Search NASA⌕ Search

SEARCH · Search NASA

Results for “function as a service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Gateway at the Crossroads of Sustainable Lunar Exploration

The Gateway Program has made substantial design and development progress toward delivering a small, human-tended lunar space station purposefully designed to enable sustainable human exploration. The Program integrates partners and providers organizationally and physically as part of the spacecraft. The Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) with the European System Providing Refueling, Infrastructure and Telecommunications (ESPRIT) HALO Lunar Communications System (HLCS) have begun manufacturing the long lead components and will be launched first as a Co-Manifested Vehicle (CMV). The International Habitat (I-Hab) and ESPRIT Refueling Module (ERM) are passing life cycle milestones and include capabilities key for human crewmembers, such as windows, private sleeping quarters, and galley functions. The Logistics Module (LM) may provide a variety of services to Gateway depending on each mission. Requirements for the airlock have been developed, including requests that it support the integrated spacecraft with functions like augmenting heat rejection capabilities, and interfaces with new spacesuits will soon be developed in more detail. As a critical element of the architecture for solar system exploration, Gateway implements key tenets and features of international interoperability standards necessary to operate with multiple visiting vehicles and lunar assets, especially avionics, communications, and docking. Specific choices such as software architecture and standards, power standards, and robotics standards make it possible to utilize heritage or proprietary technology, yet still operate as one spacecraft. Engineering teams are evaluating many possible future missions to be executed at or utilizing the Gateway. The system architecture protects for an evolvable, extensible, and flexible capability. Designing systems robust enough to serve as a cornerstone of exploration activities for decades while remaining adaptable is not without its challenges. The detailed integration activities have revealed challenges and the need to mature key technologies. Refueling is a key component of achieving long life for Gateway, with unique operations to plan, safety concerns to mitigate, and risk reduction activities to conduct to better understand the system. The constraints and impacts of the design of visiting vehicles is also an important concern, with orientation constraints, control of attitude and orbit of the Gateway with docked visiting vehicles. Tradeoffs between robust maintainable systems and lightweight, compact systems must be balanced. Opportunities still exist for adding additional advanced capabilities to increase and extend Gateway’s benefits, such as intravehicular robotics, autonomous Guidance Navigation and Control (GN&C), and augmented control propulsion, heat rejection, or other services.

Molly S Anderson↗

Gateway at the Crossroads of Sustainable Lunar Exploration

The Gateway Program has made substantial design and development progress toward delivering a small, human-tended lunar space station purposefully designed to enable sustainable human exploration. The Program integrates partners and providers organizationally and physically as part of the spacecraft. The Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) with the European System Providing Refueling, Infrastructure and Telecommunications (ESPRIT) HALO Lunar Communications System (HLCS) have begun manufacturing the long lead components and will be launched first as a Co-Manifested Vehicle (CMV). The International Habitat (I-Hab) and ESPRIT Refueling Module (ERM) are passing life cycle milestones and include capabilities key for human crewmembers, such as windows, private sleeping quarters, and galley functions. The Logistics Module (LM) may provide a variety of services to Gateway depending on each mission. Requirements for the airlock have been developed, including requests that it support the integrated spacecraft with functions like augmenting heat rejection capabilities, and interfaces with new spacesuits will soon be developed in more detail. As a critical element of the architecture for solar system exploration, Gateway implements key tenets and features of international interoperability standards necessary to operate with multiple visiting vehicles and lunar assets, especially avionics, communications, and docking. Specific choices such as software architecture and standards, power standards, and robotics standards make it possible to utilize heritage or proprietary technology, yet still operate as one spacecraft. Engineering teams are evaluating many possible future missions to be executed at or utilizing the Gateway. The system architecture protects for an evolvable, extensible, and flexible capability. Designing systems robust enough to serve as a cornerstone of exploration activities for decades while remaining adaptable is not without its challenges. The detailed integration activities have revealed challenges and the need to mature key technologies. Refueling is a key component of achieving long life for Gateway, with unique operations to plan, safety concerns to mitigate, and risk reduction activities to conduct to better understand the system. The constraints and impacts of the design of visiting vehicles is also an important concern, with orientation constraints, control of attitude and orbit of the Gateway with docked visiting vehicles. Tradeoffs between robust maintainable systems and lightweight, compact systems must be balanced. Opportunities still exist for adding additional advanced capabilities to increase and extend Gateway’s benefits, such as intravehicular robotics, autonomous Guidance Navigation and Control (GN&C), and augmented control propulsion, heat rejection, or other services.

Molly S Anderson↗

Space Station crew workload - Station operations and customer accommodations

The features of the Space Station which permit crew members to utilize work time for payload operations are discussed. The user orientation, modular design, nonstressful flight regime, in space construction, on board control, automation and robotics, and maintenance and servicing of the Space Station are examined. The proposed crew size, skills, and functions as station operator and mission specialists are described. Mission objectives and crew functions, which include performing material processing, life science and astronomy experiments, satellite and payload equipment servicing, systems monitoring and control, maintenance and repair, Orbital Maneuvering Vehicle and Mobile Remote Manipulator System operations, on board planning, housekeeping, and health maintenance and recreation, are studied.

Shinkle, G. L.↗

Airspace Automation Flight Tabletop Exercise

Interconnections of new systems are needed for airspace automation capabilities required in Urban Air Mobility (UAM). FAA Concept of Operations (CONOPS) V1.0 shows Provider of Services for UAM (PSU) at the center of the notional architecture; however, the functional role of the PSU in data exchange and the path to get there is unclear. In partnership with Wisk Aero, Avision, ANRA, Collins Aerospace, OneSky, SkyGrid, and AURA, the NASA National Campaign held discussions and tabletop exercises to test the functional allocations and work flows between an aircraft operator, airspace providers, Command and Control Communication Service Providers (C2CSP), and FAA air traffic in a real-world scenario. The exercise included preplanning and execution of a passenger mission with nominal, contingency, and conflict management scenarios for initial UAM operations. This working paper describes initial conditions for the flight tabletop exercise, exercise summaries, lessons learned, and recommendations for future work.

National Campaign↗

Cross-cutting strategies to lower electricity use of miscellaneous electric loads in the domestic sector

Miscellaneous Electric Loads (MELs) account for roughly one quarter of building electricity use in most developed countries. A product-specific approach to lowering MELs electricity use in this category takes too long and costs too much because there are so many MELs, each providing unique services. An alternative approach focusing on key functionalities was therefore explored. These functionalities include: (1) power management, (2) power scaling, and (3) power conversion. Cross-cutting efficiency improvements to these functionalities can be incorporated into broad categories of MELs, thus saving electricity and lowering costs. Even though the population of MELs is diverse and rapidly evolving, major technical opportunities exist to improve their efficiency in these functionalities. Research into energy-saving solutions within the cross-cutting technologies will probably have larger savings than focusing on single products.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Characterizing photovoltaic backsheet adhesion degradation using the wedge and single cantilever beam tests, Part I: Field Modules

Photovoltaic backsheets are exposed to harsh outdoor weathering conditions throughout their service lives that can compromise their protective function, through adhesive debonding between their constituent layers and between the backsheet and the module. We report a large-scale study on adhesive degradation was conducted on 37 field-exposed modules, that spanned 19 different module manufacturers, that were deployed among six Köppen–Geiger climatic zones, and that were fielded between 0 and 28 years. Six outer layer polymer classes were identified among the backsheets: polyamide (PA), polyethylene terephthalate (PET), polyvinyl fluoride (PVF), polyvinylidene fluoride (PVDF), fluoroethylene vinyl ether copolymer (FEVE), and tetrafluoroethylene hexafluoropropylene vinylidene fluoride copolymer (THV). Two adhesion tests were used to measure the adhesive strength: the wedge test and the width-tapered single-cantilever beam (SCB) test. Adhesion energies were compared across exposure time and Köppen–Geiger climatic zone. Many of the PET-, PVF-, and PVDF-based backsheets experienced degradation of the adhesive layer between the backsheet outer and core layers. A consistent trend of decreasing adhesion energy with exposure time was observed in five out of the six backsheet types. Trends among adhesion energy and climatic zone, while expected, were not observed, possibly due to broad ranges in temperature, humidity, and precipitation defining Köppen–Geiger climatic zones. The cantilever beam measurements produced an upper cutoff of approximately 100 J/m 2 , above which no modules exhibited field delamination. The results are part of a two-part study quantifying adhesion in both field-weathered and indoor-exposed PV backsheets.

14 SOLAR ENERGY↗

WLCG transition from X.509 to Tokens: Progress and Outlook

Since 2017, the Worldwide LHC Computing Grid (WLCG) has been working towards enabling token-based authentication and authorization throughout its entire middleware stack.Taking guidance from the WLCG Token Transition Timeline, published in 2022, substantial progress has been achieved not only in making middleware compatible with the use of tokens, but also in understanding the limitations of the WLCG Common JWT Profiles, first published in 2019. Significant scalability experience has been gained from Data Challenge 2024, during which millions of files were transferred with tokens used as credentials - a significant percentage of the total transfers completed.Besides describing the state of affairs in the transition to tokens, revisions to the WLCG token profile, and the evolving road maps, this contribution also covers the corresponding transition from VOMS-Admin to INDIGO-IAM services, with continuing improvements in terms of functionality as well as deployment.

Dack, Thomas [Rutherford Appleton Laboratory]↗

Robust Distribution System Load Restoration With Time-Dependent Cold Load Pickup

Service restoration is one of the critical functions to enable the future self-healing distribution system. To restore the distribution system in a timely and reliable manner, the realistic system operating conditions need to be accurately characterized. Here, two main factors that have great impacts on distribution system restoration (DSR) in practice are investigated. First, cold load pickup (CLPU), generally caused by thermostatically controlled loads (TCLs), is a common phenomenon after an outage and shaped by the outage duration. However, the time-dependent behaviors of CLPU are rarely considered in literature. In this paper, the operating state evolution of TCLs after an outage is analyzed to characterize time-dependent CLPU. And the time-dependent CLPU is analytically embedded in DSR to accurately represent the actual behaviors of the restored loads. Second, it is difficult to predict loads that fluctuate during DSR due to the lack of real-time measurement data. Accordingly, a robust DSR based on the information gap decision theory (IGDT) is proposed to address this challenge, fully considering the uncertainty of CLPU. The proposed models are tested in IEEE 13-node and 123-node test feeders. Simulation results demonstrate that the time-dependent CLPU model and the uncertainty modeling of CLPU can accurately capture the actual behaviors of loads with TCLs after an outage, which greatly improves DSR decisions in practice.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Module OT PNM Field Demonstration Test Procedure

This document will detail a field demonstration test procedure for the Module OT device developed for the joint NREL-SNL DOE CEDS project titled "Modular Security Apparatus for Managing Distributed Cryptography for Command & Control Messages on Operational Technology (OT) Networks." The aim of this document is to create the testing and evaluation procedure for field demonstration of the device; this includes primarily functional testing and implementation testing at Public Service Company of New Mexico's (PNM's) Prosperity solar site environment. Specifically, the Module OT devices will be integrated into the Prosperity solar site system; traffic will be encrypted between several points of interest at the site (e.g., inverter micrologger and switch). The tests described in this document will be performed to assess the impact and effectiveness of the encryption capabilities provided by the Module OT device.

97 MATHEMATICS AND COMPUTING↗

Development of a Reconstruction Methodology Based on X-Ray Computed Tomography to Generate Realistic 3D Concrete Microstructures in MOSAIC

Despite being passive components, concrete structures represent a major capital investment in nuclear power plants. However, some concrete components are critical for the safety and long-term operation of the reactors: the concrete containment building protects the reactors from external aggression. The concrete biological shield (CBS) contains the radiation exiting the reactor to protect equipment and personnel. Depending on the design, the CBS also has a function for supporting the reactor’s systems. This function needs to be ensured in-service and during accident scenarios. After several decades of use, the CBS is exposed to high-energy irradiation over an extended operation time, exceeding the fluence level currently considered detrimental for the concrete’s structural properties. Such conditions occur at different times depending on the reactor’s operation and design. Nevertheless, from the perspective of subsequent license application, it is mandatory to assess the potential effects of prolonged irradiation on concrete. Unlike steel components, concrete structures are built with local constituents (cement, sand, and coarse aggregates) to avoid prohibitive transportation costs. Thus, concrete performance is determined by the tolerance or the susceptibility of its constituents against any aging mechanism. The tolerance against irradiation of the CBSs may vary greatly among the 56 nuclear power plants and 93 nuclear power reactors that form the current US light-water reactor fleet. Irradiation-induced degradation is mainly a result of amorphization-induced expansions of the silicated minerals present in the aggregates. The neutron irradiation–induced expansion varies from one rock-forming mineral to another: well framework–structured silicates (e.g., quartz and feldspars) exhibit higher swelling than chained (e.g., pyroxene) or isolated silicates (e.g., garnet). Silicates make up nearly 90% of the Earth’s crust. Other common minerals present in construction aggregates are carbonates found, for example, in limestone. Irradiated carbonates exhibit only very minor expansions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

On-board spacecraft processor.

Onboard processor servicing spacecraft sensors, programmable from ground, discussing functions and applications

Hartenstein, R.↗

Design development of the Apollo command and service module thrust vector attitude control systems

Development of the Apollo thrust vector control digital autopilot (TVC DAP) was summarized. This is the control system that provided pitch and yaw attitude control during velocity change maneuvers using the main rocket engine on the Apollo service module. A list of ten primary functional requirements for this control system are presented, each being subordinate to a more general requirement appearing earlier on the list. Development process functions were then identified and the essential information flow paths were explored. This provided some visibility into the particular NASA/contractor interface, as well as relationships between the many individual activities.

William H. Peters↗

The 30/20 GHz fixed communications systems service demand assessment. Volume 1: Executive summary

Demand for telecommunications services is forecasted for the period 1980-2000, with particular reference to that portion of the demand associated with satellite communications. Overall demand for telecommunications is predicted to increase by a factor of five over the period studied and the satellite portion of demand will increase even more rapidly. Traffic demand is separately estimated for voice, video, and data services and is also described as a function of distance traveled and city size. The satellite component of projected demand is compared with the capacity available in the C and Ku satellite bands and it is projected that new satellite technology and the implementation of Ka band transmission will be needed in the decade of the 1990's.

Gamble, R. B.↗

The issue is leadership

Four NASA Phase B centers (NASA-Johnson, NASA-Marshall, NASA-Goddard, and NASA-Lewis) are responsible for construction, assembly, servicing, habitat, and other particular tasks and functions of the Space Station. The project has been joined by the aerospace programs of Canada, Japan, and the European Space Agency, ensuring technological and financial support, and cooperative use by the participants. Some of the future uses of the Space Station include biomedical research and applications; experiments in solar-terrestrial physics and astronomy; building, maintenance, and launching of space instruments and planetary missions; manufacturing and processing of materials that call for the conditions of microgravity and weightlessness; supporting communication operations; and improving earth and atmospheric observations. The political significance of the Space Station as a symbol of leadership and of friendly cooperation is noted.

Beggs, J. M.↗

Environmental control and life support system requirements and technology needs for advanced manned space missions

NASA has completed an environmental control and life support system (ECLSS) technology R&D plan for advanced missions which gave attention to the drivers (crew size, mission duration, etc.) of a range of manned missions under consideration. Key planning guidelines encompassed a time horizon greater than 50 years, funding resource requirements, an evolutionary approach to goal definition, and the funding of more than one approach to satisfy a given perceived requirement. Attention was given to the ECLSS requirements of transportation and service vehicles, platforms, bases and settlements, ECLSS functions and average load requirements, unique drivers for various missions, and potentially exploitable commonalities among vehicles and habitats.

Powell, Ferolyn T.↗

Geostationary platform study: Advanced ESGP/evolutionary SSF accommodation study

The implications on the evolutionary space station of accommodating geosynchronous Earth Orbit (GEO) facilities are assessed. These facilities include unmanned satellites and platforms, manned elements, and transportation and servicing vehicles/elements. The latest existing definitions of typical unmanned GEO facilities and transportation and servicing vehicles/elements are utilized. The physical design, functional design, and operations implications at the space station are determined. Various concepts of the space station from past studies are utilized ranging from the IOC Multifunction Space Station to a branched transportation node space station and the implications of accommodating the GEO infrastructure at each type are assessed. Where possible, parametric data is provided to show the implications of variations in sizes and quantities of elements, launch rates, crew sizes, etc. The use of advanced automation, robotics equipment, and an efficient mix of manned/automated support for accomplishing necessary activities at the space station are identified and assessed. The products of this study are configuration sketches, resource requirements, trade studies, and parametric data.

Source record↗