Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lunar lander”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Exploration Life Support Directions

The Exploration Life Support (ELS) Project is now developing new technologies for the Vision for Space Exploration announced in 2004. ELS project development work is organized around the three major vehicles of the Exploration Program. The first vehicle is the Orion Crew Exploration Vehicle (CEV). The ELS project will develop prototype hardware for this short duration orbital and trans-lunar vehicle s mission. The second vehicle is for sortie landings on the moon. Life support technology hardware for lunar surface access vehicles will include upgrades of existing CEV equipment and technologies to maximize commonality between the two vehicles as well as new technologies needed for the harsher thermal environments of the moon and the new element of dust. The third vehicle will be a longer duration lunar outpost. Crew stays of 180 days are planned for the lunar outpost. To minimize the need for consumables needed for resupply, a new set of hardware developments and processes better suited for long duration life support will be used. The water loop will be almost completely closed. The air revitalization will be partially closed. The outpost mission will have the continuous environment of 1/6th gravity making the separations of fluids and gases easier than the zero gravity for the CEV and orbital phases of lunar lander vehicles. This presentation will describe the planned technologies that are expected to be developed and considerations for how those technologies will be developed and demonstrated by the ELS project for these major program vehicles.

Lawson, B. Michael↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Tenderness Tester

Space telemetry has been transferred to food processing in the Armour;Tenderorneter, an instrument that predicts the tenderness of meat. The space component of the instrument is a sensitive, highly reliable strain gage originally produced for NASA's Surveyor lunar lander and other space programs by BLH Electronics, Waltham, Mass. Several years ago Armour & Co. began to develop a method of testing a hanging carcass to predict how tender the meat would be after cooking; no such method then existed. After considerable experimentation, Armour came up with a manifold-mounted group of-needle-like probes, which when stuck into a carcass, could measure the degree to which the meat resisted penetration. This provided a basis for predicting tenderness, but the development required one more . step; a device that could translate meat resistance into an electrical readout. Armour found it in the BLH strain gage. The resulting Tenderometer, now a standard and important part of Armour's meat processing operation, includes a large, 10-pronged fork which is plunged into a carcass and a cable-connected, handheld electronic device that translates the sensings of the prongs into a tenderness reading on a dial. The instrument is used by Armour to select and guarantee a premium line of beef known as TesTender, whose annual sales run into tens of millions of pounds.

Source record↗

Launching to the Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission today, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. Unlike the Apollo program of the 1960s, this phase of exploration will be a journey, not a race. In 1966, the NASA's budget was 4 percent of federal spending. Today, with 6/10 of 1 percent of the budget, NASA must incrementally develop the vehicles, infrastructure, technology, and organization to accomplish this goal. Fortunately, our knowledge and experience are greater than they were 40 years ago. NASA's goal is a return to the Moon by 2020. The Moon is the first step to America's exploration of Mars. Many questions about the Moon's history and how its history is linked to that of Earth remain even after the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment. The Moon also will serve as a training ground in several respects before embarking on the longer, more perilous trip to Mars. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, the Ares V Cargo Launch Vehicle, the Orion Crew Exploration Vehicle, and the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit on the Ares I and a second launch to orbit the lunar lander and the Earth Departure Stage to send the lander and crew vehicle to the Moon. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on proven hardware and decades of experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. Less than one year after the Exploration Launch Projects Office was formed at NASA's Marshall Space Flight Center, engineers are testing engine components, firing test rocket motors, refining vehicle designs in wind tunnel tests, and building hardware for the first flight test of Ares I, scheduled for spring 2009. The Vision for Exploration will require this nation to develop tools, machines, materials, and processes never before invented, technologies and capabilities that can be turned over to the private sector to benefit nearly all aspects of life on Earth. This new pioneering venture, as did the Apollo Program before it, will contribute to America's economic leadership, national security, and technological global competitiveness and serve as an inspiration for all its citizens.

Sumrall, John P.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

TFAWS: Ares Thermal Overview

As part of a Constellation session at the 2007 Thermal & Fluids Analysis Workshop (TFAWS), an overview of the Crew Launch Vehicle (CLV), Crew Exploration Vehicle (CEV) and Lunar Lander systems will be given. This presentation provides a general description of the CLV (also known as Ares-I)and Ares-V vehicles portion of the session. The presentation will provide an overview of the thermal requirements, design environments, challenges and thermal modeling examples.

Sharp, John R.↗

Biomedical Support of U.S. Extravehicular Activity

The world's first extravehicular activity (EVA) was performed by A. A. Leonov on March 18, 1965 during the Russian Voskhod-2 mission. The first US EVA was executed by Gemini IV astronaut Ed White on June 3, 1965, with an umbilical tether that included communications and an oxygen supply. A hand-held maneuvering unit (HHMU) also was used to test maneuverability during the brief EVA; however the somewhat stiff umbilical limited controlled movement. That constraint, plus difficulty returning through the vehicle hatch, highlighted the need for increased thermal control and improved EVA ergonomics. Clearly, requirements for a useful EVA were interrelated with the vehicle design. The early Gemini EVAs generated requirements for suits providing micro-meteor protection, adequate visual field and eye protection from solar visual and infrared radiation, gloves optimized for dexterity while pressurized, and thermal systems capable of protecting the astronaut while rejecting metabolic heat during high workloads. Subsequent Gemini EVAs built upon this early experience and included development of a portable environmental control and life support systems (ECLSS) and an astronaut maneuvering unit. The ECLSS provided a pressure vessel and controller with functional control over suit pressure, oxygen flow, carbon dioxide removal, humidity, and temperature control. Gemini EVA experience also identified the usefulness of underwater neutral buoyancy and altitude chamber task training, and the importance of developing reliable task timelines. Improved thermal management and carbon dioxide control also were required for high workload tasks. With the Apollo project, EVA activity was primarily on the lunar surface; and suit durability, integrated liquid cooling garments, and low suit operating pressures (3.75 pounds per square inch absolute [psia] or 25.8 kilopascal [kPa],) were required to facilitate longer EVAs with ambulation and significant physical workloads with average metabolic rates of 1000 BTU/hr and peaks of up to 2200 BTU/hr. Mobility was further augmented with the Lunar Roving Vehicle. The Apollo extravehicular mobility unit (EMU) was made up of over 15 components, ranging from a biomedical belt for capturing and transmitting biomedical data, urine and fecal containment systems, a liquid cooling garment, communications cap, a modular portable life support system (PLSS), a boot system, thermal overgloves, and a bubble helmet with eye protection. Apollo lunar astronauts performed successful EVAs on the lunar surface from a 5 psia (34.4 kPa) 100% oxygen environment in the Lunar Lander. A maximum of three EVAs were performed on any mission. For Skylab a modified A7LB suit, used for Apollo 15, was selected. The Skylab astronaut life support assembly (ALSA) provided umbilical support through the life support umbilical (LSU) and used open loop oxygen flow, rather than closed-loop as in Apollo missions. Thermal control was provided by liquid water circulated by spacecraft pumps and electrical power also was provided from the spacecraft via the umbilical. The cabin atmosphere of 5 psia (34.4 kPa), 70% oxygen, provided a normoxic atmosphere and because of the very low nitrogen partial pressures, no special protocols were required to protect against decompression sickness (DCS) as was the case with the Apollo spacecraft with a 5 psi, 100% oxygen environment.

Gernhardt, Michael L.↗

Test and Verification Approach for the NASA Constellation Program

This viewgraph presentation is a test and verification approach for the NASA Constellation Program. The contents include: 1) The Vision for Space Exploration: Foundations for Exploration; 2) Constellation Program Fleet of Vehicles; 3) Exploration Roadmap; 4) Constellation Vehicle Approximate Size Comparison; 5) Ares I Elements; 6) Orion Elements; 7) Ares V Elements; 8) Lunar Lander; 9) Map of Constellation content across NASA; 10) CxP T&V Implementation; 11) Challenges in CxP T&V Program; 12) T&V Strategic Emphasis and Key Tenets; 13) CxP T&V Mission & Vision; 14) Constellation Program Organization; 15) Test and Evaluation Organization; 16) CxP Requirements Flowdown; 17) CxP Model Based Systems Engineering Approach; 18) CxP Verification Planning Documents; 19) Environmental Testing; 20) Scope of CxP Verification; 21) CxP Verification - General Process Flow; 22) Avionics and Software Integrated Testing Approach; 23) A-3 Test Stand; 24) Space Power Facility; 25) MEIT and FEIT; 26) Flight Element Integrated Test (FEIT); 27) Multi-Element Integrated Testing (MEIT); 28) Flight Test Driving Principles; and 29) Constellation s Integrated Flight Test Strategy Low Earth Orbit Servicing Capability.

Strong, Edward↗

Learning from Space Entrepreneurs

The early days of rocketry and space exploration in the United States were marked by incredibly rapid progress: a seemingly endless parade of firsts. Not coincidentally, this period also saw more than its fair share of failure, especially in the infamous "kaputnik" days prior to the successful launch of Explorer. Without a standard canon of known quantities to turn to, the early pioneers of rocketry and space flight were forced to dream up new ideas that ranged from the elegant to the bizarre and to accept the fact that the price of radical progress is occasional failure. Nowadays, rapid prototyping and testing have slowed, as we rely more and more on the extensive knowledge pined by our predecessors and on the embarrassment of riches modern engineers get from computational modeling and computer assisted design. In many cases, this leads to much improved or phenomenally more efficient designs. It also, however, fosters a culture so terrified of failure that we over-engineer and overanalyze everything, often tweaking designs for decades before a new system takes flight. (This is not a problem unique to rockets; the same phenomenon seems to have occurred in high-performance jets.) This is one reason why it was possible for President Kennedy to dream of the completion of the Mercury and Gemini missions and a successful landing on the moon in under a decade, while returning to the moon may take nearly twice as long. Lacking access to the tremendous computational resources of the national space program-and, just as importantly, removed from the harsh judgment of public shareholders or congressional appropriations committees-the hungry entrepreneurs who compete for our prizes tend not to display such fear of failure. Instead, most of them follow a rapid "build, test, fly" program. They are willing to throw a handful of concepts against the wall and see what sticks. They often go from drawing on the back of a napkin to firing engines or even flying vehicles in a matter of weeks or months, learning valuable lessons along the way. Indeed, our teams have repeatedly learned many of the most valuable lessons after only a few moments of working with real hardware-lessons that could never have been learned from a CAD drawing, like finding the failure modes of different welding practices or tracking down the interference between an onboard camera and a GPS unit. As Paul Breed, the leader of a Northrop Grumman Lunar Lander Challenge team (playfully called Unreasonable Rocket), is fond of saying, "In computer simulations the plumbing never leaks. In real life, it always does."

Pomerantz, William↗

Ares Integrated Vehicle System Safety Team

NASA is working on the Constellation Program to go to the Moon and beyond. The Program contains a number of projects: a) The Ares I Launch Vehicle for the Orion Crew Module; b) The Ares V Launch Vehicle to launch large payloads into orbit, including the Earth Departure Stage (EDS); d) The Orion vehicle to transport the crew to orbit and to other destinations; and d - The Altair Lunar Lander

Wetherholt, Jon↗

Development Status of the CECE Cryogenic Deep Throttling Demonstrator Engine

As one of the first technology development programs awarded by NASA under the U.S. Space Exploration Policy (USSEP), the Pratt & Whitney Rocketdyne (PWR) Deep Throttling, Common Extensible Cryogenic Engine (CECE) program was selected by NASA in November 2004 to begin technology development and demonstration toward a deep throttling, cryogenic engine supporting ongoing trade studies for NASA's Lunar Lander descent stage. The CECE program leverages the maturity and previous investment of a flight-proven hydrogen/oxygen expander cycle engine, the PWR RLI0, to develop and demonstrate an unprecedented combination of reliability, safety, durability, throttlability, and restart capabilities in a high-energy, cryogenic engine. The testbed selected for the deep throttling demonstration phases of this program was a minimally modified RL10 engine, allowing for maximum current production engine commonality and extensibility with minimum program cost. Two series of demonstrator engine tests, the first in April-May 2006 and the second in March-April 2007, have demonstrated in excess of 10:1 throttling of the hydrogen/oxygen expander cycle engine. Both test series have explored a combustion instability ("chug") environment at low throttled power levels. These tests have provided an early demonstration of an enabling cryogenic propulsion concept with invaluable system-level technology data acquisition toward design and development risk mitigation for future CECE Demonstrator engine tests.

Source record↗

The NASA Lunar Impact Monitoring Program

We have a fruitful observing program underway which has significantly increased the number of lunar impacts observed. We have done initial test shots at the Ames Vertical Gun Range obtained preliminary luminous efficiency values. More shots and better diagnostics are needed to determine ejecta properties. We are working to have a more accurate ejecta. environment definition to support lunar lander, habitat, and EVA design. Data also useful for validation of sporadic model at large size range.

Suggs, Rob↗

Development Status of the J-2X

In June 2006, the NASA Marshall Space Flight Center (MSFC) and Pratt & Whitney Rocketdyne began development of an engine for use on the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The development program will be completed in December 2012 at the end of a Design Certification Review and after certification testing of two flight configuration engines. A team of over 600 people within NASA and Pratt & Whitney Rocketdyne are currently working to prepare for the fall 2008 Critical Design Review (CDR), along with supporting an extensive risk mitigation test program. The J-2X will power the Ares I upper stage and the Ares V earth departure stage (EDS). The initial use will be in the Ares I, used to launch the Orion crew exploration vehicle. In this application, it will power the upper stage after being sent aloft on a Space Shuttle-derived. 5-segment solid rocket booster first stage. In this mission. the engine will ignite at altitude and provide the necessary acceleration force to allow the Orion to achieve orbital velocity. The Ares I upper stage, along with the J-2X. will then be expended. On the Ares V. first stage propulsion is provided by five RS-68B engines and two 5-segment boosters similar to the Ares I configuration. In the Ares V mission. the J-2X is first started to power the EDS and its payload. the Altair lunar lander. into earth orbit, then shut-down and get prepared for its next start. The EDS/Altair will remain in a parking orbit, awaiting rendezvous and docking with Orion. Once the two spacecraft are mated, the J-2X will be restarted to achieve earth departure velocity. After powering the Orion and Altair, the EDS will be expended. By using the J-2X Engine in both applications, a significant infrastructure cost savings is realized. Only one engine development is required, and the sustaining engineering and flight support infrastructures can be combined. There is also flexibility for changing, the production and flight manifest because a single production line can support both missions with minimal differences between each engine configuration kit.

Kynard, Mike↗

Ares Launch Vehicles Development Awakens Historic Test Stands at NASA's Marshall Space Flight Center

This paper chronicles the rebirth of two national rocket testing assets located at NASA's Marshall Space Flight Center: the Dynamic Test Stand (also known as the Ground Vibration Test Stand) and the Static Test Stand (also known as the Main Propulsion Test Stand). It will touch on the historical significance of these special facilities, while introducing the requirements driving modifications for testing a new generation space transportation system, which is set to come on line after the Space Shuttle is retired in 2010. In many ways, America's journey to explore the Moon begins at the Marshall Center, which is developing the Ares I crew launch vehicle and the Ares V cargo launch vehicle, along with managing the Lunar Precursor Robotic Program and leading the Lunar Lander descent stage work, among other Constellation Program assignments. An important component of this work is housed in Marshall's Engineering Directorate, which manages more than 40 facilities capable of a full spectrum of rocket and space transportation technology testing - from small components to full-up engine systems. The engineers and technicians who operate these test facilities have more than a thousand years of combined experience in this highly specialized field. Marshall has one of the few government test groups in the United States with responsibility for the overall performance of a test program from conception to completion. The Test Laboratory has facilities dating back to the early 1960s, when the test stands needed for the Apollo Program and other scientific endeavors were commissioned and built along the Marshall Center's southern boundary, with logistics access by air, railroad, and barge or boat on the Tennessee River. NASA and its industry partners are designing and developing a new human-rated system based on the requirements for safe, reliable, and cost-effective transportation solutions. Given below are summaries of the Dynamic Test Stand and the Static Test Stand capabilities, along with an introduction to the new missions that these sleeping giants will be fulfilling as NASA readies the Ares I for service in the 2015 timeframe, and plans the development work for fielding the Ares V late next decade (fig. 1). Validating modern computer design models and techniques requires the sorts of data that can only be generated by these one-of-a-kind facilities.

Dumbacher, Daniel L.↗

Ares V and Future Very Large Launch Vehicles to Enable Major Astronomical Missions

The current NASA architecture planned to return humans to the lunar surface includes the Ares V heavy lift launch vehicle designed primarily to carry the Altair lunar lander and to be available before about 2020. However. the capabilities of this system (and its variants) are such that adapting the vehicle to launch very large optical systems could achieve major scientific goals that are not otherwise possible. For example, an 8-m monolith UV/visual/IR telescope appears able to be launched to the Sun-Earth L2 location by an Ares V with a 10-m fairing. Even larger apertures that are deployed or assembled in space seem possible, which may take advantage of other elements of NASA's future human spaceflight architecture. Alternatively. multiple elements of a spatial array or two or three astronomical observatories might he launched simultaneously. That is, Ares V appears to offer the astronomy communities an opportunity to put into orbit extremely capable observatories, in addition to being a key element of NASA's current architecture for human spaceflight. For the past year, a number of scientists and engineers have been eva1uating concepts for astronomical observatories that take advantage of future large launch vehicles, including the science goals of such missions and design modifications to the vehicle to enable the observatories. In parallel, members of the Solar System science communities have likewise been considering what major science goals can be achieved if new, extremely capable launch systems become available.

Thronson, Harley↗

Cammp Team

The International Space Station (ISS) Configuration Analysis Modeling and Mass Properties (CAMMP) Team is presenting a demo of certain CAMMP capabilities at a Booz Allen Hamilton conference in San Antonio. The team will be showing pictures of low fidelity, simplified ISS models, but no dimensions or technical data. The presentation will include a brief description of the contract and task, description and picture of the Topology, description of Generic Ground Rules and Constraints (GGR&C), description of Stage Analysis with constraints applied, and wrap up with description of other tasks such as Special Studies, Cable Routing, etc. The models include conceptual Crew Exploration Vehicle (CEV) and Lunar Lander images and animations created for promotional purposes, which are based entirely on public domain conceptual images from public NASA web sites and publicly available magazine articles and are not based on any actual designs, measurements, or 3D models. Conceptual Mars rover and lander are completely conceptual and are not based on any NASA designs or data. The demonstration includes High Fidelity Computer Aided Design (CAD) models of ISS provided by the ISS 3D CAD Team which will be used in a visual display to demonstrate the capabilities of the Teamcenter Visualization software. The demonstration will include 3D views of the CAD models including random measurements that will be taken to demonstrate the measurement tool. A 3D PDF file will be demonstrated of the Blue Book fidelity assembly complete model with no vehicles attached. The 3D zoom and rotation will be displayed as well as random measurements from the measurement tool. The External Configuration Analysis and Tracking Tool (ExCATT) Microsoft Access Database will be demonstrated to show its capabilities to organize and track hardware on ISS. The data included will be part numbers, serial numbers, historical, current, and future locations, of external hardware components on station. It includes dates of all external ISS events and flights and the associated hardware changes for each event. The hardware location information does not always reveal the exact location of the hardware, only the general location. In some cases the location is a module or carrier, in other cases it is a WIF socket, handrail, or attach point. Only small portions of the data will be displayed for demonstration purposes.

Evertt, Shonn F.↗

Review of Full-Scale Docking Seal Testing Capabilities

NASA is developing a new docking system to support future space exploration missions to low-Earth orbit, the Moon, and Mars. This mechanism, called the Low Impact Docking System (LIDS), is designed to connect pressurized space vehicles and structures including the Crew Exploration Vehicle, International Space Station, and lunar lander. NASA Glenn Research Center (GRC) is playing a key role in developing the main interface seal for this new docking system. These seals will be approximately 147 cm (58 in.) in diameter. To evaluate the performance of the seals under simulated operating conditions, NASA GRC is developing two new test rigs: a non-actuated version that will be used to measure seal leak rates and an actuated test rig that will be able to measure both seal leak rates and loads. Both test rigs will be able to evaluate the seals under seal-on-seal or seal-on-plate configurations at temperatures from -50 to 50 C (-58 to 122 F) under operational and pre-flight checkout pressure gradients in both aligned and misaligned conditions.

Dunlap, Patrick H., Jr.↗

In Situ Resource Utilization (ISRU) on the Moon: Moessbauer Spectroscopy as a Process Monitor for Oxygen Production

Essential consumables like oxygen must to be produced from materials on the lunar surface to enable a sustained, long-term presence of humans on the Moon. The Outpost Precursor for ISRU and Modular Architecture (OPTIMA) field test on Mauna Kea, Hawaii, facilitated by the Pacific International Space Center for Exploration Systems (PISCES) of the University of Hawaii at Hilo, was designed to test the implementation of three hardware concepts to extract oxygen from the lunar regolith: Precursor ISRU Lunar Oxygen Testbed (PILOT) developed by Lockheed Martin in Littleton, CO; Regolith & Environmental Science and Oxygen & Lunar Volatiles Extraction (RESOLVE) developed at the NASA Kennedy Space Center in Cape Canaveral, FL; and ROxygen developed at the NASA Johnson Space Center in Houston, TX. The three concepts differ in design, but all rely on the same general principle: hydrogen reduction of metal cations (primarily Fe2+) bonded to oxygen to metal (e.g., Fe0) with the production of water. The hydrogen source is residual hydrogen in the fuel tanks of lunar landers. Electrolysis of the water produces oxygen and hydrogen (which is recycled). We used the miniaturized M ssbauer spectrometer MIMOS II to quantify the yield of this process on the basis of the quantity of Fe0 produced. Iron M ssbauer spectroscopy identifies iron-bearing phases, determines iron oxidation states, and quantifies the distribution of iron between mineral phases and oxidation states. The oxygen yield can be calculated by quantitative measurements of the distribution of Fe among oxidation states in the regolith before and after hydrogen reduction. A M ssbauer spectrometer can also be used as a prospecting tool to select the optimum feedstock for the oxygen production plants (e.g., high total Fe content and easily reduced phases). As a demonstration, a MIMOS II backscatter spectrometer (SPESI, Germany) was mounted on the Cratos rover (NASA Glenn Research Center in Cleveland, OH), which is one of several rover concepts designed to excavate and transfer regolith to the stationary hydrogen reduction plants. Spaceflight versions of the MIMOS II are part of the instrument payloads of NASA s Mars Exploration Rovers and still operating five years after landing on the surface of the planet. MIMOS II was also selected for Phobos-Grunt, a Russian sample return mission to the martian moon Phobos scheduled to launch in 2009, and ESA s ExoMars rover, an exobiology mission scheduled to launch in 2013. An advanced version of the instrument is currently under development. A new detector system with a higher energy resolution will not only reduce the necessary measurement time considerably, but also allow the simultaneous acquisition of an X-ray fluorescence spectrum to determine the elemental composition of samples.

Morris, R.V.↗