Search NASA⌕ Search

SEARCH · Search NASA

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

AFC Metallic Fuel Research and Development 5-Year Plan

The mission of the U.S. Department of Energy (DOE) Advanced Fuel Campaign (AFC) program is conducting R&D on nuclear fuel technology that enables near- and long-term implementation of the reactor systems necessary to meet national nuclear energy objectives. Its primary goals align with goals of the DOE Office of Nuclear Energy in sustaining the current LWR fleet through Accident Tolerant Fuels program and Enabling Advanced Reactors. The latter goal is to be achieved through the following subgoals in order of logistical priority: • Establish the qualification basis for reference metallic fuel designs for sodium-cooled fast reactors. • Develop next generation metallic fuel fabrication and design for improved fissile utilization and management. • Develop accelerated fuel development and qualification methodologies. • Identify next generation fuel technologies. The purpose of this document is to serve as a five-year research and development (R&D) plan to achieve the goals identified to support enabling advanced reactor deployment related to metallic fuels starting in 2025. The specific objectives of this document are to: • align program R&D work across technical areas, national laboratories, and with stakeholder interests, and • aid yearly and outyear scope and budgetary planning activities. This plan lays the foundation of databases, capabilities, expertise, and research-commercial-regulatory integration for launching next-generation initiatives in advanced fuel technologies (fuel and cladding) and improved methodologies for achieving accelerated qualification of next generation fuel technologies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

BLAZARS IN THE FERMI ERA: THE OVRO 40 m TELESCOPE MONITORING PROGRAM

The Large Area Telescope (LAT) aboard the Fermi Gamma-ray Space Telescope provides an unprecedented opportunity to study gamma-ray blazars. To capitalize on this opportunity, beginning in late 2007, about a year before the start of LAT science operations, we began a large-scale, fast-cadence 15 GHz radio monitoring program with the 40 m telescope at the Owens Valley Radio Observatory. This program began with the 1158 northern ({delta} > -20{sup 0}) sources from the Candidate Gamma-ray Blazar Survey and now encompasses over 1500 sources, each observed twice per week with about 4 mJy (minimum) and 3% (typical) uncertainty. Here, we describe this monitoring program and our methods, and present radio light curves from the first two years (2008 and 2009). As a first application, we combine these data with a novel measure of light curve variability amplitude, the intrinsic modulation index, through a likelihood analysis to examine the variability properties of subpopulations of our sample. We demonstrate that, with high significance (6{sigma}), gamma-ray-loud blazars detected by the LAT during its first 11 months of operation vary with almost a factor of two greater amplitude than do the gamma-ray-quiet blazars in our sample. We also find a significant (3{sigma}) difference between variability amplitude in BL Lacertae objects and flat-spectrum radio quasars (FSRQs), with the former exhibiting larger variability amplitudes. Finally, low-redshift (z < 1) FSRQs are found to vary more strongly than high-redshift FSRQs, with 3{sigma} significance. These findings represent an important step toward understanding why some blazars emit gamma-rays while others, with apparently similar properties, remain silent.

79 ASTRONOMY AND ASTROPHYSICS↗

Long Reach Robotic Arm

The Accelerator Division at Fermilab began a robotics program, known as the AD Robotics Initiative. A multi-axis robotic arm was proposed to be included in the program. This summer internship, our team began the planning and design for this project, called the Long Reach Robotic Arm. The problem is that critical systems around the magnets require analysis when water leaks cause them to fail. However, the tightly compacted parts and the quadrupole magnet, weighing approximately 1,000 pounds, cause access viewing problems. The process of having to dismantle and remove the magnet is time-consuming; it is not an efficient solution. The goal for the Long Reach Robotic Arm was to extend and reach behind the component of the Main Injector while "snaking" around and avoiding obstructions. At the start of the project, my teammate, Amanda Hoeksema, and I coded a program in the C language that will determine the number of links and their respective lengths for the robot arm. After, we began the 3D CAD model of the robot arm, base, and counterweight system. The design of the Long Reach Robotic Arm provided a learning experience in learning how to code in the C programming language, using SDL libraries and understanding mechanical engineering.

43 PARTICLE ACCELERATORS↗

2022 Annual Site Environment Report, Princeton Plasma Physics Laboratory

This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2022 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2022. PPPL’s on-site operations started to be restored in 2022, following curtailments in 2020 and 2021 for the global coronavirus (COVID-19) pandemic. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the U.S. and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2022. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2022, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2022, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council.

54 ENVIRONMENTAL SCIENCES↗

Test suite for evaluating performance of multithreaded MPI communication.

As parallel systems are commonly being built out of increasingly large multicore chips, application programmers are exploring the use of hybrid programming models combining MPI across nodes and multithreading within a node. Many MPI implementations, however, are just starting to support multithreaded MPI communication, often focussing on correctness first and performance later. As a result, both users and implementers need some measure for evaluating the multithreaded performance of an MPI implementation. In this paper, we propose a number of performance tests that are motivated by typical application scenarios. These tests cover the overhead of providing the MPI-THREAD-MULTIPLE level of thread safety for user programs, the amount of concurrency in different threads making MPI calls, the ability to overlap communication with computation, and other features. We present performance results with this test suite on several platforms (Linux cluster, Sun and IBM SMPs) and MPI implementations (MPICH2, Open MPI, IBM, and Sun).

99 GENERAL AND MISCELLANEOUS↗

FRAMEWORK FOR STRUCTURAL ONLINE HEALTH MONITORING OF AGING AND DEGRADATION OF SECONDARY PIPING SYSTEMS DUE TO SOME ASPECTS OF EROSION

This paper describes the current state of research related to critical aspects of erosion and selected aspects of degradation of secondary components in nuclear power plants (NPPs). The paper also proposes a framework for online health monitoring of aging and degradation of secondary components. The framework consists of an integrated multi-sensor modality system, which can be used to monitor different piping configurations under different degradation conditions. The report analyses the currently known degradation mechanisms and available predictive models. Based on this analysis, the structural health monitoring framework is proposed. The Light Water Reactor Sustainability Program began to evaluate technologies that could be used to perform online monitoring of piping and other secondary system structural components in commercial NPPs. These online monitoring systems have the potential to identify when a more detailed inspection is needed using real time measurements, rather than at a pre-determined inspection interval. This transition to condition-based, risk-informed automated maintenance will contribute to a significant reduction of operations and maintenance costs that account for the majority of nuclear power generation costs. Furthermore, of the operations and maintenance costs in U.S. plants, approximately 80% are labor costs. To address the issue of rising operating costs and economic viability, in 2017, companies that operate the national nuclear energy fleet started the Delivering the Nuclear Promise Initiative, which is a 3 year program aimed at maintaining operational focus, increasing value, and improving efficiency. There is unanimous agreement between industry experts and academic researchers that identifying and prioritizing inspection locations in secondary piping systems (for example, in raw water piping or diesel piping) would eliminate many excessive in-service inspections. The proposed structural health monitoring framework takes aim at answering this challenge by combining long range guided wave technologies with other monitoring techniques, which can significantly increase the inspection length and pinpoint the locations that degraded the most. More widely, the report suggests research efforts aimed at developing, validating, and deploying online corrosion monitoring techniques for complex geometries, which are pervasive in NPPs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SRNL Phase 1 Assessment of the WAC/DQO and Unit Operations for the WTP Waste Qualification Program

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is currently transitioning its emphasis from a design and construction phase toward start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements related to actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program to be implemented to support the WTP. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS), based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested the utilization of subject matter experts from SRNL to support a technology exchange to perform a review of the WTP waste qualification program, discuss the general qualification approach at SRS, and to identify critical lessons learned through the support of DWPF's sludge batch qualification efforts. As part of Phase 1, SRNL subject matter experts in critical technical and/or process areas reviewed specific WTP waste qualification information. The Phase 1 review was a collaborative, interactive, and iterative process between the two organizations. WTP provided specific analytical procedures, descriptions of equipment, and general documentation as baseline review material. SRNL subject matter experts reviewed the information and, as appropriate, requested follow-up information or clarification to specific areas of interest. This process resulted in multiple teleconferences with key technical contacts from both organizations resolving technical issues that lead to the results presented in this report. This report provides the results of SRNL's Phase 1 review of the WAC-DQO waste acceptance criteria and processability parameters, and the specific unit operations which are required to support WTP waste qualification efforts. The review resulted in SRNL providing concurrence, alternative methods, or gap identification for the proposed WTP analytical methods or approaches. For the unit operations, the SRNL subject matter experts reviewed WTP concepts compared to what is used at SRS and provided thoughts on the outlined tasks with respect to waste qualification. Also documented in this report are recommendations and an outline on what would be required for the next phase to further mature the WTP waste qualification program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AdS/BCFT from conformal bootstrap: construction of gravity with branes and particles

We initiate a conformal bootstrap program to study AdS 3 /BCFT 2 with heavy excitations. We start by solving the bootstrap equations associated with two-point functions of scalar/non-scalar primaries under the assumption that one-point functions vanish. These correspond to gravity with a brane and a non-spinning/spinning particle where the brane and the particle do not intersect with each other. From the bootstrap equations, we obtain the energy spectrum and the modified black hole threshold. We then carefully analyze the gravity duals and find the results perfectly match the BCFT analysis. In particular, brane self-intersections, which are usually considered to be problematic, are nicely avoided by the black hole formation. Despite the assumption to solve the bootstrap equations, one-point functions of scalar primaries can be non-zero in general. We construct the holographic dual for a non-vanishing one-point function, in which the heavy particle can end on the brane, by holographically computing the Rényi entropy in AdS/BCFT. As a bonus, we find a refined formula for the holographic Rényi entropy, which appears to be crucial to correctly reproduce the boundary entropy term. On the other hand, we explain why one-point functions of non-scalar primaries always vanish from the gravity dual. The non-sensitivity of the solution for the bootstrap equation to the boundary entropy helps us to construct gravity duals with negative tension branes. We also find a holographic dual of boundary primaries.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Systematically testing singlet models for $(g - 2)_{μ}$

We comprehensively study all viable new-physics scenarios that resolve the muon $(g - 2)_{μ}$ anomaly with only Standard Model singlet particles coupled to muons via renormalizable interactions. Since such models are only viable in the MeV–TeV mass range and require sizable muon couplings, they predict abundant accelerator production through the same interaction that resolves the anomaly. We find that a combination of fixed-target $(\text {NA64}μ, M^{3})$, B-factory (BABAR, Belle II), and collider (LHC, muon collider) searches can cover nearly all viable singlets scenarios, independently of their decay modes. In particular, future muon collider searches offer the only certain test of singlets above the GeV scale, covering all higher masses up to the TeV-scale unitarity limit for these models. Intriguingly, we find that $ \mathcal{O}\left(100\ \mathrm{GeV}\right) $ muon colliders may yield better coverage for GeV-scale singlets compared to TeV-scale concepts, which has important implications for the starting center-of-mass energy of a staged muon collider program.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Magnets for a Muon Collider—Needs and Plans

We describe the magnet challenges for a Muon Collider, an exciting option considered for the future of particle physics at the energy frontier. Starting from the comprehensive work performed by the US Muon Accelerator Program, we have reviewed the performance specifications dictated by beam physics and the operating conditions to satisfy the accelerator needs. Among the many magnets that make up a muon collider, we have identified four systems that represent well the envelope of challenges: the target and capture solenoid, the final cooling solenoid, the accelerator dipoles and the collider dipoles. These systems provide focus for the development of novel concepts, largely based on HTS for reasons of performance, cost and sustainability. After giving a consolidated overview of the needs for the magnet systems, we describe here the basic technology options considered, and the plan for design and development activities.

43 PARTICLE ACCELERATORS↗

HLRW management during MR reactor decommissioning in NRC 'Kurchatov Institute'

A program of decommissioning of MR research reactor in the Kurchatov institute started in 2008. The decommissioning work presumed a preliminary stage, which included: removal of spent fuel from near reactor storage; removal of spent fuel assemble of metal liquid loop channel from a core; identification, sorting and disposal of radioactive objects from gateway of the reactor; identification, sorting and disposal of radioactive objects from cells of HLRW storage of the Kurchatov institute for radwaste creating form the decommissioning of MR. All these works were performed by a remote controlled means with use of a remote identification methods of high radioactive objects. A distribution of activity along high radiated objects was measured by a collimated radiometer installed on the robot Brokk-90, a gamma image of the object was registered by gamma-visor. Spectrum of gamma radiation was measured by a gamma locator and semiconductor detector system. For identification of a presence of uranium isotopes in the HLRW a technique, based on the registration of characteristic radiation of U, was developed. For fragmentation of high radiated objects was used a cold cutting technique and dust suppression system was applied for reduction of volume activity of aerosols in air. The management of HLRW was performed by remote controlled robots Brokk-180 and Brokk-330. They executed sorting, cutting and parking of high radiated part of contaminated equipment. The use of these techniques allowed to reduce individual and collective doses of personal performed the decommissioning. The average individual dose of the personnel was 1,9 mSv/year in 2011, and the collective dose is estimated by 0,0605 man x Sv/year. Use of the remote control machines enables reducing the number of working personal (20 men) and doses. X-ray spectrometric methods enable determination of a presence of the U in high radiated objects and special cans and separation of them for further spent fuel inspection. The sorting of radwaste enabled shipping of the LLRW and ILRW to special repositories and keeping of the HLRW for decay in the Kurchatov institute repository. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The VEPP-2000 electron-positron collider: First experiments

In 2007, at the Institute of Nuclear Physics (Novosibirsk), the construction of the VEPP-2000 electron-positron collider was completed. The first electron beam was injected into the accelerator structure with turned-off solenoids of the final focus. This mode was used to tune all subsystems of the facility and to train the vacuum chamber using synchrotron radiation at electron currents of up to 150 mA. The VEPP-2000 structure with small beta functions and partially turned-on solenoids was used for the first testing of the 'round beams' scheme at an energy of 508 MeV. Beam-beam effects were studied in strong-weak and strong-strong modes. Measurements of the beam sizes in both cases showed a dependence corresponding to model predictions for round colliding beams. Using a modernized SND (spherical neutral detector), the first energy calibration of the VEPP-2000 collider was performed by measuring the excitation curve of the phimeson resonance; the phi-meson mass is known with high accuracy from previous experiments at VEEP-2M. In October 2009, a KMD-3 (cryogenic magnetic detector) was installed at the VEPP-2000 facility, and the physics program with both the SND and LMD-3 particle detectors was started in the energy range of 1-1.9 GeV. This first experimental season was completed in summer 2010 with precision energy calibration by resonant depolarization.

43 PARTICLE ACCELERATORS↗

SRS Composite Analysis Monitoring Plan (FY2019 Model Validation)

Using a projected end-state date of 2065 (SRNS 2015b), the Savannah River Site (SRS) Composite Analysis (CA) modeling for each facility and waste site began on the inventory year assigned to it so that source depletion and radionuclide transport out of the system could be appropriately captured. Some SRS waste sites that have already achieved their end states (i.e. end-state inventories and end-state configuration) are currently contributing to the potential off-site public dose through source release, groundwater transport, discharge to on-site surface streams, and stream transport to the CA point of assessments (POAs). The inventory year assigned to these waste sites is 2002 or before. This means that SRS CA results from 2002 and beyond are a reasonable representation for these waste sites that have already achieved their end states and are currently contributing to the potential off-site public dose. The SRS Annual Environmental Report (AER) monitoring can differentiate and separate liquid pathway data allowing the data representing only waste sites at their end state to be produced. Because the SRS CA has projected reasonable end-state impacts from 2002 and beyond, and the AER monitoring can differentiate and separate operating and end-state contributions to annual liquid pathway release, an opportunity exists to use the AER monitoring data to validate the SRS CA model. The CA model validation program uses a graded and systematic approach for taking corrective action, starting with an SRS established administrative dose limit of 15 mrem/yr, below which no action is required. Based on the location of the 2010 SRS CA POAs, the only potential exposure pathway for the public is through surface water. The completion of the FY2019 CA model validation indicates that the SRS CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. These doses are well below the administrative limit; therefore, no additional action is required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ultrasonic Transducer Irradiation Test Results

Ultrasonic technologies offer the potential for high accuracy and resolution in-pile measurement of a range of parameters, including geometry changes, temperature, crack initiation and growth, gas pressure and composition, and microstructural changes. Many Department of Energy-Office of Nuclear Energy (DOE-NE) programs are exploring the use of ultrasonic technologies to provide enhanced sensors for in-pile instrumentation during irradiation testing. For example, the ability of small diameter ultrasonic thermometers (UTs) to provide a temperature profile in candidate metallic and oxide fuel would provide much needed data for validating new fuel performance models. These efforts are limited by the lack of identified ultrasonic transducer materials capable of long term performance under irradiation test conditions. To address this need, the Pennsylvania State University (PSU) was awarded an Advanced Test Reactor National Scientific User Facility (ATR NSUF) project to evaluate the performance of promising magnetostrictive and piezoelectric transducers in the Massachusetts Institute of Technology Research Reactor (MITR) up to a fast fluence of at least 1021 n/cm2 . A multi-National Laboratory collaboration funded by the Nuclear Energy Enabling Technologies Advanced Sensors and Instrumentation (NEET ASI) program also provided initial support for this effort. This irradiation, which started in February 2014, is an instrumented lead test and real-time transducer performance data are collected along with temperature and neutron and gamma flux data. The irradiation is ongoing and will continue to approximately mid-2015. To date, very encouraging results have been attained as several transducers continue to operate under irradiation.

Daw, Joshua↗

Updated Results of Ultrasonic Transducer Irradiation Test

Ultrasonic technologies offer the potential for high accuracy and resolution in-pile measurement of a range of parameters, including geometry changes, temperature, crack initiation and growth, gas pressure and composition, and microstructural changes. Many Department of Energy-Office of Nuclear Energy (DOE-NE) programs are exploring the use of ultrasonic technologies to provide enhanced sensors for in-pile instrumentation during irradiation testing. For example, the ability of small diameter ultrasonic thermometers (UTs) to provide a temperature profile in candidate metallic and oxide fuel would provide much needed data for validating new fuel performance models. These efforts are limited by the lack of identified ultrasonic transducer materials capable of long term performance under irradiation test conditions. To address this need, the Pennsylvania State University (PSU) was awarded an Advanced Test Reactor National Scientific User Facility (ATR NSUF) project to evaluate the performance of promising magnetostrictive and piezoelectric transducers in the Massachusetts Institute of Technology Research Reactor (MITR) up to a fast fluence of at least 10{sup 21} n/cm{sup 2}. A multi-National Laboratory collaboration funded by the Nuclear Energy Enabling Technologies Advanced Sensors and Instrumentation (NEET-ASI) program also provided initial support for this effort. This irradiation, which started in February 2014, is an instrumented lead test and real-time transducer performance data are collected along with temperature and neutron and gamma flux data. The irradiation is ongoing and will continue to approximately mid-2015. To date, very encouraging results have been attained as several transducers continue to operate under irradiation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transitioning from Construction to Startup for the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility - 17284

The original design of the Waste Treatment and Immobilization Plant (WTP) required all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has developed a sequenced approach to completing the WTP Project, beginning with delivering some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. This operating configuration is referred to as direct-feed LAW (DFLAW). The primary driver for the DFLAW approach is to enable startup and commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste facilities. In March 2016, a federal judge amended the Consent Decree between DOE and the State of Washington to require completion of hot commissioning for the LAW Facility no later than December 31, 2023. During the next few years ORP and the WTP contractor will transition the project from completion of construction to the startup and commissioning phase for the LAW Facility and the associated support facilities. The WTP contractor has developed an integrated management process to successfully conduct facility startup testing for the WTP facilities required to support DFLAW. The WTP contractor will also develop a commissioning plan and facility transition plan. These plans will describe the strategy; schedule; and requirements for safe, efficient, and sequential startup, commissioning, and transfer of the WTP facilities to an operations contractor. The WTP contractor has also established a strategy to achieve operational readiness for the facilities required to support DFLAW consistent with DOE O 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities and DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. ORP has established a strategy for oversight of the WTP contractor's startup, commissioning, and readiness activities. The strategy also encompasses ORP's own activities to achieve readiness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MARVEL Utilization Plan

This report provides a high-level overview of the operational plan for the MARVEL microreactor. The main focus is on discussing testing and application demonstration opportunities that leverage the reactor. With the reactor rapidly progressing towards demonstration, along with the short operational window (2 years), it was deemed critical to start establishing a basis for how stakeholders can engage with the program and leverage the reactor as a testbed. The report discusses potential opportunities for using MARVEL leveraging from data/design access, novel controls testing, novel nuclear-electric applications, to novel nuclear-heat applications. It also provides guidance for interested stakeholders on potential funding opportunities that can be pursued to support tests during the operational lifetime of the reactor. The report also discusses the recommended strategy for outreach and the organization structure to review and down select project. It is important to emphasize that this is intended to be a living document with revisions issued as the MARVEL demonstration timeline evolves. Similarly, the framework for engagement is subject to change as the project nears construction. As such, this first revision to the original test plan highlights the new Microreactor Program-sponsored pathway for engaging with stakeholders via an Expression of Interest and Notice of Opportunity.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗