Search NASA⌕ Search

SEARCH · Search NASA

Results for “building services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

DAWN: Dashboard for Agricultural Water Use and Nutrient Management—A Predictive Decision Support System to Improve Crop Production in a Changing Climate

Abstract Climate change presents huge challenges to the already-complex decisions faced by U.S. agricultural producers, as seasonal weather patterns increasingly deviate from historical tendencies. Under USDA funding, a transdisciplinary team of researchers, extension experts, educators, and stakeholders is developing a climate decision support Dashboard for Agricultural Water use and Nutrient management (DAWN) to provide Corn Belt farmers with better predictive information. DAWN’s goal is to provide credible, usable information to support decisions by creating infrastructure to make subseasonal-to-seasonal forecasts accessible. DAWN uses an integrated approach to 1) engage stakeholders to coproduce a decision support and information delivery system; 2) build a coupled modeling system to represent and transfer holistic systems knowledge into effective tools; 3) produce reliable forecasts to help stakeholders optimize crop productivity and environmental quality; and 4) integrate research and extension into experiential, transdisciplinary education. This article presents DAWN’s framework for integrating climate–agriculture research, extension, and education to bridge science and service. We also present key challenges to the creation and delivery of decision support, specifically in infrastructure development, coproduction and trust building with stakeholders, product design, effective communication, and moving tools toward use.

Meteorology & Atmospheric Sciences↗

Integrated Urban Services (IUS) Pilot Project Profile - Integrated Urban Agricultural Hub Development: Cagayan de Oro (CdO), Philippines

This brief provides a project snapshot of the Integrated Urban Services program's support to Cagayan de Oro, Philippines for development of an integrated urban agricultural hub. Integrated Urban Services is a U.S. State Department program launched in 2021 under the United States-Association of Southeast Asian Nations Smart Cities Partnership helping cities build resilience in their energy, food, and water provisioning systems.

ASEAN↗

Integrated Urban Services (IUS) Pilot Project Profile - Integrated AgriTech Hub Development in Flagship F Zone: Iskandar Malaysia

This brief provides a project snapshot of the Integrated Urban Services program's support to Iskandar Malaysia for development of an integrated urban agricultural hub. Integrated Urban Services is a U.S. State Department program launched in 2021 under the United States-Association of Southeast Asian Nations Smart Cities Partnership helping cities build resilience in their energy, food, and water provisioning systems.

ASEAN↗

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

NASA's Space Launch System Progress Report

Exploration beyond Earth orbit will be an enduring legacy for future generations, as it provides a platform for science and exploration that will define new knowledge and redefine known boundaries. NASA s Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is responsible for designing and developing the first exploration-class rocket since the Apollo Program s Saturn V that sent Americans to the Moon in the 1960s and 1970s. The SLS offers a flexible design that may be configured for the Orion Multi-Purpose Crew Vehicle with associated life-support equipment and provisions for long journeys or may be outfitted with a payload fairing that will accommodate flagship science instruments and a variety of high-priority experiments. Building on legacy systems, facilities, and expertise, the SLS will have an initial lift capability of 70 tonnes (t) in 2017 and will be evolvable to 130 t after 2021. While commercial launch vehicle providers service the International Space Station market, this capability will surpass all vehicles, past and present, providing the means to do entirely new missions, such as human exploration of Mars. Building on the foundation laid by over 50 years of human and scientific space flight and on the lessons learned from the Apollo, Space Shuttle, and Constellation Programs the SLS team is delivering both technical trade studies and business case analyses to ensure that the SLS architecture will be safe, affordable, reliable, and sustainable. This panel will address the planning and progress being made by NASA s SLS Program.

May, Todd A.↗

The ATLAS experiment software on ARM

With an increased dataset obtained during the Run 3 of the LHC at CERN and the even larger expected increase of the dataset by more than one order of magnitude for the HL-LHC, the ATLAS experiment is reaching the limits of the current data processing model in terms of traditional CPU resources based on x86_64 architectures and an extensive program for software upgrades towards the HL-LHC has been set up. The ARM architecture is becoming a competitive and energy efficient alternative. Some surveys indicate its increased presence in HPCs and commercial clouds, and some WLCG sites have expressed their interest. Chip makers are also developing their next generation solutions on ARM architectures, sometimes combining ARM and GPU processors in the same chip. Consequently it is important that the ATLAS software embraces the change and is able to successfully exploit this architecture. We report on the successful porting to ARM of the Athena software framework, which is used by ATLAS for both online and offline computing operations. Furthermore we report on the successful validation of simulation workflows running on ARM resources. For this we have set up an ATLAS Grid site using ARM compatible middleware and containers on Amazon Web Services (AWS) ARM resources. The ARM version of Athena is fully integrated in the regular software build system and distributed in the same way as other software releases. In addition, the workflows have been integrated into the HEPscore benchmark suite which is the planned WLCG wide replacement of the HepSpec06 benchmark used for Grid site pledges. In the overall porting process we have used resources on AWS, Google Cloud Platform (GCP) and CERN. A performance comparison of different architectures and resources will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

RODeO (Revenue Operation and Device Optimization Model) [SWR 20-67]

The Revenue, Operation, and Device Optimization (RODeO) model explores optimal system design and operation considering different levels of grid integration, equipment cost, operating limitations, financing, and credits and incentives. RODeO is a price-taker model formulated as a mixed-integer linear programming (MILP) model in the GAMS modeling platform. The objective is to maximizes the net revenue for a collection of equipment at a given site. The equipment includes generators (e.g., gas turbine, steam turbine, solar, wind, hydro, fuel cells, etc.), storage systems (batteries, pumped hydro, gas-fired compressed air energy storage, long-duration systems, hydrogen), and flexible loads (e.g., electric vehicles, electrolyzers, flexible building loads). The input data required by RODeO can be classified into three bins: 1) utility service data, which refers to retail utility rate information (meter cost, energy and demand charges), 2) electricity market data, which include energy and reserve prices, 3) other inputs, which refer to additional electrical demand, product output demand, technological assumptions, financial properties, and operational parameters.

Guerra Fernandez, Omar Jose↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

Real-time graphics for the Space Station Freedom cupola, developed in the Systems Engineering Simulator

Among the Lyndon B. Johnson Space Center's responsibilities for Space Station Freedom is the cupola. Attached to the resource node, the cupola is a windowed structure that will serve as the space station's secondary control center. From the cupola, operations involving the mobile service center and orbital maneuvering vehicle will be conducted. The Systems Engineering Simulator (SES), located in building 16, activated a real-time man-in-the-loop cupola simulator in November 1987. The SES cupola is an engineering tool with the flexibility to evolve in both hardware and software as the final cupola design matures. Two workstations are simulated with closed-circuit television monitors, rotational and translational hand controllers, programmable display pushbuttons, and graphics display with trackball and keyboard. The displays and controls of the SES cupola are driven by a Silicon Graphics Integrated Raster Imaging System (IRIS) 4D/70 GT computer. Through the use of an interactive display builder program, SES, cupola display pages consisting of two dimensional and three dimensional graphics are constructed. These display pages interact with the SES via the IRIS real-time graphics interface. The focus is on the real-time graphics interface applications software developed on the IRIS.

Red, Michael T.↗

Evolution of the Florida Launch Site Architecture: Embracing Multiple Customers, Enhancing Launch Opportunities

The impending conclusion of the Space Shuttle Program and the Constellation Program cancellation unveiled in the FY2011 President's budget created a large void for human spaceflight capability and specifically launch activity from the Florida launch Site (FlS). This void created an opportunity to re-architect the launch site to be more accommodating to the future NASA heavy lift and commercial space industry. The goal is to evolve the heritage capabilities into a more affordable and flexible launch complex. This case study will discuss the FlS architecture evolution from the trade studies to select primary launch site locations for future customers, to improving infrastructure; promoting environmental remediation/compliance; improving offline processing, manufacturing, & recovery; developing range interface and control services with the US Air Force, and developing modernization efforts for the launch Pad, Vehicle Assembly Building, Mobile launcher, and supporting infrastructure. The architecture studies will steer how to best invest limited modernization funding from initiatives like the 21 st elSe and other potential funding.

Colloredo, Scott↗

Retrieve Methane from IR sounder measurements Using Machine Learning-Enhanced Physical Inversion

The sensitivity of IR sounder measurements to atmospheric CH 4 is often limited due to interferences from signals of other trace gases, insufficient thermal contrast, and cloud blockage. In order to resolve the geographical and vertical distribution of atmospheric CH 4 profiles, accurate scene-dependent a priori information is critically needed to support an optimal estimation method-based physical inversion scheme. Following the principles of indexing, representation, and retrieval, a spectral fingerprinting methodology is developed to address the needs for both accuracy and computational efficiency in sounder-based CH 4 retrieval. Within this framework, a clustering method based on machine learning is first employed to stratify and identify the a priori state within the pre-constructed database, using optimized spectral radiances as predictors. The corresponding radiative kernel is then used to establish the physical inversion scheme for finding the solution. High-quality data from CH 4 data assimilation systems like the Carbon-Tracker and the Copernicus Atmosphere Monitoring Service (CAMS) reanalysis, as well as the state-of-art sounder products are used to build the training database, including radiative kernels. We will demonstrate the results retrieved from CrIS observations and the associated validation work.

Wan Wu↗

Workflow Submit Nodes as a Service on Leadership Class Systems

DOE scientists, today, have access to high performance computing (HPC) facilities with very powerful systems that enable them to execute their computations faster, more efficiently, and at greater scales than ever before. To further their knowledge and produce new discoveries, scientists rely on workflows - sometimes very complex - that provide them with an easy way to automate, reproduce and verify their computations. However, historically, creating workflow submission environments in large HPC facilities has been cumbersome, requires expertise and many man-hours of effort due to the peculiarities, policies, and the restrictions that these systems present. In this paper we discuss the approach a large DOE facility (OLCF) is taking in order to provide containers as a service to its users. This capability is used to create Pegasus workflow management system submit nodes as a service (WSaaS) at the Oak Ridge Leadership Computing Facilities (OLCF), targeting the Summit supercomputer. This deployment builds upon the Kubernetes/Openshift cluster (Slate) that exists within OLCF’s DMZ and its automation triggers. Additionally, we evaluate our approach’s overhead and effort to deploy the solution as compared to previous solutions, such as setting up a Pegasus submission environment on OLCF’s login nodes or submitting jobs remotely via the rvGAHP.

Papadimitriou, George↗

Draft Environmental Impact Statement for Proposed Energy Conservation Standards for Manufactured Housing

This draft environmental impact statement (EIS) analyzes the impacts related to DOE’s proposed energy conservation standards for manufactured homes. DOE’s proposed energy conservation standards are based on the 2021 International Energy Conservation Code (IECC) and relate to the building thermal envelope; air sealing; installation of insulation; duct sealing; heating, ventilation and air conditioning (HVAC); service hot water systems; mechanical ventilation fan efficacy; and heating and cooling equipment sizing. The draft EIS evaluates DOE’s proposed action (energy conservation standards tiered based the manufacturers retail list price), alternatives to the proposed action (including energy conservation standards tiered based on size of the manufactured home and untiered standards), and a no action alternative. The draft EIS presents analysis of impacts related to (1) energy resources; (2) air resources (including greenhouse gases, climate change, ambient air quality and indoor air quality); (3) health and safety; (4) socioeconomics; and (5) environmental justice.

MacDonell, Margaret↗

Next-Generation NASA Earth-Orbiting Relay Satellites: Fusing Microwave and Optical Communications

NASA is currently considering architectures and concepts for the generation of relay satellites that will replace the Tracking and Data Relay Satellite (TDRS) constellation, which has been flying since 1983. TDRS-M, the last of the second TDRS generation, launched in August 2017, extending the life of the TDRS constellation beyond 2030. However, opportunities exist to re-engineer the concepts of geosynchronous Earth relay satellites. The needs of the relay satellite customers have changed dramatically over the last 34 years since the first TDRS launch. There is a demand for greater bandwidth as the availability of the traditional RF spectrum for space communications diminishes and the demand for ground station access grows. The next generation of NASA relay satellites will provide for operations that have factored in these new constraints. In this paper, we describe a heterogeneous constellation of geosynchronous relay satellites employing optical and RF communications. The new constellation will enable new optical communications services formed by user-to-space relay, space relay-to-space relay and space relay-to-ground links. It will build upon the experience from the Lunar Laser Communications Demonstration from 2013 and the Laser Communications Relay Demonstration to be launched in 2019.Simultaneous to establishment of the optical communications space segment, spacecraft in the TDRS constellation will be replaced with RF relay satellites with targeted subsets of the TDRS capabilities. This disaggregation of the TDRS service model will allow for flexibility in replenishing the needs of legacy users as well as addition of new capabilities for future users. It will also permit the U.S. government access to launch capabilities such as rideshare and to hosted payloads that were not previously available. In this paper, we also explore how the next generation of Earth relay satellites provides a significant boost in the opportunities for commercial providers to the communications space segment. For optical communications, the backbone of this effort is adoption of commercial technologies from the terrestrial high-bandwidth telecommunications industry into optical payloads. For RF communications, the explosion of software-defined radio, high-speed digital signal processing technologies and networking from areas such as 5G multicarrier will be important. Future commercial providers will not be limited to a small set of large aerospace companies. Ultimately, entirely government-owned and -operated satellite communications will phase out and make way for commercial business models that satisfy NASAs satellite communications requirements. The competition being provided by new entrants in the space communications business may result in a future in which all NASA communications needs can be satisfied commercially.

Space Communications↗

Next-Generation NASA Earth-Orbiting Relay Satellites: Fusing Optical and Microwave Communications

NASA is currently considering architectures and concepts for the generation of relay satellites that will replace the Tracking and Data Relay Satellite (TDRS) constellation, which has been flying since 1983. TDRS-M, the last of the second TDRS generation, launched in August 2017, extending the life of the TDRS constellation beyond 2030. However, opportunities exist to re-engineer the concepts of geosynchronous Earth relay satellites. The needs of the relay satellite customers have changed dramatically over the last 34 years since the first TDRS launch. There is a demand for greater bandwidth as the availability of the traditional RF spectrum for space communications diminishes and the demand for ground station access grows. The next generation of NASA relay satellites will provide for operations that have factored in these new constraints. In this paper, we describe a heterogeneous constellation of geosynchronous relay satellites employing optical and RF communications. The new constellation will enable new optical communications services formed by user-to-space relay, space relay-to-space relay and space relay-to-ground links. It will build upon the experience from the Lunar Laser Communications Demonstration from 2013 and the Laser Communications Relay Demonstration to be launched in 2019.Simultaneous to establishment of the optical communications space segment, spacecraft in the TDRS constellation will be replaced with RF relay satellites with targeted subsets of the TDRS capabilities. This disaggregation of the TDRS service model will allow for flexibility in replenishing the needs of legacy users as well as addition of new capabilities for future users. It will also permit the U.S. government access to launch capabilities such as rideshare and to hosted payloads that were not previously available.In this paper, we also explore how the next generation of Earth relay satellites provides a significant boost in the opportunities for commercial providers to the communications space segment. For optical communications, the backbone of this effort is adoption of commercial technologies from the terrestrial high-bandwidth telecommunications industry into optical payloads. For RF communications, the explosion of software-defined radio, high-speed digital signal processing technologies and networking from areas such as 5G multicarrier will be important. Future commercial providers will not be limited to a small set of large aerospace companies. Ultimately, entirely government-owned and -operated satellite communications will phase out and make way for commercial business models that satisfy NASA's satellite communications requirements. The competition being provided by new entrants in the space communications business may result in a future in which all NASA communications needs can be satisfied commercially.

Space Communications↗

Mobile satellite service in the United States

Mobile satellite service (MSS) has been under development in the United States for more than two decades. The service will soon be provided on a commercial basis by a consortium of eight U.S. companies called the American Mobile Satellite Consortium (AMSC). AMSC will build a three-satellite MSS system that will offer superior performance, reliability and cost effectiveness for organizations requiring mobile communications across the U.S. The development and operation of MSS in North America is being coordinated with Telesat Canada and Mexico. AMSC expects NASA to provide launch services in exchange for capacity on the first AMSC satellite for MSAT-X activities and for government demonstrations.

Agnew, Carson E.↗

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation↗

Engine Development Design Margins Briefing Charts

New engines experience durability problems after entering service. The most prevalent and costly is the hot section, particularly the high-pressure turbine. The origin of durability problems can be traced back to: 1) the basic aero-mechanical design systems, assumptions, and design margins used by the engine designers, 2) the available materials systems, and 3) to a large extent, aggressive marketing in a highly competitive environment that pushes engine components beyond the demonstrated capability of the basic technology available for the hardware designs. Unfortunately the user must operate the engine in the service environment in order to learn the actual thrust loading and the time at max effort take-off conditions used in service are needed to determine the hot section life. Several hundred thousand hours of operational service will be required before the demonstrated reliability of a fleet of engines or the design deficiencies of the engine hot section parts can be determined. Also, it may take three to four engine shop visits for heavy maintenance on the gas path hardware to establish cost effective build standards. Spare parts drive the oerator's engine maintenance costs but spare parts also makes lots of money for the engine manufacturer during the service life of an engine. Unless competition prevails for follow-on engine buys, there is really no motivation for an OEM to spend internal money to improve parts durability and reduce earnings derived from a lucrative spare parts business. If the hot section life is below design goals or promised values, the OEM migh argue that the engine is being operated beyond its basic design intent. On the other hand, the airframer and the operator will continue to remind the OEM that his engine was selected based on a lot of promises to deliver spec thrust with little impact on engine service life if higher thrust is used intermittently. In the end, a standoff prevails and nothing gets fixed. This briefing will propose ways to hold competing engine manufacturers more accountable for engine hot section design margins during the entire Engine Development process as well as provide tools to assess the design temperature margins in the hot section parts of Service Engines.

Bentz, Chuck↗