Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Two-way communication and analysis program on LANDSAT

Community workshops, field visits, telephone surveys, and other research reveals that professionals at the substate level are interested in and open to consideration of LANDSAT as a planning and resource management tool, but are at the same time skeptical about some of the inherent problems with LANDSAT such as cost, resolution, frequency of coverage, and data continuity. The principal requirements for increasing the utilization of LANDSAT by potential substate users were identified and documented. Without a committment from the Federal Government for increased substrate utilization and the availability of trained professionals to meet the needs of a largely new user community, substrate activity is likely to remain at a minimum. Well conceived and well executed demonstration projects could play a critical role is shaping the technology's ability to be more sensitive to substate user needs and interests as well as validating the effectiveness of this data to a skeptical audience.

Source record↗

Deep Space 1 Mission and observation of Comet Borrelly

After DS1 1 completed its successful primary mission in 1999, NASA sent it on a risky and ambitious extended mission to conduct comet science. In September 2001, DSl executed a flawless encounter with comet Borrelly, yielding the best pictures and other scientific data ever collected at a comet, providing scientists with a tremendous advance in our understanding of these intriguing and important parts of the solar system.

image analysis image processing mission planning N↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 10. Environmental Justice

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter explores implications for environmental justice, including procedural and distributional justice, with an in-depth review of how projections for customer rooftop solar and health benefits vary by census tract.

100% Renewable↗

US Department of Energy Federal Energy Management Program Energy Treasure Hunt Toolkit

The US Department of Energy’s Federal Energy Management Program (FEMP) aims to assist federal agencies and their stakeholders with their energy-focused goals, opportunities, and barriers. The program offers various technical trainings and resources to its stakeholders. One of these resources is an energy treasure hunt program. This report presents the FEMP energy treasure hunt toolkit, a technical resource designed for systematic application for federal facilities seeking to optimize their energy and carbon usage. The toolkit was designed to help facilitate energy-focused kaizen events, identify energy-saving recommendations, analyze identified opportunities, and provide the tools needed to detect actionable projects to advance federal facilities. Through a collaboration with the Oak Ridge National Laboratory team that executed the industrial-focused Better Plants energy treasure hunt program, a similar treasure hunt toolkit was designed for FEMP. The purpose of this report is to provide an overview of the treasure hunt process and FEMP toolkit capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ATDM Rover Milestone Report STDA02-1 (FY2017 Q4)

We have successfully completed the MS-4/Y1 Milestone STDA02-1 for the Rover Project. This document describes the milestone and provides an overview of the technical details and artifacts of the milestone. This milestone is focused on building a GPU accelerated ray tracing package capable of doing multi-group radiography, both back-lit and with self-emission as well as serving as a volume rendering plot in VisIt and other VTK-based visualization tools. The long term goal is a package with in-situ capability, but for this first version integration into VisIt is the primary goal. Milestone Execution Plan: Create API for GPU Raytracer that supports multi-group transport (up to hundreds of groups); Implement components into one or more of: VTK-m, VisIt, and a new library/package implementation to be hosted on LLNL Bitbucket (initially), before releasing to the wider community.

97 MATHEMATICS AND COMPUTING↗

The first ISLSCP field experiment (FIFE)

The background and planning of the first International Satellite Land Surface Climatology Project (ISLSCP) field experiment (FIFE) are discussed. In FIFE, the NOAA series of satellites and GOES will be used to provide a moderate-temporal resolution coarse-spatial resolution data set, with SPOT and aircraft data providing the high-spatial resolution pointable-instrument capability. The paper describes the experiment design, the measurement strategy, the configuration of the site of the experiment (which will be at and around the Konza prairie near Manhattan, Kansas), and the experiment's operations and execution.

Sellers, P. J.↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

The ST5 payload, part of NASA s New Millennium Program headquartered at JPL, consisted of three micro satellites (approx. 30 kg each) deployed into orbit from the Pegasus XL launch. ST5 was a technology demonstration mission, intended to test new technologies for potential use for future missions. In order to meet the launch date schedule of ST 5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The I&T phase was planned for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 in tandem. A team of engineers and technicians planned and executed the integration of all three spacecraft emphasizing versatility and commonality. They increased their knowledge and efficiency through spacecraft #1 integration and testing and utilized their experience and knowledge to safely execute I&T for spacecraft #2 and #3. Each integration team member could perform many different roles and functions and thus better support activities on any of the three spacecraft. The I&T campaign was completed with STS s successful launch on March 22,2006

Sauerwein, Timothy A.↗

INL High-Performance and Sustainable Building Strategy

High-performance buildings are reliable, cost-effective, and sustainable structures that minimize energy and water use, reduce solid waste and pollutant emissions, and limit the depletion of natural resources while also providing a thermally and visually comfortable working environment that increases productivity for building occupants. As Idaho National Laboratory (INL) is the nation’s premier nuclear energy research laboratory, the physical infrastructure requires continual updating and re-purposing to help accomplish that mission. INL’s infrastructure must incorporate high-performance sustainable design features to be fiscally responsible and reflect an image of innovation to the public and prospective employees. INL is a large consumer of energy with annual energy costs exceeding $9M. In the current fiscal reality and with energy costs constantly increasing, this High-Performance and Sustainable Building Strategy will help engineering and construction project teams design facilities that are sustainable and will help to reduce life-cycle operating costs while providing INL employees with a safe and healthy working environment. With these goals in mind, the recommendations described in this document are intended to form INL’s foundation for sustainable and high-performance building standards. This strategy incorporates the latest federal and Department of Energy (DOE) orders and directives including Executive Order (EO) 13834, “Efficient Federal Operations” and its associated implementing instructions, DOE Order 436.1, “Departmental Sustainability,” the DOE Sustainability Report and Implementation Plan (SRIP), the INL Site Sustainability Plan (SSP), and Code of Federal Regulations (CFR). This document identifies the requirements of the Guiding Principles for Sustainable Federal Buildings (Guiding Principles) and briefly highlights the requirements of Leadership in Energy and Environmental Design (LEED®) Gold certification. LEED Gold certification, while optional, can be used to meet many of the requirements of the Guiding Principles.

13834↗

Benchmark Tracking System for Performance Monitoring

Benchmarking is essential for high-performance software development, particularly for monitoring performance across code iterations. This project focused on enhancing the benchmarking process for Lamellar, an asynchronous runtime for High-Performance Computing (HPC) systems developed at Pacific Northwest National Laboratory. Prior to this work, benchmark results were difficult to track and compare across code versions, presenting significant challenges in identifying performance regressions and long-term trends. The primary objective was to establish a systematic, reproducible approach for measuring performance and detecting regressions following code commits. Our methodology involved three key components: standardizing benchmark outputs, implementing data versioning, and developing analysis tools. We standardized the benchmark output format to JSON Line records containing specific fields (execution time, hardware specifications, and environmental variables). To address data management challenges, we evaluated several options and eventually chose a git repository dedicated to benchmark data. We developed a suite of Python tools that processed benchmark results, enriched them with metadata, and facilitated search in the repository. The resulting system enables more efficient filtering and comparison of performance metrics across commit histories, hardware configurations, and benchmark variants through a unified query interface. Our implementation reduces computational overhead by first checking for existing results through configuration matching before initiating new benchmark runs, thereby conserving resources. The system has been validated by Lamellar developers. It organizes results by benchmark type and build configurations for efficient retrieval. Future developments include a planned Large Language Model interface for predicting benchmark performance, incorporating the criterion package for statistical analysis, which will enable automated detection of statistically significant performance changes, and integration with continuous integration pipelines. Despite these enhancements being reserved for future work, this project has successfully provided the Lamellar development team with a framework for maintaining consistent performance standards and identifying optimization opportunities across workloads and hardware environments.

97 MATHEMATICS AND COMPUTING↗

Trades, Architecture, and Design of the Joint Augmented Reality Visual Informatics (Joint AR) Product

Future expeditions will enable exploration and study of the planetary surfaces of the Moon and Mars by performing extravehicular activity (EVA) operations. Present-day International Space Station (ISS) EVA operations require an intricate and tight choreography of crew, space suits, tools, systems, and flight teams to plan, train, and execute with limited advanced informatics. Additionally, EVA operations, aside from the Apollo Lunar surface missions, have predominately focused on maintenance and construction tasks where success criteria are clearly measurable. However, future exploration missions expect to enable crew to carry out scientific objectives in increasingly Earth-independent ways. In this paper, the Joint Augmented Reality Visual Informatics System (Joint AR) characterizes the design space for developing a modular augmented reality (AR) device for a spacesuit form factor that can support crew decision-making for EVA. This paper highlights the project’s experience with a product-focused management style and use-case centered systems engineering approach to iteratively design, build, and test. The Joint AR product features were defined via trade studies and market analysis of previous EVA display efforts, various AR components such as optics, commercial AR systems, light engines, data interfaces, graphics engine software and analog test beds. We outline the defining architectural design decisions, including safety criticality considerations, suit mounting interfaces, computer architectures, and partnership contracting mechanisms. The outcomes of these studies, architecture decisions, and management requirements result in a recommended design which is the Joint AR product. We discuss the evolution, development of these system components, and what work remains. We hope to share a unified understanding of various design decisions and how they impact the future of crew members’ access to data during Lunar and Martian EVAs. This ongoing effort can enable a community-wide discovery process toward realizing necessary AR features and capabilities for future missions.

Augmented Reality↗

Uncertainty in benefit cost analysis of smart grid demonstration-projects in the U.S., China, and Italy

Given the substantial investments required, there has been keen interest in conducting benefits analysis, i.e., quantifying, and often monetizing, the performance of smart grid technologies. In this study, we compare two different approaches; (1) Electric Power Research Institute (EPRI)’s benefits analysis method and its adaptation to the European contexts by the European Commission, Joint Research Centre (JRC), and (2) the Analytic Hierarchy Process (AHP) and fuzzy logic decision making method. These are applied to three case demonstration projects executed in three different countries; the U.S., China, and Italy, considering uncertainty in each case. This work is conducted under the U.S. (United States)-China Climate Change Working Group, smart grid, with an additional major contribution by the European Commission. The following is a brief description of the three demonstration projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

BOTTLE 7 - Industry Projects & Engagement

One of BOTTLE's primary goals is to work with industry to catalyze new technologies towards our overall vision and mission using a centralized industry engagement plan which aims to 1) solve real-world problems in plastics upcycling via targeted, company-funded projects; 2) promote industrial engagement via streamlined access to BOTTLE partners and technologies; and 3) collaborate with companies to scale and deploy BOTTLE technologies into the economy. Our approach follows a 5-stage model: prospecting, initial engagement, knowledge sharing, proposal and contracting, and opportunity won. Since FY21, BOTTLE has onboarded a full-time Chief Technology Officer to spearhead industry engagement and lead industrially-funded research projects. To date, BOTTLE has engaged with >150 companies, executed 6 industrial funds-in CRADAs, completed 2 industry projects successfully, extended 2 CRADAs with follow-on funds, and submitted over 30 patent applications. Industry projects span the Deconstruction, Upcycling, and Redesign tasks, harness the capabilities of the cross-cutting tasks, and take advantage of the broad IP portfolio developed through DOE funding. BOTTLE partners have an inventory of innovations that can inform the design of industry-specific collaborative projects with the highest probability of producing novel IP. Engaging with a diverse set of companies has also directly informed our R&D portfolio towards maximizing impact and utility of BOTTLE innovations.

BIOMASS FUELS↗

Orbital Express Mission Operations Planning and Resource Management using ASPEN

As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less man-power rises.Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. The Automated-Scheduling and Planning Environment (ASPEN)tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the ASE project's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

Automated Scheduling and Planning Environment (ASP↗

NASA Software Cost Estimation Model: An Analogy Based Estimation Model

The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

Hihn, Jairus↗

Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative

NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Marshall Space Flight Center Propulsion Systems Department (PSD) Knowledge Management (KM) Initiative

NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppo~th e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗