Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Resupply Scheduler Program Using Integer Optimization

Resupply Scheduling Modeler (RSM) fully menu-driven computer program using integer programming techniques to determine optimum schedule for replacing components on or before ends of fixed replacement periods. Written to analyze electrical power system on Space Station Freedom, also used to model resupply of almost any system subject to user-defined constraints on resources. Lifetimes of components, assembly schedules, and other constraints taken into account. Written in APL2(R).

Viterna, L. A.↗

Incremental Scheduling Engines: Cost Savings through Automation

As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

Jaap, John↗

Request Generation 2 mission planning and scheduling

Request Generation II (ReGe II) is a PC-based prototype knowledge based system intented to assist USAF personnel in planning and scheduling satellite operations for their Mission Control Complexes (MCC). It aids MCC personnel in producing weekly Program Action Plans (PAPs) for each of the satellite vehicles an MCC is responsible for monitoring and maintaining. The PAPs are input to the Resource Control Complex (RCC) which schedules all satellite support requests for usage of the network.

Greenhut, Darlene D.↗

Queue wait time prediction in high performance computing (HPC) systems

High Performance Computing (HPC) systems are critical enablers for groundbreaking scientific research across various domains. Efficient resource allocation, facilitated by job scheduling, is paramount for maximizing the utilization of HPC systems. However, the variability in wait times for queued jobs poses challenges for users, necessitating accurate job wait time estimation. This paper explores the influence of job characteristics, including job size (the number of nodes requested and walltime), the queue to which the job is submitted and other resource requirements, on job wait times in leadership-class HPC systems. Focusing on the Theta Cray XC40 and Polaris machines at Argonne National Laboratory, the study evaluates the performance of different supervised learning algorithms in predicting job wait times. It also evaluates the impact of data preprocessing, including outlier detection, Principal Component Analysis (PCA), and feature selection, on the performance of wait time prediction models. The findings reveal insights into the relationship between job characteristics and wait times, offering a foundation for optimizing resource allocation and enhancing user experience. The methodologies and tools developed in this study are adaptable to other leadership-class HPC systems, providing a valuable contribution to the broader HPC community aiming to improve job scheduling efficiency and user satisfaction.

Okafor, Nwamaka↗

HPC Digital Twins for Evaluating Scheduling Policies, Incentive Structures and their Impact on Power and Cooling

Schedulers are critical for optimal resource utilization in high-performance computing. Traditional methods to evaluate sched- ulers are limited to post-deployment analysis, or simulators, which do not model associated infrastructure. In this work, we present the first-of-its-kind integration of scheduling and digital twins in HPC. This enables what-if studies to understand the impact of parameter configurations and scheduling decisions on the physical assets, even before deployment, or regarching changes not easily realizable in production. We (1) provide the first digital twin framework extended with scheduling capabilities, (2) integrate various top-tier HPC systems given their publicly available datasets, (3) implement extensions to integrate external scheduling simulators. Finally, we show how to (4) implement and evaluate incentive structures, as- well-as (5) evaluate machine learning based scheduling, in such novel digital-twin based meta-framework to prototype scheduling. Our work enables what-if scenarios of HPC systems to evaluate sustainability, and the impact on the simulated system.

Maiterth, Matthias [ORNL] (ORCID:000000018698460X)↗

Task scheduling in dataflow computer architectures

Dataflow computers provide a platform for the solution of a large class of computational problems, which includes digital signal processing and image processing. Many typical applications are represented by a set of tasks which can be repetitively executed in parallel as specified by an associated dataflow graph. Research in this area aims to model these architectures, develop scheduling procedures, and predict the transient and steady state performance. Researchers at NASA have created a model and developed associated software tools which are capable of analyzing a dataflow graph and predicting its runtime performance under various resource and timing constraints. These models and tools were extended and used in this work. Experiments using these tools revealed certain properties of such graphs that require further study. Specifically, the transient behavior at the beginning of the execution of a graph can have a significant effect on the steady state performance. Transformation and retiming of the application algorithm and its initial conditions can produce a different transient behavior and consequently different steady state performance. The effect of such transformations on the resource requirements or under resource constraints requires extensive study. Task scheduling to obtain maximum performance (based on user-defined criteria), or to satisfy a set of resource constraints, can also be significantly affected by a transformation of the application algorithm. Since task scheduling is performed by heuristic algorithms, further research is needed to determine if new scheduling heuristics can be developed that can exploit such transformations. This work has provided the initial development for further long-term research efforts. A simulation tool was completed to provide insight into the transient and steady state execution of a dataflow graph. A set of scheduling algorithms was completed which can operate in conjunction with the modeling and performance tools previously developed. Initial studies on the performance of these algorithms were done to examine the effects of application algorithm transformations as measured by such quantities as number of processors, time between outputs, time between input and output, communication time, and memory size.

Katsinis, Constantine↗

Space communications scheduler: A rule-based approach to adaptive deadline scheduling

Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

Straguzzi, Nicholas↗

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗

EUROPA2: Plan Database Services for Planning and Scheduling Applications

NASA missions require solving a wide variety of planning and scheduling problems with temporal constraints; simple resources such as robotic arms, communications antennae and cameras; complex replenishable resources such as memory, power and fuel; and complex constraints on geometry, heat and lighting angles. Planners and schedulers that solve these problems are used in ground tools as well as onboard systems. The diversity of planning problems and applications of planners and schedulers precludes a one-size fits all solution. However, many of the underlying technologies are common across planning domains and applications. We describe CAPR, a formalism for planning that is general enough to cover a wide variety of planning and scheduling domains of interest to NASA. We then describe EUROPA(sub 2), a software framework implementing CAPR. EUROPA(sub 2) provides efficient, customizable Plan Database Services that enable the integration of CAPR into a wide variety of applications. We describe the design of EUROPA(sub 2) from the perspective of both modeling, customization and application integration to different classes of NASA missions.

Bedrax-Weiss, Tania↗

SchedInspector: A Batch Job Scheduling Inspector Using Reinforcement Learning

Improving the performance of job executions is an important goal of HPC batch job schedulers, such as minimizing job waiting time, slowdown, or completion time. Such a goal is often accomplished using carefully designed heuristics based on job features, such as job size and job duration. However, these heuristics overlook important runtime factors (e.g., cluster availability and waiting job patterns), which may vary across time and make a previously sound scheduling decision not hold any longer. In this study, we propose a new approach to incorporate runtime factors into batch job scheduling for better job execution performance. The key idea is to add a scheduling inspector on top of the base job scheduler to scrutinize its scheduling decisions. The inspector will take the runtime factors into consideration and accordingly determine the fitness of the scheduled job. It then either accepts the scheduled job or rejects it and asks the base schedulers to try again later. We realize such an inspector, namely SchedInspector, by leveraging the intelligence of reinforcement learning. Through extensive experiments, we show SchedInspector can intelligently integrate the runtime factors into various batch job scheduling policies, including the state-of-the-art one, to gain better job execution performance, such as smaller average bounded job slowdown (up to 69% better) or average job waiting time (up to 52% better), across various real-world workloads. We also show that although rejecting scheduling decisions may leave the resources idle hence affect the system utilization, SchedInspector is able to achieve the job execution performance improvement with marginal impact on the system utilization (typically less than 1%). We consider one key advantage of SchedInspector is it automatically learns to work with and improve existing job scheduling policies without changing them, which makes it promising to serve as a generic enhancer for various batch job scheduling policies.

Zhang, Di↗

A new technology for manufacturing scheduling derived from space system operations

A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

Hornstein, R. S.↗

Privacy-Preserving Control of Partitioned Energy Resources

Distributed energy resources are an increasingly important part of the electric grid. We examine the problem of partitioning a distributed energy resource among many users while providing privacy to them. In this model, clients can send requests to a server, the server can verify that the requests are valid and aggregate them, but it cannot see the actual values in the requests. Without privacy, each user is forced to reveal their daily schedule or energy use. Energy resources add a novel challenge that prior systems do not address: they require verifying limits on private power (a rate over time) and energy (a sum) values. Furthermore, the cryptographic mechanisms must run on embedded energy control systems. We describe Weft, a novel cryptographic system that verifies both power (rate) and energy (integral) constraints on private client values and aggregates them. The key insight behind the approach is to rely on additively homomorphic secret shares, which allows servers to compute sums from rates. We present 3 cryptographic proof systems with different system trade-off for embedded systems: bit-splitting proofs minimize memory use, sorting proofs minimize computation, and commitment proofs minimize network communication. Using bit-splitting proofs, it takes an IoT client using a CortexM microcontroller 4 minutes of compute time to privately control its share of an energy resource for a day at 20s granularity.

Laufer, Evan↗

Managing Capital Investments and Resources for Large, Complex Satellite Development Efforts

Once the schedule was baselined and the primary, secondary, and tertiary critical paths (at least) were established: Identified what entity control which portion of the schedule reserve Dollarized the time associated with the schedule reserve and segregated it off from other budget reserves authorization to spend only came when authorization to utilize the time was given Created a process to manage the control of these resources This process was above and beyond the typical schedule controls used to monitor and maintain the day-to-day schedules Webb telescope will be the premier space observatory for astronomers worldwide,extending the tantalizing discoveries of the Hubble Space telescope• An international collaboration among NASA, the European Space Agency, and theCanadian Space Agency• The largest telescope ever placed in space, Webb will be ~100 times more powerful thanHubble• It is so big it has to fold origami-style to fit in the rocket and will unfold like a transformeronce in space• The 5-layer sunshield protects the telescope from the Sun, Earth, and Moon’s infraredradiation. It’s like having sun protection of SPF 1 million• Unprecedented infrared sensitivity will peer back in time over 13.5 billion years to see thefirst galaxies born after the Big Bang• Hubble orbits ~350 miles above the Earth; Webb will orbit the sun ~1 million miles fromEarth• Launch from French Guiana in 2018

Ryan, Richard M.↗

A Model-based Approach to Controlling the ST-5 Constellation Lights-Out Using the GMSEC Message Bus and Simulink

Space Technology 5 (ST-5) is a three-satellite constellation, technology validation mission under the New Millennium Program at NASA to be launched in March 2006. One of the key technologies to be validated is a lights-out, model-based operations approach to be used for one week to control the ST-5 constellation with no manual intervention. The ground architecture features the GSFC Mission Services Evolution Center (GMSEC) middleware, which allows easy plugging in of software components and a standardized messaging protocol over a software bus. A predictive modeling tool built on MatLab's Simulink software package makes use of the GMSEC standard messaging protocol to interface to the Advanced Mission Planning System (AMPS) Scenario Scheduler which controls all activities, resource allocation and real-time re-profiling of constellation resources when non-nominal events occur. The key features of this system, which we refer to as the ST-5 Simulink system, are as follows: Original daily plan is checked to make sure that predicted resources needed are available by comparing the plan against the model. As the plan is run in real-time, the system re-profiles future activities in real-time if planned activities do not occur in the predicted timeframe or fashion. Alert messages are sent out on the GMSEC bus by the system if future predicted problems are detected. This will allow the Scenario Scheduler to correct the situation before the problem happens. The predictive model is evolved automatically over time via telemetry updates thus reducing the cost of implementing and maintaining the models by an order of magnitude from previous efforts at GSFC such as the model-based system built for MAP in the mid-1990's. This paper will describe the key features, lessons learned and implications for future missions once this system is successfully validated on-orbit in 2006.

Witt, Kenneth J.↗

A Modified Maximum Entropy Inverse Reinforcement Learning Approach for Microgrid Energy Scheduling

Increasing popularity of integrating distributed energy resources (DERs) into the power system brings a challenge to optimize the microgrid dispatch policy. The reinforcement learning methods suffer from a long-time problem with the theoretical assumption of the objective/reward function for the microgrid system. Although the traditional inverse reinforcement learning (IRL) approaches can solve this problem to some extent, they encounter a limitation of complex computations for state visitation frequency in the large and continuous state space. To alleviate this limitation, we propose a modified maximum entropy IRL (MMIRL) method to extract the reward function from the expert demonstrations for solving the microgrid energy scheduling problem. The proposed MMIRL algorithm is promising in recovering the reward function and learning the dispatch policy compared to conventional approaches. Case studies are performed in an energy arbitrage problem and a microgrid system with DERs. Results substantiate that the proposed MMIRL approach can learn the dispatch policy with more than 99% efficiency and outperforms other comparative methods.

artificial intelligence, reinforcement learning, m↗

Request-Driven Schedule Automation for the Deep Space Network

The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

Johnston, Mark D.↗

Automated Scheduling Via Artificial Intelligence

Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

Biefeld, Eric W.↗

A planning language for activity scheduling

Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

Zoch, David R.↗