheric models. Although Kp at launch was 3-, quiet time magnetic models best fit the echo measurements. Geosynchronous satellite magnetometer measurements near the Echo 7 field lines during the flight were best modeled by the Olson-Pfitzer Dynamic Model and the Tsyganenko-Usmanov model for Kp = 3. The discrepancy between the models that best fit the Echo 7 data and those that fit the satellite data was most likely due to uncertainties in the small-scale configuration of the magnetospheric models. The field line length measured by the conjugate echoes showed some temporal variation in the magnetic field, also indicated by the satellite magnetometers. This demonstrates the utility an Echo-style experiment could have in substorm studies.

Nemzek, R. J.↗

Launch vehicle operations cost reduction through artificial intelligence techniques

NASA's Kennedy Space Center has attempted to develop AI methods in order to reduce the cost of launch vehicle ground operations as well as to improve the reliability and safety of such operations. Attention is presently given to cost savings estimates for systems involving launch vehicle firing-room software and hardware real-time diagnostics, as well as the nature of configuration control and the real-time autonomous diagnostics of launch-processing systems by these means. Intelligent launch decisions and intelligent weather forecasting are additional applications of AI being considered.

Davis, Tom C., Jr.↗

Trajectories for Flyby Sample Return at Saturn's Moons

Ballistic trajectories are computed which would enable a sample return mission to Titan or Enceladus without capturing, descending, or landing. The low-cost mission concept utilizes a free return trajectory that also involves a close flyby of the moon. This work extends the concept, and related trajectory analysis methodology, previously applied to a Europa mission. Specifically, a broad search algorithm is employed to systematically locate potentially feasible itineraries over an entire Saturn period. High-quality approximate solutions are then optimized to be continuous using high-fidelity dynamics. Techniques and software from the Europa analysis, were readily adapted and able to find numerous mission enabling trajectories. A direct mission to Titan is possible with flight time under 16 years and Earth-relative speeds below 11.0 km/sec. The VEEGA option is shown to substantially reduce launch C3, but flight times exceed 21 years. Unfortunately, an Enceladus mission requires a flight time of 25 years or more, and incurs fairly high relative speeds. Nevertheless, an optimized reference mission is computed.

Jones, Drew Ryan↗

High-C3 Applications for NASA's Space Launch System

For numerous high-interest science targets in the outer solar system and elsewhere, the limits of available launch vehicles have placed significant constraints on mission designs. Even for the current generation of heavy-lift launch vehicles, baseline capabilities still impose limitations, for example, the outer solar system in areas such as launch window availability, transit time, science payload mass, time at destination, etc. Initial studies show benefits for ultra-high C3 missions from configurations of NASA’s Space Launch System(SLS) adding third or fourth payload stages.

Robert W Stough↗

Vulcan Reuse

This is an exciting time in the space launch market. We have providers developing various reuse concepts to help drive continued cost reductions in access to space. At the same time visions of a future marketplace in space are emerging that have energized the community to move toward economically viable space-based ventures. This paper explores the intersection of these two developments. Specifically, we focus on the underlying technologies developed for ULA’s Sensible, Modular, Autonomous Return Technology (SMART) approach to reuse and the intersection with needs in the cislunar marketplace. ULA has been working with NASA Langley Research Center on maturing their Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology into the Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) technology demonstration mission scheduled to fly with the JPSS-2 Launch in 2022, and have honed in on a 6m diameter HIAD for that application. These efforts, under the NASA Space Act Agreements (SAA), have helped identify elements requiring further development for SMART Reuse, which could also benefit other potential mission infusion opportunities. This has proved to be a very fruitful collaboration as these aspects have evolved. The paper further delves into applications across commercial space and NASA’s Space Exploration mandate, in addition to the reusable launch vehicle applications.

John G Reed↗

Launch-Off-Need Shuttle Hubble Rescue Mission: Medical Issues

The Space Shuttle Hubble repair mission (STS-125) is unique in that a rescue mission (STS-400) has to be ready to launch before STS-125 life support runs out should the vehicle become stranded. The shuttle uses electrical power derived from fuel cells that use cryogenic oxygen and hydrogen (CRYO) to run all subsystems including the Environmental Control System. If the STS-125 crew cannot return to Earth due to failure of a critical subsystem, they must power down all nonessential systems and wait to be rescued by STS-400. This power down will cause the cabin temperature to be 60 F or less and freeze the rest of the vehicle, preventing it from attempting a reentry. After an emergency has been declared, STS-125 must wait at least 7 days to power down since that is the earliest that STS-400 can be launched. Problem The delayed power down of STS-125 causes CYRO to be consumed at high rates and limits the survival time after STS-400 launches to 10 days or less. CRYO will run out sooner every day that the STS-400 launch is delayed (weather at launch, technical issues etc.). To preserve CRYO and lithium hydroxide (LiOH - carbon dioxide removal) the crew will perform no exercise to reduce their metabolic rates, yet each deconditioned STS-125 crewmember must perform an EVA to rescue himself. The cabin may be cold for 10 days, which may cause shivering, increasing the metabolic rate of the STS-125 crew. Solution To preserve LiOH, the STS-125 manifest includes nutrition bars with low carbohydrate content to maintain crew respiratory quotient (RQ) below 0.85 as opposed to the usual shuttle galley food which is rich in carbohydrates and keeps the RQ at approximately 0.95. To keep the crew more comfortable in the cold vehicle warm clothing also has been included. However, with no exercise and limited diet, the deconditioned STS-125 crew returning on STS-400 may not be able to egress the vehicle autonomously requiring a supplemented crash-and-rescue capability.

Hamilton, Douglas↗