Search NASA⌕ Search

SEARCH · Search NASA

Results for “operator decision support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Simulation of Terminal-Area Flight Management System Arrivals with Airborne Spacing

A simulation evaluated the feasibility and potential benefits of using decision support tools to support time-based airborne spacing and merging for aircraft arriving in the terminal area on charted Flight Management System (FMS) routes. Sixteen trials were conducted in each treatment combination of a 2X2 repeated-measures design. In trials 'with ground tools' air traffic controller participants managed traffic using sequencing and spacing tools. In trials 'with air tools' approximately seventy-five percent of aircraft assigned to the primary landing runway were equipped for airborne spacing, including flight simulators flown by commercial pilots. The results indicate that airborne spacing improves spacing accuracy and is feasible for FMS operations and mixed spacing equipage. Controllers and pilots can manage spacing clearances that contain two call signs without difficulty. For best effect, both decision support tools and spacing guidance should exhibit consistently predictable performance, and merging traffic flows should be well coordinated.

Callantine, Todd J.↗

Prediction of Weather Impacted Airport Capacity using Ensemble Learning

Ensemble learning with the Bagging Decision Tree (BDT) model was used to assess the impact of weather on airport capacities at selected high-demand airports in the United States. The ensemble bagging decision tree models were developed and validated using the Federal Aviation Administration (FAA) Aviation System Performance Metrics (ASPM) data and weather forecast at these airports. The study examines the performance of BDT, along with traditional single Support Vector Machines (SVM), for airport runway configuration selection and airport arrival rates (AAR) prediction during weather impacts. Testing of these models was accomplished using observed weather, weather forecast, and airport operation information at the chosen airports. The experimental results show that ensemble methods are more accurate than a single SVM classifier. The airport capacity ensemble method presented here can be used as a decision support model that supports air traffic flow management to meet the weather impacted airport capacity in order to reduce costs and increase safety.

Weather impact↗

Methodology Development for Assessment of Spaceport Technology Returns and Risks

As part of Kennedy Space Center's (KSC's) challenge to open the space frontier, new spaceport technologies must be developed, matured and successfully transitioned to operational systems. R&D investment decisions can be considered from multiple perspectives. Near mid and far term technology horizons must be understood. Because a multitude of technology investment opportunities are available, we must identify choices that promise the greatest likelihood of significant lifecycle At the same time, the costs and risks of any choice must be well understood and balanced against its potential returns The problem is not one of simply rank- ordering projects in terms of their desirability. KSC wants to determine a portfolio of projects that simultaneously satisfies multiple goals, such as getting the biggest bang for the buck, supporting projects that may be too risky for private funding, staying within annual budget cycles without foregoing the requirements of a long term technology vision, and ensuring the development of a diversity of technologies that, support the variety of operational functions involved in space transportation. This work aims to assist in the development of in methods and techniques that support strategic technology investment decisions and ease the process of determining an optimal portfolio of spaceport R&D investments. Available literature on risks and returns to R&D is reviewed and most useful pieces are brought to the attention of the Spaceport Technology Development Office (STDO). KSC's current project management procedures are reviewed. It is found that the "one size fits all" nature of KSC's existing procedures and project selection criteria is not conducive to prudent decision-making. Directions for improving KSC's - procedures and criteria are outlined. With help of a contractor, STDO is currently developing a tool, named Change Management Analysis Tool (CMAT)/ Portfolio Analysis Tool (PAT), to assist KSC's R&D portfolio determination. A critical review of CMAT/PAT is undertaken. Directions for the improvement of this tool are provided. STDO and KSC intend to follow up on many, if not all, of the recommendations provided.

Joglekar, Prafulla↗

An Evaluation of a Flight Deck Interval Management Algorithm Including Delayed Target Trajectories

NASA's first Air Traffic Management (ATM) Technology Demonstration (ATD-1) was created to facilitate the transition of mature air traffic management technologies from the laboratory to operational use. The technologies selected for demonstration are the Traffic Management Advisor with Terminal Metering (TMA-TM), which provides precise timebased scheduling in the terminal airspace; Controller Managed Spacing (CMS), which provides controllers with decision support tools enabling precise schedule conformance; and Interval Management (IM), which consists of flight deck automation that enables aircraft to achieve or maintain precise in-trail spacing. During high demand operations, TMA-TM may produce a schedule and corresponding aircraft trajectories that include delay to ensure that a particular aircraft will be properly spaced from other aircraft at each schedule waypoint. These delayed trajectories are not communicated to the automation onboard the aircraft, forcing the IM aircraft to use the published speeds to estimate the target aircraft's estimated time of arrival. As a result, the aircraft performing IM operations may follow an aircraft whose TMA-TM generated trajectories have substantial speed deviations from the speeds expected by the spacing algorithm. Previous spacing algorithms were not designed to handle this magnitude of uncertainty. A simulation was conducted to examine a modified spacing algorithm with the ability to follow aircraft flying delayed trajectories. The simulation investigated the use of the new spacing algorithm with various delayed speed profiles and wind conditions, as well as several other variables designed to simulate real-life variability. The results and conclusions of this study indicate that the new spacing algorithm generally exhibits good performance; however, some types of target aircraft speed profiles can cause the spacing algorithm to command less than optimal speed control behavior.

Swieringa, Kurt A.↗

Flexible User Radio for Lunar Missions

NASA’s Artemis program and other lunar exploration and development programs are planning over 40 lunar missions before 2030. Lunar missions, both crewed and uncrewed, include orbiters, landers, rovers, and surface stations. All these missions require communications with Earth, either via Direct to Earth (DTE) links or through relays in lunar orbit. Multiple DTE options are available among existing and planned ground stations: Deep Space Network (DSN), European Space Agency, and others. Relay options include the planned Lunar Gateway, LunaNet compliant relays, and some lunar landers propose to launch dedicated orbiters. The dilemma for lunar system designers is to identify a communication link which meets mission requirements but does not have issues of limited access (e.g. DSN is in high demand supporting deep space missions with high priority and some with inflexible schedules), system impacts (high power Radio Frequency (RF) for DTE links), cost (dedicated relay), or operational date. To avoid this difficult decision, a Flexible Radio for Lunar Missions is proposed, which will enable system designs to proceed prior to any final decision on the communication network to be used, by enabling compatibility with any of multiple DTE or orbital relay communication systems. The Flexible Radio will support the necessary frequency, bandwidth, modulation, and power requirements to interoperate with the majority of known or planned DTE or relay systems, and can be designed into a lunar mission without prior knowledge of which link will ultimately be used. Furthermore, the link being used can be changed as needed during the mission, in near real time. The Flexible Radio design will leverage work already completed at NASA in the areas of Wideband RF, Software Defined Radio, Adaptive Coding and Modulation, and Phased Array antennas. The Flexible Radio requires sufficient bandwidth to cover the allocated frequencies for both the operation of links in cislunar space and for space-to-Earth links; the flexibility to support multiple modulations, data rates, and coding schemes; the ability to identify available relays, detect and recognize the signals of those relays, and adapt its own frequency, modulation, symbol rate, and code rate to operate with the detected relay (or DTE station); and finally, it requires appropriate software to support network configuration and interoperability with the detected network. The Flexible Radio can be designed in a sufficiently small, lightweight, and low-power package to be used in a wide variety of lunar systems. The initial implementation, as proposed, will focus on the Ka-band, supporting up to 2 GHz bandwidth around the 27 GHz frequency for return links, and 23 GHz for forward links. Other frequency bands are under consideration for future configurations. The software defined modem will support OQPSK, BPSK, and NASA-defined modulations which also support two-way ranging with data. For near-real time adaptation, the Flexible Radio will scan the sky for available relays, using a phased array antenna with Adaptive/Cognitive Communications. It will then configure for network interoperability supporting DTN and other protocol options. The Flexible Radio will support scheduled connections and on-demand use when available.

Lunar Space Communications↗

Flexible User Radio for Lunar Missions

NASA’s Artemis program and other lunar exploration and development programs are planning over 40 lunar missions before 2030. Lunar missions, both crewed and uncrewed, include orbiters, landers, rovers, and surface stations. All these missions require communications with Earth, either via Direct to Earth (DTE) links or through relays in lunar orbit. Multiple DTE options are available among existing and planned ground stations: Deep Space Network (DSN), European Space Agency, and others. Relay options include the planned Lunar Gateway, LunaNet compliant relays, and some lunar landers propose to launch dedicated orbiters. The dilemma for lunar system designers is to identify a communication link which meets mission requirements but does not have issues of limited access (e.g. DSN is in high demand supporting deep space missions with high priority and some with inflexible schedules), system impacts (high power Radio Frequency (RF) for DTE links), cost (dedicated relay), or operational date. To avoid this difficult decision, a Flexible Radio for Lunar Missions is proposed, which will enable system designs to proceed prior to any final decision on the communication network to be used, by enabling compatibility with any of multiple DTE or orbital relay communication systems. The Flexible Radio will support the necessary frequency, bandwidth, modulation, and power requirements to interoperate with the majority of known or planned DTE or relay systems, and can be designed into a lunar mission without prior knowledge of which link will ultimately be used. Furthermore, the link being used can be changed as needed during the mission, in near real time. The Flexible Radio design will leverage work already completed at NASA in the areas of Wideband RF, Software Defined Radio, Adaptive Coding and Modulation, and Phased Array antennas. The Flexible Radio requires sufficient bandwidth to cover the allocated frequencies for both the operation of links in cislunar space and for space-to-Earth links; the flexibility to support multiple modulations, data rates, and coding schemes; the ability to identify available relays, detect and recognize the signals of those relays, and adapt its own frequency, modulation, symbol rate, and code rate to operate with the detected relay (or DTE station); and finally, it requires appropriate software to support network configuration and interoperability with the detected network. The Flexible Radio can be designed in a sufficiently small, lightweight, and low-power package to be used in a wide variety of lunar systems. The initial implementation, as proposed, will focus on the Ka-band, supporting up to 2 GHz bandwidth around the 27 GHz frequency for return links, and 23 GHz for forward links. Other frequency bands are under consideration for future configurations. The software defined modem will support OQPSK, BPSK, and NASA-defined modulations which also support two-way ranging with data. For near-real time adaptation, the Flexible Radio will scan the sky for available relays, using a phased array antenna with Adaptive/Cognitive Communications. It will then configure for network interoperability supporting DTN and other protocol options. The Flexible Radio will support scheduled connections and on-demand use when available.

Lunar Space Communications↗

NASA Applications and Lessons Learned in Reliability Engineering

Since the Shuttle Challenger accident in 1986, communities across NASA have been developing and extensively using quantitative reliability and risk assessment methods in their decision making process. This paper discusses several reliability engineering applications that NASA has used over the year to support the design, development, and operation of critical space flight hardware. Specifically, the paper discusses several reliability engineering applications used by NASA in areas such as risk management, inspection policies, components upgrades, reliability growth, integrated failure analysis, and physics based probabilistic engineering analysis. In each of these areas, the paper provides a brief discussion of a case study to demonstrate the value added and the criticality of reliability engineering in supporting NASA project and program decisions to fly safely. Examples of these case studies discussed are reliability based life limit extension of Shuttle Space Main Engine (SSME) hardware, Reliability based inspection policies for Auxiliary Power Unit (APU) turbine disc, probabilistic structural engineering analysis for reliability prediction of the SSME alternate turbo-pump development, impact of ET foam reliability on the Space Shuttle System risk, and reliability based Space Shuttle upgrade for safety. Special attention is given in this paper to the physics based probabilistic engineering analysis applications and their critical role in evaluating the reliability of NASA development hardware including their potential use in a research and technology development environment.

Safie, Fayssal M.↗

Evaluation of the Terminal Area Precision Scheduling and Spacing System for Performance-Based Navigation Arrivals

The growth of global demand for air transportation has put increasing strain on the nation's air traffic management system. To relieve this strain, the International Civil Aviation Organization has urged all nations to adopt Performance-Based Navigation (PBN), which can help to reduce air traffic congestion, decrease aviation fuel consumption, and protect the environment. NASA has developed a Terminal Area Precision Scheduling and Spacing (TAPSS) system that can support increased use of PBN during periods of high traffic, while supporting fuel-efficient, continuous descent approaches. In the original development of this system, arrival aircraft are assigned fuel-efficient Area Navigation (RNAV) Standard Terminal Arrival Routes before their initial descent from cruise, with routing defined to a specific runway. The system also determines precise schedules for these aircraft that facilitate continuous descent through the assigned routes. To meet these schedules, controllers are given a set of advisory tools to precisely control aircraft. The TAPSS system has been evaluated in a series of human-in-the-loop (HITL) air traffic simulations during 2010 and 2011. Results indicated increased airport arrival throughput up to 10 over current operations, and maintained fuel-efficient aircraft decent profiles from the initial descent to landing with reduced controller workload. This paper focuses on results from a joint NASA and FAA HITL simulation conducted in 2012. Due to the FAA rollout of the advance terminal area PBN procedures at mid-sized airports first, the TAPSS system was modified to manage arrival aircraft as they entered Terminal Radar Approach Control (TRACON). Dallas-Love Field airport (DAL) was selected by the FAA as a representative mid-sized airport within a constrained TRACON airspace due to the close proximity of a major airport, in this case Dallas-Ft Worth International Airport, one of the busiest in the world. To address this constraint, RNAV routes and Required Navigation Performance with the particular capability known as Radius-to-Fix (RNP-RF) approaches to a short final were used. The purpose of this simulation was to get feedback on how current operations could benefit with the TAPSS system and also to evaluate the efficacy of the advisory tools to support the broader use of PBN in the US National Airspace System. For this NASA-FAA joint experiment, an Air Traffic Control laboratory at NASA Ames was arranged to simulate arrivals into DAL in Instrument Meteorological Conditions utilizing parallel dependent approaches, with two feeder positions that handed off traffic to one final position. Four FAA controllers participated, alternately covering these three positions. All participants were Full-Performance Level terminal controllers and members of the National Air Traffic Controllers Association. During the simulation, PBN arrival operations were compared and contrasted in three conditions. They were the Baseline, where none of the TAPSS systems TRACON controller decision support advisories were provided, the Limited Advisories, reflecting the existing but dormant capabilities of the current terminal automation equipment with providing a subset of the TAPSS systems advisories; numerical delay, landing sequence, and runway assignment information, and the Full Advisories, with providing the following in addition to the ones in the Limited condition; trajectory slot markers, timelines of estimated times of arrivals and sched

Performance based navigation↗

Logistics support economy and efficiency through consolidation and automation

An integrated logistics support system, which would provide routine access to space and be cost-competitive as an operational space transportation system, was planned and implemented to support the NSTS program launch-on-time goal of 95 percent. A decision was made to centralize the Shuttle logistics functions in a modern facility that would provide office and training space and an efficient warehouse area. In this warehouse, the emphasis is on automation of the storage and retrieval function, while utilizing state-of-the-art warehousing and inventory management technology. This consolidation, together with the automation capabilities being provided, will allow for more effective utilization of personnel and improved responsiveness. In addition, this facility will be the prime support for the fully integrated logistics support of the operations era NSTS and reduce the program's management, procurement, transportation, and supply costs in the operations era.

Savage, G. R.↗

Datascope to Enable Earth Independent Medical Operations (EIMO)

BACKGROUND: NASA has amassed sixty years of knowledge and experience relevant to maintenance of crew health and performance in low earth orbit. The Apollo Program introduced the importance of ensuring progressively autonomous operational capability. Earth Independent Medical Operations (EIMO) will require a gradual shift in the balance of medical responsibility, management, and authority from terrestrial to space-based assets. Terrestrial assets will continue to be essential for pre-mission screening and planning in addition to maintenance of crew health and performance. However, new capabilities are needed to enable EIMO and the amount of data required to support these systems, and mitigate the impacts of data transmission delays and reduced bandwidth coupled with lack of cloud-like resources and on-board computing capacity that is currently unclear or operationally insufficient. OVERVIEW: The overall goal of EIMO is to develop artificial intelligence (AI)-based solutions to analyze crew health and performance data utilizing a clinical decision support system (CDSS) to provide crew medical officers (CMO) with the equivalent of real-time, on-board medical consults. The EIMO ecosystem is envisioned as a “system of systems” where embedded reference databases and real-time data streams from multiple input vectors continuously and seamlessly assess crew health and performance. EIMO will be designed to make recommendations to the CMO using multi-modal AI-based natural language processing and machine learning methods with interoperability to push/pull data within and between multiple vehicle and habitat architectures. DISCUSSION: Data flows and storage/retrieval capacity are severely constrained during space missions and the challenges will become even greater during exploration missions. Just as each past program from Mercury to the International Space Station (ISS) required rethinking the interaction between ground-based controllers and space-based crew, so too will future missions to the Moon and Mars. While the NASA High-Performance Spaceflight Computing Processor project aims to increase computational capacity by 100 times over current spaceflight computers, the projected deliverable still lags considerably behind what will be needed to enable an AI-driven CDSS. Restrictions in processing speed and data storage capacity, coupled with transmission bottlenecks and delays, necessitate definition and optimization of an integrated data architecture to enable a progressively autonomous medical capability.

Medical operations↗

V-INT: Automated Vulnerability Intelligence and Risk Assessment

The project team, including the University of Arkansas (UA) as the lead, the University of Arkansas at Little Rock (UALR), Network Perception (NP), and Bastazo, has successfully researched, developed, and demonstrated the V-INT toolset, and also integrated it into the commercial products of NP (i.e., NP-View) and Bastazo (i.e., Spartan). The end product is a cybersecurity software tool for energy utilities that can automatically assess the risks of software vulnerabilities in an organization’s assets considering the organization’s firewall policies. It allows security operators to identify the small portion of vulnerabilities that poses true threats to their system (i.e., those that are not protected by firewall policies) and prioritize the mitigation of these vulnerabilities to minimize risks. It also allows security operators to identify the vulnerability-induced attack paths under their organization’s firewall policy, providing effective decision supports for mitigating potential attacks.

97 MATHEMATICS AND COMPUTING↗

Dynamically Reconfigurable Data Readout of Pixel Detectors for Automatic Synchronization with Data Acquisition Systems

Reconfigurable detectors with dynamically selectable sensing and readout modes are highly desirable for implementing edge computing as well as enabling advanced imaging techniques such as foveation. The concept of a camera system capable of simultaneous passive imaging and dynamic ranging in different regions of the detector is presented. Such an adaptive-autonomous detector with both spatial and temporal control requires programmable window of exposure (time frames), ability to switch between readout modes such as full-frame imaging and zero-suppressed data, modification of the number of pixel data bits and independent programmability for distinct detector regions. In this work, a method is presented for seamlessly changing time frames and readout modes without data corruption while still ensuring that the data acquisition system (DAQ) does not need to stop and resynchronize at each change of setting, thus avoiding significant dead time. Data throughput is maximized by using a minimum unique data format, rather than lengthy frame headers, to differentiate between consecutive frames. A data control and transmitter (DCT) synchronizes data transfer from the pixel to the periphery, reconfigures the data to transmit it serially off-chip, while providing optimized decision support based on a DAQ definable mode. Measurements on a test structure demonstrate that the DCT can operate at 1 GHz in a 65 nm LP CMOS process.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Scientific challenges to characterizing the wind resource in the marine atmospheric boundary layer

Abstract. With the increasing level of offshore wind energy investment, it is correspondingly important to be able to accurately characterize the wind resource in terms of energy potential as well as operating conditions affecting wind plant performance, maintenance, and lifespan. Accurate resource assessment at a particular site supports investment decisions. Following construction, accurate wind forecasts are needed to support efficient power markets and integration of wind power with the electrical grid. To optimize the design of wind turbines, it is necessary to accurately describe the environmental characteristics, such as precipitation and waves, that erode turbine surfaces and generate structural loads as a complicated response to the combined impact of shear, atmospheric turbulence, and wave stresses. Despite recent considerable progress both in improvements to numerical weather prediction models and in coupling these models to turbulent flows within wind plants, major challenges remain, especially in the offshore environment. Accurately simulating the interactions among winds, waves, wakes, and their structural interactions with offshore wind turbines requires accounting for spatial (and associated temporal) scales from O(1 m) to O(100 km). Computing capabilities for the foreseeable future will not be able to resolve all of these scales simultaneously, necessitating continuing improvement in subgrid-scale parameterizations within highly nonlinear models. In addition, observations to constrain and validate these models, especially in the rotor-swept area of turbines over the ocean, remains largely absent. Thus, gaining sufficient understanding of the physics of atmospheric flow within and around wind plants remains one of the grand challenges of wind energy, particularly in the offshore environment. This paper provides a review of prominent scientific challenges to characterizing the offshore wind resource using as examples phenomena that occur in the rapidly developing wind energy areas off the United States. Such phenomena include horizontal temperature gradients that lead to strong vertical stratification; consequent features such as low-level jets and internal boundary layers; highly nonstationary conditions, which occur with both extratropical storms (e.g., nor'easters) and tropical storms; air–sea interaction, including deformation of conventional wind profiles by the wave boundary layer; and precipitation with its contributions to leading-edge erosion of wind turbine blades. The paper also describes the current state of modeling and observations in the marine atmospheric boundary layer and provides specific recommendations for filling key current knowledge gaps.

17 WIND ENERGY↗

Predictive monitoring research: Summary of the PREMON system

Traditional approaches to monitoring are proving inadequate in the face of two important issues: the dynamic adjustment of expectations about sensor values when the behavior of the device is too complex to enumerate beforehand, and the selective but effective interpretation of sensor readings when the number of sensors becomes overwhelming. This system addresses these issues by building an explicit model of a device and applying common-sense theories of physics to model causality in the device. The resulting causal simulation of the device supports planning decisions about how to efficiently yet reliably utilize a limited number of sensors to verify correct operation of the device.

Doyle, Richard J.↗

The Aura Mission, Science and Validation

The EOS-Aura Mission is designed to answer three basic questions concerning the Earth's atmosphere: 1) Is stratospheric ozone recovering as predicted, 2) what are the processes that control air quality, and 3) how is changes in atmospheric chemistry effecting climate? Aura's four instruments work synergistically and are dedicated to answering these questions. Aura's instruments observe from the ultraviolet to the microwave region and view in the nadir and limb. This capability allows measurements of all the critical source, radical, and reservoir gases in the stratosphere to be observed globally on a daily basis. Aura will also continue the TOMS global ozone trend record. Observations in the troposphere will be conducted with the best spatial resolution and coverage ever achieved from space. Key pollutants, including aerosols, gases, and their precursors are the primary targets for Aura. High vertical resolution measurements will be made in the vicinity of the tropopause to better define the interactions of the UT/LS and particularly determine the amount downward transport of ozone and upward transport.of water vapor where both contribute to climate forcing. Aura will also measure aerosols in the stratosphere and troposphere where they play a role in ozone chemistry, air quality and climate. Aura data will be used by several environmental agencies for their decision support systems. Aura post launch validation program includes an augmented ground based measurement program which include the operational networks which measure atmospheric composition. Validation will be conducted under a range of geophysical conditions and throughout most of Aura s observing range. Balloon campaigns will conducted from a variety of latitudes and numerous aircraft missions are planned to cover an altitude range from the middle troposphere to the lower stratosphere and include in-situ and remote sensors. Long duration Un-inhabited aircraft are also being considered as part of the validation program. Substantial collaboration is planned with other chemistry satellite missions such as Envisat, SciSat, and Odin in order to make efficient use of resources and to provide continuity among these missions.

Hilsenrath, Ernest↗

Cost/Effort Drivers and Decision Analysis

Engineering trade study analyses demand consideration of performance, cost and schedule impacts across the spectrum of alternative concepts and in direct reference to product requirements. Prior to detailed design, requirements are too often ill-defined (only goals ) and prone to creep, extending well beyond the Systems Requirements Review. Though lack of engineering design and definitive requirements inhibit the ability to perform detailed cost analyses, affordability trades still comprise the foundation of these future product decisions and must evolve in concert. This presentation excerpts results of the recent NASA subsonic Engine Concept Study for an Advanced Single Aisle Transport to demonstrate an affordability evaluation of performance characteristics and the subsequent impacts on engine architecture decisions. Applying the Process Based Economic Analysis Tool (PBEAT), development cost, production cost, as well as operation and support costs were considered in a traditional weighted ranking of the following system-level figures of merit: mission fuel burn, take-off noise, NOx emissions, and cruise speed. Weighting factors were varied to ascertain the architecture ranking sensitivities to these performance figures of merit with companion cost considerations. A more detailed examination of supersonic variable cycle engine cost is also briefly presented, with observations and recommendations for further refinements.

Seidel, Jonathan↗

Long Term Integration and Implementation of ATD-2 Phase 3 Capabilities

Topics include review of recommendations from an earlier Surface CDM (Collaborative Decision Making) Team (SCT) & Flow Evaluation Team (FET) meeting, support of alternative work flows, and software integration in operational systems. The briefing also identifies incorporation of ATD-2 Phase 3 capabilities into the alternative work flows.

ATD-2, IADS↗

Upgrading Fermilab’s accelerator control system with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗