Search NASA⌕ Search

SEARCH · Search NASA

Results for “buildings”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Viper Rover: Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

Building Automation System Replacement and Improvements during Concurrent Integration and Testing for the Spacecraft Systems Development and Integration Facility

The Spacecraft Systems Development and Integration Facility (SSDIF), the premier cleanroom for NASA Goddard Space Flight Center (GSFC), has gone through multiple iterations of changes to its building automation system (BAS). NASA flight projects require more stringent environmental controls for temperature, humidity, air exchange rates, and pressurization. This led to increasingly difficult circumstances with replacing and improving the BAS during Integration and Testing (I&T) operations. The SSDIF was partially transitioned to a new BAS during November and December of 2023. Transition occurred in a live environment, while regular I&T activities resumed for the Roman Space Telescope. This resulted in the development and execution of a comprehensive method of procedure. Strategies such as sequencing equipment transition, and using temporary controls for critical equipment, avoided detriments to cleanroom environment. While the new BAS was being built, data points on the previous system would become obsolete, leading to data gaps and uncertainties. Critical data points were distinguished and trended on the new system, providing key insights on equipment functionality, while the BAS was completed. Control hunting and environmental deviations were persistent cases with the SSDIF. In some instances, proportional-integral-derivative (PID) tuning was implemented on current logic to bring smooth PID loop hunting. In other situations, controls logic was completely altered by changing setpoints or sequences. This provided greater laminar flow, more stable pressurization, and improved temperature and humidity controls. This paper documents the transitionary procedure to a new BAS, the improvements made, and challenges faced when altering a BAS during I&T operations.

Cleanroom↗

VIPER Rover Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

Base Support Building and Kennedy Athletic, Recreation, and Social Park II, SWMU 014 and SWMU 118 PFAS 2023 Site Assessment Progress Report, Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) 2023 Site Assessment Progress Report presents the findings from the 2023 investigation activities, completed between October 12, 2022, and January 24, 2024, at the Base Support Building, Solid Waste Management Unit (SWMU) 014 and at the Kennedy Athletic, Recreation, and Social (KARS) Park II SWMU 118 located within Kennedy Space Center, Florida.

Richard G Smith↗

2023 Annual Long-Term Monitoring Report Vehicle Assembly Building Area

This report presents a summary of the groundwater monitoring activities that occurred in February 2024 at two sites in the Vehicle Assembly Building (VAB) Area Long-Term Monitoring (LTM) program at the John F. Kennedy Space Center, Florida. The two sites are Fire Station 3 (formerly Fire Station 6) (FS3) – Solid Waste Management Unit (SWMU) 106 and Launch Complex 39 Observation Gantry Area (LC39OGA) – SWMU 107.

VAB Long-Term Groundwater Monitoring↗

Launch Complex 39A Operations Support Building Area SWMU 111 Year 3 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) System Performance Monitoring Report (PMR) presents the findings, observations, and results for Year 3 of operation, maintenance, and monitoring activities for the AS Interim Measure (IM) at the Launch Complex 39A Operations Support Building Area (AOSB) at Kennedy Space Center (KSC), Florida. This report was presented as an Advance Data Package during the October 2024 KSC Remediation Team (KSCRT) meeting. The reporting period for activities covered under this PMR is from August 2023 through October 2024.

Mark P Speranza↗

Converter Compressor Building, SWMU 089 Monitoring Well 21 Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.

Mark Jonnet↗

NASA DEVELOP’s User-Centric Approach to Building Capacity to Use Earth Observations for Decision Making

The DEVELOP Program, part of NASA’s Applied Sciences, conducts 50-60 feasibility studies annually that center on user needs. Each project is tailored to its partner’s decision making processes with the goal of identifying and implementing opportunities for Earth observation data and information to be integrated into environmental decision making processes. These projects are conducted by a team of early career professionals through a 10-week term where the DEVELOP team rapidly iterates with partners culminating in a “recipe” for using NASA Earth observations. This presentation will introduce the DEVELOP model for user-centered design of projects, share the program's iterative approach to project execution, highlight multiple case studies, and lessons learned in the program’s model evolution.

Capacity Building↗