Search NASA⌕ Search

SEARCH · Search NASA

Results for “observation planning operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

The MSFC Solar Activity Future Estimation (MSAFE) Model

The Natural Environments Branch of the Engineering Directorate at Marshall Space Flight Center (MSFC) provides solar cycle forecasts for NASA space flight programs and the aerospace community. These forecasts provide future statistical estimates of sunspot number, solar radio 10.7 cm flux (F10.7), and the geomagnetic planetary index, Ap, for input to various space environment models. For example, many thermosphere density computer models used in spacecraft operations, orbital lifetime analysis, and the planning of future spacecraft missions require as inputs the F10.7 and Ap. The solar forecast is updated each month by executing MSAFE using historical and the latest month's observed solar indices to provide estimates for the balance of the current solar cycle. The forecasted solar indices represent the 13-month smoothed values consisting of a best estimate value stated as a 50 percentile value along with approximate +/- 2 sigma values stated as 95 and 5 percentile statistical values. This presentation will give an overview of the MSAFE model and the forecast for the current solar cycle.

Suggs, Ron↗

The MSFC Solar Activity Future Estimation (MSAFE) Model

The Natural Environments Branch of the Engineering Directorate at Marshall Space Flight Center (MSFC) provides solar cycle forecasts for NASA space flight programs and the aerospace community. These forecasts provide future statistical estimates of sunspot number, solar radio 10.7 cm flux (F10.7), and the geomagnetic planetary index, Ap, for input to various space environment models. For example, many thermosphere density computer models used in spacecraft operations, orbital lifetime analysis, and the planning of future spacecraft missions require as inputs the F10.7 and Ap. The solar forecast is updated each month by executing MSAFE using historical and the latest month's observed solar indices to provide estimates for the balance of the current solar cycle. The forecasted solar indices represent the 13-month smoothed values consisting of a best estimate value stated as a 50 percentile value along with approximate +/- 2 sigma values stated as 95 and 5 percentile statistical values. This presentation will give an overview of the MSAFE model and the forecast for the current solar cycle.

Suggs, Ron↗

An Overview of Recent NASA Airborne Science Projects in the Arctic Using Manned and Unmanned Aircraft

As NASA prepares to launch ICESAT-II there are significant efforts underway to plan for aircraft under-flights to calibrate the onboard lasers and to validate data products. This presentation will begin with an overview of recent airborne science missions including Operation Ice Bridge that have focused observations on the arctic. This will be followed by results from recent NASA sponsored unmanned aircraft missions and a discussion how these new observing technologies can contribute to future research in the Arctic. Information on recent icing wind tunnel testing and comparisons with icing prediction models will also be shared leading to discussions on specific challenges in adapting systems to harsh arctic conditions.

Aircraft↗

Science Performance Comparison Between a Spaceborne HSRL and CALIOP

NASA operates airborne and spaceborne lidar systems to answer aerosol and cloud related science questions. NASA Langley Research Center has extensive experience operating lidar systems in both regimes. These include High Spectral Resolution Lidar (HSRL) systems, which have been operating on airborne systems,and CALIOP, the spaceborne elastic backscatter lidar system on board CALIPSO. In support of NASA’s ACCP Study Plan to address the Aerosol (A) and Cloud, Convection, and Precipitation (CCP) Designated Observables called out in the 2017 Earth Science Decadal Survey, LaRC is using lidar simulation tools to evaluate the performance of spaceborne systems using both the HSRL and elastic backscatter techniques. The LaRC high-fidelity simulator tool models both HSRL and elastic backscatter lidar systems by modeling the effects of the instrument specifications and producing backscatter signals generated from molecules, aerosols, clouds, ocean surface, and ocean subsurface. It derives the solar background signals from the scene specific aerosol and cloud characteristics, surface type, and sun elevation. The tool models both random and systematic uncertainties in the retrieved geophysical parameters. In this study, we will present simulated results that compare and contrast the performance of spaceborne HSRL systems to the performance of CALIOP. As recommended by the Decadal Study, ACCP is seeking advances over performance that has been achieved by A-Train. This study will provide a description of the HSRL and elastic backscatter techniques and demonstrate how and why the performance of these HSRL systems exceeds the performance of CALIOP.

Kathleen A Powell↗

Observations of the earth using nighttime visible imagery

The earth as viewed from space in visible light at night reveals some features not easily discernible during the day such as aurora, forest fires, city lights and gas flares. In addition, those features having a high albedo such as snow and ice can be identified on many moonlit nights nearly as well as they can in sunlight. The Air Force DMSP satellites have been operating in the visible wavelengths at night since the mid 1960s. Most all other satellites having optical sensors are incapable of imaging at night. Imaging systems having improved light sensitivity in the visible portion of the spectrum should be considered when planning future earth resources satellite missions in order to utilize nighttime as well as daytime visual observations.

Foster, J. L.↗

Planning Mars Memory: Learning from the Mer Mission

Knowledge management for space exploration is part of a multi-generational effort at recognizing, preserving and transmitting learning. Each mission should be built on the learning, of both successes and failures, derived from previous missions. Knowledge management begins with learning, and the recognition that this learning has produced knowledge. The Mars Exploration Rover mission provides us with an opportunity to track how learning occurs, how it is recorded, and whether the representations of this learning will be optimally useful for subsequent missions. This paper focuses on the MER science and engineering teams during Rover operations. A NASA team conducted an observational study of the ongoing work and learning of the these teams. Learning occurred in a wide variety of areas: how to run two teams on Mars time for three months; how to use the instruments within the constraints of the martian environment, the deep space network and the mission requirements; how to plan science strategy; how best to use the available software tools. This learning is preserved in many ways. Primarily it resides in peoples memories, to be carried on to the next mission. It is also encoded in stones, in programming sequences, in published reports, and in lessons learned activities, Studying learning and knowledge development as it happens allows us to suggest proactive ways of capturing and using it across multiple missions and generations.

Linde, Charlotte↗

Solar Maximum Mission

The paper considers the objectives of the Solar Maximum Mission (SMM), and describes its spacecraft, the scientific planning, the observing program, and the guest investigator programs. The SMM observatory will be injected into a circular orbit with an altitude of 574 km and it is designed for a minimum of one year of operational life; its observing program is directed at the physics of solar flares, and includes studies of thermalization, the nature of electron acceleration, the flare energy budget, and the flare decay. Finally, the SMM Guest Investigator program is discussed, including ground-based synoptic and atomic data investigations and SMM data interpretation.

Bohlin, J. D.↗

The Lunar Prospector Mission: Final Results of Trajectory Design, Quasi-Frozen Orbits, Extended Mission Targeting, and Lunar Topography and Potential Models

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission was NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Goddard Space Flight Center and the Ames Research Center became partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100-km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered its extended mission phase. The mission orbit was lowered from 100 km to a mean altitude of 40 km. Due to lunar potential effects, the altitude of Lunar Prospector varied from 25 to 55 km above the mean lunar geoid. After one month at 40 km, the lunar potential model was updated based upon the new tracking data at 40 km. On January 15, 1999, the altitude was lowered again to a mean altitude of 30 km. The spherical altitude varied between 15 km and 45 km above the mean lunar geoid while the topographical altitude varied between 10 km and 50 km. Various means were employed to get accurate lunar surface elevation including Clementine altimetry and LOS analysis. Based upon the best available terrain maps, Lunar Prospector reached actual altitudes of 8 km above lunar mountains in the southern polar region. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. At the end of the operations mission, LP was targeted for impact at a chosen location that allowed optical observation of the lunar ejecta as LP ended its mission at 1.6 km/sec. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector nominal and extended mission including maneuver design, eccentricity vs. argument of perigee evolution, topographical altitude estimation, and lunar potential modeling. This paper provides understanding of the quasi-frozen orbit design of the LP mission, the optimization process of lunar orbit targets, the impacts that the selected lunar potential models play, and discusses the feasibility of meeting the mission goals. Observed evolution of the Keplerian orbit elements are compared to the theoretical predictions using the latest lunar potential model available which incorporates the Lunar Prospector Doppler data. Mapping orbit maintenance maneuver design along with results of the actual maneuvers to maintain the orbital requirements are also presented.

Folta, David↗

Optimisation of the Future Routine Orbit for Mars Express

Mars Express (MEX), the first planetary mission of the European Space Agency (ESA), reached Mars on December 25th 2003. Since then it is performing routine operations. Its operational phase had to cover one Martian year, with the possibility of an extension for a second Martian year (i.e. until November 2007). The end of the mission extension is approaching but, given the good health of the payload instruments and the high science return of the mission, there is a strong will to achieve further extensions. Mars Express is also seen as an important asset, capable to provide relay functions for future Martian missions. The ESA Science Program Committee has recently approved a second extension of the MEX mission until May 2009 and even further extensions are possible. Mars Express has an eccentric quasi-polar orbit with a period of approximately 6.72 hours and a pericentre height of about 300 km. Science observations are mainly performed at pericentre (but not only). In addition the orbit has a resonance of 11 revolutions per 3 Martian days. This means that ground tracks corresponding to orbits separated by 11 revolutions are adjacent, such that a given area can be covered by the on-board camera without leaving gaps. The J2 effect of Mars causes a drift of both ascending node and argument of pericentre. The drift of argument of pericentre makes it possible to observe periodically all Mars latitudes from close distance. Illumination conditions at pericentre are influenced by both the drift of the argument of pericentre and the drift of ascending node, as well as by the rotation of Mars around the Sun. The original MEX routine orbit was optimized for the duration of the nominal mission and extension, such that it produced a balanced share of day-side observations (for the optical instruments) and night-side observations (for the radar). The orbit was thus not optimized for the time beyond the assumed extension. Indeed, the evolution of the ascending node and argument of pericentre would cause in the following years a drift of the pericentre towards night-side observation conditions, hence uninteresting for the optical instruments. In order to prevent this an optimisation process for the future routine orbit has taken place. The share between day-side and night-side observations can be controlled by adjusting the drift of argument of pericentre and ascending node. This can in particular be achieved by changing the semimajor axis, eccentricity and/or inclination. A change of inclination is inefficient compared to a change in semimajor axis and eccentricity, and has therefore been discarded. An in-plane maneuvre can be performed to change both semi-major axis and eccentricity, and thus the period of the orbit. Although an apocentre manoeuvre is cheaper in terms of deltaV, it would result in raising the pericentre height, which is unfavourable for close observations. Hence a pericentre manoeuvre is proposed, which will increase the apocentre height. A repeat cycle is still required to allow mapping areas with adjacent ground tracks, so the change of semimajor axis must result in a new resonance. Resonances 18:5, 25:7 and 7:2 have been considered as potential candidates. The resulting long term evolution of the observation conditions has been analysed. Finally it has been decided to perform a change of orbit to reach the 18:5. Another aspect of the optimisation process is the control of the ground track. The previous MEX reference trajectory included regular maneuvres at every apocentre in order to adjust the orbital period, such that the separation of the ground tracks would be optimal, regardless of the latitude of pericentre. The implementation of the actual delatVs on-board was done partly by optimizing the attitude of reaction-wheel desaturation activities. Despite of it, this strategy has a significant propellant cost, because it prevents to optimize reaction wheel de-saturation activities to minimize propellant consumption. Therore, with the aim at preserving propellant resources for a long time extension it has been agreed to stop the ground-track control. This requires now a more accurate science operation planning, with improved attitude pointing control. Finally, the approach to phase Mars Express to provide back-up relay functions for NASA Phoenix landing is explained. In the context of the routine trajectory optimisation a new requirement for close fly-bys at Phobos, with different observation geometries, has been specified. The approach to fulfill this requirement is explained.

Carranza, Manuel↗

Increases in efficiency and enhancements to the Mars Observer non-stored commanding process

The Mars Observer team was, until the untimely loss of the spacecraft on August 21, 1993, performing flight operations with greater efficiency and speed than any previous JPL mission of its size. This level of through-put was made possible by a mission operations system which was composed of skilled personnel using sophisticated sequencing and commanding tools. During cruise flight operations, however, it was realized by the project that this commanding level was not going to be sufficient to support the activities planned for mapping operations. The project had committed to providing the science instrument principle investigators with a much higher level of commanding during mapping. Thus, the project began taking steps to enhance the capabilities of the flight team. One mechanism used by project management was a tool available from total quality management (TQM). This tool is known as a process action team (PAT). The Mars Observer PAT was tasked to increase the capacity of the flight team's nonstored commanding process by fifty percent with no increase in staffing and a minimal increase in risk. The outcome of this effort was, in fact, to increase the capacity by a factor of 2.5 rather than the desired fifty percent and actually reduce risk. The majority of these improvements came from the automation of the existing command process. These results required very few changes to the existing mission operations system. Rather, the PAT was able to take advantage of automation capabilities inherent in the existing system and make changes to the existing flight team procedures.

Brooks, Robert N., Jr.↗

Flight Testing of In-Time Safety Assurance Technologies for UAS Operations

Ongoing research at NASA is driven by a strategic plan defined by the Aeronautics Research Mission Directorate and a vision for future In-Time Aviation Safety Management Systems (IASMS) as described by the National Academies. In both visions, system safety awareness and provision are expanded through increased access to relevant data; integrated analysis and predictive capabilities; improved real-time detection and alerting of domain-specific hazards; decision support, and in some cases, automated risk mitigation strategies. One primary research focus is to develop means by which more timely (i.e., “in-time”) actions may be taken to mitigate precursors, anomalies, or trends that are observed during operations. In this paper, we describe such means as a collection of Services, Functions, and Capabilities (SFCs) that are supported by an underlying information system. For example, an integrated risk assessment capability is envisioned that continuously monitors safety-related metrics and margins and recommends timely operational changes. Assessment functions and/or services can be based on data analytics and predictive models derived from heterogeneous data sets that span relevant indicator metrics and their time histories. Likewise, on-board functions can identify and reduce susceptibility to precursor conditions that have led (and can lead) to aircraft loss-of-control or out-of-control accidents. This paper summarizes development and testing of such an information system tailored to hazards anticipated for future highly autonomous flight missions near and over densely populated areas. Testing is accomplished via simulation and by using small, unmanned aircraft operating over a test range at NASA’s Langley Research Center. Flight plans and test scenarios are defined to emulate several use-cases, including package delivery; reconnaissance; fire management; and urban air taxi vertiport operations. Two test phases are summarized with Phase 1 occurring in (2019-2020) and Phase 2 ongoing (2021-present). Results focus on SFC performance, technology readiness level assessment, and requirements discovery/validation. Companion papers are cited throughout for additional details on the recent testing.

safety management↗

DSN research and technology support

The activities of the Venus Station (DSS 13) and the Microwave Test Facility (MTF) during the period October 11, 1976, through February 13, 1977, are discussed. A significant effort on implementation of equipment for the planned conversion of DSS 13 to unattended operation is discussed. The Receiver and Microwave Subsystem are near completion, and the new feedcone and position encoders are implemented onto the 26-m antenna. Support of the 400-kW X-band radar, located at DSS 14, is reported, and the activities of the DSN High Power Transmitter Maintenance Facility (HPTMF), located at DSS 13 and MTF, are discussed. The successful completion of the first series of observations planned for VLBI validation is reported and significant station maintenance activities are covered. Clock synchronization transmissions to DSS 43 and DSS 63 are reported, and an evaluation of any pointing errors in the 26-m antenna position transducer are made.

Jackson, E. B.↗

Increases in Efficiency and Enhancements to the Mars Observer Non-stored Commanding Process

The Mars Observer team was, until the untimely loss of the spacecraft on August 21, 1993, performing flight operations with greater efficiency and speed than any previous JPL mission of its size. This level of through-put was made possible by a Mission Operations System which was composed of skilled personnel using sophisticated sequencing and commanding tools. During cruise flight operations, however, it was realized by the project that this commanding level was not going to be sufficient to support the activities planned for the mapping operations. The project had committed to providing the science instrument principle investigators with a much higher level of commanding during mapping. Thus, the project began taking steps to enhance the capabilities of the flight team. One mechanism used by project management was a tool available from Total Quality Management (TQM). This tool is known as a Process Action Team (PAT). The Mars Observer PAT was tasked to increase the capacity of the flight team's non-stored commanding process by fifty percent with no increase in staffing and a minimal increase in risk. The outcome of this effort was to, in fact, increase the capacity by a factor of 2.5 rather than the desired fifty percent and actually reduce risk. The majority of these improvements came from the automation of the existing command process. The results required very few changes to the existing mission operations system. Rather, the PAT was able to take advantage of automation capabilities inherent in the existing system and make changes to the existing flight team procedures. This paper will describe in detail the enhancements recommended by the PAT for the non-stored command generation process on Mars Observer. This will be contrasted with the process used by the flight team prior to implementation of these improvements. Finally, there will be a discussion of the applicability of the techniques devised by the PAT for enhancement of the non-stored command process to present and future projects.

Process↗

Enhanced Formation Flying for the Earth Observing-1 (EO-1) New Millennium Mission

With scientific objectives for Earth observation programs becoming more ambitious and spacecraft becoming more autonomous, the need for new technical approaches on the feasibility of achieving and maintaining formations of spacecraft has come to the forefront. The trend to develop small low cost spacecraft has led many scientists to recognize the advantage of flying several spacecraft in formation, an example of which is shown in the figure below, to achieve the correlated instrument measurements formerly possible only by flying many instruments on a single large platform. Yet, formation flying imposes additional complications on orbit maintenance, especially when each spacecraft has its own orbit requirements. However, advances in automation proposed by GSFC Codes 550 and 712 allow more of the burden in maneuver planning and execution to be placed onboard the spacecraft, mitigating some of the associated operational concerns. The purpose of this analysis is to develop the fundamentals of formation flying mechanics, concepts for understanding the relative motion of free flying spacecraft, and an operational control theory for formation maintenance of the Earth Observing-1 (EO-l) spacecraft that is part of the New Millennium. Results of this development can be used to determine the appropriateness of formation flying for a particular case as well as the operational impacts. Applications to the Mission to Planet Earth (MTPE) Earth Observing System (EOS) and New Millennium (NM) were highly considered in analysis and applications. This paper presents the proposed methods for the guidance and control of the EO-1 spacecraft to formation fly with the Landsat-7 spacecraft using an autonomous closed loop three axis navigation control, GPS, and Cross link navigation support. Simulation results using various fidelity levels of modeling, algorithms developed and implemented in MATLAB, and autonomous 'fuzzy logic' control using AutoCon will be presented. The results of these analysis on the ability to meet mission and formation flying requirements will be presented.

Folta, David↗

Orbit Transfers for Dawn's Vesta Operations : Navigation and Mission Design Experience

Dawn, a mission belonging to NASA's Discovery Program, was launched on September 27, 2007 to explore main belt asteroids in order to yield insights into important questions about the formation and evolution of the solar system. From July of 2011 to August of 2012, the Dawn spacecraft successfully returned valuable science data, collected during the four planned mapping orbits at its first target asteroid, Vesta. Each mapping orbit was designed to enable a different set of scientific observations. Such a mission would have been impossible without the low thrust ion propulsion system (IPS). Maneuvering a spacecraft using only the IPS for the transfers between the mapping orbits posed many technical challenges to Dawn's flight team at NASA's Jet Propulsion Laboratory. Each transfer needs a robust plan that accounts for uncertainties in maneuver execution, orbit determination, and physical characteristics of Vesta. This paper discusses the mission design and navigational experience during Dawn's Vesta operations. Topics include requirements and constraints from Dawn's science and spacecraft teams, orbit determination and maneuver design and building process for transfers, developing timelines for thrust sequence build cycles, and the process of scheduling very demanding coverage with ground antennae at NASA's Deep Space Network.

low thrust↗

A Global Aerosol Model Forecast for the ACE-Asia Field Experiment

We present the results of aerosol forecast during the Aerosol Characterization Experiment (ACE-Asia) field experiment in spring 2001, using the Georgia Tech/Goddard Global Ozone Chemistry Aerosol Radiation and Transport (GOCART) model and the meteorological forecast fields from the Goddard Earth Observing System Data Assimilation System (GEOS DAS). The aerosol model forecast provides direct information on aerosol optical thickness and concentrations, enabling effective flight planning, while feedbacks from measurements constantly evaluate the model, making successful model improvements. We verify the model forecast skill by comparing model predicted total aerosol extinction, dust, sulfate, and SO2 concentrations with those quantities measured by the C-130 aircraft during the ACE-Asia intensive operation period. The GEOS DAS meteorological forecast system shows excellent skills in predicting winds, relative humidity, and temperature for the ACE-Asia experiment area as well as for each individual flight, with skill scores usually above 0.7. The model is also skillful in forecast of pollution aerosols, with most scores above 0.5. The model correctly predicted the dust outbreak events and their trans-Pacific transport, but it constantly missed the high dust concentrations observed in the boundary layer. We attribute this missing dust source to the desertification regions in the Inner Mongolia Province in China, which have developed in recent years but were not included in the model during forecasting. After incorporating the desertification sources, the model is able to reproduce the observed high dust concentrations at low altitudes over the Yellow Sea. Two key elements for a successful aerosol model forecast are correct source locations that determine where the emissions take place, and realistic forecast winds and convection that determine where the aerosols are transported. We demonstrate that our global model can not only account for the large-scale intercontinental transport, but also produce the small-scale spatial and temporal variations that are adequate for aircraft measurements planning.

Chin, Mian↗

Characterizing the Oscillatory Properties of Bulk Electric Systems

This paper presents a process for characterizing the oscillatory dynamics of a large bulk power system. As a demonstration, the process is applied to the Western Interconnection of North America. Several complementary analysis approaches, both new and existing, are employed to provide a comprehensive understanding of the oscillatory properties of the system. Established modal analysis techniques based on ringdown and mode-meter algorithms are utilized. In addition, we derive and apply methods based on spectral correlation analysis to identify modal frequencies, distinguish between modes that are closely spaced in frequency, and determine locations at which the modes are observable. Critical interarea modes are identified and characterized using actual-system synchrophasor measurements taken over several years of operation in concert with industry-standard simulation models. This includes 145 hours of PMU data and two planning base cases.

42 ENGINEERING↗

Future Satellite Observations of Solar Irradiance

Required solar irradiance measurements for climate studies include those now being made by the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM) onboard the SORCE satellite, part of the Earth Observing System fleet of NASA satellites. Equivalent or better measures of Total Solar Irradiance (TSI) and Spectral Solar Irradiance (SSI, 200 to 2000 nm) are planned for the post-2010 satellites of the National Polar-orbiting Operational Environmental Satellite System ("OESS). The design life of SORCE is 5 years, so a "Solar Irradiance Gap Filler" EOS mission is being planned for launch in the 2007 time frame, to include the same TSI and SSI measurements. Besides avoiding any gap, overlap of the data sources is also necessary for determination of possible multi-decadal trends in solar irradiance. We discuss these requirements and the impacts of data gaps, and data overlaps, that may occur in the monitoring of the critical solar radiative forcing.

Cahalan, R. F.↗