Search NASA⌕ Search

SEARCH · Search NASA

Results for “SATELLITE MANEUVER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

SPECS: Orbital debris removal

The debris problem has reached a stage at which the risk to satellites and spacecraft has become substantial in low Earth orbit (LEO). This research discovered that small particles posed little threat to spacecraft because shielding can effectively prevent these particles from damaging the spacecraft. The research also showed that, even though collision with a large piece of debris could destroy the spacecraft, the large pieces of debris pose little danger because they can be tracked and the spacecraft can be maneuvered away from these pieces. Additionally, there are many current designs to capture and remove large debris particles from the space environment. From this analysis, it was decided to concentrate on the removal of medium-sized orbital debris, that is, those pieces ranging from 1 cm to 50 cm in size. The current design incorporates a transfer vehicle and a netting vehicle to capture the medium-sized debris. The system is based near an operational space station located at 28.5 deg inclination and 400 km altitude. The system uses ground-based tracking to determine the location of a satellite breakup or debris cloud. These data are uploaded to the transfer vehicle, which proceeds to rendezvous with the debris at a lower altitude parking orbit. Next, the netting vehicle is deployed, tracks the targeted debris, and captures it. After expending the available nets, the netting vehicle returns to the transfer vehicle for a new netting module and continues to capture more debris in the target area. Once all the netting modules are expended, the transfer vehicle returns to the space station's orbit where it is resupplied with new netting modules from a space shuttle load. The new modules are launched by the shuttle from the ground and the expended modules are taken back to Earth for removal of the captured debris, refueling, and repacking of the nets. Once the netting modules are refurbished, they are taken back into orbit for reuse. In a typical mission, the system has the ability to capture 50 pieces of orbital debris. One mission will take approximately six months and the system is designed to allow for a 30 deg inclination change on the outgoing and incoming trips of the transfer vehicle.

Source record↗

Orbit Control Operations for the Cassini-Huygens Mission

The Cassini-Huygens spacecraft was launched in 1997 as an international and collaborative mission to study Saturn and its many moons. After a seven-year cruise, Cassini began orbiting Saturn for a four- year tour. This tour consists of 157 planned maneuvers, and their back-up locations, designed to target 52 encounters, mostly of Saturn's largest moon Titan. One of the mission's first activities was to release the Huygens probe to Titan in December 2004. Currently in its last year of the prime mission, Cassini-Huygens continues to obtain valuable data on Saturn, Titan, and Saturn's other satellites. Return of this information is in large part due to a healthy spacecraft and successful navigation. A two-year extended mission, beginning July 2008, will offer the opportunity to continue science activities. With a demanding navigation schedule that compares with the prime tour, the Cassini Navigation team relies on operations procedures developed during the prime mission to carry-out the extended mission objectives. Current processes for orbit control operations evolved from the primary navigational requirement of staying close to predetermined targeting conditions according to Cassini science sequence planning. The reference trajectory is comprised of flyby conditions to be accomplished at minimal propellant cost. Control of the planned reference trajectory orbit, and any trajectory updates, is achieved with the execution of Orbit Trim Maneuvers (OTMs). The procedures for designing, processing, and analyzing OTMs during Cassini operations is presented. First, a brief overview of the Cassini-Huygens Mission is given, followed by a general description of navigation. Orbit control and maneuver execution methods are defined, along with an outline of the orbit control staffing and operations philosophy. Finally, an example schedule of orbit control operations is shown.

navigation↗

STS Flight 64 Mission Highlights

The pre-launch, launch, in-flight, and landing activities of STS Flight 64 are highlighted in this video. Footage of the astronauts (Richard, Hammond, Lee, Helms, Meade, and Linenger) suiting up, the payload activities with the Shuttle arm, the deployment of the Spartan satellite, the untethered spacewalk of Lee and other in-space experiments with Lee and Meade (including a body roll), the pre-landing shots and actual landing, and some footage of the Mission Operations Control Room watching the Space Shuttle maneuvers are included.

Source record↗

NASA's Orbital Debris Conjuction Assessment and Collision Avoidance Strategy

NASA has successfully used debris avoidance maneuvers to protect our spacecraft for more than 20 . years. This process which started out using parametric data and maneuver boxes has seen considerable evolution and now allows us to continue nominal operations for all but the most threatening objects. This has greatly reduced the interruptions to the critical mission objectives being pursued by NASA s Space Station, Space Shuttle, and robotic satellites.

Gavin, Richard T.↗

Orbital Debris Quarterly News, March 2023

- ISS Maneuver - NASA Releases HOOSF Update - Robert C. Reynolds Passes Away - Updates of the ES-MCAT for GEO Survey Operations - SpaceX Crew-4 Post-flight Inspection - Goldstone Measurements of the OD Environment: 2020-2021 - Meeting Reports - Upcoming Meetings - Plots - Space Missions and Satellite Box Score

Heather Mae Cowardin↗

Orbital spacecraft consumables resupply

The capability to replenish spacecraft, satellites, and laboratories on-orbit with consumable fluids provides significant increases in their cost and operational effectiveness. Tanker systems to perform on-orbit fluid resupply must be flexible enough to operate from the Space Transportation System (STS), Space Station, or the Orbital Maneuvering Vehicle (OMV), and to accommodate launch from both the Shuttle and Expendable Launch Vehicles (ELV's). Resupply systems for storable monopropellant hydrazine and bipropellants, and water have been developed. These studies have concluded that designing tankers capable of launch on both the Shuttle and ELV's was feasible and desirable. Design modifications and interfaces for an ELV launch of the tanker systems were identified. Additionally, it was determined that modularization of the tanker subsystems was necessary to provide the most versatile tanker and most efficient approach for use at the Space Station. The need to develop an automatic umbilical mating mechanism, capable of performing both docking and coupler mating functions was identified. Preliminary requirements for such a mechanism were defined. The study resulted in a modular tanker capable of resupplying monopropellants, bipropellants, and water with a single design.

Dominick, Sam M.↗

Conceptual design of a manned orbital transfer vehicle

With the advent of the manned space station, man now requires a spacecraft based on the space station with the ability to deploy, recover, and repair satellites quickly and economically. Such a craft would prolong and enhance the life and performance of many satellites. A basic design was developed for an orbital tansfer vehicle (OTV). The basic design criteria are discussed. The design of the OTV and systems were researched in the following areas: avionics, crew systems, electrical power systems, environmental control/life support systems, navigation and orbital maneuvers, propulsion systems, reaction control systems (RCS), servicing systems, and structures. The basic concepts in each of the areas are summarized.

Davis, Richard↗

Venus and Beyond Using the Ariane ASAP Launch Capability

The cost of executing planetary missions in the next ten years is expected to decrease significantly. The principle reason is that new technology is reducing spacecraft mass while increasing capability. Another reason is that launch costs are expected to decrease. A move in this direction is to permit important planetary missions to fly as secondary payloads, and this opportunity is now provided by the French on the Ariane 5 using the Ariane Structure for Auxiliary Payloads (ASAP). The ASAP will fly on GEO missions, and can boost up to eight 100 kg (or 200 kg, if paired) payloads into the elliptical geosynchronous transfer orbit (GTO), which delivers large communication satellites to GEO. An efficient multi-burn method has been developed by this author to deliver these small spacecraft from GTO to Mars and other destinations. This method, referred to here as Moon-Earth Gravity Assist (MEGA), requires 3 or more major maneuvers together with close flybys of the earth and moon. An example for a Mars 2003 mission (not to scale) is shown in Figure 1, where, once in GTO, the first burn sends the spacecraft beyond the Moon to a distance of 1.2 million kilometers. At apogee, the second burn targets to an encounter with the Moon such that a swingby returns the spacecraft to the Earth with a 300 km perigee, and with an inclination such that a perigee burn will send the spacecraft off to Mars with the required escape velocity vector. Details of this method, specifically for Mars missions, can be found in Reference 3. A similar strategy works for Venus, with some caveats. This method is required to work for any Ariane 5 launch date over a three month period, to ensure a high probability of getting off the ground. The launch period is provided by fixing the Earth escape date (3rd burn), but allowing the high ellipse (beyond the Moon) period to vary by one or two months, and also allowing a one to two month wait time in GTO (or other orbit) before the first burn is performed. Figure 2 shows the trajectory profiles for the early and late GTO launch dates for a Mars 2003 mission. Venus. which is an inner planet, poses special problems for the MEGA process. The escape direction is reverse that of Earth's motion, and the GTO apogee arrival

Penzo, Paul A.↗

Orbital Debris Quarterly News, February 2024

- The Second International Orbital Debris Conference - ISS Maneuvers to Avoid Potential November 2023 Collision - Goldstone Radar Measurements of the Orbital Debris Environment: 2022 - ODPO Lab Updates - Conference and Workshop Reports - Upcoming Meetings - IOC II Conference Abstracts from the NASA HVIT - IOC II Conference Abstracts from the NASA ODPO - Space Missions and Satellite Box Score

Heather Cowardin↗

Orbit Determination Covariance Analysis for the Europa Clipper Mission

A new Jovian satellite tour is proposed by NASA, which would include numerous flybys of the moon Europa, and would explore its potential habitability by characterizing the existence of any water within and beneath Europa's ice shell. This paper describes the results of a covariance study that was undertaken on a sample tour to assess the navigational challenges and capabilities of such a mission from an orbit determination (OD) point of view, and to help establish a delta V budget for the maneuvers needed to keep the spacecraft on the reference trajectory. Additional parametric variations from the baseline case were also investigated. The success of the Europa Clipper mission will depend on the science measurements that it will enable. Meeting the requirements of the instruments onboard the spacecraft is an integral part of this analysis.

satellite tour↗

Nutation control during precession of a spin-stabilized spacecraft

Precession maneuver control laws for single-spin spacecraft are investigated so that nutation is concurrently controlled. Analysis has led to the development of two types of control laws employing precession modulation for concurrent nutation control. Results were verified through digital simulation of a Synchronous Meteorological Satellite (SMS) configuration. An addition research effort was undertaken to investigate the cause and elimination of nutation anomalies in dual-spin spacecraft. A literature search was conducted and a dual-spin configuration was simulated to verify that nutational anomalies are not predicted by the existing nonlinear model. No conclusions were drawn as to the cause of the observed nutational anomalies in dual-spin spacecraft.

Source record↗

Geostationary Operational Environmental Satellite (GOES)-8 mission flight experience

The Geostationary Operational Environmental Satellite (GOES)-8 spacecraft was launched on April 13, 1994, at 06:04:02 coordinated universal time (UTC), with separation from the Atlas-Centaur launch vehicle occurring at 06:33:05 UTC. The launch was followed by a series of complex, intense operations to maneuver the spacecraft into its geosynchronous mission orbit. The Flight Dynamics Facility (FDF) of the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) was responsible for GOES-8 attitude, orbit maneuver, orbit determination, and station acquisition support during the ascent phase. This paper summarizes the efforts of the FDF support teams and highlights some of the unique challenges the launch team faced during critical GOES-8 mission support. FDF operations experience discussed includes: (1) The abort of apogee maneuver firing-1 (AMF-1), cancellation of AMF-3, and the subsequent replans of the maneuver profile; (2) The unexpectedly large temperature dependence of the digital integrating rate assembly (DIRA) and its effect on GOES-8 attitude targeting in support of perigee raising maneuvers; (3) The significant effect of attitude control thrusting on GOES-8 orbit determination solutions; (4) Adjustment of the trim tab to minimize torque due to solar radiation pressure; and (5) Postlaunch analysis performed to estimate the GOES-8 separation attitude. The paper also discusses some key FDF GOES-8 lessons learned to be considered for the GOES-J launch which is currently scheduled for May 19, 1995.

Noonan, C. H.↗

On alighting daintily at Jupiter: innovative methods for efficiently achieving Jovian orbit

Spacecraft bound for Jupiter orbit typically spend the majority of their ΔV in the capture process. The Galilean satellites provide myriad flyby opportunities to assist in the capture process. In addition, the relatively low solar range (compared to the other outer planets) and absence of significant rings add to the option space. Starting with typical single-flyby and Jupiter Orbit Insertion (JOI) maneuver sequences, we will walk through a range of capture options, including longer post-capture tours, double flybys (and their constraints), combined with solar-electric propulsion (SEP) usage, and finally the potential benefits of retrograde, “cloudtops” orbit insertion. In combination with a ΔV-EGA interplanetary trajectory, the cloudtops arrival saves over 500 m/s in the capture sequence.

Siddique, Fazie E.↗

The Space Superhighway: Space Infrastructure for the 21st Century

This poster introduces a concept for space infrastructure developed with input from multiple U.S. government agencies called the Space Superhighway, which could support civil, commercial, and national security space activities. The Space Superhighway is a commercial-first space infrastructure that contains three primary components: regional hubs, a sustainable transportation network, and Earth-to-orbit logistics. Civil, commercial, and national security space sectors could use this common infrastructure to support missions such as satellite servicing, Earth science, and space domain awareness, among others. It utilizes a commercial-first, “infrastructure-as-a-service” approach which contains industry-owned and operated assets with government anchor tenants for commercial services, enabling extended mission lifetime, on-orbit repair, maneuver without regret, and debris mitigation and removal. The Space Superhighway is the space infrastructure needed for the 21st century.

space infrastructure↗

GPS Receiver On-Orbit Performance for the GOES-R Spacecraft

This paper evaluates the on-orbit performance of the first civilian operational use of a Global Positioning System Receiver (GPSR) at a geostationary orbit (GEO). The GPSR is on-board the newly launched Geostationary Operational Environmental Satellite (GOES-R). GOES-R is the first of four next generation GEO weather satellites for NOAA, now in orbit GOES-R is formally identified as GOES-16. Among the pioneering technologies required to support its improved spatial, spectral and temporal resolution is a GPSR. The GOES-16 GPSR system is a new design that was mission critical and therefore received appropriate scrutiny. As ground testing of a GPSR for GEO can only be done by simulations with numerous assumptions and approximations regarding the current GPS constellation, this paper reveals what performance can be achieved in using on orbit data. Extremely accurate orbital position is achieved using GPS navigation at GEO. Performance results are shown demonstrating compliance with the1007575 meter and 6 cms radial/in-track/cross-track orbital position and velocity accuracy requirements of GOES-16. The aforementioned compliance includes station-keeping and momentum management maneuvers, contributing to no observational outages. This performance is achieved by a completely new system design consisting of a unique L1 GEOantenna, low-noise amplifier (LNA) assembly and a 12 channel GPSR capable of tracking the edge of the main beam and the side lobes of the GPS L1 signals. This paper presents the definitive answer that the GOES-16 GPSR solution exceeds all performance requirements tracking up to 12 satellites and achieving excellent carrier-to-noise density (C/N0). Additionally, these performance results show the practicality of this approach. This paper makes it clear that all future GEO Satellites should consider the addition of a GPSR in their spacecraft design, otherwise they may be sacrificing spacecraft capabilities and accuracy along with incurring increased and continual demand on ground support.

GEO GPS↗

Spacecraft servicing demonstration plan

A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.

Bergonz, F. H.↗

Sensitivity of Magnetospheric Multi-Scale (MMS) Mission Navigation Accuracy to Major Error Sources

The Magnetospheric Multiscale (MMS) mission consists of four satellites flying in formation in highly elliptical orbits about the Earth, with a primary objective of studying magnetic reconnection. The baseline navigation concept is independent estimation of each spacecraft state using GPS pseudorange measurements referenced to an Ultra Stable Oscillator (USO) with accelerometer measurements included during maneuvers. MMS state estimation is performed onboard each spacecraft using the Goddard Enhanced Onboard Navigation System (GEONS), which is embedded in the Navigator GPS receiver. This paper describes the sensitivity of MMS navigation performance to two major error sources: USO clock errors and thrust acceleration knowledge errors.

Olson, Corwin↗

Sensitivity of Magnetospheric Multi-Scale (MMS) Mission Naviation Accuracy to Major Error Sources

The Magnetospheric Multiscale (MMS) mission consists of four satellites flying in formation in highly elliptical orbits about the Earth, with a primary objective of studying magnetic reconnection. The baseline navigation concept is independent estimation of each spacecraft state using GPS pseudorange measurements referenced to an Ultra Stable Oscillator (USO) with accelerometer measurements included during maneuvers. MMS state estimation is performed onboard each spacecraft using the Goddard Enhanced Onboard Navigation System (GEONS), which is embedded in the Navigator GPS receiver. This paper describes the sensitivity of MMS navigation performance to two major error sources: USO clock errors and thrust acceleration knowledge errors.

Olson, Corwin↗