Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pathway Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Test Plan for the Horizontal Dry Cask Simulator

The thermal performance of commercial spent nuclear fuel dry storage casks is evaluated through detailed numerical analysis. These modeling efforts are completed by the vendor to demonstrate performance and regulatory compliance. The calculations are then independently verified by the Nuclear Regulatory Commission(NRC). Canistered dry storage cask systems rely on ventilation between the inner canister and the overpack to convect heat away from the canister to the surrounding environment for both horizontal and vertical configurations. Recent advances in dry storage cask designs have significantly increased the maximum thermal load allowed in a cask in part by increasing the efficiency of internal conduction pathways and by increasing the internal convection through greater canister helium pressure. Carefully measured data sets generated from testing of full sized casks or smaller cask analogs are widely recognized as vital for validating these models. While several testing programs have been previously conducted, these earlier validation studies did not integrate all the physics or components important in a modern, horizontal dry cask system. The purpose of the investigation described in this test plan is to produce data sets that can be used to benchmark the codes and best practices presently used to determine cladding temperatures and induced cooling air flows in modern horizontal dry storage systems. The horizontal dry cask simulator(HDCS) has been designed to generate this benchmark data and add to the existing knowledgebase. The pressure vessel representing the canister has been designed, fabricated, and pressure tested for a maximum allowable pressure(MAWP)rating of 2,400 kPa at400 °C. An existing electrically heated but otherwise prototypic boiling water reactor(BWR), Incoloy-clad test assembly will be deployed inside of a representative storage basket and canister. An insulated sheet metal enclosure will be used to mimic the thermal properties of the concrete vault enclosure used in a modern horizontal storage system. Radial and axial temperature profiles along with induced cooling air flow will be measured for a wide range of decay powers and representative(and higher)cask pressures using various backfills of helium, argon, or air. The single assembly geometry with well-controlled boundary conditions simplifies computational requirements while preserving relevant physics. The proposed test apparatus integrates all the underlying thermal-hydraulics important to defining the performance of a modern horizontal storage system. These include combined-mode heat transfer from the electrically-heated assembly to the canister walls and the primarily natural-convective heat transfer from the canister to the cooling air flow passing through the horizontal vault enclosure. The objective of the HDCS is not to reproduce the performance of a commercial dry storage system for any given set of operational parameters. Rather ,the objective is to capture the dominant physics in a well-characterized test apparatus. The close coupling between the thermal response of the canister system and the resulting induced cooling air flow rate is of particular importance. While incorporating the best available information based on thermal-hydraulic scaling arguments as well as previous vertical testing, this test plan is subject to changes due to improved understanding or from as built deviations to designs. As-built conditions and actual procedures will be documented in the final test report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of groundwater monitoring and vegetation sampling at Everest, Kansas, in 2009 .

In April 2008, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) conducted groundwater sampling for the analysis of volatile organic compounds (VOCs) in the existing network of monitoring points at Everest, Kansas (Argonne 2008). The objective of the 2008 investigation was to monitor the distribution of carbon tetrachloride contamination in groundwater previously identified in CCC/USDA site characterization and groundwater sampling studies at Everest in 2000-2006 (Argonne 2001, 2003, 2006a,b). The work at Everest is being undertaken on behalf of the CCC/USDA by Argonne National Laboratory, under the oversight of the Kansas Department of Health and Environment (KDHE). The findings of the 2008 investigation were as follows: (1) Measurements of groundwater levels obtained manually and through the use of automatic recorders demonstrated a consistent pattern of groundwater flow - and inferred contaminant migration - to the north-northwest from the former CCC/USDA facility toward the Nigh property, and then west-southwest from the Nigh property toward the intermittent creek that lies west of the former CCC/USDA facility and the Nigh property. (2) The range of concentrations and the areal distribution of carbon tetrachloride identified in the groundwater at Everest in April 2008 were generally consistent with previous results. The results of the 2008 sampling (reflecting the period from 2006 to 2008) and the earlier investigations at Everest (representing the period from 2000 to 2006) show that no significant downgradient extension of the carbon tetrachloride plume occurred from 2000 to 2008. (3) The slow contaminant migration indicated by the monitoring data is qualitatively consistent with the low groundwater flow rates in the Everest aquifer unit estimated previously on the basis of site-specific hydraulic testing (Argonne 2006a,b). (4) The April 2008 and earlier sampling results demonstrate that the limits of the plume have been effectively, identified by the existing network of monitoring points and have not changed significantly during the CCC/USDA investigation program. The carbon tetrachloride distribution within the plume has continued to evolve, however, with relatively constant or apparently decreasing contaminant levels at most sampling locations. In response to these findings, the KDHE requested that the CCC/USDA develop a plan for annual monitoring of the groundwater and surface water at Everest, to facilitate continued tracking of the carbon tetrachloride plume at this site (KDHE 2009a). A recommendation for annual sampling (for analyses of VOCs) of 16 existing groundwater monitoring points within and near the identified contaminant migration pathway and surface water sampling at 5 locations along the intermittent creek west (downgradient) of the identified plume was presented by the CCC/USDA (Appendix A) and approved by the KDHE (2009b) for implementation. The monitoring wells will be sampled according to the low-flow procedure, and sample preservation, shipping, and analysis activities will be consistent with previous work at Everest. The annual sampling will continue until identified conditions at the site indicate a technical justification for a change. This report summarizes the results of sampling and monitoring activities conducted at the Everest site since completion of the April 2008 groundwater sampling event (Argonne 2008). The investigations performed during the current review period (May 2008 to October 2009) were as follows: (1) With one exception, the KDHE-approved groundwater and surface water monitoring points were sampled on April 24-27, 2009. In this event, well PT1 was inadvertently sampled instead of the adjacent well MW04. This investigation represents the first groundwater and surface water sampling event performed under the current plan for annual monitoring approved by the KDHE. (2) Ongoing monitoring of the groundwater levels at Everest is performed with KDHE approval. The levels in selected monitoring wells are recorded continuously, by using downhole pressure sensors equipped with automatic data loggers, and periodically are also measured manually. Groundwater level data were recovered during the current review period on September 19, 2008, and on March 25, April 25-27, and October 20, 2009. (3) Argonne experience has demonstrated that the sampling and analysis (for VOCs) of native vegetation, and particularly tree tissues, often provides a sensitive indicator of possible carbon tetrachloride contamination in the surface water or shallow groundwater within the plant rooting zone. With the approval of the CCC/USDA, on August 28, 2009, samples of tree branch tissues were therefore collected for analyses at 18 locations along the intermittent creek west (downgradient) of the former CCC/USDA facility and the Nigh property.

54 ENVIRONMENTAL SCIENCES↗

Manual Asset Inventory: NASA Kennedy Space Center

The National Aeronautics and Aerospace Administration (NASA) relies in the security and protection of the information and information systems to know the devices that are connected to the Agency networks whether these are business, mission, research, or engineering devices. The Agency uses different Information Technology resources in order to do this process automatically, however, there are some devices that need to be reported manually. As a result of this, every month the Agency distributes among its Information System Owners (ISOs) the Manual Asset Inventory, a document that consists of a Microsoft Excel spreadsheet with twenty field descriptions cells that has to be filled out by the ISO of every Security Plan in the Center [fifty three in total] and uploaded into the IT Security Enterprise Data Warehouse (ITSEC-EDW).

Presentation↗

When do different scenarios of projected electricity demand start to meaningfully diverge?

Resource adequacy studies look at balancing electricity supply and demand on 10- to 15-year time horizons while asset investment planning typically evaluates returns on 20- to 40-year time horizons. Projections of electricity demand are factored into the decision-making in both cases. Climate, energy policy, and socioeconomic changes are key uncertainties known to influence electricity demands, but their relative importance for demands over the next 10-40 years is unclear. The power sector would benefit from a better understanding of the need to characterize these uncertainties for resource adequacy and investment planning. In this study, we quantify when projected United States (U.S.) electricity demands start to meaningfully diverge in response to a range of climate, energy policy, and socioeconomic drivers. Here we use a wide yet plausible range of 21st century scenarios for the U.S. The projections span two population/economic growth scenarios (Shared Socioeconomic Pathways 3 and 5) and two climate/energy policy scenarios, one including climate mitigation policies and one without (Representative Concentration Pathways 4.5 and 8.5). Each climate/energy policy scenario has two warming levels to reflect a range of climate model uncertainty. We show that the socioeconomic scenario matters almost immediately – within the next 10 years, the climate/policy scenario matters within 25-30 years, and the climate model uncertainty matters only after 50+ years. This work can inform the power sector working to integrate climate change uncertainties into their decision-making.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A control-inspired approach for energy transition planning under uncertainty

As the global carbon footprint continues to grow, many countries are implementing carbon emission reduction policies which have incentivized the expansion of low-carbon and renewable technologies. However, the speed and scale of deployment falls short of that needed to meet climate goals. Energy system models serve as key tools for guiding investment decisions and helping policymakers evaluate the effects of various policies on the development of an energy system. This study focuses on the energy system of the United States and builds upon prior work by incorporating more geographic granularity to account for the trade of commodities and addresses transmission congestion through electricity price adjustments. Furthermore, real-world characteristics, such as delays in constructing new liquid fuel production and electricity generation facilities, are integrated using a sequential decision-making approach that better reflects how decisions can be updated as uncertainties unfold. Results demonstrate that stochastic programming combined with sequential decision-making produces energy transition pathways that are robust to multiple uncertain futures. Additionally, considering real-world characteristics significantly impacts the deployment of renewable technologies and the ability to meet carbon emission reduction goals while also reliably meeting demand. These findings highlight the importance of accounting for uncertainty and real-world characteristics to avoid overly optimistic projections in energy system planning.

energy systems↗

Supplemental Structural Analyses Used in Support of Certification of the Defense Programs Package 3

The Defense Programs Package (DPP)-3 is to be certified by the National Nuclear Security Administration (NNSA) Packaging and Transportation Division (PTD). Certification is based on successful physical testing of the package, and six certification test units (CTUs) have been subjected to the normal conditions of transport (NCT) and hypothetical accident conditions (HAC) outlined in Title 10 of the Code of Federal Regulations Part 71 (10 CFR 71). During regulatory testing of one of the CTUs, the drum lid closure bolt closest to the impact surface failed during the HAC 30-ft side drop. One of the testing goals for this CTU was to minimize the thermal pathway from the drum exterior shell to the containment vessel (CV) flange and O-rings, leading to the maximum damage scenario in preparation for thermal testing at 1475 °F. Therefore, the puncture bar impact proceeded as originally planned by striking the side wall of the package exterior closest to the location of the CV flange. This puncture bar impact did not attempt to exploit the region of the failed drum lid closure bolt to potentially cause more damage to the package. After the conclusion of regulatory testing, the DPP-3 package finite element model was used to numerically evaluate the effects of puncture bar impacts to the drum exterior in the vicinity of the failed drum lid closure bolt to further demonstrate the robustness of the DPP-3 design. Three alternate puncture bar impact locations and orientations were evaluated to demonstrate that these puncture bar impacts would not substantially reduce the effectiveness of the DPP-3 packaging. This paper describes the supplemental finite element models performed and structural analysis results that demonstrate the alternate HAC 40-in. puncture bar impact tests would have no deleterious effect on the performance of the DPP-3.

Sakalaukus Jr., Peter J.↗

Planned Relocation: A Pluralistic and Integrated Approach to Science and Governance

Planned relocation is an ambitious objective that occurs in complex governance settings rife with inequalities of power, discrimination, distrust, deep uncertainty, misalignment of incentives and authorities, and other challenges. Taking planned relocation from ambition to an equitable and effective portfolio of measures will require changes in science, governance and how they work together. Research will need to understand perverse incentives, conflicts, limits to risk perception, and other factors across individuals, communities, governance levels, and sectors. Knowledge to enable planned relocation will emerge not just from technical studies but from entwined processes of action, learning and capacity building. Science and governance must advance their collaboration to better support and learn from these tangled processes to identify adaptive pathways, build agency and implement strategies under deep uncertainty.

global environmental change, adapatation, decision↗

Plan to Verify and Validate Multi-Hazard Risk-Informed Margin Management Methods and Tools

This report describes the development plan for verification and validation (V&V) of multihazard risk informed margin management (RIMM) methods and tools. The plan will include using new INL developed tool sets coupled with the new multi-partner External Hazards Experimental Group (EHEG) coordinated by the Idaho National Laboratory (INL) within the Risk-Informed Safety Margin Characterization (RISMC) technical pathway of the Light Water Reactor Sustainability Program. The RISMC pathway is developing a suite of new tools and methods for advanced evaluation of facility risk. The RISMC toolkit, includes tools and methods focused on evaluation of risk from external hazards (e.g, seismic and flooding events), which have been shown to be dominant risk contributors in probabilistic risk assessments performed for operating nuclear power plants (NPPs). The external events activity (EEA) within the RISMC pathway is tasked with developing tools and methods focused on evaluation of multi-hazard external risk (e.g, seismic and flooding events). The EHEG will provide technical expertise and experimental large-scale testing data needed for development and validation of tools and methods in the RISMC toolkit for external hazard safety evaluations. The EEA within RISMC has two key elements: (1) an organizational and research framework provided by INL and (2) a coordinated group of university and national laboratory partners with the complementary expertise and experimental capabilities needed to conduct large-scale external hazard-focused experiments. This cooperative group will allow INL to leverage a range of existing capabilities to meet the unique needs of RISMC tool and method development. In addition, the capabilities of the EHEG could be used to address needs of other national laboratories. Currently, there is limited data available for development and validation of the tools and methods being developed in the RISMC Toolkit. The EHEG is being developed to obtain high quality, large-scale experimental data validation of RISMC tools and methods in a timely and cost-effective way. The group of universities and national laboratories that will eventually form the EHEG (which is ultimately expected to include both the initial participants and other universities and national laboratories that have been identified) have the expertise and experimental capabilities needed to both obtain and compile existing data archives and perform additional seismic and flooding experiments. The data developed by EHEG will be stored in databases within RISMC. These databases will be used to validate the advanced external hazard tools and methods. The numerical tools under development in RISMC are used to evaluate the impacts that external hazards have on nuclear power plants. These analysis tools will be used to advanced current risk calculation processes and reduce uncertainty in these calculations. To have confidence in the predictive capability of these numerical tools it is important to verify and validate them. To verify and validate numerical tools the user must understand what physics is being used to represent the problem (i.e. constitutive models used to represent the soil and structure), the numerical solver approach used (i.e. finite element), what data already exists that could be used to validate the tools, and what data is needed for validation.

31274↗

Climate Change Mitigation Potential of Wind Energy

Global wind resources greatly exceed current electricity demand and the levelized cost of energy from wind turbines has shown precipitous declines. Accordingly, the installed capacity of wind turbines grew at an annualized rate of about 14% during the last two decades and wind turbines now provide ~6–7% of the global electricity supply. This renewable electricity generation source is thus already playing a role in reducing greenhouse gas emissions from the energy sector. Here we document trends within the industry, examine projections of future installed capacity increases and compute the associated climate change mitigation potential at the global and regional levels. Key countries (the USA, UK and China) and regions (e.g., EU27) have developed ambitious plans to expand wind energy penetration as core aspects of their net-zero emissions strategies. The projected climate change mitigation from wind energy by 2100 ranges from 0.3–0.8 °C depending on the precise socio-economic pathway and wind energy expansion scenario followed. The rapid expansion of annual increments to wind energy installed capacity by approximately two times current rates can greatly delay the passing of the 2 °C warming threshold relative to pre-industrial levels. To achieve the required expansion of this cost-effective, low-carbon energy source, there is a need for electrification of the energy system and for expansion of manufacturing and installation capacity.

17 WIND ENERGY↗

A Plan to Qualify New Fuel for the High Flux Isotope Reactor for Material Minimization

The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is one of five high power research reactors the Office of Material Management and Minimization (M3) Program, Office of Conversion is working to convert from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. This effort stems from the primary objective within the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) to achieve permanent threat reduction by minimizing, and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project is pursuing fuel qualification and licensing of LEU fuels to support the high-performance reactors. All high-performance reactors except HFIR will be converted to LEU monolithic uranium-molybdenum alloy fuel. HFIR will be evaluated for conversion to LEU using a uranium silicide fuel, namely, U3Si2-Al dispersion fuel. The mission of the USHPRR Project is to develop the technology needed to reduce, and eventually eliminate, worldwide use of HEU in civilian applications. The goal is to develop the technical means needed to use low enriched uranium (LEU) instead of HEU fuel in research and test reactors without significant penalties in performance, economics, or safety of the reactors. The USHPRR Project has four major elements, called Pillars: Fuel Qualification (FQ) managed at Idaho National Laboratory (INL), Fuel Fabrication (FF) managed at Pacific Northwest National Laboratory (PNNL), Reactor Conversion (RC) managed at Argonne National Laboratory (Argonne), and Cross-Cutting (CC) managed at Savannah River National Laboratory (SRNL). FQ is responsible for the qualification of the fuel type. RC is responsible for supporting reactor conversion analysis and overseeing licensing submittals leading to conversions of domestic reactors to LEU fuel. For the FQ effort, FQ (INL) worked in collaboration with RC (Argonne) and ORNL to develop the plan for the uranium silicide fuel qualification for HFIR. The resulting HFIR Fuel Qualification Plan provides the general approach for the USHPRR team to move the selected uranium silicide fuel design for HFIR conversion through qualification. Authorization and use in HFIR will be approved through the DOE’s Office of Science. Uranium silicide fuel was previously qualified in NUREG-1313 at an approximate maximum heat flux of 1.4 MW/m2 and a maximum fuel section temperature of about 130°C. In addition to the different regulator process utilized by DOE, these upper limits will be exceeded in HFIR; therefore, further testing will be necessary to ensure the fuel can meet HFIR qualification requirements. The HFIR fuel loading may exceed 4.8 gU/cm3 which was determined in the NUREG-1313 safety evaluation to be acceptable for use in non-power NRC-licensed reactors provided there exist no other safety considerations. In addition, the uranium silicide fuel will need to be qualified in a HFIR-specific design. This plan includes the currently available information from the USHPRR Project Functions and Requirements document and expands these requirements to ensure that planned tests have traceable results providing evidence that the requirements have been met. Data collection methods are discussed as well as the process to show that the requirements have been met. This document is designed to provide a pathway for researchers to obtain data necessary and at the appropriate quality level for HFIR fuel qualification

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Plan to Qualify New Fuel for the High Flux Isotope Reactor for Material Minimization

The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is one of five high power research reactors the Office of Material Management and Minimization (M3) Program, Office of Conversion is working to convert from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. This effort stems from the primary objective within the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) to achieve permanent threat reduction by minimizing, and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project is pursuing fuel qualification and licensing of the high-performance reactors to operate with LEU fuels. All high-performance reactors except HFIR will be converted to LEU monolithic uranium-molybdenum alloy fuel. HFIR will be evaluated for conversion to LEU using a uranium silicide fuel, namely, U3Si2-Al dispersion fuel.The mission of the USHPRR Project is to develop the technology needed to reduce, and eventually eliminate, worldwide use of HEU in civilian applications. The goal is to develop the technical means needed to use low enriched uranium (LEU) instead of HEU fuel in research and test reactors without significant penalties in performance, economics, or safety of the reactors. The USHPRR Project has four major elements, called Pillars: Fuel Qualification (FQ) managed at Idaho National Laboratory (INL), Fuel Fabrication (FF) managed at Pacific Northwest National Laboratory (PNNL), Reactor Conversion (RC) managed at Argonne National Laboratory (Argonne), and Cross-Cutting (CC) managed at Savannah River National Laboratory (SRNL). FQ is responsible for the qualification of the fuel type. RC is responsible for supporting reactor conversion analysis and overseeing licensing submittals leading to conversions of domestic reactors to LEU fuel. For the FQ effort, FQ (INL) worked in collaboration with RC (Argonne) and ORNL to develop the plan for the uranium silicide fuel qualification for HFIR.The resulting HFIR Fuel Qualification Plan provides the general approach for the USHPRR team to move the selected uranium silicide fuel design for HFIR conversion through qualification. Authorization and use in HFIR will be approved through the DOE’s Office of Science. Uranium silicide fuel was previously qualified in NUREG-1313 at an approximate maximum heat flux of 1.4 MW/m2 and a maximum fuel section temperature of about 130°C. In addition to the different regulator process utilized by DOE, these upper limits will be exceeded in HFIR; therefore, further testing will be necessary to ensure the fuel can meet HFIR qualification requirements. The HFIR fuel loading may exceed 4.8 gU/cm3 which was determined in the NUREG-1313 safety evaluation to be acceptable for use in non-power NRC-regulated reactors provided there exist no other safety considerations. In addition, the uranium silicide fuel will need to be qualified in a HFIR-specific design. This plan includes the currently available information from the USHPRR Project Functions and Requirements document and expands these requirements to ensure that planned tests have traceable results providing evidence that the requirements have been met. Data collection methods are discussed as well as the process to show that the requirements have been met. This document is designed to provide a pathway for researchers to obtain data necessary and at the appropriate quality level for HFIR fuel qualification.

Shokes, Tamara↗

Initial Testing of Off-Gas Recycle Condensate Liquid from the WTP Low Activity Waste Vitrification Process - 16432

The Waste Treatment and Immobilization Plant (WTP) under construction at the Hanford site is designed to treat and immobilize the inventory of High-Level Waste stored in the 177 underground storage tanks. The WTP process flow was designed to pre-treat this waste, separating it into High Level Waste (HLW) and Low Activity Waste (LAW) fractions for vitrification. Vitrification of the waste generates a condensate stream from the off-gas processes originating from two off-gas treatment unit operations, the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP). The baseline plan for disposition of the stream from the LAW melter is to recycle it to the Pretreatment facility where it gets evaporated and processed through the LAW melter again. If the Pretreatment facility is unavailable, this baseline disposition pathway is not viable. Additionally, chloride, fluoride, and sulfate are partially volatile in the melter, accumulating to high concentrations while recycling and impacting the glass waste loading and facility throughput. The primary radionuclide that volatizes and accumulates is {sup 99}Tc. The long half-life and environmental mobility of {sup 99}Tc complicates disposal options for this secondary aqueous waste stream. This task is investigating {sup 99}Tc removal to examine the potential for diverting this stream to an alternate disposition path and avoiding impacting the glass waste loading. Separation methods for {sup 99}Tc have focused on using inorganic precipitation agents that can remove it by reducing it from soluble pertechnetate ion, with a +7 oxidation state, to insoluble technetium dioxide in the +4 oxidation state. Stannous chloride (SnCl{sub 2}) has been found highly effective at causing the reduction and precipitating {sup 99}Tc for removal, but it also precipitates other components. The primary competitor that precipitates is chromium, which consumes the redox activity of the Sn(II), causing addition of more of the SnCl{sub 2}. Research has examined the optimum quantity of SnCl{sub 2}, mixing time, and the impact of other redox-active species. It is also important to know the stability of the precipitated {sup 99}Tc in process conditions, since it is expected it will eventually be re-oxidized by oxygen and dissolve. This work is expected to determine if a {sup 99}Tc removal step could be used to decontaminate the bulk of this stream, and make it suitable for other disposal paths so that the chloride, fluoride, and sulfate can be diverted away from the glass melter. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hyperlight Energy 7342 10-26-19 (Final Report)

One of the principal issues preventing the widescale deployment of Concentrating Solar Power (CSP) technologies for power and process heat generation is the high cost per unit energy produced. While the operating expenses of a solar plant are often far less than those of a comparable natural gas plant due to zero fuel costs, the increased capital costs of the system, and the collector field in particular, are a significant barrier to project feasibility. Hyperlight Energy has been funded under the DOE COLLECTS program to further develop its novel Linear Fresnel Reflector (LFR) design to meet the DOE’s programmatic goal of creating a solar collector that has an installed cost of less than $\$$99/m2 with a pathway towards a future price of $\$$50/m2. Hyperlight Energy has a unique, inexpensive design featuring four-inch-wide mirror slats mounted on 48 ft long extruded plastic D-profile tubes. By removing the steel and concrete of a traditional collectors Hyperlight is able to drastically decrease the materials and fabrication costs of the primary reflectors. The goal of this project was to prove the manufacturability of these reflectors, install a half-acre system of the collector, and test the performance of the field to determine the actual cost of the energy produced by the solar field. During the course of the project the half-acre system was successfully manufactured and deployed at the company’s demonstration site in Brawley, CA. The total collector cost came in under the desired $\$$99/m2 goal and proved the feasibility of this new type of solar field. With further planned cost reductions the DOE’s ultimate goal of $\$$50/m2 appears to be achievable. The data generated from this project has already been sufficient to secure Hyperlight Energy’s first commercial project, and continued operations will help to validate the product’s lifespan and performance over time. This will provide invaluable support for future installations. Hyperlight Energy has won a contract for a three-acre commercial project, but the company plans to aggressively pursue multiple similar and larger-scale projects in the near future. At present, these projects will serve to replace natural gas fired boilers in industrial processes, reducing the emissions of the associated plants. In the future, potential project sites will expand to include enhanced oil recovery (EOR) and other uses in the transportation fuel pathway, leading to fuels with a lower carbon intensity (CI). This path will allow renewable energy to begin to make an impact on the industrial process heat sector, which is one the primary consumers of natural gas and other fossil fuels in the country, and which is beyond the scope of other existing renewable technologies that exclusively generate electricity. Only by replacing the fossil fuels burned in industrial processes will the DOE’s emissions goals be achieved.

14 SOLAR ENERGY↗

Assessing the Relative Climate Impact of Carbon Utilization for Concrete, Chemical, and Mineral Production

Estimates show that 6.2 gigatons of carbon dioxide (CO2) can be captured and utilized across three pathways, concrete, chemical, and minerals, by 2050. However, it is difficult to compare the climate benefit across these three carbon capture and utilization (CCU) pathways to determine the most effective use of captured CO2. The life cycle assessment methods to evaluate the climate benefit of CCU chemicals should additionally account for the change in material properties of concrete due to CO2 utilization. Furthermore, with most CO2 utilization technologies being in the early stages of research and development, the uncertainty and variability in process and inventory data present a significant challenge in evaluating the climate benefit. We present a stochastically determined climate return on investment (ROI) metric to rank and prioritize CO2 utilization across 20 concrete, chemical and mineral pathways based on the realized climate benefit. We show that two concrete pathways, which use CO2 during concrete mixing, and two chemical pathways, which produce formic acid through hydrogenation of CO2 and carbon monoxide through dry reforming of methane, generate the greatest climate ROI and are the only CCU pathways with a higher likelihood of generating a climate benefit than a climate burden.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Deep Vadose Zone Treatability Test for the Hanford Central Plateau: Interim Post-Desiccation Monitoring Results, Fiscal Year 2014

Over decades of operation, the U.S. Department of Energy (DOE) and its predecessors have released nearly 2 trillion L (450 billion gal.) of liquid into the vadose zone at the Hanford Site. Much of this discharge of liquid waste into the vadose zone occurred in the Central Plateau, a 200 km 2 (75 mi 2 ) area that includes approximately 800 waste sites. Some of the inorganic and radionuclide contaminants in the deep vadose zone at the Hanford Site are at depths below the limit of direct exposure pathways, but may need to be remediated to protect groundwater. The Tri-Party Agencies (DOE, U.S. Environmental Protection Agency, and Washington State Department of Ecology) established Milestone M 015 50, which directed DOE to submit a treatability test plan for remediation of technetium-99 (Tc-99) and uranium in the deep vadose zone. These contaminants are mobile in the subsurface environment and have been detected at high concentrations deep in the vadose zone, and at some locations have reached groundwater. Testing technologies for remediating Tc-99 and uranium will also provide information relevant for remediating other contaminants in the vadose zone. A field test of desiccation is being conducted as an element of the DOE test plan published in March 2008 to meet Milestone M 015 50. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 3 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.

54 ENVIRONMENTAL SCIENCES↗

Power Sector Transformation Pathways: Exploring Objectives, Factors, and Technology Innovations to Inform Power Sector Pathway Decisions

The power and heating sectors are responsible for around 30% of global CO2 emissions and this share is likely to grow as countries move towards electrification of the transportation and building sectors. Therefore, enabling forward-thinking, long term strategies in the power sector is a crucial area for international collaboration and support. The rapid transition of power systems toward modern, low-carbon pathways and technologies will be necessary to meet key climate goals while also enabling other critical objectives such as economic development, energy access, and energy system resiliency, among others. Many developed and developing countries are well-poised to champion power sector transformation (PST), however, further support is needed to identify pathways and implement critical near and long-term actions. To address this need, the Low Emission Development Strategies Global Partnership (LEDS GP) together with an expert team including Agora Energiewende, Energy Innovation, European Climate Foundation, Fraunhofer Institute for Systems and Innovation Research , Prayas Energy Group and LEDS Latin America and Caribbean Platform, developed a framework identifying four key pathways that can be integrated and combined to support low-carbon PST. These four pathways are: (1) Distributed Energy Resource Revolution, (2) Bulk Power Transformation, (3) Transmission and Distribution Interactivity, and (4) Distributed Transactional Future. To support exploration of pathways, this study examines PST objectives and factors that may lead countries or jurisdictions to place a greater relative emphasis on certain pathways as well as a framework and complementary tool for considering the emphasis in a hands on manner. The report provides case studies on application of the approach to bring life to the topic. The case studies include Haiti, Kenya, Mexico, Southeast Asia, and the European Union, among others. The report also presents actions to-be-taken in the near-, medium- and long-term to support the realization of pathways and long-term transformation of the power sector. The report, together with a complementary spreadsheet tool developed under the effort, can be used to enable stakeholder engagement and visioning for the power sector over the long-term, taking into account key factors and potential innovations. It can also be used to understand and inform relevant analysis tools and models based on which pathways are emphasized, and to identify key actions in the near- and medium-term to avoid lock-in of carbon-intensive technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗