Search NASA⌕ Search

SEARCH · Search NASA

Results for “observation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

ART-XC: A Medium-energy X-ray Telescope System for the Spectrum-R-Gamma Mission

The ART-XC instrument is an X-ray grazing-incidence telescope system in an ABRIXAS-type optical configuration optimized for the survey observational mode of the Spectrum-RG astrophysical mission which is scheduled to be launched in 2011. ART-XC has two units, each equipped with four identical X-ray multi-shell mirror modules. The optical axes of the individual mirror modules are not parallel but are separated by several degrees to permit the four modules to share a single CCD focal plane detector, 1/4 of the area each. The 450-micron-thick pnCCD (similar to the adjacent eROSITA telescope detector) will allow detection of X-ray photons up to 15 keV. The field of view of the individual mirror module is about 18 x 18 arcminutes(exp 2) and the sensitivity of the ART-XC system for 4 years of survey will be better than 10(exp -12) erg s(exp -1) cm(exp -2) over the 4-12 keV energy band. This will allow the ART-XC instrument to discover several thousand new AGNs.

Arefiev, V.↗

Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

Marquez, Jessica J.↗

Early Transition and Use of VIIRS and GOES-R Products by NWS Forecast Offices

The Visible Infrared Imaging Radiometer Suite (VIIRS) on the NPOESS Preparatory Project (NPP) satellite, part of the Joint Polar Satellite System (JPSS), and the ABI and GLM sensors scheduled for the GOES-R geostationary satellite will bring advanced observing capabilities to the operational weather community. The NASA Short-term Prediction Research and Transition (SPoRT) project at Marshall Space Flight Center has been facilitating the use of real-time experimental and research satellite data by NWS Weather Forecast Offices (WFOs) for a number of years to demonstrate the planned capabilities of future sensors to address particular forecast challenges through improve situational awareness and short-term weather forecasts. For the NOAA GOES-R Proving Ground (PG) activity, SPoRT is developing and disseminating selected GOES-R proxy products to collaborating WFOs and National Centers. SPoRT developed the a pseudo-Geostationary Lightning Mapper product and helped in the transition of the Algorithm Working Group (AWG) Convective Initiation (CI) proxy product for the Hazardous Weather Testbed (HWT) Spring Experiment,. Along with its partner WFOs, SPoRT is evaluating MODIS/GOES Hybrid products, which brings ABI-like data sets from existing NASA instrumentation in front of the forecaster for everyday use. The Hybrid uses near real-time MODIS imagery to demonstrate future ABI capabilities, while utilizing standard GOES imagery to provide the temporal frequency of geostationary imagery expected by operational forecasters. In addition, SPoRT is collaborating with the GOES-R hydrology AWG to transition a baseline proxy product for rainfall rate / quantitative precipitation estimate (QPE) to the OCONUS regions. For VIIRS, SPoRT is demonstrating multispectral observing capabilities and the utility of low-light channels not previously available on operational weather satellites to address a variety of weather forecast challenges. This presentation will discuss the results of transitioning these products to collaborating WFOs throughout the country.

Fuell, Kevin K.↗

Mission Overview and Status IGARSS Conference

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Scheduled for launch in January 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records [1]. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s, building on the exceptional heritages of the Sea-Viewing Wide Field-of-View Sensor (SeaWiFS), the Moderate Resolution Imaging Spectroradiometer (MODIS), the Multi-angle Imaging SpectroRadiometer (MISR), and the Visible Infrared Imaging Radiometer Suite (VIIRS). The PACE project office at NASA’s GSFC is responsible for the satellite development, launch and operations. The NASA Headquarters PACE Program Science office is responsible for supporting the science data processing system and assembling competed community science teams, which will include field-based vicarious calibration and data product validation efforts to support the PACE Project Science team. The mission is planned for launch into a Sun synchronous polar orbit at 676.5 km with an inclination of 98 degrees and a 1 pm local ascending node crossing time. The PACE observatory is comprised of three instruments, an Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone). The OCI is the primary instrument on the observatory and is being developed at Goddard Space Flight Center (GSFC). The OCI is a hyperspectral scanning radiometer designed to measure spectral radiances from the ultraviolet to shortwave infrared (SWIR) to enable advanced ocean color and heritage cloud and atmospheric aerosol science [2]. The HARP2 and SPEXone are complimentary instruments on the PACE observatory, acquired outside of GSFC. The HARP2 is multi-spectral, wide swath (supporting atmospheric correction of OCI), and hyper-angular, with capabilities for cloud science that exceed what is capable from OCI alone. The SPEXone is narrow swath, multi-angular, and hyperspectral, with capabilities for atmospheric aerosol science that exceed what can be accomplished with OCI. NASA Headquarters directed the mission development to be guided by a Design-to-Cost (DTC) process. All elements of the mission, other than the cost, are in the DTC trade space. At the heart of the DTC process are the mission studies, performed across all the mission elements. The mission studies were used to define appropriate approaches within and across elements while maximizing science capabilities at a high cost confidence. Mission baseline requirements development is also embedded within the DTC process, as these requirements were not established at the onset of the mission concept development. Baseline mission requirements are a product of the mission studies and are defined by the project office as part of the DTC process. At the time of this writing, OCI, HARP2 and SPEXone are integrated onto the PACE spacecraft, creating the PACE observatory. The instruments and spacecraft subsystems are undergoing combined functional performance testing in preparation for observatory-level environmental testing prior to shipment to the launch site. Here, we will provide an update on science capabilities and observatory readiness for its early 2024 launch.

remote sensing↗

Spike: Artificial intelligence scheduling for Hubble space telescope

Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

Johnston, Mark↗

Shuttle spacelab simulation using a Lear jet aircraft: Mission no. 3 (ASSESS program)

The third ASSESS mission using a Lear Jet aircraft conducted to continue the study of scientific experiment operations in a simulated Spacelab environment. Prior to the mission, research planning and equipment preparation were observed and documented. A flight readiness review for the experiment was conducted. Nine of the ten scheduled flights were completed during simulation mission and all major science objectives were accomplished. The equipment was well qualified for flight and gave little trouble; telescope malfunctions occurred early in the mission and were corrected. Both real-time and post-observation data evaluation were used to assess research progress and to plan subsequent flight observations for maximum effectiveness.

Reller, J. O., Jr.↗

Applicability of Markets to Global Scheduling in Grids: Critical Examination of General Equilibrium Theory and Market Folklore

Markets are often considered superior to other global scheduling mechanisms for distributed computing systems. This claim is supported by: a casual observation from our every-day life that markets successfully equilibrate supply and demand, and the features of markets which originate in the general equilibrium theory, e.g., efficiency and the lack of necessity of 2 central controller. This paper describes why such beliefs in markets are not warranted. It does so by examining the general equilibrium theory, in terms of scope, abstraction, and interpretation. Not only does the general equilibrium theory fail to provide a satisfactory explanation of actual economies, including a computing-resource economy, it also falls short of supplying theoretical foundations for commonly held views of market desirability. This paper also points out that the argument for the desirability of markets involves circular reasoning and that the desirability can be established only vis-a-vis a scheduling goal. Finally, recasting the conclusion of Arrow's Impossibility Theorem as that for global scheduling, we conclude that there exists no market-based scheduler that is rational (in the sense defined in microeconomic theory), takes into account utility of more than one user, and yet yields a Pareto-optimal outcome for arbitrary user utility functions.

Nakai, Junko↗

Lessons learned from the Hubble Space Telescope planning and scheduling system implementation and operation

The major challenge of the NASA Hubble Space Telescope (HST) Ground System has been the implementation of the planning and scheduling system. This paper describes the operational flow of HST from science proposals to the actual execution of science observations on board the HST. The paper provides a collection of lessons learned over the 10 years that have covered the definition, development, test, and initial operation of HST's planning and scheduling system.

Ruitberg, Edward O.↗

HST/STIS Observations of Ganymede's Auroral Ovals at Eastern Elongation

We report on new Space Telescope Imaging Spectrograph (STIS) observations of Ganymede s auroral emissions obtained (to be obtained) during two visits with the Hubble Space Telescope (HST). The observations of the first visit, a five orbits, were obtained on November 19, 2010 and the second visit, also a five orbits, is scheduled for opposition in October/November 2011. We will present results of the full campaign, in case of a successful execution of the second visit. Our observations cover more than half a cycle of system III longitudes of Ganymede s positions within Jupiter s magnetosphere for each visit. We analyze the observations with respect to brightness and locations of Ganymede auroral ovals. Our goal is to set constrains on the interaction of Ganymede s mini-magnetosphere with Jupiter s magnetosphere, Ganymede s magnetic field and plasma environment, and if possible on Ganymede s neutral atmosphere.

Saur, J.↗

Development of the first infrared satellite observatory

A development history is given for the Infrared Astronomical Satelite (IRAS), whose primary mission objective is an unbiased, all-sky survey in the 8-120 micron wavelength range. A point source catalog of more than 200,000 IR sources, to be published later this year, represents the accomplishment of this objective. IRAS has also conducted 10,000 pointed observations of specific objects. Attention is given to the cost increases and schedule slips which resulted from the substantial technical challenges of IRAS hardware and software development, and to the management techniques which had to be employed in this major international project.

Smith, G. M.↗

Effects of aircraft and flight parameters on energy-efficient profile descents in time-based metered traffic

Attention is given to a computer algorithm yielding the data required for a flight crew to navigate from an entry fix, about 100 nm from an airport, to a metering fix, and arrive there at a predetermined time, altitude, and airspeed. The flight path is divided into several descent and deceleration segments. Results for the case of a B-737 airliner indicate that wind and nonstandard atmospheric properties have a significant effect on the flight path and must be taken into account. While a range of combinations of Mach number and calibrated airspeed is possible for the descent segments leading to the metering fix, only small changes in the fuel consumed were observed for this range of combinations. A combination that is based on scheduling flexibility therefore seems preferable.

Dejarnette, F. R.↗

OSTA-3 Shuttle payload

The Office of Space and Terrestrial Applications-3 payload, scheduled for flight on STS Mission 17, consists of four earth-observation experiments. The Feature Identification and Location Experiment-1 will spectrally sense and numerically classify the earth's surface into water, vegetation, bare earth, and ice/snow/cloud-cover, by means of spectra ratio techniques. The Measurement of Atmospheric Pollution from Satellite experiment will measure CO distribution in the middle and upper troposphere. The Imaging Camera-B uses side-looking SAR to create two-dimensional images of the earth's surface. The Large Format Camera/Attitude Reference System will collect metric quality color, color-IR, and black-and-white photographs for topographic mapping.

Dillman, R. D.↗

Applications of spaceborne laser ranger on EOS

An account is given of the design concept and potential applications in science and engineering of the spaceborne laser ranging and altimeter apparatus employed by the Geodynamics Laser Ranging System; this is scheduled for 1997 launch as part of the multiple-satellite Earth Observing System. In the retrograding mode for geodynamics, the system will use a Nd:YAG laser's green and UV output for distance determination to ground retroreflectors. Engineering applications encompass land management and long-term ground stability studies relevant to nuclear power plant, pipeline, and aqueduct locations.

Degnan, John J.↗

2MASS - The 2 Micron All Sky Survey

This paper describes a new sky survey to be carried out in three wavebands, J(1.25 m), H(1.65 m), and K(2.2 m). The limiting sensitivity of the survey, 10 sigma detection of point sources with K not greater than 14 mag, coupled with its all-sky coverage, were selected primarily to support studies of the large-scale structure of the Milky Way and the Local Universe. The survey requires construction of a pair of observing facilities, one each for the Northern and Southern Hemispheres. Operations are scheduled to begin in 1995. The data will begin becoming publicly available soon thereafter.

Kleinmann, S. G.↗

The Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER)

The Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) is a multispectral imaging radiometer scheduled to fly in Earth orbit in 1998 on NASA's Earth Observation System platform. The instrument will have 14 spectral bands from the visible to thermal infrared wavelength regions with high spectral and spatial resolution and with along-track stereoscopic capability. ASTER imagery will be used to study such phenomena as Earth surface properties, elements of the surface heat balance, cloud cover characteristics, glacier and sea ice extent, patterns of vegetation and land use, volcanoes, coral reefs and coastal processes, geology and topography, and hydrology. ASTER will have three separate radiometer subsystems, each with a swath width of 60 km. Any point on the globe will be accessible at least once every 16 days for the short wavelength infrared and thermal infrared subsystems, and once every five days for the visible and near infrared subsystem. Instrument and spacecraft resources are allocated to support an 8 percent average duty cycle, corresponding to over 700 60 by 60-km scenes per day. ASTER data will be acquired and processed according to specific user requirements over its five-year mission.

Kahle, Anne B.↗

Towards Evolving Electronic Circuits for Autonomous Space Applications

The relatively new field of Evolvable Hardware studies how simulated evolution can reconfigure, adapt, and design hardware structures in an automated manner. Space applications, especially those requiring autonomy, are potential beneficiaries of evolvable hardware. For example, robotic drilling from a mobile platform requires high-bandwidth controller circuits that are difficult to design. In this paper, we present automated design techniques based on evolutionary search that could potentially be used in such applications. First, we present a method of automatically generating analog circuit designs using evolutionary search and a circuit construction language. Our system allows circuit size (number of devices), circuit topology, and device values to be evolved. Using a parallel genetic algorithm, we present experimental results for five design tasks. Second, we investigate the use of coevolution in automated circuit design. We examine fitness evaluation by comparing the effectiveness of four fitness schedules. The results indicate that solution quality is highest with static and co-evolving fitness schedules as compared to the other two dynamic schedules. We discuss these results and offer two possible explanations for the observed behavior: retention of useful information, and alignment of problem difficulty with circuit proficiency.

Lohn, Jason D.↗

Stratospheric Aerosol Measurements

Stratospheric aerosols affect the atmospheric energy balance by scattering and absorbing solar and terrestrial radiation. They also can alter stratospheric chemical cycles by catalyzing heterogeneous reactions which markedly perturb odd nitrogen, chlorine and ozone levels. Aerosol measurements by satellites began in NASA in 1975 with the Stratospheric Aerosol Measurement (SAM) program, to be followed by the Stratospheric Aerosol and Gas Experiment (SAGE) starting in 1979. Both programs employ the solar occultation, or Earth limb extinction, techniques. Major results of these activities include the discovery of polar stratospheric clouds (PSCs) in both hemispheres in winter, illustrations of the impacts of major (El Chichon 1982 and Pinatubo 1991) eruptions, and detection of a negative global trend in lower stratospheric/upper tropospheric aerosol extinction. This latter result can be considered a triumph of successful worldwide sulfur emission controls. The SAGE record will be continued and improved by SAGE III, currently scheduled for multiple launches beginning in 2000 as part of the Earth Observing System (EOS). The satellite program has been supplemented by in situ measurements aboard the ER-2 (20 km ceiling) since 1974, and from the DC-8 (13 km ceiling) aircraft beginning in 1989. Collection by wire impactors and subsequent electron microscopic and X-ray energy-dispersive analyses, and optical particle spectrometry have been the principle techniques. Major findings are: (1) The stratospheric background aerosol consists of dilute sulfuric acid droplets of around 0.1 micrometer modal diameter at concentration of tens to hundreds of monograms per cubic meter; (2) Soot from aircraft amounts to a fraction of one percent of the background total aerosol; (3) Volcanic eruptions perturb the sulfuric acid, but not the soot, aerosol abundance by several orders of magnitude; (4) PSCs contain nitric acid at temperatures below 195K, supporting chemical hypotheses implicating manmade fluorocarbons as cause of the --'ozone hole'; (5) The current soot loading is too small to be of environmental (radiative and chemical) consequence. However, the fractal nature of soot distinguishes it aerodynamically and radiatively from sulfuric acid droplets such that its stratospheric residence time is longer, mainly because of vertical transport against gravity due to gravito-photophoretic forces. Thus it may accumulate and become of environmental concern in the future.

Pueschel, Rudolf, F.↗