Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Shuttle Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

A programmable power processor for a 25-kW power module

A discussion of the power processor for an electrical power system for a 25-kW Power Module that could support the Space Shuttle program during the 1980's and 1990's and which could be a stepping stone to future large space power systems is presented. Trades that led to the selection of a microprocessor-controlled power processor are briefly discussed. Emphasis is given to the power processing equipment that uses a microprocessor to provide versatility that allows multiple use and to provide for future growth by reprogramming output voltage to a higher level (to 120 V from 30 V). Efficiency data from a breadboard programmable power processor are presented, and component selection and design considerations are also discussed.

Lanier, R., Jr.↗

Expert systems and imaging - NASA's start-up work in intelligent image management

The problem of image management for NASA's Space Shuttle program and the future role of expert systems are considered. The difficulties involved in the storage and retrieval of the estimated 100,000 color photographs used for verification of essential installation, test, and repair procedures for Space Shuttle prelaunch are discussed. It is noted that the collection, classification, storage, and retrieval of high-quality pictoral images is possible through the use of pixels and an expert systems-assisted relational data base management system. The development of a query by pictorial example process is discussed. The NASA Intelligent Interactive Visual Data Base Management Systems project is detailed. It aims to conduct a systems analysis of a large-scale traditional image processing operation, collect data on critical human performance factors in the areas of image creation, processing, classification, storage, and retreival, and validate the attributes identified through the creation and testing of prototype models.

Ragusa, James M.↗

Global distribution of hand-held photographs of ocean and coastal regions taken during space shuttle missions - 1981-1991

During the first 10 years of the US Space Shuttle program, 26,736 high-quality, hand-held photographs have been acquired of the earth's ocean and coastal areas from orbit by astronauts during 40 missions. The photographs are cataloged and stored in the Space Shuttle Earth Observations Project (SSEOP) database. While the majority of photographs are of tropical and subtropical coastal areas, many open-ocean and high-latitude areas have also been photographed. The majority of space shuttle missions have permitted photographing northern hemisphere areas in daylight. As a result, the latitudinal distribution of photographs is biased toward the northern hemisphere, particularly in high latitudes. Coastal areas and islands are most frequently photographed, while photographs of central ocean areas are either infrequent or nonexistent.

Ackleson, Steven G.↗

Mission Operations, Cubed: NASA Marshall Operations Support for SmallSats

SmallSats have come a long way since the Huntsville Operations Support Center (HOSC) at NASA’s Marshall Space Flight Center supported its first “minisatellite” mission in 2010. And just as SmallSats themselves have evolved in those 12 years, so too has the HOSC’s mission support for SmallSats. Marshall Space Flight Center has a long history with payload and mission operations, including support for the Apollo missions to the moon, the Space Shuttle program, and 21 years of continuous around-the-clock science operations support for research aboard the International Space Station. Today, the HOSC is a multi-tenant facility, supporting not only ISS, but also NASA’s Commercial Crew program, the Space Launch System, the Hubble and Chandra observatories and others – including multiple SmallSat missions. Two SmallSat solar sail missions will be among those taking advantage of the HOSC’s resources for planning, training for and executing mission operations – the Near Earth Asteroid (NEA) Scout and Solar Cruiser missions. One of 10 6U CubeSats manifest on the Artemis I launch of NASA’s Space Launch System rocket this year, NEA Scout’s three-year mission will be supported through a more traditional operations concept, with a dedicated Flight Controller staff operating within the HOSC. Scheduled to launch as part of the Interstellar Mapping and Acceleration Probe (IMAP) in February 2025, Solar Cruiser’s 11-month mission will take a next-generation approach to operations by utilizing a multi-mission flight controller concept, as well as Marshall’s Telescience Resource Kit (TreK). TreK provides a suite of software applications and libraries that allow the Mission Operations Center to serve as an in-house ground system which incorporates remote and automation capability options for engineers and scientists. This presentation will compare the approaches the HOSC will use to support these two missions as a way of demonstrating the array of options NASA MSFC offers for operations support for CubeSat and SmallSat missions.

Darren S Wallace↗

Shuttle Ground Operations Efficiencies/Technologies (SGOE/T) study. Volume 1: Executive summary

Methods and technolgoy were defined to reduce the overall operations cost of a major space program. Space Shuttle processing at Kennedy Space Center (KSC) was designed as the working model that would be the source of the operational information. Methods of improving efficiency of ground operations were assessed and technology elements that could reduce cost identified. Emphasis is on: (1) specific technology items and (2) management approaches required to develop and support efficient ground operations. Prime study results are to be recommendations on how to achieve more efficient operations and identification of existing or new technology that would make vehicle processing in both the current program and future programs more efficient and, therefore, less costly.

Scholz, A. L.↗

The best we can be

A brief history of the U.S. manned space program is presented covering the early Mercury and Gemini missions, the Apollo lunar missions, the Skylab project, and the Space Shuttle missions. The role of the Space Station in future manned missions is also discussed. Descriptions of government centers and major contractors supporting the Space Shuttle program are given.

Source record↗

STS-114: Discovery Day 3/Mission Status Briefing

Paul Hill, STS-114 Lead Flight Director, and John Shannon, Flight Operations and Integrations Manager for the Space Shuttle Program were present. Paul gave a detailed description of the Orbiter's performance upon its arrival on the International Space Station, orbital rendezvous and docking was completed, performance was nominal by all measures, and crew is already inside the ISS. He also briefly mentioned the next day crew activities, robotics work and first space walk. John emphasized on ground technical engineering tasks, data gathering and inspection of data, imagery and damage assessment, assessing the performance of the external tank, engineering analysis, and the increase of understanding of the overall condition of the vehicle. Safety of the vehicle, battery lifetime, foam loss, tile damage, post launch analysis were some of the topics discussed with the News Media.

Source record↗

Ares I Crew Launch Vehicle Upper Stage/Upper Stage Engine Element Overview

The Ares I upper stage is an integral part of the Constellation Program transportation system. The upper stage provides guidance, navigation and control (GN and C) for the second stage of ascent flight for the Ares I vehicle. The Saturn-derived J-2X upper stage engine will provide thrust and propulsive impulse for the second stage of ascent flight for the Ares I launch vehicle. Additionally, the upper stage is responsible for the avionics system of the the entire Ares I. This brief presentation highlights the requirements, design, progress and production of the upper stage. Additionally, test facilities to support J-2X development are discussed and an overview of the operational and manufacturing flows are provided. Building on the heritage of the Apollo and Space Shuttle Programs, the Ares I Us and USE teams are utilizing extensive lessons learned to place NASA and the US into another era of space exploration. The NASA, Boeing and PWR teams are integrated and working together to make progress designing and building the Ares I upper stage to minimize cost, technical and schedule risks.

McArthur, J. Craig↗

Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

Source record↗

Application of Non-Deterministic Methods to Assess Modeling Uncertainties for Reinforced Carbon-Carbon Debris Impacts

The Space Shuttle Columbia Accident Investigation Board (CAIB) made several recommendations for improving the NASA Space Shuttle Program. An extensive experimental and analytical program has been developed to address two recommendations related to structural impact analysis. The objective of the present work is to demonstrate the application of probabilistic analysis to assess the effect of uncertainties on debris impacts on Space Shuttle Reinforced Carbon-Carbon (RCC) panels. The probabilistic analysis is used to identify the material modeling parameters controlling the uncertainty. A comparison of the finite element results with limited experimental data provided confidence that the simulations were adequately representing the global response of the material. Five input parameters were identified as significantly controlling the response.

Lyle, Karen H.↗

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Control System Design Implementation and Preliminary Demonstration for a Tendon-Actuated Lightweight In-Space MANipulator (TALISMAN)

Satellite servicing is a high priority task for NASA and the space industry, addressing the needs of a variety of missions, and potentially lowering the overall cost of missions through refurbishment and reuse. However, the ability to service satellites is severely limited by the lack of long reach manipulation capability and inability to launch new devices due the end of the Space Transport System, or Space Shuttle Program. This paper describes the design and implementation of a control system for a Tendon-Actuated Lightweight In-Space MANipulator (TALISMAN), including; defining the forward and inverse kinematics, endpoint velocity to motor velocity, required cable tensions, and a proportional-integral-derivative (PID) controller. The tensions and velocities necessary to maneuver and capture small and large payloads are also discussed. To demonstrate the utility of the TALISMAN for satellite servicing, this paper also describes a satellite servicing demonstration using two TALISMAN prototypes to grasp and inspect a satellite mockup. Potential avenues for improving the control system are discussed.

Komendera, Erik E.↗

Infrared On-Orbit RCC Inspection With the EVA IR Camera: Development of Flight Hardware From a COTS System

In November 2004, NASA's Space Shuttle Program approved the development of the Extravehicular (EVA) Infrared (IR) Camera to test the application of infrared thermography to on-orbit reinforced carbon-carbon (RCC) damage detection. A multi-center team composed of members from NASA's Johnson Space Center (JSC), Langley Research Center (LaRC), and Goddard Space Flight Center (GSFC) was formed to develop the camera system and plan a flight test. The initial development schedule called for the delivery of the system in time to support STS-115 in late 2005. At the request of Shuttle Program managers and the flight crews, the team accelerated its schedule and delivered a certified EVA IR Camera system in time to support STS-114 in July 2005 as a contingency. The development of the camera system, led by LaRC, was based on the Commercial-Off-the-Shelf (COTS) FLIR S65 handheld infrared camera. An assessment of the S65 system in regards to space-flight operation was critical to the project. This paper discusses the space-flight assessment and describes the significant modifications required for EVA use by the astronaut crew. The on-orbit inspection technique will be demonstrated during the third EVA of STS-121 in September 2005 by imaging damaged RCC samples mounted in a box in the Shuttle's cargo bay.

Gazanik, Michael↗

Space Shuttle operational logistics plan

The Kennedy Space Center plan for logistics to support Space Shuttle Operations and to establish the related policies, requirements, and responsibilities are described. The Directorate of Shuttle Management and Operations logistics responsibilities required by the Kennedy Organizational Manual, and the self-sufficiency contracting concept are implemented. The Space Shuttle Program Level 1 and Level 2 logistics policies and requirements applicable to KSC that are presented in HQ NASA and Johnson Space Center directives are also implemented.

Botts, J. W.↗

Material Testing in Support of the ISS Electrochemical Disinfection Feasibility Study

The International Space Station Program recognizes the risk of microbial contamination in their potable and non-potable water sources. With the end of the Space Shuttle Program, the ability to send up shock-kits of biocides in the event of an outbreak becomes even more difficult. Currently, the US Segment water system relies primarily on iodine to mitigate contamination concerns. To date, several small cases of contamination have occurred which have been remediated. NASA, however, realizes that having a secondary method of combating a microbial outbreak is a prudent investment. NASA is looking into developing hardware that can generate biocides electrochemically, and potentially deploying that hardware. The specific biocides that the technology could generate include: hydrogen peroxide, oxone, hypochlorite and peracetic acid. In order to use these biocides on deployed water systems, the project must determine that all the materials in the potential application are compatible with the biocides at their anticipated administered concentrations. This paper will detail the materials test portion of the feasibility assessment including the plan for both metals and non-metals along with results to date.

Clements, Anna↗

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. The National Aeronautics and Space Administration (NASA) has worked diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond low earth orbit (LEO) large-scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decision-making framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing figure of merit (FOM)-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

Space Launch System Complex Decision-Making Process

The Space Shuttle program has ended and elements of the Constellation Program have either been cancelled or transitioned to new NASA exploration endeavors. The National Aeronautics and Space Administration (NASA) has worked diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond low earth orbit (LEO) large-scale missions for the next several decades. From Fall 2010 until Spring 2011, an SLS decision-making framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing figure of merit (FOM)-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper focuses on the various steps and methods of this process (rather than specific data) that allowed for competing concepts to be compared across a variety of launch vehicle metrics in support of the successful completion of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗