Search NASA⌕ Search

SEARCH · Search NASA

Results for “reasoning about programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

SU-E-T-479: IMRT Plan Recalculation in Patient Based On Dynalog Data and the Effect of a Single Failing MLC Motor

Purpose: Using Linac dynamic logs (Dynalogs) we evaluate the impact of a single failing MLC motor on the deliverability of an IMRT plan by assessing the recalculated dose volume histograms (DVHs) taking the delivered MLC positions and beam hold-offs into consideration. Methods: This is a retrospective study based on a deteriorating MLC motor (leaf 36B) which was observed to be failing via Dynalog analysis. To investigate further, Eclipse-importable MLC files were generated from Dynalogs to recalculate the actual delivered dose and to assess the clinical impact through DVHs. All deliveries were performed on a Varian 21EX linear accelerator equipped with Millennium-120 MLC. The analysis of Dynalog files and subsequent conversion to Eclipse-importable MLC files were all performed by in-house programming in Python. Effects on plan DVH are presented in the following section on a particular brain-IMRT plan which was delivered with a failing MLC motor which was then replaced. Results: Global max dose increased by 13.5%, max dose to the brainstem PRV increased by 8.2%, max dose to the optic chiasm increased by 7.6%, max dose to optic nerve increased by 8.8% and the mean dose to the PTV increased by 7.9% when comparing the original plan to the fraction with the failing MLC motor. The reason the dose increased was due to the failure being on the B-bank which is the lagging side on a sliding window delivery, therefore any failures on this side will cause an over-irradiation as the B-bank leaves struggles to keep the window from growing. Conclusion: Our findings suggest that a single failing MLC motor may jeopardize the entire delivery. This may be due to the bad MLC motor drawing too much current causing all MLCs on the same bank to underperform. This hypothesis will be investigated in a future study.

60 APPLIED LIFE SCIENCES↗

Conclusions from 3 years of continuous capture plant operation without exchange of the AMP/PZ-based solvent at Niederaussem – insights into solvent degradation management

A many times heard mantra of solvent degradation management in amine-based post combustion capture is “keep the solvent clean” to minimize solvent consumption. It is assumed that the amine losses would decrease by the removal of metals, degradation products, and reactive trace components which are captured from the flue gas, like NO 2 (as potentially driving components of the amine degradation besides dissolved O 2 ). However, this theoretical hypothesis – based on results from laboratory experiments typically generated with fresh amines – disregards the complexity of the solvent matrix, interaction of potential metal catalysts with degradation products and oxidizing agents, and specific chemical requirements which must be fulfilled before a degradation mechanism can proceed. Degradation of the solvent CESAR1 (aqueous solution of 3.0 molar 2-amino-2-methylpropan-1-ol (AMP) and 1.5 molar piperazine (PZ)) is investigated in a unique long-time test campaign (testing time up to now 40 months; 24/7 operation) without replacement of the solvent inventory at the capture pilot plant at the lignite-fired power plant in Niederaussem. Three solvent management strategies with different effect mechanisms are investigated and evaluated: (a) removal of only anionic compounds and trace elements (within 75 days solvent inventory treated two times) and anionic as well as cationic compounds and trace elements (114 days, inventory treated four times) from the solvent by ion exchange, (b) adsorptive removal of trace elements from the solvent by active carbon in 35% of the operating time, and (c) removal of >80% NO 2 by flue gas pretreatment with thiosulfate/sulfite solution (dosing for 2,000 h). The results of the testing program clearly show that “solvent cleanliness” is not a well-defined parameter and that results from laboratory tests, tests without fully representative industrial flue gasses, and short-term testing of monoethanolamine cannot be generalized for other solvents and industrial application. Furthermore, these results showcase that specific degradation management considering solvent, capture plant and flue gas quality is reasonable. Overshooting efforts for solvent management are contra-productive and produce unnecessary waste streams, efficiency losses and costs.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Micro-Bubble Experiments at the Van de Graaff Accelerator

In order to test and verify the experimental designs at the linear accelerator (LINAC), several micro-scale bubble ("micro-bubble") experiments were conducted with the 3-MeV Van de Graaff (VDG) electron accelerator. The experimental setups included a square quartz tube, sodium bisulfate solution with different concentrations, cooling coils, gas chromatography (GC) system, raster magnets, and two high-resolution cameras that were controlled by a LabVIEW program. Different beam currents were applied in the VDG irradiation. Bubble generation (radiolysis), thermal expansion, thermal convection, and radiation damage were observed in the experiments. Photographs, videos, and gas formation (O 2 + H 2 ) data were collected. The micro-bubble experiments at VDG indicate that the design of the full-scale bubble experiments at the LINAC is reasonable.

43 PARTICLE ACCELERATORS↗

Virgo Redux: The Masses and Stellar Content of Nuclei in Early-type Galaxies from Multiband Photometry and Spectroscopy

We present an analysis of 39 nuclei and their early-type hosts in the Virgo Cluster using 10 broadband filters: F300W, F475W, F850LP, F160W, u{sup ∗}griz, and K {sub s}. We describe the Virgo Redux program, which provides high-resolution UV and NIR imaging. Combining this data with optical and NIR imaging from the ACS Virgo Cluster Survey and the Next Generation Virgo Cluster Survey, we estimate masses, metallicities, and ages using simple stellar population (SSP) models. For 19 nuclei, we compare to SSP parameters derived from Keck and Gemini spectra and find reasonable agreement between the photometric and spectroscopic metallicity: the rms scatter is 0.3 dex. We reproduce the nucleus–galaxy mass fraction of 0.33{sub −0.07}{sup +0.09}% for galaxy stellar masses 10{sup 8.4}--10{sup 10.3} M{sub ⊙} with a typical precision of ∼35% for the nuclei masses. Based on available model predictions, there is no single preferred formation scenario for nuclei, suggesting that nuclei are formed stochastically through a mix of processes. Nuclei metallicities are statistically identical to those of their hosts, appearing 0.07 ± 0.3 dex more metal-rich on average; however, omitting galaxies with unusual origins, nuclei are 0.20 ± 0.28 dex more metal-rich. Nuclei appear to be 0.56 ± 0.12 dex more metal-rich than ultracompact dwarf galaxies (UCDs) at fixed mass. We find no clear age difference between nuclei and their galaxies, with nuclei displaying a broad range of ages. Interestingly, we find that the most massive nuclei may be flatter and more closely aligned with the semimajor axes of their hosts, suggesting that they formed through predominantly dissipative processes.

79 ASTRONOMY AND ASTROPHYSICS↗

High Performance Computing Based Parallel HIearchical Modal Association Clustering (HPAR HMAC)

For many applications, clustering is a crucial step in order to gain insight into the makeup of a dataset. The best approach to a given problem often depends on a variety of factors, such as the size of the dataset, time restrictions, and soft clustering requirements. The HMAC algorithm seeks to combine the strengths of 2 particular clustering approaches: model-based and linkage-based clustering. One particular weakness of HMAC is its computational complexity. HMAC is not practical for mega-scale data clustering. For high-definition imagery, a user would have to wait months or years for a result; for a 16-megapixel image, the estimated runtime skyrockets to over a decade! To improve the execution time of HMAC, it is reasonable to consider an multi-core implementation that utilizes available system resources. An existing imple-mentation (Ray and Cheng 2014) divides the dataset into N partitions - one for each thread prior to executing the HMAC algorithm. This implementation benefits from 2 types of optimization: parallelization and divide-and-conquer. By running each partition in parallel, the program is able to accelerate computation by utilizing more system resources. Although the parallel implementation provides considerable improvement over the serial HMAC, it still suffers from poor computational complexity, O(N2). Once the maximum number of cores on a system is exhausted, the program exhibits slower behavior. We now consider a modification to HMAC that involves a recursive partitioning scheme. Our modification aims to exploit divide-and-conquer benefits seen by the parallel HMAC implementation. At each level in the recursion tree, partitions are divided into 2 sub-partitions until a threshold size is reached. When the partition can no longer be divided without falling below threshold size, the base HMAC algorithm is applied. This results in a significant speedup over the parallel HMAC.

Patlolla, Dilip R↗

Analysis of Tank 38H (HTF-38-18-43, -44) and Tank 43H (HTF-43-18-41, -42) Samples for Support of the Enrichment Control and Corrosion Control Programs

SRNL analyzed samples from Tank 38H and Tank 43H to support ECP and CCP. The total uranium in the Tank 38H surface sample was 38.8 mg/L while the sub-surface sample was 35.7 mg/L. The Tank 43H samples contained total uranium concentrations of 27.5 mg/L in the surface sample and 23.4 mg/L in the sub-surface sample. The U-235 weight fraction ranged from 0.62% to 0.63% for the Tank 38H samples and Tank 43H samples. The total uranium concentrations in the table are reasonably consistent with recent Tank 38H/43H sample uranium measurements. The plutonium results in the table are consistent with the range of concentrations measured in recent samples from these tanks with the exception of the Pu-238 value measured in the Tank 43H sub-surface sample. The Pu-238 in the Tank 43H sub-surface sample is higher than any recent measurement by a factor of two. The Cs-137 results show slightly lower concentrations in the surface samples versus the sub-surface samples from each tank. The non-radioactive components of the samples show some differences between the surface and sub-surface samples for each tank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Tank 38H (HTF-38-18-43,-44) and Tank 43H (HTF-43-18-41, -42) Samples for Support of the Enrichment Control and Corrosion Control Programs

SRNL analyzed samples from Tank 38H and Tank 43H to support ECP and CCP. The total uranium in the Tank 38H surface sample was 38.8 mg/L while the sub-surface sample was 35.7 mg/L. The Tank 43H samples contained total uranium concentrations of 27.5 mg/L in the surface sample and 23.4 mg/L in the sub-surface sample. The U-235 weight fraction ranged from 0.62% to 0.63% for the Tank 38H samples and Tank 43H samples. The total uranium concentrations in the table are reasonably consistent with recent Tank 38H/43H sample uranium measurements. The plutonium results in t he table are consistent with the range of concentrations measured in recent samples from these tanks with the exception of the Pu-238 value measured in the Tank 43H sub-surface sample. The Pu-238 in the Tank 43H sub-surface sample is higher than any recent measurement by a factor of two. The Cs-137 reslts show slightly lower concentrations in the surface samples versus the sub-surface samples from each tank. The non-radioactive components of the samples show some differences between the surface and sub-surface samples for each tank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Heuristic solutions to the single depot electric vehicle scheduling problem with next day operability constraints

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. Further, a case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Fixed-node diffusion Monte Carlo potential energy curve of the fluorine molecule F{sub 2} using selected configuration interaction trial wavefunctions

The potential energy curve of the F{sub 2} molecule is calculated with Fixed-Node Diffusion Monte Carlo (FN-DMC) using Configuration Interaction (CI)-type trial wavefunctions. To keep the number of determinants reasonable and thus make FN-DMC calculations feasible in practice, the CI expansion is restricted to those determinants that contribute the most to the total energy. The selection of the determinants is made using the CIPSI approach (Configuration Interaction using a Perturbative Selection made Iteratively). The trial wavefunction used in FN-DMC is directly issued from the deterministic CI program; no Jastrow factor is used and no preliminary multi-parameter stochastic optimization of the trial wavefunction is performed. The nodes of CIPSI wavefunctions are found to reduce significantly the fixed-node error and to be systematically improved upon increasing the number of selected determinants. To reduce the non-parallelism error of the potential energy curve, a scheme based on the use of a R-dependent number of determinants is introduced. Using Dunning’s cc-pVDZ basis set, the FN-DMC energy curve of F{sub 2} is found to be of a quality similar to that obtained with full configuration interaction/cc-pVQZ.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Retrospective Analysis of Backwater Habitat Availability Using Remote Sensing

Low-velocity channel-margin habitats serve as important nursery habitats for the endangered Colorado pikeminnow (Ptychocheilus lucius) in the middle Green River between Jensen and Ouray, Utah. These habitats, known as backwaters, are associated with emergent sandbars, and are shaped and reformed annually by peak flows. Our recent knowledge about backwater characteristics and dynamics that is summarized in the synthesis report (Grippo et al. 2015) was based on detailed annual survey data from a relatively small sample of backwaters that were collected from 2003 to 2014 and reach-wide evaluations of backwater surface area based on manual interpretation of aerial and satellite imagery. Methods that bridge the gap between the detailed surveys from a small number of backwaters and the reach-wide assessment of their surface area would enable an assessment of the availability of backwater habitats that meet the minimum depth requirements for suitable habitat for Colorado pikeminnow. In 2015 Argonne National Laboratory (Argonne) tested three regression models—linear, multiple, and partial least square (PLS) regression models—for estimating backwater depth using National Agriculture Imagery Program (NAIP) imagery collected in July 2006 that covered the Jensen-Ouray reach of the Green River (Hamada and LaGory 2016). The results suggested that a PLS regression model showed high correlation with the reference depth (R 2 = 0.69) and had the most unbiased and consistent estimate of backwater depth. The results also indicated that the PLS model would provide reasonable estimates of the amount of habitat providing a minimum suitable depth of 30 cm for young-of-the-year Colorado pikeminnow, even though absolute depth estimates may be uncertain for backwater areas deeper than approximately 40 cm. The study also provided insights regarding the amount and the selection of calibration and validation (cal-val) data needed for improving the accuracy of depth prediction.

54 ENVIRONMENTAL SCIENCES↗

Rolex: Resilience-oriented language extensions for extreme-scale systems

Future exascale high-performance computing (HPC) systems will be constructed from VLSI devices that will be less reliable than those used today, and faults will become the norm, not the exception. This will pose significant problems for system designers and programmers, who for half-a-century have enjoyed an execution model that assumed correct behavior by the underlying computing system. The mean time to failure (MTTF) of the system scales inversely to the number of components in the system and therefore faults and resultant system level failures will increase, as systems scale in terms of the number of processor cores and memory modules used. However every error detected need not cause catastrophic failure. Many HPC applications are inherently fault resilient. Yet it is the application programmers who have this knowledge but lack mechanisms to convey it to the system. In this paper, we present new Resilience Oriented Language Extensions (Rolex) which facilitate the incorporation of fault resilience as an intrinsic property of the application code. We describe the syntax and semantics of the language extensions as well as the implementation of the supporting compiler infrastructure and runtime system. Furthermore, our experiments show that an approach that leverages the programmer's insight to reason about the context and significance of faults to the application outcome significantly improves the probability that an application runs to a successful conclusion.

97 MATHEMATICS AND COMPUTING↗

Re-evaluation of ortho-para- dependence of self pressure-broadening in the ν 1 + ν 3 band of acetylene

Optical frequency comb-referenced measurements of self pressure-broadened line profiles of the R(8) to R(13) lines in the ν 1 + ν 3 combination band of acetylene near 1.52 µ m are reported. The analysis of the data found no evidence for a previously reported systematic alternation in self pressure-broadened line widths with the nuclear spin state of the molecule. This work brought out the need for the use of an accurate line profile model and careful accounting for weak background absorptions due to hot band and lower abundance isotopomer lines. The data were adequately fit using the quadratic speed-dependent Voigt profile model, neglecting the small speed-dependent shift. Parameters describing the most probable and speed-dependent pressure-broadening, most probable shift, and the line strength were determined for each line. Detailed modeling of the results of Iwakuni et al. showed that their neglect of collisional narrowing due to the speed-dependent broadening term combined with the strongly absorbing data recorded and analyzed in transmission mode were the reasons for their results.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Fiscal Year 2023 Software Quality Assurance Activities for the ARC Software

The Argonne Reactor Code (ARC) software suite [1-17] has been developed by Argonne researchers for fast reactor design and analysis since the 1970s. With the ARC software suite, a user can quickly build a model of a proposed or existing fast spectrum reactor and carry out fuel cycle, nominal thermal analysis and flow requirements, and assess, as is appropriate, whether the core design and constraint system yield an acceptable mechanical behavior. For transient reactor analysis with SAS4A [18], the ARC software suite can be used to generate reactivity coefficients and kinetics parameters at any modeled fuel cycle time point which forms part of the input to SAS4A. The ARC suite was consistently being developed until the 1990s and followed a software QA program which was an appropriate standard for the time. In the 1990s, the DOE funding to fast reactor research and development was all but eliminated and the ARC software was put into maintenance mode. In the early 2000s, the software quality assurance (SQA) program for ARC was still in place to define an official version, but by 2005 it all but was abandoned as there were insufficient staff to fill the work roles. Since 2005, there has been a considerable increase in research and design work on fast spectrum reactors. The ARC software as a whole has since been exported to many universities and commercial companies and ANL support has been given to the various projects over the years [19-23]. Further, MC 2 -3, PERSENT, and DASSH were all developed after 2005 without any adherence to a software standard. In recent time, the DOE VTR project [22] paid for verification work to be done on the ARC software as part of the goal of making it NQA-1 complaint. The VTR project was not considered the appropriate pathway to fund and maintain a SQA program for the ARC software and while software developments (DASSH) were made and several manuals were updated and software verification work was carried out, the ARC software is not NQA-1 compliant. More recently the Advanced Reactor Development Program (ARDP [23]) has funded the creation of manuals for some ARC utility programs and funded additional software verification work on DIF3D [6, 7] and MC 2 -3 [2-5] for the purpose of commercial grade dedication. Because of the VTR and ARDP projects, software verification work was completed on MC 2 -3 and DIF3D, and detailed reports were created for each piece of software, which discuss the inputs and outputs from the codes that are covered by the verification work and link various analytic, code-to-code, and hand calculation based verification work presented in the report with verification test problems provided with the software. This is a key part of the commercial grade dedication work and constitutes the bulk of the cost to get the ARC software to commercial grade. The ARC software suite is a valuable asset as a fast reactor design and analysis tool set that has been reasonably well verified and validated with various fast reactor benchmark problems and experiments over decades. Some or all of the ARC software suite has been utilized for designing the IFR [20], PGSFR [21], VTR [22], and Natrium [23] reactors and we can expect it to continue to be used for advanced fast reactor design and/or confirmatory calculation purposes in the future. Due to increased interest by commercial companies and regulatory bodies, it is becoming more important to make the ARC software suite complete and ready-to-use in terms of its SQA pedigree and commercial grade dedication needs. This report discusses the achievements made towards building a new SQA program for the ARC software and dealing with outstanding identified QA gaps.

97 MATHEMATICS AND COMPUTING↗

Scalable Replay with Partial-Order Dependencies for Message-Logging Fault Tolerance

Deterministic replay of a parallel application is commonly used for discovering bugs or to recover from a hard fault with message-logging fault tolerance. For message passing programs, a major source of overhead during forward execution is recording the order in which messages are sent and received. During replay, this ordering must be used to deterministically reproduce the execution. Previous work in replay algorithms often makes minimal assumptions about the programming model and application in order to maintain generality. However, in many cases, only a partial order must be recorded due to determinism intrinsic in the code, ordering constraints imposed by the execution model, and events that are commutative (their relative execution order during replay does not need to be reproduced exactly). In this paper, we present a novel algebraic framework for reasoning about the minimum dependencies required to represent the partial order for different concurrent orderings and interleavings. By exploiting this theory, we improve on an existing scalable message-logging fault tolerance scheme. The improved scheme scales to 131,072 cores on an IBM BlueGene/P with up to 2x lower overhead than one that records a total order.

fault tolerance↗

Geochemical Data Package for Performance Assessment Calculations Related to the Savannah River Site

The Savannah River Site (SRS) disposes of low-level radioactive waste (LLW) and stabilizes high-level radioactive waste (HLW) tanks in the subsurface environment. Calculations used to establish the radiological limits of these facilities are referred to as Performance Assessments (PA), Special Analyses (SA), and Composite Analyses (CA). The objective of this document is to revise existing geochemical input values used for these calculations. This work builds on earlier compilations of geochemical data (2007, 2010), referred to a geochemical data packages. This work is being conducted as part of the on-going maintenance program of the SRS PA programs that periodically updates calculations and data packages when new information becomes available. Because application of values without full understanding of their original purpose may lead to misuse, this document also provides the geochemical conceptual model, the approach used for selecting the values, the justification for selecting data, and the assumptions made to assure that the conceptual and numerical geochemical models are reasonably conservative (i.e., bias the recommended input values to reflect conditions that will tend to predict the maximum risk to the hypothetical recipient). This document provides 1088 input parameters for geochemical parameters describing transport processes for 64 elements (>740 radioisotopes) potentially occurring within eight subsurface disposal or tank closure areas: Slit Trenches (ST), Engineered Trenches (ET), Low Activity Waste Vault (LAWV), Intermediate Level (ILV) Vaults, Naval Reactor Component Disposal Areas (NRCDA), Components-in-Grout (CIG) Trenches, Saltstone Facility, and Closed Liquid Waste Tanks. The geochemical parameters described here are the distribution coefficient, Kd value, apparent solubility concentration, k s value, and the cementitious leachate impact factor.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility of Using Fourier Neural Operators for 3D Elastic Seismic Simulations

Seismic simulations in three-dimensional (3D) Earth models are important in many of the seismological applications related to our lab’s mission, however, accurate high-fidelity simulations are computationally costly. We investigated the capabilities of the newly developed Fourier Neural Operator (FNO) to solve the 3D elastic wave equations for seismic simulations. We generated simulation data for training the FNO model, and analyzed its performance on various test cases, such as the performance with different number of training data, different resolutions, and on more canonical structures. We found the FNO model can reproduce 3D seismic simulations with high accuracy and ~169 times faster on a small spatial grid size of 16 x 16 x16. When applied on higher resolution data, we found that transfer learning with fine-tuning on a small amount of data achieves reasonable results. This feasibility study showed promising results for using FNO’s for 3D seismic simulations and represents the foundation of further research to develop this into a more mature approach for different seismological applications. The potential impact of this project will provide techniques for large-scale or real-time applications of solving PEDs in support of national lab’s programs.

58 GEOSCIENCES↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders - Chicago, IL and Devens, MA

TO4 Task 3.1 - K Hovnanian Chicago, IL DOE Challenge Home Program Certified Home Constructed and Verified Specifications DOE Challenge Home Building envelope Ceiling R-49 blown fiberglass, Grade I Walls 2x4 framing @ 16 o.c. with R-13 fiberglass batts, Grade I and 1"" R-5 extruded polystyrene (XPS) insulating sheathing Frame Floors R-38 blown fiberglass, Grade I Basement Walls R-19 fiberglass batts draped full height, Grade I Basement Slab uninsulated Windows Above Grade: ENERGY STAR certified, U=0.29, SHGC=0.28 Basement: Non ENERGY STAR certified, U=0.29, SHGC=0.24 Infiltration 2 ACH 50 Mechanical systems Heat 95% AFUE sealed combustion natural gas furnace in conditioned space Goodman GMH950703BXAF Cooling 13 SEER split system Goodman GSX130301BC DHW AO Smith Vertex 100 0.96 EF natural gas tank water heater in 2nd floor utility closet Hot Water Distribution Redesigned trunk and branch Compliant with EPA WaterSense Efficient Distribution Requirements Ducts Located 100% in conditioned space via floor joists leak free to outside (5% or less) Ventilation Central Fan Integrated Supply (CFIS) ventilation with 6"" insulated outside air duct Fan Controller: Air Cycler FRV, with 6"" motorized damper 50 CFM outside air flow, 33% duty cycle (10 minutes on, 20 minutes off); ASHRAE 62.2-2010 compliance via an exhaust fan - Panasonic FV-08VQ5 WhisperCeiling Rerturn Pathways Active Return at Master Bedroom Transfer Grilles in Secondary Bedrooms Appliances, Lighting, MELs Lights 80% ENERGY STAR certified CFL Appliances ENERGY STAR certified refrigerator, dishwasher, and clothes washer; Natural gas range/oven and clothes dryer" STRUCTURE - Test House Lot 145 - 2013 DOE Challenge Test House Task 3.1 Bolingbrook, IL 60490 House is constructed and is DOE Challenge Verified by Don Nelson, a local rater. The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. To that end, Building Science Corporation (BSC) consulted on the construction of five test houses by three cold climate production builders in three separate U.S. cities. (1) K. Hovnanian Homes, Chicago, Illinois (2) David Weekley Homes, Denver, Colorado (3) Transformations, Inc., Devens, Massachusetts. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations about the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: (1) Adding services to the scope of work for various trades, such as HERS Rater and heating, ventilation, and air conditioning contractor. (2) Increased material costs related to the checklists, especially the U.S. Environmental Protection Agency Indoor airPLUS and WaterSense Efficient Hot Water Distribution requirement. Ceiling - 18" cellulose Walls - 12" open cell spray foam in double stud walls Foundation - R-10 under slab, 3 1/2" closed-cell spray foam at walls Windows - Harvey U=0.20, SHGC=0.22 Infiltration - 1.0 sq in per 100 sq ft Heating - Mini split heat pump, 10.6 HSPF, 23 SEER Cooling - Mini split heat pump, 10.6 HSPF, 23 SEER DHW - 0.97 EF instantaneous propane water heater Ventilation - bathroom exhaust fans as basic option, HRV upgrade option Adams Circle Devens MA 01434 Cavite Street Devens, MA 01434

Array↗