Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

And the Human Saves the Day or Maybe They Ruin It, The Importance of Humans in the Loop

Flying a mission in space requires a massive commitment of resources, and without the talent and commitment of the people involved in this effort we would never leave the atmosphere of Earth as safely as we have. When we use the phrase "humans in the loop", it could apply to almost any endeavor since everything starts with humans developing a concept, completing the design process, building or implementing a product and using the product to achieve a goal or purpose. Narrowing the focus to spaceflight, there are a variety of individuals involved throughout the preparations for flight and the flight itself. All of the humans involved add value and support for program success. The paper discusses the concepts of human involvement in technological programs, how a Probabilistic Risk Assessment (PRA) accounts for the human in the loop for potential missions using a technique called Human Reliability Analysis (HRA) and the tradeoffs between having a human in the loop or not. Human actions can increase or decrease the overall risk via initiating events or mitigating them, thus removing the human from the loop doesn't always lowers the risk.

DeMott, Diana L.↗

Modification of the SAS4A Safety Analysis Code for Integration with the ADAPT Discrete Dynamic Event Tree Framework.

It is difficult to assess the consequences of a transient in a sodium-cooled fast reactor (SFR) using traditional probabilistic risk assessment (PRA) methods, as numerous safety-related sys- tems have passive characteristics. Often there is significant dependence on the value of con- tinuous stochastic parameters rather than binary success/failure determinations. One form of dynamic PRA uses a system simulator to represent the progression of a transient, tracking events through time in a discrete dynamic event tree (DDET). In order to function in a DDET environment, a simulator must have characteristics that make it amenable to changing physical parameters midway through the analysis. The SAS4A SFR system analysis code did not have these characteristics as received. This report describes the code modifications made to allow dynamic operation as well as the linking to a Sandia DDET driver code. A test case is briefly described to demonstrate the utility of the changes.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

SAPHIRE 8 Volume 2 - Technical Reference

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) refers to a set of computer programs that were developed to create and analyze probabilistic risk assessment (PRAs). Herein information is provided on the principles used in the construction and operation of Version 8.0 of the SAPHIRE system. This report summarizes the fundamental mathematical concepts of sets and logic, fault trees, and probability. This volume then describes the algorithms used to construct a fault tree and to obtain the minimal cut sets. It gives the formulas used to obtain the probability of the top event from the minimal cut sets, and the formulas for probabilities that apply for various assumptions concerning reparability and mission time. It defines the measures of basic event importance that SAPHIRE can calculate. This volume gives an overview of uncertainty analysis using simple Monte Carlo sampling or Latin Hypercube sampling, and states the algorithms used by this program to generate random basic event probabilities from various distributions. Also covered are enhance capabilities such as seismic analysis, Workspace algorithms, cut set "recovery," end state manipulation, and use of "compound events."

97 MATHEMATICS AND COMPUTING↗

A review for identification of initiating events in event tree development process on nuclear power plants

Initiating event is defined as any event either internal or external to the nuclear power plants (NPPs) that perturbs the steady state operation of the plant, if operating, thereby initiating an abnormal event such as transient or loss of coolant accident (LOCA) within the NPPs. These initiating events trigger sequences of events that challenge plant control and safety systems whose failure could potentially lead to core damage or large early release. Selection for initiating events consists of two steps i.e. first step, definition of possible events, such as by evaluating a comprehensive engineering, and by constructing a top level logic model. Then the second step, grouping of identified initiating event's by the safety function to be performed or combinations of systems responses. Therefore, the purpose of this paper is to discuss initiating events identification in event tree development process and to reviews other probabilistic safety assessments (PSA). The identification of initiating events also involves the past operating experience, review of other PSA, failure mode and effect analysis (FMEA), feedback from system modeling, and master logic diagram (special type of fault tree). By using the method of study for the condition of the traditional US PSA categorization in detail, could be obtained the important initiating events that are categorized into LOCA, transients and external events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wind Turbine Development at Montana State University

A survey of wind turbine blade manufacturers, repair companies, wind farm operators, and third party investigators has directed the focus of this investigation on several types of flaws commonly found in wind turbine blades: waviness and porosity/voids. Several commercial scale wind turbine blades were inspected for the development of metrics for the identification, analysis and disposition. Analysis of flaw geometries yielded metrics which utilize specific parameters to physically characterize a defect. Data as it relates flaw parameters to frequencies of occurrence have been complied. Basic statistical analysis shows that the frequency of flaw parameters generally follows standard distributions. A testing program was then developed around this flaw data. Results from static testing indicate that there is strong correlation between flaw parameters and mechanical response. Preliminary results from the in-field data collection effort and coupon level testing have established a protocol by which a defect in a blade can be characterized quantifiably. With this data it is possible to develop probabilistic analysis, damage progression models and criticality assessment tools that will enable improved blade design methodology and the development of a risk management framework which describes the probability of failure for blades with defects.

17 WIND ENERGY↗

Development of cyber security test scenario for non-safety display system - 226

In order to test the cyber security of NPP related to safety, the results of probabilistic safety assessment were used. The fault tree (FT) is used to reflect the impact of the cyber-attack on the operator. The cyber security test should be performed focusing on the scenario derived from the FT. The concept of a security case has been introduced. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Lessons Learned on Benchmarking from the International Human Reliability Analysis Empirical Study

The International Human Reliability Analysis (HRA) Empirical Study is a comparative benchmark of the prediction of HRA methods to the performance of nuclear power plant crews in a control room simulator. There are a number of unique aspects to the present study that distinguish it from previous HRA benchmarks, most notably the emphasis on a method-to-data comparison instead of a method-to-method comparison. This paper reviews seven lessons learned about HRA benchmarking from conducting the study: (1) the dual purposes of the study afforded by joining another HRA study; (2) the importance of comparing not only quantitative but also qualitative aspects of HRA; (3) consideration of both negative and positive drivers on crew performance; (4) a relatively large sample size of crews; (5) the use of multiple methods and scenarios to provide a well-rounded view of HRA performance; (6) the importance of clearly defined human failure events; and (7) the use of a common comparison language to “translate” the results of different HRA methods. These seven lessons learned highlight how the present study can serve as a useful template for future benchmarking studies.

99 GENERAL AND MISCELLANEOUS↗

Design for Reliability and Safety Approach for the NASA New Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new crew launch vehicle called ARES I. The ARES I is being developed by NASA Marshall Space Flight Center (MSFC) in support of the Constellation program. The ARES I consists of three major Elements: A solid First Stage (FS), an Upper Stage (US), and liquid Upper Stage Engine (USE). Stacked on top of the ARES I is the Crew exploration vehicle (CEV). The CEV consists of a Launch Abort System (LAS), Crew Module (CM), Service Module (SM), and a Spacecraft Adapter (SA). The CEV development is being led by NASA Johnson Space Center (JSC). Designing for high reliability and safety require a good integrated working environment and a sound technical design approach. The "Design for Reliability and Safety" approach addressed in this paper discusses both the environment and the technical process put in place to support the ARES I design. To address the integrated working environment, the ARES I project office has established a risk based design group called "Operability Design and Analysis" (OD&A) group. This group is an integrated group intended to bring together the engineering, design, and safety organizations together to optimize the system design for safety, reliability, and cost. On the technical side, the ARES I project has, through the OD&A environment, implemented a probabilistic approach to analyze and evaluate design uncertainties and understand their impact on safety, reliability, and cost. This paper focuses on the use of the various probabilistic approaches that have been pursued by the ARES I project. Specifically, the paper discusses an integrated functional probabilistic analysis approach that addresses upffont some key areas to support the ARES I Design Analysis Cycle (DAC) pre Preliminary Design (PD) Phase. This functional approach is a probabilistic physics based approach that combines failure probabilities with system dynamics and engineering failure impact models to identify key system risk drivers and potential system design requirements. The paper also discusses other probabilistic risk assessment approaches planned by the ARES I project to support the PD phase and beyond.

Safie, Fayssal, M.↗

Risk-Based Comparison of Carbon Capture Technologies

In this paper, we describe an integrated probabilistic risk assessment methodological framework and a decision-support tool suite for implementing systematic comparisons of competing carbon capture technologies. Culminating from a collaborative effort among national laboratories under the Carbon Capture Simulation Initiative (CCSI), the risk assessment framework and the decision-support tool suite encapsulate three interconnected probabilistic modeling and simulation components. The technology readiness level (TRL) assessment component identifies specific scientific and engineering targets required by each readiness level and applies probabilistic estimation techniques to calculate the likelihood of graded as well as nonlinear advancement in technology maturity. The technical risk assessment component focuses on identifying and quantifying risk contributors, especially stochastic distributions for significant risk contributors, performing scenario-based risk analysis, and integrating with carbon capture process model simulations and optimization. The financial risk component estimates the long-term return on investment based on energy retail pricing, production cost, operating and power replacement cost, plan construction and retrofit expenses, and potential tax relief, expressed probabilistically as the net present value distributions over various forecast horizons.

Engel, David W.↗

Bayesian Analysis for Risk Assessment of Selected Medical Events in Support of the Integrated Medical Model Effort

The Exploration Medical Capability project is creating a catalog of risk assessments using the Integrated Medical Model (IMM). The IMM is a software-based system intended to assist mission planners in preparing for spaceflight missions by helping them to make informed decisions about medical preparations and supplies needed for combating and treating various medical events using Probabilistic Risk Assessment. The objective is to use statistical analyses to inform the IMM decision tool with estimated probabilities of medical events occurring during an exploration mission. Because data regarding astronaut health are limited, Bayesian statistical analysis is used. Bayesian inference combines prior knowledge, such as data from the general U.S. population, the U.S. Submarine Force, or the analog astronaut population located at the NASA Johnson Space Center, with observed data for the medical condition of interest. The posterior results reflect the best evidence for specific medical events occurring in flight. Bayes theorem provides a formal mechanism for combining available observed data with data from similar studies to support the quantification process. The IMM team performed Bayesian updates on the following medical events: angina, appendicitis, atrial fibrillation, atrial flutter, dental abscess, dental caries, dental periodontal disease, gallstone disease, herpes zoster, renal stones, seizure, and stroke.

Gilkey, Kelly M.↗

An Approach to Risk-Based Design Incorporating Damage Tolerance Analyses

Incorporating risk-based design as an integral part of spacecraft development is becoming more and more common. Assessment of uncertainties associated with design parameters and environmental aspects such as loading provides increased knowledge of the design and its performance. Results of such studies can contribute to mitigating risk through a system-level assessment. Understanding the risk of an event occurring, the probability of its occurrence, and the consequences of its occurrence can lead to robust, reliable designs. This paper describes an approach to risk-based structural design incorporating damage-tolerance analysis. The application of this approach to a candidate Earth-entry vehicle is described. The emphasis of the paper is on describing an approach for establishing damage-tolerant structural response inputs to a system-level probabilistic risk assessment.

Knight, Norman F., Jr.↗

A Preliminary Radiological Risk Assessment Model for Disposition of Remote-Handled Transuranic Wastes at Los Alamos National Laboratory Area G - 20116

The U.S. Department of Energy (DOE) operates a low-level radioactive waste (LLW) disposal site at Material Disposal Area G, in Los Alamos, New Mexico, USA. Area G has been the primary LLW disposal site for Los Alamos National Laboratory (LANL) since the 1960's. In addition to LLW, Area G is host to a variety of other wastes, the disposition of which must be determined before closure of the site. A probabilistic Radiological Risk Assessment (RRA) for Area G is used in order to support decision making regarding some wastes that are not addressed in the extant Area G Performance Assessment (PA) and Composite Analysis (CA). Between 1979 and 1987, 33 special shafts were augered into the Bandelier Tuff at Area G. This volcanic tuff is present across Pajarito Plateau on the eastern slopes of the Jemez Mountains, and varies widely in its consistency, from weakly indurated non-welded layers to welded layers that uphold the mesa cliffs of the Plateau. These mesas are home to LANL, Area G, and the townsites of Los Alamos and White Rock, with residences about 1400 m from Area G. The 33 Shafts were lined with steel casing, and contain remote-handled (RH) transuranic wastes (TRU) resulting from experiments and analysis performed in special glove boxes at the Chemistry and Metallurgy Research (CMR) facility at LANL. Some of these wastes originated as used nuclear fuel. The purpose of the Area G RRA is to evaluate the potential future risk to humans and the environment from the RH TRU in the 33 Shafts in the context of the risk associated with the surrounding wastes at Area G. The analysis is responsive to expectations outlined in DOE Order 458.1, Radiation Protection of the Public and the Environment, and is informed by the Manual and Guidance accompanying DOE O 435.1, Radioactive Waste Management. Because the waste meets the definition of TRU, the regulatory context necessarily takes into consideration the regulation governing the disposal of TRU from the U.S. Environmental Protection Agency (EPA): 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Given the broader regulatory context for the RRA, the analysis is subject to different assumptions from those made in the existing DOE O 435.1 PA and CA, such as allowing for future occupation of the site. The analysis begins with a comprehensive evaluation of features, events, processes, and exposure scenarios (FEPS) for Area G and the wastes it contains. These FEPSs are screened to eliminate from further consideration those of extremely low probability and/or consequence, and a conceptual site model (CSM) is subsequently developed. The scope and structure of the Area G RRA Model is informed by this CSM, and the Area G RRA Model is developed using the GoldSim systems analysis modeling platform. This paper presents the initial version of a defensible, transparent, and reasonably realistic model, which is based on the state of knowledge of the wastes, the site, and the FEPSs that govern contaminant transport from wastes into the environment and subsequent exposures to humans and other biota. Probabilistic model input distributions represent uncertainties inherent in the real and modeled systems. The results of the Area G RRA Model inform decisions regarding the disposition of the RH TRU in the 33 Shafts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing State Nuclear Weapons Proliferation: Using Bayesian Network Analysis of Social Factors

A Bayesian network (BN) model of social factors can support proliferation assessments by estimating the likelihood that a state will pursue a nuclear weapon. Social factors including political, economic, nuclear capability, security, and national identity and psychology factors may play as important a role in whether a State pursues nuclear weapons as more physical factors. This paper will show how using Bayesian reasoning on a generic case of a would-be proliferator State can be used to combine evidence that supports proliferation assessment. Theories and analysis by political scientists can be leveraged in a quantitative and transparent way to indicate proliferation risk. BN models facilitate diagnosis and inference in a probabilistic environment by using a network of nodes and acyclic directed arcs between the nodes whose connections, or absence of, indicate probabilistic relevance, or independence. We propose a BN model that would use information from both traditional safeguards and the strengthened safeguards associated with the Additional Protocol to indicate countries with a high risk of proliferating nuclear weapons. This model could be used in a variety of applications such a prioritization tool and as a component of state safeguards evaluations. This paper will discuss the benefits of BN reasoning, the development of Pacific Northwest National Laboratory’s (PNNL) BN state proliferation model and how it could be employed as an analytical tool.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Architecture and design of third Qinshan nuclear power plant risk monitor

Risk monitor is a real-time analysis tool to determine the point-in-time risk based on actual plant configuration, which is an important application of PSA (Probabilistic Safety Assessment). In this study the status and development trend of risk monitor were investigated and a risk monitor named TQRM (Third Qinshan nuclear power plant Risk Monitor) was developed. The B/S architecture and the two key computing methods pre-solved and resolving PSA model method adopted in TQRM were introduced. The functions and technical features were also presented. Now TQRM has been on-line for more than one year and used in the operation and maintenance of TQNPP. The experience demonstrates that TQRM's results are accurate and real-time, the architecture is stable, and it could be extended and maintained conveniently for any other Risk-Informed Application. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A framework to implement human reliability analysis during early design stages of advanced reactors

Nuclear power plants require human actions throughout their lifecycle from design, construction, operation, and decommissioning. However, for advanced reactors (e.g., Generation IV), the reliance on human intervention in safety-related actions is expected to be reduced or completely replaced by automated actions. The Probabilistic Risk Assessment (PRA) Standard for Advanced Non-LWR Nuclear Power Plants requires that the impacts of all operator actions are captured and incorporated in the risk of the modeled plant. Moreover, the Modernization of Technical Requirements for Licensing Advanced Reactors requires human reliability analysis (HRA) to be included throughout all design and PRA development stages. However, due to the lack of details during the early design stages, HRA is often postponed until the design is mature enough. Conducting HRA in later design stages, though it may be adequate in capturing pre-, at-, and post-initiators comes short of informing the design itself in the iterative design lifecycle. Hence, this paper presents a framework to include HRA during the design's early stages, pre-conceptual or conceptual. The proposed framework provides a process for the removal of operator actions that do not contribute to the risk and the identification of all key operator actions that are critical to the safety of the design. The results of this framework are then used to inform the design of those safety-related operator actions to update the design further. Then, using information from the updated design, this framework can be reapplied to investigate the impact of the design update on human reliability. The PRA model of the X-energy's pre-conceptual Xe-100 high-temperature gas-cooled pebble-bed reactor (HTGR-PB) design is used to demonstrate the approach. In the pre-conceptual Xe-100 PRA model, also called Phase 0 PRA model, human actions were considered an integral part of analyzing the plant response to different initiating events. Hence, in this paper, all possible human actions in the Xe-100 PRA model are identified, analyzed, and removed to emulate a design relying only on the available automated control systems. The preliminary results of this assessment show how safe the Xe-100 design is even without crediting any human actions. The results also list necessary sequences in which operator actions are critical to the risk profile of the design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A computational risk assessment approach to the integration of seismic and flooding hazards with internal hazards

Probabilistic risk assessment (PRA) of nuclear power plants historically focuses on internal events at the plant, rather than external hazards. Although the importance of external hazards risk analysis is now well recognized, the methods for assessing the risk associated with low probability external hazards rely heavily on subjective judgment of specialists, often using conservative elements in the analysis, as is the case with the Conservative Deterministic Failure Margin approach commonly used for seismic PRA. The U.S. Department of Energy Light Water Reactor Sustainability program has been investigating the use of first principles analyses to provide a more realistic assessment of the risk of external hazards, in a process called computational risk assessment (CRA). Efforts undertaken are described in the development of CRA methods to integrate the risk associated with seismic and flooding events into traditional PRA. Further, the results of four case studies are presented.

99 GENERAL AND MISCELLANEOUS↗

Human reliability analysis for NMSS P-406

The PRA Technology Training Program was established in 1982 to formulate a curriculum for training NRC staff members in the use of Probabilistic Risk Assessment (PRA) techniques. Use of these techniques enables the employee to evaluate risks associated with various safety issues, and to apply the results in the process of regulating and inspecting nuclear systems. The training materials are periodically reviewed and revised to incorporate the latest information available, and as needs change, new courses and workshops are added to the curriculum. Course instructors are PRA experts employed in private industry and at the national laboratories.

99 GENERAL AND MISCELLANEOUS↗