Search NASA⌕ Search

SEARCH · Search NASA

Results for “payload challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions.NASAs Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS).

Autonomous Mission Operations↗

Integrated Design Results for the MSR SRC Mars Ascent Vehicle

The primary mission of the NASA Mars Sample Return (MSR) Campaign is to return samples of the Martian surface to Earth for scientific study. As part of this campaign, NASA is developing a Mars Ascent Vehicle (MAV). This vehicle must survive an approximate two-year journey to the Martian surface as a payload aboard a separate lander spacecraft. After residing on the surface for another year, the MAV will carry a payload of samples into orbit. From there, following ejection from the MAV, the samples will rendezvous with an Earth return spacecraft for capture, and ultimately, return to Earth. The design of the MAV represents a number of unique challenges, as no launch vehicle has ever left the surface of a planet other than Earth. Although conceptual designs for a MAV have been in various levels of development since the 1970s, none have achieved the level of fidelity and support that exists in the current MSR-MAV design. Early MSR-MAV concept studies examined multiple methods of propulsion, ultimately deciding that a Two-Stage-to-Orbit (TSTO) solid propulsion vehicle would provide the most capable performance in a Martian environment. Following this key architecture decision, the vehicle design was further matured to a Solid-Solid Guided-Guided (SSGG) architecture for NASA Key Decision Point A (KDP-A). Although the SSGG design was able to meet all mission constraints, concerns were raised regarding limited mass margin on other elements of the MSR campaign at such an early phase. A design challenge was issued to reduce MAV total mass by as much as possible. It was ultimately determined that by moving a number of components of the vehicle second stage to the first stage, the overall vehicle mass could be reduced significantly. The new design features a much smaller and completely unguided second stage. This paper describes the resultant Solid-Solid Guided-Unguided (SSGU) MAV design concept developed as part of the Systems Requirement Cycle (SRC). This design was developed primarily by NASA Marshall Space Flight Center (MSFC), in association with NASA Jet Propulsion Laboratory (JPL) and NASA Langley Research Center (LaRC). The TSTO vehicle includes one solid rocket motor per stage. As the vehicle second stage is unguided, it features spin-stabilization to maintain vehicle stability during flight. An electromechanically actuated Thrust Vector Control (TVC) system and a monopropellant Reaction Control System (RCS) are employed for active guidance on the first stage. The vehicle is designed to deliver up to 0.47kg of Martian samples to a Mars circular orbit of 380km at 27° inclination. Due to the extremely unique design constraints of this mission, and a recent transition to a Risk Class A posture, the MAV team was compelled to devise unconventional solutions to the vehicle design. The detailed design and analysis of these subsystems and the vehicle as a whole are discussed in this paper relative to all of the engineering disciplines involved.

MAV↗

Computer aided processing using laser measurements

The challenge exists of processing the STS and its cargo through KSC facilities in the most timely and cost effective manner possible. To do this a 3-D computer graphics data base was established into which was entered the STS, payloads, and KSC facilities. The facility drawing data are enhanced by laser theodolite measurements into an as-built configuration. Elements of the data base were combined to study orbiter/facility interfaces payload/facility access problems and design/arrangement of various GSE to support processing requirements. With timely analysis/design utilizing the 3-D computer graphics system, costly delays can be avoided. Better methodology can be analyzed to determine procedures for cost avoidance.

Davis, R. M.↗

Fabrication and Testing of Ceramic Matrix Composite Propulsion Components

A viewgraph presentation outlines NASA's goals for the Second and Third Generation Reusable Launch Vehicles, placing emphasis on improving safety and decreasing the cost of transporting payloads to orbit. The use of ceramic matrix composite (CMC) technology is discussed. The development of CMC components, such as the Simplex CMC Blisk, cooled CMC nozzle ramps, cooled CMC thrust chambers, and CMC gas generators, are described, including challenges, test results, and likely future developments.

Effinger, Michael R.↗

Mass Property Measurements of the Mars Science Laboratory Rover

The NASA/JPL Mars Science Laboratory (MSL) spacecraft mass properties were measured on a spin balance table prior to launch. This paper discusses the requirements and issues encountered with the setup, qualification, and testing using the spin balance table, and the idiosyncrasies encountered with the test system. The final mass measurements were made in the Payload Hazardous Servicing Facility (PHSF) at Kennedy Space Center on the fully assembled and fueled spacecraft. This set of environmental tests required that the control system for the spin balance machine be at a remote location, which posed additional challenges to the operation of the machine

rover↗

An Advanced Loop Heat Pipe for Cryogenic Applications

A loop heat pipe (LHP) is a very versatile heat transfer device that can transport a large heat load over a long distance with a small temperature difference. All LHPs currently servicing orbiting spacecraft are designed to operate in the room temperature range. Future space telescopes and space-based Earth resource imaging satellites require passive cryogenic heat transport devices that can thermally couple remote cryocoolers to sensor or instrument of interest while providing the capability of payload vibration jitter isolation, implementation of redundant coolers, and coupling of multiple sensors to a common heat sink. All of these requirements can be satisfied by using a cryogenic LHP (CLHP). Although the development of CLHPs faces several technical challenges, NASA Goddard Space Flight Center has devoted extensive efforts in developing CLHP technology over the past decade and has made significant progress. In particular, the combination of the innovative ideas of using a secondary capillary pump to manage the parasitic heat gain and using a hot reservoir to reduce the system pressure under the ambient condition has led to the successful development of the CLHP. Several CLHPs charged with nitrogen and hydrogen were built and tested in thermal vacuum chambers. These CLHPs demonstrated reliable start-up and robust operation during power cycle and sink temperature cycle tests.

Loop Heat Pipes↗

An Advanced Loop Heat Pipe for Cryogenic Applications

A loop heat pipe (LHP) is a very versatile heat transfer device that can transport a large heat load over a long distance with a small temperature difference. All LHPs currently servicing orbiting spacecraft are designed to operate in the room temperature range. Future space telescopes and space-based Earth resource imaging satellites require passive cryogenic heat transport devices that can thermally couple remote cryocoolers to sensor or instrument of interest while providing the capability of payload vibration jitter isolation, implementation of redundant coolers, and coupling of multiple sensors to a common heat sink. All of these requirements can be satisfied by using a cryogenic LHP (CLHP). Although the development of CLHPs faces several technical challenges, NASA Goddard Space Flight Center has devoted extensive efforts in developing CLHP technology over the past decade and has made significant progress. In particular, the combination of the innovative ideas of using a secondary capillary pump to manage the parasitic heat gain and using a hot reservoir to reduce the system pressure under the ambient condition has led to the successful development of the CLHP. Several CLHPs charged with nitrogen and hydrogen were built and tested in thermal vacuum chambers. These CLHPs demonstrated reliable start-up and robust operation during power cycle and sink temperature cycle tests.

Loop Heat Pipes↗

Simulaneous optimization of spacecraft and trajectory design for interplanetary missions utilizing solar electric propulsion

A major challenge in formulating interplanetary mission concepts utilizing electric propulsion is the large number of trajectory variables that must be considered (thrust profile, flyby options, launch vehicle delivery), all of which are affected by spacecraft design variables (power, mass, thruster, payload, staging). This is significantly more complex than traditional ballistic/chemical mission design and early concepts are often suboptimal as a result, potentially missing valuable options. This paper presents a novel tool (MORT) for simultaneously optimizing the spacecraft design alongside the trajectory given mission constraints and objectives, including example results relevant to the exploration of Mars.

Lock, Rob↗

MBSE Applications for the MSR SRC Mars Ascent Vehicle

The objective of the NASA Mars Sample Return (MSR) Campaign is to collect samples from the surface of Mars and return them to Earth for scientific research. The Mars Ascent Vehicle (MAV) will be integrated into a larger Mars Sample Retrieval Lander (SRL) for transit to and storage on Mars. After all Martian samples have been collected and loaded into the MAV payload assembly, MAV will deliver the samples from the Martian surface to Mars orbit. A separate spacecraft, the Earth Return Orbiter (ERO) will retrieve the samples from Mars orbit and return them to Earth. To address common systems engineering challenges associated with using traditional systems engineering practices on complex projects, the MAV systems engineering team has explored implementation of Model-Based Systems Engineering (MBSE) tools and languages. This paper describes the current state of implementation and development of the MAV MBSE model with the Systems Modeling Language (SysML) within the scope of the MAV Systems Requirement Cycle (SRC) systems engineering workflow. The MAV MBSE model has been developed within Magic Draw – a SysML editor commonly used to implement MBSE. The MAV MBSE model has been used to develop mission phase functional flow diagrams for the Concept of Operations, decompose mission to vehicle subsystem functions, develop a functional decomposition, derive functional requirements, trace requirements up to customer-imposed requirements, trace requirements within MAV requirement space, identify requirements trace gaps, define and map the physical design space architecture, allocate requirements to subsystems, develop validation items, define assembly, integration, and test (AI&T) operations, and trace these items across driving goals to develop an integrated digital thread of systems engineering information used to drive design specifications, decision making, and ultimately design verification and validation. Findings and results associated with implementing MBSE in these ways, alongside traditional methods will be discussed.

MBSE↗

MBSE Applications for the MSR SRC Mars Ascent Vehicle

The objective of the NASA Mars Sample Return (MSR) Campaign is to collect samples from the surface of Mars and return them to Earth for scientific research. The Mars Ascent Vehicle (MAV) will be integrated into a larger Mars Sample Retrieval Lander (SRL) for transit to and storage on Mars. After all Martian samples have been collected and loaded into the MAV payload assembly, MAV will deliver the samples from the Martian surface to Mars orbit. A separate spacecraft, the Earth Return Orbiter (ERO) will retrieve the samples from Mars orbit and return them to Earth. To address common systems engineering challenges associated with using traditional systems engineering practices on complex projects, the MAV systems engineering team has explored implementation of Model-Based Systems Engineering (MBSE) tools and languages. This paper describes the current state of implementation and development of the MAV MBSE model with the Systems Modeling Language (SysML) within the scope of the MAV Systems Requirement Cycle (SRC) systems engineering workflow. The MAV MBSE model has been developed within Magic Draw – a SysML editor commonly used to implement MBSE. The MAV MBSE model has been used to develop mission phase functional flow diagrams for the Concept of Operations, decompose mission to vehicle subsystem functions, develop a functional decomposition, derive functional requirements, trace requirements up to customer-imposed requirements, trace requirements within MAV requirement space, identify requirements trace gaps, define and map the physical design space architecture, allocate requirements to subsystems, develop validation items, define assembly, integration, and test (AI&T) operations, and trace these items across driving goals to develop an integrated digital thread of systems engineering information used to drive design specifications, decision making, and ultimately design verification and validation. Findings and results associated with implementing MBSE in these ways, alongside traditional methods will be discussed.

MBSE↗

HBU R and D Cask Transportation Options - 20436

The TN-32B HBU Demonstration Cask was successfully loaded in November 2017 with 32 high burnup (HBU) fuel assemblies at Dominion's North Anna Nuclear Plant and is collecting thermal data as intended. The first two phases of this very successful project sponsored by DOE and EPRI was designed to collect thermal data of HBU fuel to support extended storage. The next phase of the project requires the cask be licensed for transportation so the cask can be relocated to a site (to be determined by DOE) to facilitate long term monitoring and additional research on the fuel. This is a unique challenge given the constraints that exist for this particular bolted metal cask. The TN-32B cask is a 234,288 lb. (storage configuration) dry storage system that was selected for this project and it was modified to provide thermal data and the ability to collect gas samples after loading. Several major issues must be addressed to obtain the transport license including protecting the seven lid penetrations that were made to allow for the insertion of the thermocouples into the selected fuel assemblies after the cask was loaded. In order to protect the integrity of the research, the payload must remain as is. Therefore, the cask system must be placed into the transportation configuration without rewetting the fuel, replacing the lid and without removing the thermocouple instrumentation that is currently installed. A critical portion of the design and engineering that was performed in the first two phases of the project was to ensure that future transportation of the cask was integrated into the approach. Efforts were made to accommodate requirements such as containment boundary leakage testing, installation of impact limiter brackets and lid bolts suitable for transportation. Due to the science requirements of the project, the fuel selected was intended to yield the highest payload temperatures permitted to provide the greatest value for the researchers. This resulted in higher than usual external dose rates and surface temperatures that warranted performing as much preparatory work prior to cask loading to ensure ALARA and personnel safety to the greatest extent practical rather than working on a loaded cask. In addition to the work performed prior to cask load, there are remaining challenges such as protecting the modified lid, design and fabrication of impact limiters that accommodate the modified cask lid and preserving the thermocouple connections for continued monitoring. The project team is currently performing the necessary calculations, engineering, and design to support the licensing as required by the US NRC. Pre-application meetings have been held to inform the regulator of the planned technical approach to ensure compliance with the applicable regulations. The current plan is to obtain the transportation C of C by the end of 2021. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building on the Past - Looking to the Future: A Focus on Expanding Horizons - Part 2

The history of space endeavors stretches far from Robert Goddard s initial flights and will certainly extend far beyond the construction of the International Space Station. As society grows in knowledge of and familiarity with space, the focus of maintaining the safety of the crews and the habitability of the vehicles will be of the utmost importance to the National Aeronautics and Space Administration (NASA) community. Through the years, Payload Safety has developed not only as a Panel, but also as part of the NASA community, striving to enhance the efficiency and understanding of how business should be conducted as more International Partners become involved. The recent accomplishments of the first docking of the Japan Aerospace Exploration Agency (JAXA) HII Transfer Vehicle (HTV 1) and completion of the Japanese Experiment Module (JEM) or KIBO and the Russian MRM2 to the International Space Station (ISS) mark significant steps for the future of ISS. 2010 will mark the final flights of the Shuttle and the completion of ISS assembly. Future delivery of humans and hardware will rely on the Russian Progress and Soyuz, the Japanese HII Transfer Vehicle (HTV), the European Automated Transfer Vehicle (ATV) and US "Commercial Off-The-Shelf" (COTS) and Constellation vehicles. The International Partners (IPs) will have more capability in delivery as well as responsibility for review of hardware they deliver to assure safe operation. This is the second in a series of papers and presentations in what is hoped to be an annual update that illustrates challenges and lessons learned in the areas of communication (how hazard reports can be misunderstood), safety requirements (transitioning from Shuttle-centric to ISS-centric), and processes (review of hardware by RSC-E and Franchised ESA and JAXA PSRP) which have been vital in conducting the business of the Payload Safety Review Panel (PSRP). This year will focus on the items annotated above.

Guidry, Richard W.↗

Thermal systems design and analysis for a 10 K Sorption Cryocooler flight experiment

The design, analysis and predicted performance of the Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE) is described from a thermal perspective. BETSCE is a shuttle side-wall mounted cryogenic technology demonstration experiment planned for launch in November 1994. BETSCE uses a significant amount of power (about 500 W peak) and the resultant heat must be rejected passively with radiators, as BETSCE has no access to the active cooling capability of the shuttle. It was a major challenge to design and configure the individual hardware assemblies, with their relatively large radiators, to enable them to reject their heat while satisfying numerous severe shuttle-imposed constraints. This paper is a useful case study of a small shuttle payload that needs to reject relatively high heat loads passively in a highly constrained thermal environment. The design approach described is consistent with today's era of 'faster, better, cheaper' small-scale space missions.

Bhandari, Pradeep↗

Towards a Multisensor Approach to Improve on Current TRMM Retrievals of Clouds and Precipitation

The Tropical Rainfall Measuring Mission (TRMM) was designed to measure tropical rainfall and its variation from a low inclination orbiting satellite. The TRMM payload was carefully chosen to overcome a number of limitations of past satellite observing systems. This payload is predicated on the combination of active and passive observations from the TRMM Precipitation Radar (PR) and TRMM Microwave Imager (TMI) and Visible and Infrared Scanner (VIRS). Our research over the past three years has been devoted to the challenge of developing the most effective way of combining complementary information from these sensors to provide the most consistent estimate of precipitation. We have approached this problem from three directions. The first was to carry out preliminary analysis of passive microwave and infrared data from the TMI and VIRS instruments to understand the character of clear and cloudy skies in the basis defined by polarization and brightness temperature differences. Using this information as a foundation, the properties of two retrieval algorithms were analyzed, one for retrieving ice clouds from VIRS that was developed in parallel with this project and the other for rainfall from the TMI. Finally, the knowledge gleaned from each of these studies, coupled with ancillary data from NWP models and a broadband radiative transfer model, was used to create and algorithm for synthesizing the principal components of the Earth's energy budget from the basic building blocks of the atmosphere, gases, clouds, and precipitation. Principal results from each of these areas of research and their role in the TRMM and climate communities are summarized.

Stephens, Graeme L.↗

Independent Review of the Failure Modes of F-1 Engine and Propellants System

The F-1 is the powerful engine, that hurdled the Saturn V launch vehicle from the Earth to the moon on July 16,1969. The force that lifted the rocket overcoming the gravitational force during the first stage of the flight was provided by a cluster of five F-1 rocket engines, each of them developing over 1.5 million pounds of thrust (MSFC-MAN-507). The F-1 Rocket engine used RP-1 (Rocket Propellant-1, commercially known as Kerosene), as fuel with lox (liquid Oxygen) as oxidizer. NASA terminated Saturn V activity and has focused on Space Shuttle since 1972. The interest in rocket system has been revived to meet the National Launch System (NLS) program and a directive from the President to return to the Moon and exploration of the space including Mars. The new program Space Launch Initiative (SLI) is directed to drastically reduce the cost of flight for payloads, and adopt a reusable launch vehicle (RLV). To achieve this goal it is essential to have the ability of lifting huge payloads into low earth orbit. Probably requiring powerful boosters as strap-ons to a core vehicle, as was done for the Saturn launch vehicle. The logic in favor of adopting Saturn system, a proven technology, to meet the SLI challenge is very strong. The F-1 engine was the largest and most powerful liquid rocket engine ever built, and had exceptional performance. This study reviews the failure modes of the F-1 engine and propellant system.

Ray, Paul↗

Transport and Use of a Centaur Second Stage in Space

As nations continue to explore space, the desire to reduce costs will continue to grow. As a method of cost reduction, transporting and/or use of launch system components as integral components of missions may become more commonplace in the future. There have been numerous scenarios written for using launch vehicle components (primarily space shuttle used external tanks) as part of flight missions or future habitats. Future studies for possible uses of launch vehicle upper stages might include asteroid diverter using gravity orbital perturbation, orbiting station component, raw material at an outpost, and kinetic impactor. The LCROSS (Lunar CRater Observation and Sensing Satellite) mission was conceived as a low-cost means of determining whether water exists at the polar regions of the moon. Manifested as a secondary payload with the LRO (Lunar Reconnaissance Orbiter) spacecraft aboard an Atlas V launch vehicle, LCROSS guided its spent Centaur Earth Departure Upper Stage (EDUS) into the lunar crater Cabeu's, as a kinetic impactor. This paper describes some of the challenges that the LCROSS project encountered in planning, designing, launching with and carrying the Centaur upper stage to the moon.

Strong, James M.↗

Telemetry Tracking & Control (TT&C) - First TDRSS, then Commercial GEO & Big LEO and Now Through LEO

The advent of low earth orbit (LEO) commercial communication satellites provides an opportunity to dramatically reduce Telemetry, Tracking and Control (TT&C) costs of launch vehicles, Unpiloted Aerial Vehicles (UAVs), Research Balloons and spacecraft by reducing or eliminating ground infrastructure. Personnel from the Goddard Space Flight Center's Wallops Flight Facility (GSFC\WFF) have successfully used commercial Geostationary Earth Orbit (GEO) and Big LEO communications satellites for Long Duration Balloon Flight TT&C. The Flight Modem is a GSFC\WFF Advanced Range Technology initiative (ARTI) designed to streamline TT&C capability in the user community of these scientific data gathering platforms at low cost. Making use of existing LEO satellites and adapting and ruggedized commercially available components; two-way, over the horizon communications may be established with these vehicles at great savings due to reduced infrastructure. Initially planned as a means for permitting GPS data for tracking and recovery of sounding rocket and balloon payloads, expectations are that the bandwidth can soon be expanded to allow more comprehensive data transfer. The system architecture which integrates antennas, GPS receiver, commercial satellite packet data modem and a single board computer with custom software is described and technical challenges are discussed along with the plan for their resolution. A three-phase testing and development plan is outlined and the current results are reported. Results and status of ongoing flight tests on aircraft and sounding rockets are reported. Future applications on these platforms and the potential for satellite support are discussed along with an analysis of cost effectiveness of this method vs. other tracking and data transmission schemes.

Morgan, Dwayne R.↗

Universal Payload Information Management

As the overall manager and integrator of International Space Station (ISS) science payloads, the Payload Operations Integration Center (POIC) at Marshall Space Flight Center has a critical need to provide an information management system for exchange and control of ISS payload files as well as to coordinate ISS payload related operational changes. The POIC's information management system has a fundamental requirement to provide secure operational access not only to users physically located at the POIC, but also to remote experimenters and International Partners physically located in different parts of the world. The Payload Information Management System (PIMS) is a ground-based electronic document configuration management and collaborative workflow system that was built to service the POIC's information management needs. This paper discusses the application components that comprise the PIMS system, the challenges that influenced its design and architecture, and the selected technologies it employs. This paper will also touch on the advantages of the architecture, details of the user interface, and lessons learned along the way to a successful deployment. With PIMS, a sophisticated software solution has been built that is not only universally accessible for POIC customer s information management needs, but also universally adaptable in implementation and application as a generalized information management system.

Elmore, Ralph B.↗