Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHUTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

RHIC BBLR measurements in 2009

Long range beam-beam experiments were conducted during the Run 2009 in the Yellow and the Blue beams of the RHIC accelerator with DC wires. The effects of a long-range interaction with a DC wire on colliding and non-colliding bunches with the aid of beam losses, orbits, tunes were studied. Results from distance scans and an attempt to compensate a long-range interaction with a DC wire is presented. Two DC wires in the vertical plane were installed in the RHIC accelerator in 2006 with the aim of investigating long range (LR) beam-beam effects and a potential compensation. Extensive experiments were conducted focusing mainly on the effect of a wire on single ion beams from 2006-2009. A unique opportunity to compare the effect of the wire on colliding beams and compensation of a single LR beam-beam interaction were conducted in Run2009 with protons at 100 GeV. Due to aperture considerations for decreasing {beta}*, the Blue wire was removed during the shutdown after the Run2009 and the Yellow wire is foreseen to be removed in the near future. Therefore, these experiments serve as the final set of measurements for LR beam-beam with RHIC as a test bed. The relevant RHIC beam and lattice parameters are listed in Table 1 for the experiments in Run2009.

43 PARTICLE ACCELERATORS↗

Study of effects of failure of beamline elements and their compensation in CW superconducting linac

Project-X is the proposed high intensity proton facility to be built at Fermilab, US. First stage of the Project-X consists of superconducting linac which will be operated in continuous wave (CW) mode to accelerate the beam from 2.5 MeV to 3 GeV. The operation at CW mode puts high tolerances on the beam line components, particularly on radiofrequency (RF) cavity. The failure of beam line elements at low energy is very critical as it results in mis-match of the beam with the following sections due to different beam parameters than designed parameter. It makes the beam unstable which causes emittance dilution, and ultimately results in beam losses. In worst case, it could affect the reliability of the machine and may lead to the shutdown of the Linac to replace the failed elements. Thus, it is important to study these effects and their compensation to get smooth beam propagation in linac. This paper describes the results of study performed for the failure of RF cavity & solenoid in SSR0 section.

43 PARTICLE ACCELERATORS↗

NETL to establish Dynamic Simulation Research and Training Center to promote IGCC technology with CO2 cpture

To meet increasing demand for education and experience with commercial-scale, coal-fired, integrated gasification combined cycle (IGCC) plants with CO2 capture, the Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) is leading a project to deploy a generic, full-scope, real-time IGCC dynamic plant simulator for use in establishing a world-class research and training center, and to promote and demonstrate IGCC technology to power industry personnel. The simulator, being built by Invensys Process Systems (IPS), will be installed at two separate sites, at NETL and West Virginia University (WVU), and will combine a process/gasification simulator with a power/combined-cycle simulator together in a single dynamic simulation framework for use in engineering research studies and training applications. The simulator, scheduled to be launched in mid-year 2010, will have the following capabilities: High-fidelity, dynamic model of process-side (gasification and gas cleaning with CO2 capture) and power-block-side (combined cycle) for a generic IGCC plant fueled by coal and/or petroleum coke. Highly flexible configuration that allows concurrent training on separate gasification and combined cycle simulators, or up to two IGCC simulators. Ability to enhance and modify the plant model to facilitate studies of changes in plant configuration, equipment, and control strategies to support future R&D efforts. Training capabilities including startup, shutdown, load following and shedding, response to fuel and ambient condition variations, control strategy analysis (turbine vs. gasifier lead, etc.), representative malfunctions/trips, alarms, scenarios, trending, snapshots, data historian, etc. To support this effort, process descriptions and control strategies were developed for key sections of the plant as part of the detailed functional specification, which is serving as the basis of the simulator development. In this paper, we highlight the contents of the detailed functional specification for the simulator. We also describe the engineering, design, and expert testing process that the simulator will undergo in order to ensure that maximum fidelity is built into the generic simulator. Future applications and training programs associated with gasification, combined cycle, and IGCC simulations are discussed, including plant operation and control demonstrations, as well as education and training services.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Virtual engineering for the design and operation of advanced energy plants

The goals and objectives of this presentation are: (1) Develop and apply dynamic simulation to pulverized coal (PC) plants with post- and oxy-combustion CO{sub 2} capture systems - (a) Improve operational flexibility, controllability, and efficiency, (b) Optimize transient operations including disturbances, startup, shutdown, fuel switching, and load following, (c) Enhance malfunction, safety, and environmental analysis; (2) Provide dynamic simulator-based training for design, process, and control engineers, as well as plant operators; and (3) Learn-by-operating to accelerate CO{sub 2} capture technology scale-up, risk reduction, and deployment.

97 MATHEMATICS AND COMPUTING↗

REACTOR PHYSICS MODELING OF SPENT RESEARCH REACTOR FUEL FOR TECHNICAL NUCLEAR FORENSICS

Technical nuclear forensics (TNF) refers to the collection, analysis and evaluation of pre- and post-detonation radiological or nuclear materials, devices, and/or debris. TNF is an integral component, complementing traditional forensics and investigative work, to help enable the attribution of discovered radiological or nuclear material. Research is needed to improve the capabilities of TNF. One research area of interest is determining the isotopic signatures of research reactors. Research reactors are a potential source of both radiological and nuclear material. Research reactors are often the least safeguarded type of reactor; they vary greatly in size, fuel type, enrichment, power, and burn-up. Many research reactors are fueled with highly-enriched uranium (HEU), up to {approx}93% {sup 235}U, which could potentially be used as weapons material. All of them have significant amounts of radiological material with which a radioactive dispersal device (RDD) could be built. Therefore, the ability to attribute if material originated from or was produced in a specific research reactor is an important tool in providing for the security of the United States. Currently there are approximately 237 operating research reactors worldwide, another 12 are in temporary shutdown and 224 research reactors are reported as shut down. Little is currently known about the isotopic signatures of spent research reactor fuel. An effort is underway at Savannah River National Laboratory (SRNL) to analyze spent research reactor fuel to determine these signatures. Computer models, using reactor physics codes, are being compared to the measured analytes in the spent fuel. This allows for improving the reactor physics codes in modeling research reactors for the purpose of nuclear forensics. Currently the Oak Ridge Research reactor (ORR) is being modeled and fuel samples are being analyzed for comparison. Samples of an ORR spent fuel assembly were taken by SRNL for analytical and radiochemical analysis. The fuel assembly was modeled using MONTEBURNS(MCNP5/ ORIGEN2.2) and MCNPX/CINDER90. The results from the models have been compared to each other and to the measured data.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Automating power supply checkout

Power Supply checkout is a necessary, pre-beam, time-critical function. At odds are the desire to decrease the amount of time to perform the checkout while at the same time maximizing the number and types of checks that can be performed and analyzing the results quickly (in case any problems exist that must be addressed). Controls and Power Supply Group personnel have worked together to develop tools to accomplish these goals. Power Supply checkouts are now accomplished in a time-frame of hours rather than days, reducing the number of person-hours needed to accomplish the checkout and making the system available more quickly for beam development. The goal of the Collider-Accelerator Department (CAD) at Brookhaven National Laboratory is to provide experimenters with collisions of heavy-ions and polarized protons. The Relativistic Heavy-Ion Collider (RHIC) magnets are controlled by 100's of varying types of power supplies. There is a concentrated effort to perform routine maintenance on the supplies during shutdown periods. There is an effort at RHIC to streamline the time needed for system checkout in order to quickly arrive at a period of beam operations for RHIC. This time-critical period is when the checkout of the power supplies is performed as the RHIC ring becomes cold and the supplies are connected to their physical magnets. The checkout process is used to identify problems in voltage and current regulation by examining data signals related to each for problems in settling and regulation (ripple).

43 PARTICLE ACCELERATORS↗

Application of the NUREG/CR-6850 EPRI/NRC Fire PRA Methodology to a DOE Facility

The application NUREG/CR-6850 EPRI/NRC fire PRA methodology to DOE facility presented several challenges. This paper documents the process and discusses several insights gained during development of the fire PRA. A brief review of the tasks performed is provided with particular focus on the following: • Tasks 5 and 14: Fire-induced risk model and fire risk quantification. A key lesson learned was to begin model development and quantification as early as possible in the project using screening values and simplified modeling if necessary. • Tasks 3 and 9: Fire PRA cable selection and detailed circuit failure analysis. In retrospect, it would have been beneficial to perform the model development and quantification in 2 phases with detailed circuit analysis applied during phase 2. This would have allowed for development of a robust model and quantification earlier in the project and would have provided insights into where to focus the detailed circuit analysis efforts. • Tasks 8 and 11: Scoping fire modeling and detailed fire modeling. More focus should be placed on detailed fire modeling and less focus on scoping fire modeling. This was the approach taken for the fire PRA. • Task 14: Fire risk quantification. Typically, multiple safe shutdown (SSD) components fail during a given fire scenario. Therefore dependent failure analysis is critical to obtaining a meaningful fire risk quantification. Dependent failure analysis for the fire PRA presented several challenges which will be discussed in the full paper.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Calculation of Fire Severity Factors and Fire Non-Suppression Probabilities For A DOE Facility Fire PRA

Over a 12 month period, a fire PRA was developed for a DOE facility using the NUREG/CR-6850 EPRI/NRC fire PRA methodology. The fire PRA modeling included calculation of fire severity factors (SFs) and fire non-suppression probabilities (PNS) for each safe shutdown (SSD) component considered in the fire PRA model. The SFs were developed by performing detailed fire modeling through a combination of CFAST fire zone model calculations and Latin Hypercube Sampling (LHS). Component damage times and automatic fire suppression system actuation times calculated in the CFAST LHS analyses were then input to a time-dependent model of fire non-suppression probability. The fire non-suppression probability model is based on the modeling approach outlined in NUREG/CR-6850 and is supplemented with plant specific data. This paper presents the methodology used in the DOE facility fire PRA for modeling fire-induced SSD component failures and includes discussions of modeling techniques for: • Development of time-dependent fire heat release rate profiles (required as input to CFAST), • Calculation of fire severity factors based on CFAST detailed fire modeling, and • Calculation of fire non-suppression probabilities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

PV array simulator development and validation.

The ability to harvest all available energy from a photovoltaic (PV) array is essential if new system developments are to meet levelized cost of energy targets and achieve grid parity with conventional centralized utility power. Therefore, exercising maximum power point tracking (MPPT) algorithms, dynamic irradiance condition operation and startup and shutdown routines and evaluating inverter performance with various PV module fill-factor characteristics must be performed with a repeatable, reliable PV source. Sandia National Laboratories is collaborating with Ametek Programmable Power to develop and demonstrate a multi-port TerraSAS PV array simulator. The simulator will replicate challenging PV module profiles, enabling the evaluation of inverter performance through analyses of the parameters listed above. Energy harvest algorithms have traditionally implemented methods that successfully utilize available energy. However, the quantification of energy capture has always been difficult to conduct, specifically when characterizing the inverter performance under non-reproducible dynamic irradiance conditions. Theoretical models of the MPPT algorithms can simulate capture effectiveness, but full validation requires a DC source with representative field effects. The DC source being developed by Ametek and validated by Sandia is a fully integrated system that can simulate an IV curve from the Solar Advisor Model (SAM) module data base. The PV simulator allows the user to change the fill factor by programming the maximum power point voltage and current parameters and the open circuit voltage and short circuit current. The integrated PV simulator can incorporate captured irradiance and module temperature data files for playback, and scripted profiles can be generated to validate new emerging hardware embedded with existing and evolving MPPT algorithms. Since the simulator has multiple independent outputs, it also has the flexibility to evaluate an inverter with multiple MPPT DC inputs. The flexibility of the PV simulator enables the validation of the inverter's capability to handle vastly different array configurations.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

ITER's Tokamak Cooling Water System and the the Use of ASME Codes to Comply with French Regulations of Nuclear Pressure Equipment

During inductive plasma operation of ITER, fusion power will reach 500 MW with an energy multiplication factor of 10. The heat will be transferred by the Tokamak Cooling Water System (TCWS) to the environment using the secondary cooling system. Plasma operations are inherently safe even under the most severe postulated accident condition a large, in-vessel break that results in a loss-of-coolant accident. A functioning cooling water system is not required to ensure safe shutdown. Even though ITER is inherently safe, TCWS equipment (e.g., heat exchangers, piping, pressurizers) are classified as safety important components. This is because the water is predicted to contain low-levels of radionuclides (e.g., activated corrosion products, tritium) with activity levels high enough to require the design of components to be in accordance with French regulations for nuclear pressure equipment, i.e., the French Order dated 12 December 2005 (ESPN). ESPN has extended the practical application of the methodology established by the Pressure Equipment Directive (97/23/EC) to nuclear pressure equipment, under French Decree 99-1046 dated 13 December 1999, and Order dated 21 December 1999 (ESP). ASME codes and supplementary analyses (e.g., Failure Modes and Effects Analysis) will be used to demonstrate that the TCWS equipment meets these essential safety requirements. TCWS is being designed to provide not only cooling, with a capacity of approximately 1 GW energy removal, but also elevated temperature baking of first-wall/blanket, vacuum vessel, and divertor. Additional TCWS functions include chemical control of water, draining and drying for maintenance, and facilitation of leak detection/localization. The TCWS interfaces with the majority of ITER systems, including the secondary cooling system. U.S. ITER is responsible for design, engineering, and procurement of the TCWS with industry support from an Engineering Services Organization (ESO) (AREVA Federal Services, with support from Northrop Grumman, and OneCIS). ITER International Organization (ITER-IO) is responsible for design oversight and equipment installation in Cadarache, France. TCWS equipment will be fabricated using ASME design codes with quality assurance and oversight by an Agreed Notified Body (approved by the French regulator) that will ensure regulatory compliance. This paper describes the TCWS design and how U.S. ITER and fabricators will use ASME codes to comply with EU Directives and French Orders and Decrees.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Degradation mechanisms and accelerated testing in PEM fuel cells

The durability of PEM fuel cells is a major barrier to the commercialization of these systems for stationary and transportation power applications. Although there has been recent progress in improving durability, further improvements are needed to meet the commercialization targets. Past improvements have largely been made possible because of the fundamental understanding of the underlying degradation mechanisms. By investigating component and cell degradation modes; defining the fundamental degradation mechanisms of components and component interactions new materials can be designed to improve durability. Various factors have been shown to affect the useful life of PEM fuel cells. Other issues arise from component optimization. Operational conditions (such as impurities in either the fuel and oxidant stream), cell environment, temperature (including subfreezing exposure), pressure, current, voltage, etc.; or transient versus continuous operation, including start-up and shutdown procedures, represent other factors that can affect cell performance and durability. The need for Accelerated Stress Tests (ASTs) can be quickly understood given the target lives for fuel cell systems: 5000 hours ({approx} 7 months) for automotive, and 40,000 hrs ({approx} 4.6 years) for stationary systems. Thus testing methods that enable more rapid screening of individual components to determine their durability characteristics, such as off-line environmental testing, are needed for evaluating new component durability in a reasonable turn-around time. This allows proposed improvements in a component to be evaluated rapidly and independently, subsequently allowing rapid advancement in PEM fuel cell durability. These tests are also crucial to developers in order to make sure that they do not sacrifice durability while making improvements in costs (e.g. lower platinum group metal [PGM] loading) and performance (e.g. thinner membrane or a GDL with better water management properties). To achieve a deeper understanding and improve PEM fuel cell durability LANL is conducting research to better define fuel cell component degradation mechanisms and correlate AST measurements to component in 'real-world' situations.

30 DIRECT ENERGY CONVERSION↗

What HERA May Provide?

More than 100 people participated in a discussion session at the DIS08 workshop on the topic What HERA may provide. A summary of the discussion with a structured outlook and list of desirable measurements and theory calculations is given. The HERA accelerator and the HERA experiments H1, HERMES and ZEUS stopped running in the end of June 2007. This was after 15 years of very successful operation since the first collisions in 1992. A total luminosity of {approx} 500 pb{sup -1} has been accumulated by each of the collider experiments H1 and ZEUS. During the years the increasingly better understood and upgraded detectors and HERA accelerator have contributed significantly to this success. The physics program remains in full swing and plenty of new results were presented at DIS08 which are approaching the anticipated final precision, fulfilling and exceeding the physics plans and the previsions of the upgrade program. Most of the analyses presented at DIS08 were still based on the so called HERA I data sample, i.e. data taken until 2000, before the shutdown for the luminosity upgrade. This sample has an integrated luminosity of {approx} 100 pb{sup -1}, and the four times larger statistics sample from HERA II is still in the process of being analyzed.

43 PARTICLE ACCELERATORS↗

Essay: In Memory of Robert Siemann

Bob Siemann came to SLAC from Cornell in 1991. With the support from Burton Richter, then Director of SLAC, he took on a leadership role to formulate an academic program in accelerator physics at SLAC and the development of its accelerator faculty. Throughout his career he championed accelerator physics as an independent academic discipline, a vision that he fought so hard for and never retreated from. He convinced Stanford University and SLAC to create a line of tenured accelerator physics faculty and over the years he also regularly taught classes at Stanford and the U.S. Particle Accelerator School. After the shutdown of the SSC Laboratory, I returned to SLAC in 1993 to join the accelerator faculty he was forming. He had always visualized a need to have a professional academic journal for the accelerator field, and played a pivotal role in creating the journal Physical Review Special Topics - Accelerators and Beams, now the community standard for accelerator physics after nine years of his editorship. Today, Bob's legacy of accelerator physics as an independent academic discipline continues at SLAC as well as in the community, from which we all benefit. Bob was a great experimentalist. He specialized in experimental techniques and instrumentation, but what he wanted to learn is physics. If he had to learn theory - heaven forbid - to reach that goal, he would not hesitate one second to do so. In fact, he had written several theoretical papers as results of these efforts. Now this is what I call a true experimentalist! Ultimately, however, I think it was experimental instruments that he loved most. His eyes widened when he talked about his instruments. Prompted by a question, he would proceed to a nearby blackboard, with a satisfying grin, and draw his experimental device in a careful thinking manner, then describe his experiment and educate the questioner with some insightful physics. These moments were most enjoyable, to him and the questioner alike. When I think of Bob today, it is these moments that first come to mind, and it is these moments I will miss the most. I should like to mention another curious thing about Bob, namely he had a special talent of finding persuasive arguments that went his way. It was difficult to argue with Bob because it was so difficult to win. Generally quiet otherwise, he was too good and too methodical a debater. I had never seen him losing a debate on a policy issue or in a committee setting. However, when it comes to physics, his soft spot, he occasionally let go some weakness. When so doing, he would lose the debate, but his grin revealed that the loss was more than compensated by the physics he gained together with his debater. It is hard to believe that the office around the corner is now empty. The dear colleague we have come to know, to talk to, and to seek advice from, together with the feet-on-the-desk posture and the familiar grin, are no longer there. I wonder, who will now occupy that office next? And who will continue to carry on Bob Siemann's legacy? Many of us are waiting.

43 PARTICLE ACCELERATORS↗

Top Quark Production at the Tevatron

The top quark is the most recently discovered of the standard model quarks, and because of its very large mass, studies of the top quark and its interactions are important both as tests of the standard model and searches for new phenomena. In this document, recent results of analyses of top quark production, via both the electroweak and strong interactions, from the CDF and D0 experiments are presented. The results included here utilize a dataset corresponding to up to 6 fb{sup -1} of integrated luminosity, slightly more than half of the dataset recorded by each experiment before the Tevatron was shutdown in September 2011.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Upgrade fo the CMS Hadron Outer Calorimeter with SIPMs

The CMS Hadron Outer Calorimeter (HO) is undergoing an upgrade to replace the existing photodetectors (HPDs) with SIPMs. The chosen device is the Hamamatsu 3 x 3mm 50 {mu}m pitch MPPC. The system has been developed to be a 'drop-in' replacement of the HPDs. A complete control system of bias voltage generation, leakage current monitoring, temperature monitoring, and temperature control using solid state Peltier coolers has been developed and tested. 108 channels of the system have been installed into CMS and operated for more than 2 years. The complete system of about 2200 channels is in production and will be installed in the next LHC long shutdown scheduled for 2013. The CMS central calorimeter consists of a detector inside the solenoidal magnet, HB, and a component outside the magnet, the Outer Hadron Calorimeter, HO [1]. The HO is installed inside the magnet flux return yoke and provides for typically 3{lambda} of additional absorber to the calorimetric measurement. The outer calorimeter is composed of one or more layers of scintillator with wavelength shifting fiber readout into photodetectors. Figure 1 (a) shows the schematic layout of the calorimeters in CMS and shows the location of the HO scintillator layers. The front end electronics are placed inside the CMS detector, close to the scintillators. Figure 1(b) shows a photograph of the scintillators. Note the four wavelength shifting fibers per tile. The tile size creates a projective tower with the HB. Currently the photodetector used is the HPD but for performance and operational reasons it is desired to upgrade these with SIPMs. The CMS HCAL group has developed a drop-in replacement for the HPD using SIPMs. SIPMs are very suitable for this application because of several factors: The radiation levels are modest with a lifetime expected fluence of less than 5*10{sup 11} neutrons (E > 100 KeV) per cm{sup 2}. The energy flux into HO is small, the rate of larger energy depositions is low, and the required dynamic range is modest. The HO is in the return magnetic field of up to 2KG and the photodetector needs to operate in that environment. Finally, the available physical volume for the photodetectors is small.

43 PARTICLE ACCELERATORS↗

Observation of Beam ION Instability in Spear3

Weak vertical coupled bunch instability with oscillation amplitude at {mu}m level has been observed in SPEAR3. The instability becomes stronger when there is a vacuum pressure rise by partially turning off vacuum pumps and it becomes weaker when the vertical beam emittance is increased by turning off the skew quadrupole magnets. These confirmed that the instability was driven by ions in the vacuum. The threshold of the beam ion instability when running with a single bunch train is just under 200 mA. This paper presents the comprehensive observations of the beam ion instability in SPEAR3. The effects of vacuum pressure, beam current, beam filling pattern, chromaticity, beam emittance and bunch-by-bunch feedback are investigated in great detail. In an electron accelerator, ions generated from the residual gas molecules can be trapped by the beam. Then these trapped ions interact resonantly with the beam and cause beam instability and emittance blow-up. Most existing light sources use a long single bunch train filling pattern, followed by a long gap to avoid multi-turn ion trapping. However, such a gap does not preclude ions from accumulating during one passage of the single bunch train beam, and those ions can still cause a Fast Ion Instability (FII) as predicted by Raubenheimer and Zimmermann. FII has been observed in ALS, and PLS by artificially increasing the vacuum pressure by injecting helium gas into the vacuum chamber or by turning off the ion pumps in order to observe the beam ion instability. In some existing rings, for instance B factory, the beam ion instability was observed at the beginning of the machine operation after a long period of shutdown and then it automatically disappeared when the vacuum was better. However, when the beam emittance becomes smaller, the FII can occur at nominal conditions as observed in PLS, SOLEIL and SSRF. This paper reports the observations of beam ion instabilities in SPEAR3 under different condition during a period of one year, which includes single bunch train instability (FII) and multi-bunch train instability. Note that the instability may be not the same even with the same beam due to the change of the vacuum with time. SPEAR3 has a circumference of 234 m with a harmonic number of 372. SPEAR3 runs with six bunch train filling pattern in order to suppress the possible beam ion instability. Table 1 lists the main parameters of SPEAR3. The vacuum of SPEAR3 ranges from 0.1 to 0.5 nTorr, which varies from section to section.

43 PARTICLE ACCELERATORS↗

NOvA detector technology with intial performance from the surface prototype

NOvA, the NuMI Off-Axis {nu}{sub e} Appearance experiment, will study {nu}{sub {mu}} {yields} {nu}{sub e} oscillations characterized by the mixing angle {Theta}{sub 13}. Provided {Theta}{sub 13} is large enough, NOvA may ultimately determine the ordering of the neutrino masses and measure CP violation in neutrino oscillations. A complementary pair of detectors will be constructed {approx}14 mrad off beam axis to optimize the energy profile of the neutrinos. This system consists of a surface based 14 kTon liquid scintillator tracking volume located 810 km from the main injector source (NuMI) in Ash River, Minnesota and a smaller underground 222 Ton near detector at the Fermilab. The first neutrino signals at the Ash River Site are expected prior to the 2012 accelerator shutdown. In the meantime, a near detector surface prototype has been completed and neutrinos from two Fermilab sources have been observed using the same highly segmented PVC and liquid scintillator detector system that will be deployed in the full scale experiment. Design and initial performance characteristics of this prototype system are being fed back into the design for the full NOvA program.

43 PARTICLE ACCELERATORS↗

Intial performance from the NOvA surface prototype detector

NOvA, the NuMI Off-Axis {nu}{sub e} Appearance experiment, will study {nu}{sub {mu}} {yields} {nu}{sub e} oscillations characterized by the mixing angle {Theta}{sub 13}. Provided {Theta}{sub 13} is large enough, NOvA may ultimately determine the ordering of the neutrino masses and measure CP violation in neutrino oscillations. A complementary pair of detectors will be constructed {approx}14 mrad off beam axis to optimize the energy profile of the neutrinos. This system consists of a surface based 14 kTon liquid scintillator tracking volume located 810 km from the main injector source (NuMI) in Ash River, Minnesota and a smaller underground 222 Ton near detector at the Fermilab. The first neutrino signals at the Ash River Site are expected prior to the 2012 accelerator shutdown. In the meantime, a near detector surface prototype has been completed and neutrinos from two Fermilab sources have been observed using the same highly segmented PVC and liquid scintillator detector system that will be deployed in the full scale experiment. Design and initial performance characteristics of this prototype system are being fed back into the design for the full NOvA program.

43 PARTICLE ACCELERATORS↗