Search NASA⌕ Search

SEARCH · Search NASA

Results for “probabilistic program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Statistical and Probabilistic Extensions to Ground Operations' Discrete Event Simulation Modeling

NASA's human exploration initiatives will invest in technologies, public/private partnerships, and infrastructure, paving the way for the expansion of human civilization into the solar system and beyond. As it is has been for the past half century, the Kennedy Space Center will be the embarkation point for humankind's journey into the cosmos. Functioning as a next generation space launch complex, Kennedy's launch pads, integration facilities, processing areas, launch and recovery ranges will bustle with the activities of the world's space transportation providers. In developing this complex, KSC teams work through the potential operational scenarios: conducting trade studies, planning and budgeting for expensive and limited resources, and simulating alternative operational schemes. Numerous tools, among them discrete event simulation (DES), were matured during the Constellation Program to conduct such analyses with the purpose of optimizing the launch complex for maximum efficiency, safety, and flexibility while minimizing life cycle costs. Discrete event simulation is a computer-based modeling technique for complex and dynamic systems where the state of the system changes at discrete points in time and whose inputs may include random variables. DES is used to assess timelines and throughput, and to support operability studies and contingency analyses. It is applicable to any space launch campaign and informs decision-makers of the effects of varying numbers of expensive resources and the impact of off nominal scenarios on measures of performance. In order to develop representative DES models, methods were adopted, exploited, or created to extend traditional uses of DES. The Delphi method was adopted and utilized for task duration estimation. DES software was exploited for probabilistic event variation. A roll-up process was used, which was developed to reuse models and model elements in other less - detailed models. The DES team continues to innovate and expand DES capabilities to address KSC's planning needs.

Trocine, Linda↗

Space transportation architecture: Reliability sensitivities

A sensitivity analysis is given of the benefits and drawbacks associated with a proposed Earth to orbit vehicle architecture. The architecture represents a fleet of six vehicles (two existing, four proposed) that would be responsible for performing various missions as mandated by NASA and the U.S. Air Force. Each vehicle has a prescribed flight rate per year for a period of 31 years. By exposing this fleet of vehicles to a probabilistic environment where the fleet experiences failures, downtimes, setbacks, etc., the analysis involves determining the resiliency and costs associated with the fleet of specific vehicle/subsystem reliabilities. The resources required were actual observed data on the failures and downtimes associated with existing vehicles, data based on engineering judgement for proposed vehicles, and the development of a sensitivity analysis program.

Williams, A. M.↗

Assessing the Likelihood of Rare Medical Events in Astronauts

Despite over half a century of manned space flight, the space flight community is only now coming to fully assess the short and long term medical dangers of exposure to reduced gravity environments. Further, as new manned spacecraft are designed and with the advent of commercial flight capabilities to the general public, a full understanding of medical risk becomes even more critical for maintaining and understanding mission safety and crew health. To address these critical issues, the National Aeronautics and Space Administration (NASA) Human Research Program (HRP) has begun to address the medical hazards with a formalized risk management approach by effectively identifying and attempting to mitigate acute and chronic medical risks to manned space flight. This paper describes NASA Glenn Research Center?s (GRC) efforts to develop a systematic methodology to assess the likelihood of in-flight medical conditions. Using a probabilistic approach, medical risks are assessed using well established and accepted biomedical and human performance models in combination with fundamentally observed data that defines the astronauts? physical conditions, environment and activity levels. Two different examples of space flight risk are used to show the versatility of our approach and how it successfully integrates disparate information to provide HRP decision makers with a valuable source of information which is otherwise lacking.

Myers, Jerry G., Jr.↗

Dynamic Modeling of Ascent Abort Scenarios for Crewed Launches

For the last 30 years, the United States's human space program has been focused on low Earth orbit exploration and operations with the Space Shuttle and International Space Station programs. After nearly 50 years, the U.S. is again working to return humans beyond Earth orbit. To do so, NASA is developing a new launch vehicle and spacecraft to provide this capability. The launch vehicle is referred to as the Space Launch System (SLS) and the spacecraft is called Orion. The new launch system is being developed with an abort system that will enable the crew to escape launch failures that would otherwise be catastrophic as well as probabilistic design requirements set for probability of loss of crew (LOC) and loss of mission (LOM). In order to optimize the risk associated with designing this new launch system, as well as verifying the associated requirements, NASA has developed a comprehensive Probabilistic Risk Assessment (PRA) of the integrated ascent phase of the mission that includes the launch vehicle, spacecraft and ground launch facilities. Given the dynamic nature of rocket launches and the potential for things to go wrong, developing a PRA to assess the risk can be a very challenging effort. Prior to launch and after the crew has boarded the spacecraft, the risk exposure time can be on the order of three hours. During this time, events may initiate from either of the spacecraft, the launch vehicle, or the ground systems, thus requiring an emergency egress from the spacecraft to a safe ground location or a pad abort via the spacecraft's launch abort system. Following launch, again either the spacecraft or the launch vehicle can initiate the need for the crew to abort the mission and return to the home. Obviously, there are thousands of scenarios whose outcome depends on when the abort is initiated during ascent as to how the abort is performed. This includes modeling the risk associated with explosions and benign system failures that require aborting a spacecraft under very dynamic conditions, particularly in the lower atmosphere, and returning the crew home safely. This paper will provide an overview of the PRA model that has been developed of this new launch system, including some of the challenges that are associated with this effort. Key Words: PRA, space launches, human space program, ascent abort, spacecraft, launch vehicles

Bigler, Mark↗

Light Water Reactor Sustainability Program: Use of Time Distributions to Predict Operator Procedure Performance in Dynamic Human Reliability Analysis

The Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER) framework affords software capable of conducting human reliability analysis (HRA) using a dynamic approach built around operating procedures (OPs) from nuclear power plants (NPPs). Previous HUNTER reports document the development of this software tool, the coupling of HUNTER to the simulator code, the collection of operator performance data by using simulators to calibrate HUNTER models, and linking HUNTER to probabilistic risk assessment (PRA) software. The present report largely addresses two topics. The first is a new function in HUNTER called the HUNTER Procedure Performance Predictor (P3). HUNTER P3 uses HUNTER’s built in Monte Carlo tools featuring human performance variability to identify potential error traps in procedures. The second topic is time distribution analysis to generate time inputs for dynamic HRA. The current analysis was performed to investigate time distributions for task primitives, which are the minimum task unit of analysis used in dynamic HRA modeling. Using the time distribution data, the elapsed time for human actions in an extended loss of AC power (ELAP) scenario is then investigated. Time data and prediction are essential for modeling procedure performance.

99 GENERAL AND MISCELLANEOUS↗

Composite load spectra for select space propulsion structural components

The objective of this program is to develop generic load models with multiple levels of progressive sophistication to simulate the composite (combined) load spectra that are induced in space propulsion system components, representative of Space Shuttle Main Engines (SSME), such as transfer ducts, turbine blades, and liquid oxygen posts and system ducting. The first approach will consist of using state of the art probabilistic methods to describe the individual loading conditions and combinations of these loading conditions to synthesize the composite load spectra simulation. The second approach will consist of developing coupled models for composite load spectra simulation which combine the deterministic models for composite load dynamic, acoustic, high pressure, and high rotational speed, etc., load simulation using statistically varying coefficients. These coefficients will then be determined using advanced probabilistic simulation methods with and without strategically selected experimental data.

Newell, J. F.↗

An approximate methods approach to probabilistic structural analysis

A probabilistic structural analysis method (PSAM) is described which makes an approximate calculation of the structural response of a system, including the associated probabilistic distributions, with minimal computation time and cost, based on a simplified representation of the geometry, loads, and material. The method employs the fast probability integration (FPI) algorithm of Wu and Wirsching. Typical solution strategies are illustrated by formulations for a representative critical component chosen from the Space Shuttle Main Engine (SSME) as part of a major NASA-sponsored program on PSAM. Typical results are presented to demonstrate the role of the methodology in engineering design and analysis.

Mcclung, R. C.↗

Nuclear Safety [Vol. 35, No. 2, July-December 1994]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 179 Consideration of Postaccident Consequences in the Determination of Safety Objectives for Future Nuclear Power Plants in France, D. Queniart, A. Sugier, and J. Lochard; ACCIDENT ANALYSIS: 187 Nuclear Safety Research: The Phebus FP Severe Accident Experimental Program, P. von der Hardt, A. V. Jones, C. Lecomte, and A. Tattegrain; 205 Containment Performance Analysis of the Advanced Neutron Source Reactor at the Oak Ridge National Laboratory, S. H. Kim, R. P. Taleyarkhan, and V. Georgevich; 213 Assessment of Fission Product Deposits in the Reactor Coolant System: The DEVAP Program, G. Le Marois and M. Megnin; 222 Erratum to “A Review of the Available Information on the Triggering Stage of a Steam Explosion," Vol. 35, No. 1, CONTROL AND INSTRUMENTATION: 223 Effects of Normal Aging on Calibration and Response Time of Nuclear Plant Resistance Temperature Detectors and Pressure Sensors, H. M. Hashemian; DESIGN FEATURES: 235 Defense in Depth Against the Hydrogen Risk—A European Research Program, F. Fineschi; ENVIRONMENTAL EFFECTS: 246 Technical Note: A Preliminary Analysis of the Risks to Hong Kong Resulting from Potential Accidents of Daya Bay Nuclear Power Plant, Z. Shi and X. Wei; OPERATING EXPERIENCES: 253 Reactor Shutdown Experience, Compiled by J. W. Cletcher; SPECIAL SECTION ON TMI-2 VESSEL INVESTIGATION PROJECT: 256 Three Mile Island—New Findings 15 Years After the Accident A. M. Rubin and E. Beckjord; 269 Relocation of Molten Material to the TMI-2 Lower Head, J. R. Wolf, D. W. Akers, and L. A. Neimark; 280 Insight Into the TMI-2 Core Material Relocation Through Examination of Instrument Tube Nozzles, L. A. Neimark; 288 Physical and Radiochemical Examinations of Debris from the TMI-2 Lower Head, D. W. Akers and B. K. Schuetz; 301 Results of Metallographic Examinations and Mechanical Tests of Pressure Vessel Samples from the TMI-2 Lower Head, D. R. Diercks and G. E. Korth; 313 Margin-to-Failure Calculations for the TMI-2 Vessel, J. Rempe, L. Stickler, S. Chavez, G. Thinnes, R. Witt, and M. Corradini; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 328 1993 Accident Sequence Precursor (ASP) Program Results, L. N. Vanden Heuvel, J. W. Cletcher, D. A. Copinger, J. W. Minarick, B. W. Dolan, and P. D. O’Reilley; RECENT DEVELOPMENTS: 339 Reports, Standards, and Safety Guides, D. S. Queener; 345 Proposed Rule Changes as of June 30, 1994; ANNOUNCEMENTS: 234 Thirty-First Annual Meeting of the National Council on Radiation Protection and Measurements; 356 1995 International Incineration Conference; 358 Fifth International Controls and Instrumentation Conference; 359 ANS International Topical Meeting on Safety of Operating Reactors; 359 Fifth International Conference on Nuclear Criticality Safety; 360 International Conference on Probabilistic Safety Assessment Methodology and Applications; 351 The Authors; 357 Reviewers of Nuclear Safety, Vol. 35.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

System Level Uncertainty Assessment for Collaborative RLV Design

A collaborative design process utilizing Probabilistic Data Assessment (PDA) is showcased. Given the limitation of financial resources by both the government and industry, strategic decision makers need more than just traditional point designs, they need to be aware of the likelihood of these future designs to meet their objectives. This uncertainty, an ever-present character in the design process, can be embraced through a probabilistic design environment. A conceptual design process is presented that encapsulates the major engineering disciplines for a Third Generation Reusable Launch Vehicle (RLV). Toolsets consist of aerospace industry standard tools in disciplines such as trajectory, propulsion, mass properties, cost, operations, safety, and economics. Variations of the design process are presented that use different fidelities of tools. The disciplinary engineering models are used in a collaborative engineering framework utilizing Phoenix Integration's ModelCenter and AnalysisServer environment. These tools allow the designer to join disparate models and simulations together in a unified environment wherein each discipline can interact with any other discipline. The design process also uses probabilistic methods to generate the system level output metrics of interest for a RLV conceptual design. The specific system being examined is the Advanced Concept Rocket Engine 92 (ACRE-92) RLV. Previous experience and knowledge (in terms of input uncertainty distributions from experts and modeling and simulation codes) can be coupled with Monte Carlo processes to best predict the chances of program success.

Charania, A. C.↗

Probabilistic Seismic Hazard Assessment for Azerbaijan

Probabilistic Seismic Hazard Assessments (PSHA) underpin the determination of seismic loads in most contemporary seismic provisions of building codes around the world. Modern building codes are migrating towards using the entire uniform hazard spectrum at a range of vibration periods (typically up to 4 s or 10 s) rather than a single peak value such as peak ground acceleration (PGA), thus requiring a larger range of PSHA outputs. The hazard maps in the current version of the building code of Azerbaijan (2011) are in terms of intensity and peak ground acceleration. Recognizing the need for an up-to-date seismic hazard assessment in the country, Seismic Cooperation Program (SCP) under the Lawrence Livermore National Laboratory (LLNL) undertook, in coordination with the Republican Seismic Survey Center of the Azerbaijan National Academy of Sciences and the Azerbaijan Scientific Research Institute of Construction and Architecture, a PSHA study that reflects new seismic data recorded locally and recent research conducted nationally and regionally since the last update to the building code. The PSHA framework for this project was designed to help develop a new earthquake catalogue, to incorporate a novel characterization of ground motions that specifically reflects the attenuation characteristics in the eastern Caucasus, and to generate hazard information in a form that is useful for an update of the current building code or the development of a new building code for Azerbaijan. The project also aimed to provide training and support for the local seismologists and engineers related to the seismic hazard models, probabilistic seismic hazard results and their use towards changes in the building code.

58 GEOSCIENCES↗

Optimal maintenance center inventories for fault-tolerant repairable systems

A probabilistic approach is taken to determine the optimal repairable parts inventory for a maintenance center, servicing machines which contain several m-out-of-n systems of different parts, with a constraint on the total inventory investment. A model, based on the discrete Markov process, accounts for a typical ultrareliable avionics system, such as one presently being developed by NASA. The dynamic programming algorithm for minimizing the stockout and holding costs is applied to an exemplary maintenance center, and solutions for single-item and multi-item cases are given. The computational burden is noted to be reasonable and a computer program is used to generate optimal solutions.

Lawrence, S. H.↗

Computational methods for probability of instability calculations

This paper summarizes the development of the methods and a computer program to compute the probability of instability of a dynamic system than can be represented by a system of second-order ordinary linear differential equations. Two instability criteria based upon the roots of the characteristics equation or Routh-Hurwitz test functions are investigated. Computational methods based on system reliability analysis methods and importance sampling concepts are proposed to perform efficient probabilistic analysis. Numerical examples are provided to demonstrate the methods.

Wu, Y.-T.↗

Multi-Disciplinary System Reliability Analysis

The objective of this study is to develop a new methodology for estimating the reliability of engineering systems that encompass multiple disciplines. The methodology is formulated in the context of the NESSUS probabilistic structural analysis code developed under the leadership of NASA Lewis Research Center. The NESSUS code has been successfully applied to the reliability estimation of a variety of structural engineering systems. This study examines whether the features of NESSUS could be used to investigate the reliability of systems in other disciplines such as heat transfer, fluid mechanics, electrical circuits etc., without considerable programming effort specific to each discipline. In this study, the mechanical equivalence between system behavior models in different disciplines are investigated to achieve this objective. A new methodology is presented for the analysis of heat transfer, fluid flow, and electrical circuit problems using the structural analysis routines within NESSUS, by utilizing the equivalence between the computational quantities in different disciplines. This technique is integrated with the fast probability integration and system reliability techniques within the NESSUS code, to successfully compute the system reliability of multi-disciplinary systems. Traditional as well as progressive failure analysis methods for system reliability estimation are demonstrated, through a numerical example of a heat exchanger system involving failure modes in structural, heat transfer and fluid flow disciplines.

Mahadevan, Sankaran↗

Multidisciplinary System Reliability Analysis

The objective of this study is to develop a new methodology for estimating the reliability of engineering systems that encompass multiple disciplines. The methodology is formulated in the context of the NESSUS probabilistic structural analysis code, developed under the leadership of NASA Glenn Research Center. The NESSUS code has been successfully applied to the reliability estimation of a variety of structural engineering systems. This study examines whether the features of NESSUS could be used to investigate the reliability of systems in other disciplines such as heat transfer, fluid mechanics, electrical circuits etc., without considerable programming effort specific to each discipline. In this study, the mechanical equivalence between system behavior models in different disciplines are investigated to achieve this objective. A new methodology is presented for the analysis of heat transfer, fluid flow, and electrical circuit problems using the structural analysis routines within NESSUS, by utilizing the equivalence between the computational quantities in different disciplines. This technique is integrated with the fast probability integration and system reliability techniques within the NESSUS code, to successfully compute the system reliability of multidisciplinary systems. Traditional as well as progressive failure analysis methods for system reliability estimation are demonstrated, through a numerical example of a heat exchanger system involving failure modes in structural, heat transfer and fluid flow disciplines.

Mahadevan, Sankaran↗

Statistical Evaluation and Improvement of Methods for Combining Random and Harmonic Loads

Structures in many environments experience both random and harmonic excitation. A variety of closed-form techniques has been used in the aerospace industry to combine the loads resulting from the two sources. The resulting combined loads are then used to design for both yield/ultimate strength and high- cycle fatigue capability. This Technical Publication examines the cumulative distribution percentiles obtained using each method by integrating the joint probability density function of the sine and random components. A new Microsoft Excel spreadsheet macro that links with the software program Mathematica to calculate the combined value corresponding to any desired percentile is then presented along with a curve tit to this value. Another Excel macro that calculates the combination using Monte Carlo simulation is shown. Unlike the traditional techniques. these methods quantify the calculated load value with a consistent percentile. Using either of the presented methods can be extremely valuable in probabilistic design, which requires a statistical characterization of the loading. Additionally, since the CDF at high probability levels is very flat, the design value is extremely sensitive to the predetermined percentile; therefore, applying the new techniques can substantially lower the design loading without losing any of the identified structural reliability.

Brown, A. M.↗

Uncertainty Considerations for Ballistic Limit Equations

The overall risk for any spacecraft system is typically determined using a Probabilistic Risk Assessment (PRA). A PRA attempts to determine the overall risk associated with a particular mission by factoring in all known risks (and their corresponding uncertainties, if known) to the spacecraft during its mission. The threat to mission and human life posed by the mircro-meteoroid & orbital debris (MMOD) environment is one of the risks. NASA uses the BUMPER II program to provide point estimate predictions of MMOD risk for the Space Shuttle and the International Space Station. However, BUMPER II does not provide uncertainty bounds or confidence intervals for its predictions. With so many uncertainties believed to be present in the models used within BUMPER II, providing uncertainty bounds with BUMPER II results would appear to be essential to properly evaluating its predictions of MMOD risk. The uncertainties in BUMPER II come primarily from three areas: damage prediction/ballistic limit equations, environment models, and failure criteria definitions. In order to quantify the overall uncertainty bounds on MMOD risk predictions, the uncertainties in these three areas must be identified. In this paper, possible approaches through which uncertainty bounds can be developed for the various damage prediction and ballistic limit equations encoded within the shuttle and station versions of BUMPER II are presented and discussed. We begin the paper with a review of the current approaches used by NASA to perform a PRA for the Space Shuttle and the International Space Station, followed by a review of the results of a recent sensitivity analysis performed by NASA using the shuttle version of the BUMPER II code. Following a discussion of the various equations that are encoded in BUMPER II, we propose several possible approaches for establishing uncertainty bounds for the equations within BUMPER II. We conclude with an evaluation of these approaches and present a recommendation regarding which of them would be the most appropriate to follow.

Schonberg, W. P.↗

Use of Neutron Flux Calculated by Shift in a Grizzly Reactor Pressure Vessel Fracture Simulation

The reactor pressure vessel (RPV) plays the critical role of containing the reactor and coolant in a light water reactor nuclear power plant, and must be able to safely perform this function under a variety of normal and off-normal transient loading conditions. The RPV is subjected to harsh environmental conditions (elevated temperature and high neutron flux) whenever the plant is operating, which leads to embrittlement of the steel over time. RPVs contain populations of flaws introduced during the manufacturing process, and the primary safety concern is that during a transient event, a fracture could initiate at the site of one of these flaws and lead to rupture of the RPV. RPVs are very rugged structures, and the probability of this occurring is very low, but as the RPV's steel becomes embrittled over time, its resistance to fracture decreases and this becomes more likely. Assessing the likelihood of RPV fracture during a transient event involves performing a probabilistic fracture mechanics analysis, in which random sampling procedures are used to assess the probability of fracture of a population of flaws. Grizzly offers unique capabilities for modeling the RPV using 1D, 2D, or 3D representations, taking advantage of parallel computing for this type of analysis. One of the important inputs to Grizzly is the spatial distribution of the neutron fluence, which has a large impact on the material embrittlement, and should thus be characterized as accurately as possible. The VERA core simulator developed by the CASL program takes advantage of high performance computing resources to perform high-fidelity multiphysics simulations of reactor physics, including the effects of neutron transport, fuel performance, and thermal hydraulics. Recently a capability was developed to also evaluate neutron fluxes away from the reactor core through the Shift code. This allows for a detailed 3D map of the spatial variation of the fluence in components such as the RPV to be computed, which is ideal for use with Grizzly. This report documents a procedure developed to use the fluences computed in Shift in a Grizzly simulation, which allows for improved realisim in the prediction of the effects of environmental exposure on propensity for reactor pressure vessel fracture. This capability demonstrated on RPVs with multiple types of configurations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Generation and evaluation of synthetic patient data

Background: Machine learning (ML) has made a significant impact in medicine and cancer research; however, its impact in these areas has been undeniably slower and more limited than in other application domains. A major reason for this has been the lack of availability of patient data to the broader ML research community, in large part due to patient privacy protection concerns. High-quality, realistic, synthetic datasets can be leveraged to accelerate methodological developments in medicine. By and large, medical data is high dimensional and often categorical. These characteristics pose multiple modeling challenges. Methods: In this paper, we evaluate three classes of synthetic data generation approaches; probabilistic models, classification-based imputation models, and generative adversarial neural networks. Metrics for evaluating the quality of the generated synthetic datasets are presented and discussed. Results: While the results and discussions are broadly applicable to medical data, for demonstration purposes we generate synthetic datasets for cancer based on the publicly available cancer registry data from the Surveillance Epidemiology and End Results (SEER) program. Specifically, our cohort consists of breast, respiratory, and non-solid cancer cases diagnosed between 2010 and 2015, which includes over 360,000 individual cases. Conclusions: We discuss the trade-offs of the different methods and metrics, providing guidance on considerations for the generation and usage of medical synthetic data.

59 BASIC BIOLOGICAL SCIENCES↗