Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Acceptability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Engineering Catalyst–Electrolyte Microenvironments to Optimize the Activity and Selectivity for the Electrochemical Reduction of CO 2 on Cu and Ag

We report the electrochemical reduction of carbon dioxide (CO 2 R) driven by renewably generated electricity (e.g., solar and wind) offers a promising means for reusing the CO 2 released during the production of cement, steel, and aluminum as well as the production of ammonia and methanol. If CO 2 could be removed from the atmosphere at acceptable costs (i.e., <$100/t of CO 2 ), then CO 2 R could be used to produce carbon-containing chemicals and fuels in a fully sustainable manner. Economic considerations dictate that CO 2 R current densities must be in the range of 0.1 to 1 A/cm 2 and selectivity toward the targeted product must be high in order to minimize separation costs. Industrially relevant operating conditions can be achieved by using gas diffusion electrodes (GDEs) to maximize the transport of species to and from the cathode and combining such electrodes with a solid-electrolyte membrane by eliminating the ohmic losses associated with liquid electrolytes. Additionally, high product selectivity can be attained by careful tuning of the microenvironment near the catalyst surface (e.g., the pH, the concentrations of CO 2 and H 2 O, and the identities of the cations in the double layer adjacent to the catalyst surface).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Composite Power System Reliability with Renewables and Customer Flexibility

Composite Power System Reliability is defined as the computational procedure that quantifies the probability that the power system will perform the function of delivering electric power to customers adequately, on a continuous basis and with an acceptable quality. This definition leaves many details undefined and exemplifies the ambiguity in reliability analysis. The increasing deployment of wind and PV creates additional uncertainties that make reliability analysis a rather complex issue. Because of increased uncertainty the need for composite reliability analysis and utilization of results in power system planning is critical. New approaches are emerging for dealing with these problems from the operational point of view, including demand response programs, tapping on customer and distributed resource flexibility and new control approaches. The key question to be addressed is: how the new operational paradigms affect composite power system reliability. Here, this paper presents the ongoing work of the IEEE Composite System Reliability Task Force of the IEEE PES Reliability, Risk, Probability Application (RRPA) Subcommittee.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Octet scalars shaping LHC distributions in 4-jet final states

We study properties of a hypothetical scalar particle, Θ, which is a color octet and an electroweak singlet. At hadron colliders, Θ is pair produced through its QCD coupling to gluons, so that its mass determines the cross section. It decays at tree level into $q\bar{q}$ through dimension-5 operators, and at one loop into gluons. Thus, the main LHC signature of Θ is a pair of dijets of equal invariant mass. The CMS search in this channel shows a 3.6σ excess over the QCD background for a dijet mass M jj ≈ 0.95 TeV, which can be due to Θ : its production cross section (65 fb for a real scalar) and the acceptance of the CMS event selection applied to pp → ΘΘ → ($q\bar{q}$) ($q\bar{q}$) yield a rate consistent with the excess. Furthermore, the shape of the dσ/dM jj signal is in agreement with the CMS result. Given the data-driven background fit performed by CMS, we find that a complex scalar (whose production rate is twice as large) fits better the data than a real scalar. Besides the pair of dijets, testable LHC signals include a trijet-dijet topology, a $t\bar{t}$ pair plus a dijet resonance, as well as final states involving a Higgs, W or Z boson plus jets.

Dobrescu, Bogdan A. [Fermi National Accelerator La↗

Microgrid Controller Survey Report: 2024 Update

In the past decade, the number of microgrids deployed by electric utilities, end-use customers, and third parties has been increasing significantly both in the US and worldwide. The increase is driven by various reasons, such as carbon emission reduction, energy efficiency improvement, reliability and resilience enhancement, energy infrastructure modernization, and more. Microgrid controllers, as the most important components in these deployed microgrids, optimally coordinate the operation and control of the microgrid assets (e.g., distributed energy resources [DERs], energy storage systems, demand response, and even electric vehicles) and ensure that the microgrid is being operated in an efficient, clean, and resilient manner. To that end, the market for microgrid controllers has been growing rapidly in recent years. Various microgrid controllers have been released and continuously updated by vendors to satisfy the different needs of microgrid customers. However, the functionalities demonstrated by microgrid controllers released by different vendors show a huge difference because of a lack of widely known and accepted industrial standards, and various microgrid customers have specific requirements for different applications and scenarios. To obtain a clear view of the current state of the commercial microgrid controllers’ functionalities and identify potential research gaps, a survey of the functionalities of commercial microgrid controllers and the Advanced Distribution Management System (ADMS) developed by vendors and national laboratories was conducted in 2023. The results of the survey are presented in this report with the current status of commercial microgrid controllers analyzed, potential research gaps identified, and future research trends revealed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of AI-enabled Digital Documented Safety Analysis

The National Reactor Innovation Center (NRIC) is leading a transformative initiative to accelerate advanced reactor deployment by fundamentally reimagining how nuclear safety basis documentation is developed, reviewed, and maintained. Traditional Documented Safety Analysis (DSA) processes for DOE-authorized facilities rely on static, document-centric workflows that consume significant time and resources, exemplified by recent major licensing efforts requiring hundreds of thousands of staff hours and millions of pages of documentation review. These conventional approaches create barriers to the rapid, cost-effective deployment of advanced reactors that America's future energy needs demand. NRIC's DOE Authorization Digital Transformation Project addresses these challenges through an innovative framework that integrates artificial intelligence (AI), digital engineering, and systems-based data management into a cohesive digital ecosystem. This white paper presents NRIC's methodology for evaluating AI-enabled document generation capabilities within this broader digital infrastructure, using the Demonstration of Microreactor Experiments (DOME) facility as a pilot case study. The evaluation will assess an AI tool's ability to generate a Preliminary Documented Safety Analysis (PDSA) through progressive integration stages—from standalone document processing to full digital thread connectivity—while maintaining rigorous verification, validation, and regulatory acceptance standards. By establishing dynamic, traceable connections between design data and safety documentation, NRIC's approach has the potential to reduce both document development time and regulatory review cycles by as much as 50%, while simultaneously improving accuracy, consistency, and traceability. This initiative represents a critical step toward establishing reusable digital infrastructure that reactor developers can leverage to accelerate their path from concept to commercial operation, directly supporting NRIC's mission to demonstrate and deploy advanced nuclear energy technologies.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Identification and Catalysis of the Potential-Limiting Step in Lithium-Sulfur Batteries

The Li-S chemistry is thermodynamically promising for high-density energy storage but kinetically challenging. Over the past few years, many catalyst materials have been developed to improve the performance of Li-S batteries and their catalytic role has been increasingly accepted. However, the classic catalytic behavior, i.e., reduction of reaction barrier, has not been clearly observed. Crucial mechanistic questions, including what specific step is limiting the reaction rate, whether/how it can be catalyzed, and how the catalysis is sustained after the catalyst surface is covered by solid products, remain unanswered. Herein, we report the first identification of the potential-limiting step of Li-S batteries operating under lean electrolyte conditions and its catalysis that conforms to classic catalysis principles, where the catalyst lowers the kinetic barrier of the potential-limiting step and accelerates the reaction without affecting the product composition. After carefully examining the electrochemistry under lean electrolyte conditions, we update the pathway of the Li-S battery reaction: S 8 solid is first reduced to Li 2 S 8 and Li 2 S 4 molecular species sequentially; the following reduction of Li 2 S 4 to a Li 2 S 2 -Li 2 S solid with an almost constant ratio of 1:4 is the potential-limiting step; the previously believed Li 2 S 2 -to-Li 2 S solid-solid conversion does not occur; the recharging reaction is relatively fast. We further demonstrate that supported cobalt phthalocyanine molecules can effectively catalyze the potential-limiting step. After Li 2 S 2 /Li 2 S buries the active sites, it can self-catalyze the reaction and continue driving the discharging process.

25 ENERGY STORAGE↗

Low Cost High-Performance HRE-Free 3-in-1 Electric Drive Unit

The project team completed work to expand upon American Axle & Manufacturing’s (AAM) baseline technology and develop a high-speed, AC induction electric drive unit (EDU) with total direct-oil-cooling and integrated power electronics. The project accelerated advancements in EDU technology by allowing AAM to build upon the progress made in developing the underlying baseline technologies. The following seven improvements to AAM’s baseline technology were implemented in this research and development program: 1) Increased speed (30k RPM) AC induction motor, 2) Silver-sintering of discrete silicon carbide (SiC) metal-oxide-semiconductor field-effect transistors (MOSFET) to heat sinks, 3) Electrically insulated rotor bars, 4) Optimized lamination steel, 5) EDU-integrated 650VDC inverter package, 6) Over-molded stator with molded liners, and 7) 650VDC power-dense stator design. The successful development of the technology resulted in a meaningful cost reduction for EDU systems in the market. Coupled with falling battery system costs, lower EDU costs will likely accelerate the market acceptance and related production scaling of battery electric vehicles. The objective of this project was to research, develop, and test a Heavy Rare Earth (HRE)-free 3-In-1 electric drive unit (EDU) that has class leading power density and cost. The key technologies to be developed were anticipated to meet or exceed the Department of Energy (DOE) targets of a cost ≤ $\$$7/kilowatt (kW), power density ≥ 12 kW/liter, and operating voltage ≥ 600 VDC.

33 ADVANCED PROPULSION SYSTEMS↗

Bayesian Optimization of The Relativistic Heavy Ion Collider Luminosity via s * Control

A state-of-the-art jet detector named sPHENIX was proposed, commissioned, and operated at the Rel ativistic Heavy Ion Collider (RHIC) from 2023 to 2025. This detector featured precision tracking and calorime try that enable high-statistics studies of the Quark Gluon Plasma through jet modification, upsilon suppres sion, and open heavy flavor production. The innermost component of the three sPHENIX tracking systems is the Monolithic-Active-Pixel-Sensor-based Vertex Detec tor (MVTX) (Fig. 1), which has an acceptance within | s | < 0.1m of the interaction point (IP).

43 PARTICLE ACCELERATORS↗

Emerging Energy Market Analysis Initiative, Methodological Framework

Planning and operations of the electric power sector are undergoing radical changes. Climate change mitigation efforts have forced rapid changes to the technology mix. Technologies like wind and solar have experienced rapid growth, while investment in fossil sources has peaked or is declining. These foundational changes are forcing changes to energy systems. Demand-side adoption of electrified technologies, including electric vehicles, is changing load profiles and opening up new avenues for consumer participation in the power systems. The implications of an evolving power system pertain to more than environmental and technical dimensions. Changes to the generation mix and its consequent upstream and downstream impacts such as fuel production have significant and highly concentrated consequences on economies and employment. Shifts towards distributed (or decentralized) generating assets offer the potential to reshape economic and employment opportunities associated with the energy sector across space and socioeconomic groups. The Emerging Energy Market Analysis (EMA) initiative aims to identify sustainable, regionally acceptable, and high-value energy solutions that are secure and equitable. Unlike short-term, least-cost choices that can narrowly account for traditional options, EMA’s focus on emerging energy markets recognizes that new or adapted practices and technologies can alter the frontier of solutions and advance a community’s social, economic, and natural pathways. Such change requires a more comprehensive analysis of societal input, resources, capabilities, and infrastructure. These considerations lay the foundation for community decision-making models that are responsive to community values as well as the history and drivers. The result is a community-based decision and engagement model that will be valuable to decisionmakers and developers of advanced and emerging energy solutions, seeking a social license to operate prior to project development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermal performance and energy consumption validation of an occupied local government office building outfitted with ceiling tile phase change materials

Buildings present an opportunity for energy conservation and the modulation of peak energy demand through controlled Heating, Ventilation, and Air Conditioning (HVAC) energy use. The administrative and office building stock in the United States holds potential to achieve energy and demand savings through retrofits such as insulation, weatherization, and thermal energy storage. Specifically, there is a need to validate passive phase change material (PCM) applications in full scale in aging administrative buildings in the US to evaluate the energy benefits. Aim of this study was to conduct a whole building level thermal and energy validation of an operational building and explore an alternative method for evaluating energy efficiency. To accomplish this, the study employed PCMs in the drop ceiling and carry out an energy audit and on-site measurement of HVAC systems' energy demand and consumption. A full-scale EnergyPlus energy model, modeled by the authors, served as a baseline for evaluation. The results show that calibrated model's envelope temperature measures fall within the accepted errors. HVAC energy simulation results also fall within the accepted errors for monthly and hourly pre- and post- PCM retrofit electricity and natural gas data. The novelty of this study is that it employees energy scales per Heating Degree Hour and Cooling Degree Hour, in contrast to the commonly used Heating Degree Days and Cooling Degree Days as reported in the literature to analyze energy savings. These findings underscore the pivotal role of a calibrated model in assessing the efficacy of a singular energy measure, like a PCM-retrofitted ceiling, in an occupied office building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Flanged Tritium Waste Containers: Background and Current Path to Disposal

The MLLW Flanged Tritium Waste Container (FTWC) Project has been operational since 2007 when, during an audit of the FTWC waste stream, it was determined that four FTWC containers contained lead in amounts greater than LDR treatment standards. From June to August of 2007, four FTWC containers were shipped to TA-54 for disposal as LLW from WETF. The contents of the FTWCs were characterized as high activity LLW and were thought to be in compliance with LANL's Waste Acceptance Criteria (WAC). During the packaging of these FTWC's, 36 intact squib valves (aka actuators), containing detonated squibs were included with the waste stream After being transported to TA-54 Area G, it was determined that the explosive used in some of the squibs was Normal Lead Styphnate (NLS). A recharacterization of the entire contents in the FTWC's was performed with the conclusion that the squib valves exhibited the RCRA toxic characteristic for Lead (D008), thus resulting in the contents of the FTWCs being reclassified as a Mixed LLW.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advancements Toward ASME Nuclear Code Case for Compact Heat Exchangers

Our research team proposes to advance the state of the ASME section III code (nuclear service) for Compact Heat Exchangers (CHX). This work will improve the technical state of CHXs and lay the foundation necessary for these heat exchangers to be certified for use in nuclear service. During the course of this work, we will advance the understanding of the performance, integrity, and lifetime of the CHXs for use in any industrial application, making their use more attractive and accessible to the industry. We will do this by developing qualification and inspection procedures that utilize Non-destructive evaluation (NDE) and advanced in-service inspection techniques, with insight from the industrial utility leader EPRI. We have enlisted colleagues at MPR Associates (MPR), an elite nuclear code consulting firm, who are experts on the ASME section III code and who, with input from members of the ASME section III committee, will direct the testing and help develop a series of documents that define the rules and regulations for use of the CHX. Colleagues at North Carolina State University (NCSU) and Oregon State University (OSU) will conduct extensive tensile, creep, and fatigue experiments on diffusion bonded samples (manufactured by US-based Vacuum Process engineering) along with modeling using the elastic perfectly plastic assumptions and comprehensive full inelastic finite element analysis (FEA). This work will allow analysis by design and confidence in the strength of different internal structures. To ensure industry acceptance and long term confidence, team members at the University of Wisconsin–Madison (UW), University of Michigan (UM), Georgia Tech (GT), and the University of Idaho (UI) will extensively test prototypic heat exchangers manufactured by US-based manufactures CompRex and Vacuum Process Engineering (VPE), a leader in the development of advanced CHX. This testing will include the use of various working fluids (salt, sodium, helium, and sCO2) to evaluate operational issues as well as structural integrity under the most severe conditions. Post-test analysis of the tested CHXs coupled with pre/in-service/post NDE (ultrasonic and radiography) led by the Electric Power Research Institute (EPRI) will be incorporated into the development of the rules and regulations for their use in nuclear service.

42 ENGINEERING↗

DLR Calculation Engine Interoperability Profile: A Project for the TOGETs Task Force

This document contains a detailed interoperability profile outlining how the components of the CIM can be used to implement DLR in support of the two use cases identified in the Use Case Document. An interoperability profile is defined by the Smart Electric Power Alliance (SEPA) as a document that “specifies standards-based requirements for interfaces or applications that are accepted by the user-community, testing authorities, and other stakeholders. It specifies configuration options within a standard’s requirements sufficient to deliver the desired level of interoperability and functionality.” To that end, this document is not in itself a standard, nor has it been approved by any formal body. Rather, it is an example of how to implement the CIM standard and has been reviewed by industry, including transmission operators and DLR vendors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cesium Removal from AP-106 Tank Waste Using Crystalline Silicotitanate

The Tank Side Cesium Removal (TSCR) system, currently operated by Washington River Protection Solutions, LLC, prepares Hanford waste tank supernate feeds for the Low-Activity Waste Facility at the Hanford Waste Treatment and Immobilization Plant (WTP). In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange (IX), allowing contact handling of the liquid effluent product at the WTP as governed by a waste acceptance criterion (WAC). Specific to 137 Cs, this requirement is <3.18E-5 Ci 137 Cs/mole of Na. Crystalline silicotitanate (CST), manufactured by Honeywell UOP, LLC (product IONSIV R9140-B), was selected as the ion exchange media for TSCR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Power Sharing-Based Framework for Allocating Automatic Generation Control in Distributed Energy Resources: Preprint

The recent proliferation of distributed energy resources (DERs) in the power network along with the retirement of conventional generators has made it challenging to regulate system frequency. In this paper, we present a centralized control framework to leverage the potential of DERs in the distribution network in provisioning secondary frequency control services to the grid. The proposed framework is based on network volt-watt sensitivity analysis and takes into account DER operational and network-imposed constraints to allocate the automatic generation control (AGC) request among the aggregated units. The proposed framework was implemented on the IEEE 8500-node test feeder and results were validated against a standard linear programming-based scheme. Numerical results indicate that the proposed framework can successfully utilize the available power production headroom of the network to meet the AGC request while maintaining nodal voltages within acceptable limits.

distributed energy resources↗

Real-time hybrid controls of energy storage and load shedding for integrated power and energy systems of ships

This paper presents an original energy management methodology to enhance the resilience of ship power systems. The integration of various energy storage systems (ESS), including battery energy storage systems (BESS) and super-capacitor energy storage systems (SCESS), in modern ship power systems poses challenges in designing an efficient energy management system (EMS). The EMS proposed in this paper aims to achieve multiple objectives. The primary objective is to minimize shed loads, while the secondary objective is to effectively manage different types of ESS. Considering the diverse ramp-rate characteristics of generators, SCESS, and BESS, the proposed EMS exploits these differences to determine an optimal long-term schedule for minimizing shed loads. Furthermore, the proposed EMS balances the state-of-charge (SoC) of ESS and prioritizes the SCESS’s SoC levels to ensure the efficient operation of BESS and SCESS. For better computational efficiency, we introduce the receding horizon optimization method, enabling real-time EMS implementation. Further, a comparison with the fixed horizon optimization (FHO) validates its effectiveness. Simulation studies and results demonstrate that the proposed EMS efficiently manages generators, BESS, and SCESS, ensuring system resilience under generation shortages. Additionally, the proposed methodology significantly reduces the computational burden compared to the FHO technique while maintaining acceptable resilience performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗