Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Extensive middle atmosphere (20-120 KM) modification in the Global Reference Atmospheric Model (GRAM-90)

The Global Reference Atmospheric Model (GRAM) is currently available in the 'GRAM-88' version (Justus, et al., 1986; 1988), which includes relatively minor upgrades and changes from the 'MOD-3' version (Justus, et al., 1980). Currently a project is underway to use large amounts of data, mostly collected under the Middle Atmosphere Program (MAP) to produce a major upgrade of the program planned for release as the GRAM-90 version. The new data and program revisions will particularly affect the 25-90 km height range. Sources of data and preliminary results are described here in the form of cross-sectional plots.

Justus, C. G.↗

Experimental studies of 90 deg corner cascades in the National Full-Scale Aerodynamic Complex

Two 90 deg, fixed geometry, turning vane cascades were replaced in the 40- by 80-foot wind tunnel circuit of the National Full-Scale Aerodynamic Complex as a part of a major facility upgrade. Prior to the replacement of these vanes, small-scale, two-dimensional tests were conducted to assess the aerodynamic performance of the original, 1930's technology vane geometry and a new vane geometry which was developed using a modern cascade design code. The small scale tests were conducted in the 1/10th-Scale Cascade Test Facility and included measurements of total pressure, static pressure, and flow angularity distributions in the wake of the cascade and static pressure distributions along the vane profiles. Test results and a detailed comparison of the two vanes designs are presented. Based on these results, the new design was chosen and subsequently installed in the wind tunnel. During the integrated systems test of the upgraded facility, two of the 52 vanes in the first cascade were instrumented near midspan. The full-scale test results are presented, these show the cascade pressure loss coefficient to be slightly larger than obtained in the small-scale tests. Elements of the three-dimensional flow field upstream of the cascade, which effect can impact cascade performance, are discussed and recommendations for future research are given.

Meyn, Larry A.↗

NSI directed to continue SPAN's functions

During a series of network management retreats in June and July 1990, representatives from NASA Headquarters Codes O and S agreed on networking roles and responsibilities for their respective organizations. The representatives decided that NASA Science Internet (NSI) will assume management of both the Space Physics Analysis Network (SPAN) and the NASA Science Network (NSN). SPAN is now known as the NSI/DECnet, and NSN is now known as the NSI/IP. Some management functions will be distributed between Ames Research Center (ARC) and Goddard Space Flight Center (GSFC). NSI at ARC has the lead role for requirements generation and networking engineering. Advanced Applications and the Network Information Center is being developed at GSFC. GSFC will lead the NSI User Services, but NSI at Ames will continue to provide the User Services during the transition. The transition will be made as transparent as possible for the users. DECnet service will continue, but is now directly managed by NSI at Ames. NSI will continue to work closely with routing center managers at other NASA centers, and has formed a transition team to address the change in management. An NSI/DECnet working group had also been formed as a separate engineering group within NSI to plan the transition to Phase 5, DECnet's approach to Open System Integration (OSI). Transition is not expected for a year or more due to delays in produce releases. Plans to upgrade speeds in tail circuits and the backbone are underway. The proposed baseline service for new connections is up to 56 Kbps; 9.6 Kbps lines will gradually be upgraded as requirements dictate. NSI is in the process of consolidating protocol traffic, tail circuits, and the backbone. Currently NSI's backbone is fractional T1; NSI will go to full T1 service as soon as it is feasible.

Rounds, Fred↗

Comparisons of elastic and rigid blade-element rotor models using parallel processing technology for piloted simulations

A piloted comparison of rigid and aeroelastic blade-element rotor models was conducted at the Crew Station Research and Development Facility (CSRDF) at Ames Research Center. A simulation development and analysis tool, FLIGHTLAB, was used to implement these models in real time using parallel processing technology. Pilot comments and quantitative analysis performed both on-line and off-line confirmed that elastic degrees of freedom significantly affect perceived handling qualities. Trim comparisons show improved correlation with flight test data when elastic modes are modeled. The results demonstrate the efficiency with which the mathematical modeling sophistication of existing simulation facilities can be upgraded using parallel processing, and the importance of these upgrades to simulation fidelity.

Hill, Gary↗

Manifest - Payloads and accommodations

Developing a long-range manifest begins with the assessment of flight rate capability for the next 6 years. Payloads priorities, launch readiness, and service needs are reviewed and compatible mixed cargo flights are determined and integrated with the dedicated missions to become the manifest. Manifest development must also address Orbiter upgrades to assure that payload-related enhancements meet need dates and that new hardware integration does not adversely affect flight rate capability. A series of Space Shuttle upgrades and new capabilities are in development driven by a continuing effort to improve safety margins, support recognized payload needs, and unique SSF requirements. These enhancements include extended mission duration capability, ASRM development, extended middeck payload support capability, and improved attitude control systems.

Hedin, Dan↗

Wavefront control of large optical systems

Several levels of wavefront control are necessary for the optimum performance of very large telescopes, especially segmented ones like the Large Deployable Reflector. In general, the major contributors to wavefront error are the segments of the large primary mirror. Wavefront control at the largest optical surface may not be the optimum choice because of the mass and inaccessibility of the elements of this surface that require upgrading. The concept of two-stage optics was developed to permit a poor wavefront from the large optics to be upgraded by means of a wavefront corrector at a small exit pupil of the system.

Meinel, Aden B.↗

Mechanical design of a rotary balance system for NASA. Langley Research Center's vertical spin tunnel

A new, lightweight Rotary Balance System is presently being fabricated and installed as part of a major upgrade to the existing 20-Foot Vertical Spin Tunnel (Figure 1) located at NASA's Langley Research Center. This upgrade, to improve model testing productivity of the only free-spinning vertical wind tunnel in the Western Hemisphere, includes a modern fan/drive and tunnel control system, an updated video recording system, and the new rotary balance system. The rotary balance is a mechanical apparatus which enables the measurement of aerodynamic force and moment data under spinning conditions (100 rpm). This data is used in spin analysis and is vital to the implementation of large amplitude maneuvering simulations required for all new high performance aircraft. The present system is over 40 years old and is worn beyond acceptable tolerances, as well as being susceptible to frequent breakdowns. It has serious limitations in model weight, position adjustment and spin-rate capabilities. The new rotary balance system described in this report will permit greater test efficiency and improved data accuracy. Rotary Balance testing with the model enclosed in a tare bag can also be performed to obtain resulting model forces from the spinning operation. The rotary balance system will be stored against the tunnel sidewall during free-flight model testing.

J. W. Allred↗

Users manual and modeling improvements for axial turbine design and performance computer code TD2-2

Computer code TD2 computes design point velocity diagrams and performance for multistage, multishaft, cooled or uncooled, axial flow turbines. This streamline analysis code was recently modified to upgrade modeling related to turbine cooling and to the internal loss correlation. These modifications are presented in this report along with descriptions of the code's expanded input and output. This report serves as the users manual for the upgraded code, which is named TD2-2.

Glassman, Arthur J.↗

On-line replacement of program modules using AdaPT

One purpose of our research is the investigation of the effectiveness and expressiveness of AdaPT(1), a set of language extensions to Ada 83, for distributed systems. As a part of that effort, we are now investigating the subject of replacing, e.g., upgrading, software modules while the software system remains in operation. The AdaPT language extension provide a good basis for this investigation for several reasons: (1) they include the concept of specific, self-contained program modules which can be manipulated; (2) support for program configuration is included in the language; and (3) although the discussion will be in terms of the AdaPT language, the AdaPT to Ada 83 conversion methodology being developed as another part of this project will provide a basis for the application of our findings to Ada 83 systems. The purpose of this investigation is to explore the basic mechanisms to the replacement process. Thus, while replacement in the presence of real-time deadlines, heterogeneous systems, and unreliable networks is certainly a topic of interest, we will first gain an understanding of the basic processes in the absence of such concerns. The extension of the replacement process to more complex situations can be made later. This report will establish an overview of the on-line upgrade problem, and present a taxonomy of the various aspects of the replacement process.

Waldrop, Raymond S.↗

A piloted comparison of elastic and rigid blade-element rotor models using parallel processing technology

A piloted comparison of rigid and aeroelastic blade-element rotor models was conducted at the Crew Station Research and Development Facility (CSRDF) at Ames Research Center. FLIGHTLAB, a new simulation development and analysis tool, was used to implement these models in real time using parallel processing technology. Pilot comments and quantitative analysis performed both on-line and off-line confirmed that elastic degrees of freedom significantly affect perceived handling qualities. Trim comparisons show improved correlation with flight test data when elastic modes are modeled. The results demonstrate the efficiency with which the mathematical modeling sophistication of existing simulation facilities can be upgraded using parallel processing, and the importance of these upgrades to simulation fidelity.

Hill, Gary↗

Comparison of elastic and rigid blade-element rotor models using parallel processing technology for piloted simulations

A piloted comparison of rigid and aeroelastic blade-element rotor models was conducted at the Crew Station Research and Development Facility (CSRDF) at Ames Research Center. A simulation development and analysis tool, FLIGHTLAB, was used to implement these models in real time using parallel processing technology. Pilot comments and qualitative analysis performed both on-line and off-line confirmed that elastic degrees of freedom significantly affect perceived handling qualities. Trim comparisons show improved correlation with flight test data when elastic modes are modeled. The results demonstrate the efficiency with which the mathematical modeling sophistication of existing simulation facilities can be upgraded using parallel processing, and the importance of these upgrades to simulation fidelity.

Hill, Gary↗

Hypersonic aerodynamic/aerothermodynamic testing capabilities at Langley Research Center

Capabilities of the Langley Hypersonic Facilities Complex that consists of nine blowdown-to-vacuum wind tunnels are reviewed. These tunnels complement one another to provide ranges of Mach number from 6 to 20, unit Reynolds number from 0.03 to 40 million per ft, and normal shock density ratio from 2 to 12. Topics under consideration include the basic components of each facility, status, and upgrades recently performed; instrumentation and testing techniques routinely used to measure forces and moments, surface pressures, surface temperature-time histories, flow properties within the shock layer about the model via survey probes, and flow visualization; and data acquisition systems and upgrades performed via a NASA revitalization program.

Miller, C. G., III↗

Application of programmable logic controllers to space simulation

Incorporating a state-of-the-art process control and instrumentation system into a complex system for thermal vacuum testing is discussed. The challenge was to connect several independent control systems provided by various vendors to a supervisory computer. This combination will sequentially control and monitor the process, collect the data, and transmit it to color a graphic system for subsequent manipulation. The vacuum system upgrade included: replacement of seventeen diffusion pumps with eight cryogenic pumps and one turbomolecular pump, replacing a relay based control system, replacing vacuum instrumentation, and upgrading the data acquisition system.

Sushon, Janet↗

Investigation of cloud/water vapor motion winds from geostationary satellite

This report summarizes the research work accomplished on the NASA grant contract NAG8-892 during 1992. Research goals of this contract are the following: to complete upgrades to the Cooperative Institute for Meteorological Satellite Studies (CIMSS) wind system procedures for assigning heights and incorporating first guess information; to evaluate these modifications using simulated tracer fields; to add an automated quality control system to minimize the need for manual editing, while maintaining product quality; and to benchmark the upgraded algorithm in tests with NMC and/or MSFC. Work progressed on all these tasks and is detailed. This work was done in collaboration with CIMSS NOAA/NESDIS scientists working on the operational winds software, so that NASA funded research can benefit NESDIS operational algorithms.

Source record↗

Nuclear Engine System Simulation (NESS). Version 2.0: Program user's guide

This Program User's Guide discusses the Nuclear Thermal Propulsion (NTP) engine system design features and capabilities modeled in the Nuclear Engine System Simulation (NESS): Version 2.0 program (referred to as NESS throughout the remainder of this document), as well as its operation. NESS was upgraded to include many new modeling capabilities not available in the original version delivered to NASA LeRC in Dec. 1991, NESS's new features include the following: (1) an improved input format; (2) an advanced solid-core NERVA-type reactor system model (ENABLER 2); (3) a bleed-cycle engine system option; (4) an axial-turbopump design option; (5) an automated pump-out turbopump assembly sizing option; (6) an off-design gas generator engine cycle design option; (7) updated hydrogen properties; (8) an improved output format; and (9) personal computer operation capability. Sample design cases are presented in the user's guide that demonstrate many of the new features associated with this upgraded version of NESS, as well as design modeling features associated with the original version of NESS.

Pelaccio, Dennis G.↗

Radiative cryogenic cooler for the pressure modulator IR radiometer

An existing operational low-earth-orbit radiative cooler is being upgraded for use on the Mars Observer polar-orbiting mission, using the Landsat Thematic Mapper cooler as a basis for upgrading. Significant improvements were achieved in the design of the thermal performance and vibration endurance, and in the mass minimization design. The cooler provides about 18 mW of useful refrigeration power in Mars orbit at its equilibrium operating temperature. The detector operating temperature for the worst-case orbital environment is about 73 K.

Kuyper, Donald J.↗

Space Station Freedom extravehicular activity systems evolution study

Evaluation of Space Station Freedom (SSF) support of manned exploration is in progress to identify SSF extravehicular activity (EVA) system evolution requirements and capabilities. The output from these studies will provide data to support the preliminary design process to ensure that Space Station EVA system requirements for future missions (including the transportation node) are adequately considered and reflected in the baseline design. The study considers SSF support of future missions and the EVA system baseline to determine adequacy of EVA requirements and capabilities and to identify additional requirements, capabilities, and necessary technology upgrades. The EVA demands levied by formal requirements and indicated by evolutionary mission scenarios are high for the out-years of Space Station Freedom. An EVA system designed to meet the baseline requirements can easily evolve to meet evolution demands with few exceptions. Results to date indicate that upgrades or modifications to the EVA system may be necessary to meet the full range of EVA thermal environments associated with the transportation node. Work continues to quantify the EVA capability in this regard. Evolution mission scenarios with EVA and ground unshielded nuclear propulsion engines are inconsistent with anthropomorphic EVA capabilities.

Rouen, Michael↗

Environmental projects. Volume 15: Environmental assessment: Proposed 1-megawatt radar transmitter at the Mars site

The Goldstone Deep Space Communications Complex (GDSCC), located in the Mojave Desert about 64.5 km (40 mi) north of Barstow, California. and about 258 km (160 mi) northeast of Pasadena, California, is part of the National Aeronautics and Space Administration's (NASA's) Deep Space Network (DSN), one of the world's larger and more sensitive scientific telecommunications and radio navigation networks. The Goldstone Complex is managed, technically directed, and operated for NASA by the Jet Propulsion Laboratory (JPL) of the California Institute of Technology in Pasadena, California. Activities at the GDSCC support the operation of six parabolic dish antennas located at five separate sites called Deep Space Stations (DSS's). Four sites, named Echo, Mars, Uranus, and Apollo, are operational for space missions, while the remaining Venus Site is devoted to research and development activities. The Mars Site at the GDSCC contains two antennas: the Uranus antenna (DSS 15, 34 m) and the Mars antenna (DSS 14, 70 m). This present volume deals solely with the DSS-14 Mars antenna. The Mars antenna not only can act as a sensitive receiver to detect signals from spacecraft, but it also can be used in radar astronomy as a powerful transmitter to send out signals to probe the solar system. At present, the Mars antenna operates as a continuous-wave microwave system at a frequency of 8.51 GHz at a power level of 0.5 MW. JPL has plans to upgrade the Mars antenna to a power level of 1 MW. Because of the anticipated increase in the ambient levels of radio frequency radiation (RFR), JPL retained Battelle Pacific Northwest Laboratories (BPNL), Richland, Washington, to conduct an environmental assessment with respect to this increased RFR. This present volume is a JPL-expanded version of the BPNL report titled Environmental Assessment of the Goldstone Solar System Radar, which was submitted to JPL in Nov. 1991. This BPNL report concluded that the operation of the upgraded Mars antenna at the GDSCC, with its increased potential electromagnetic radiation hazards and interferences, would have no significantly adverse biological, physical, or socioeconomic effects on the environment. Thus, a Finding of No Significant Impact (FONSI) is appropriate in accordance with local, State, Federal, and NASA environmental rules and regulations.

Source record↗