Demonstration of Defense Waste Processing Facility (DWPF) Higher Fissile Content Glass
The Accelerated Basin De-inventory (ABD) Program has been proposed as an alternative for future spent nuclear fuel (SNF) and nuclear material processing at the Savannah River Site (SRS). This approach would change the baseline H-Canyon (HCAN), Concentrate, Storage, and Transfer Facility (CSTF), and Defense Waste Processing Facility (DWPF) operations. The ABD Program would require that all domestic and foreign research reactor SNF currently at SRS be dissolved, stored, and then transferred to CSTF without the recovery of uranium. Preliminary assessments in the ABD Program plan have shown that ~5000 extra SRS high-level waste (HLW) canisters would be produced if the fissile mass loading remains at the current 897 g/m 3 limit; however, increasing the limit to 2500 g/m 3 would result in ~520 extra canisters. Thus, the ABD Program plan requires an increase of the DWPF fissile mass loading limit to 2500 g/m 3 to minimize canister production. DWPF considers the following isotopes in the calculation of fissile mass loading: U-233, U-235, Pu-239 and Pu-241.