Concepts in distributed planning, scheduling, and control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling, and control must allow for: (1) interactive real-time remote operations; (2) responsive scheduling and rescheduling; (3) support of the full range of distributed science, application and commercial users; (4) interaction and cooperation among distributed users; and (5) efficient use of often onboard, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe approaches to distributed planning, scheduling and control functions that are based on resources and on a distributed knowledge hierarchy. We describe the scheduling functions as the component of the integrated space-ground Operations Management System. We include the integration of the planning and scheduling functions with the real-time operations control system, and we discuss automated scheduling assistants. These suggested approaches, taken from the users' point-of-view, have resulted in two prototype systems: Operations and Science Instrument Support package and Science User Resource Planning and Scheduling System.

Hansen, Elaine↗

Microreactor System Design for a NASA In Situ Propellant Production Plant on Mars

The NASA In Situ Resource Utilization (ISRU) program is planning near-term missions to Mars that will include chemical processes for converting the carbon dioxide (CO2) and possibly water from the Martian environment to propellants, oxygen, and other useful chemicals. The use of indigenous resources reduces the size and weight of the payloads from Earth significantly, representing enormous cost savings that make human exploration of Mars affordable. Extraterrestrial chemical processing plants will need to be compact, lightweight, highly efficient under reduced gravity, and extraordinarily reliable for long periods. Microchemical and thermal systems represent capability for dramatic reduction in size and weight, while offering high reliability through massive parallelization. In situ propellant production (ISPP), one aspect of the ISRU program, involves collecting and pressurizing atmospheric CO2, conversion reactions, chemical separations, heat exchangers, and cryogenic storage. A preliminary system design of an ISPP plant based on microtechnology has demonstrated significant size, weight, and energy efficiency gains over the current NASA baseline. Energy management is a strong driver for Mars-based processes, not only because energy is a scarce resource, but because heat rejection is problematic; the low pressure environment makes convective heat transfer ineffective. Energy efficiency gains are largely achieved in the microchemical plant through extensive heat recuperation and energy cascading, which has a small size and weight penalty because the added micro heat exchangers are small. This leads to additional size and weight gains by reducing the required area of waste heat radiators. The microtechnology-based ISPP plant is described in detail, including aspects of pinch analysis for optimizing the heat exchanger network. Three options for thermochemical compression Of CO2 from the Martian atmosphere, adsorption, absorption, and cryogenic freezing, are presented, as well as three options for water decomposition, low temperature electrolysis, high temperature electrolysis, and thermochemical decomposition. Other elements of the plant include Sabatier and reverse water gas shift reactors, water recovery, chemical separations, and cryogenic storage. Data are presented supporting preliminary sizing of components, and results of the system design are compared to the existing NASA baseline that is based on conventional technologies.

TeGrotenhuis, W. E.↗

Mission Activity Planning for Humans and Robots on the Moon

A series of studies is conducted to develop a systematic approach to optimizing, both in terms of the distribution and scheduling of tasks, scenarios in which astronauts and robots accomplish a group of activities on the Moon, given an objective function (OF) and specific resources and constraints. An automated planning tool is developed as a key element of this optimization system.

task allocation↗

Charles River Watershed Water Resources: Assessing Flooding Vulnerability to Assist High Water Intervention and Urban Planning Programs in the Charles River Watershed

The Charles River watershed intersects 35 municipalities within the Boston Metropolitan Area and has a population of 1.2 million, making it one of the most densely populated watersheds in New England. In recent years, the watershed has observed higher rates of flood inundation, mainly due to increased development, extreme precipitation events, and increased surface runoff. As the frequency of flood events increases and a changing climate poses an ongoing threat to local communities, governments, and organizations in Massachusetts need accurate flood risk assessments. This project partnered with the Charles River Watershed Association, the Town of Natick’s Office of Sustainability, and the Massachusetts Audubon Society to assess the potential for watershed degradation, flood vulnerability, and flood susceptibility in the watershed. The team used Landsat 5 Thematic Mapper (TM), Landsat 8 Operational Land Imager (OLI), Sentinel-1 C-Band Synthetic Aperture Radar (C-SAR), and Sentinel-2 MultiSpectral Instrument (MSI) to assess the feasibility of identifying flood events using remote sensing. After identifying images that overlapped with the reported flood events, the team concluded that it was not feasible to use Earth observation data to detect localized flooding. Instead, the Federal Emergency Management Agency (FEMA) 100-year floodplain was used as a proxy for areas where flooding may occur. The team used statistical analysis and supervised classification to develop a flood susceptibility map, incorporating factors like soil drainage, height above nearest drainage, and topographic wetness index. This was overlaid with demographic and socioeconomic data to create a flood vulnerability map. The flood susceptibility map captured over 2/3 of reported flood events in the watershed, an improvement over the 1/3 of events captured by the FEMA 100-year and 500-year floodplain maps.

DEVELOP Project Summary↗

Real-Time Projection to Verify Plan Success During Execution

The Mission Data System provides a framework for modeling complex systems in terms of system behaviors and goals that express intent. Complex activity plans can be represented as goal networks that express the coordination of goals on different state variables of the system. Real-time projection extends the ability of this system to verify plan achievability (all goals can be satisfied over the entire plan) into the execution domain so that the system is able to continuously re-verify a plan as it is executed, and as the states of the system change in response to goals and the environment. Previous versions were able to detect and respond to goal violations when they actually occur during execution. This new capability enables the prediction of future goal failures; specifically, goals that were previously found to be achievable but are no longer achievable due to unanticipated faults or environmental conditions. Early detection of such situations enables operators or an autonomous fault response capability to deal with the problem at a point that maximizes the available options. For example, this system has been applied to the problem of managing battery energy on a lunar rover as it is used to explore the Moon. Astronauts drive the rover to waypoints and conduct science observations according to a plan that is scheduled and verified to be achievable with the energy resources available. As the astronauts execute this plan, the system uses this new capability to continuously re-verify the plan as energy is consumed to ensure that the battery will never be depleted below safe levels across the entire plan.

Wagner, David A.↗

Flight Test Hazard Planning Near the Speed of Light

A viewgraph presentation describing flight test safety near the speed of light is shown. The topics include: 1) Concept; 2) Portal Content; 3) Activity to Date; 4) FTS Database Updatd FAA Program; 5) FAA Flight Test Risk Management; 6) CFR 14 Part 21.35 Current and proposed changes; 7) An Online Resource for Flight Test Safety Planning; 8) Data Gathering; 9) NTPS Role; 10) Example Maturation; 11) Many Varied Inputs; 12) Matured Stall Hazards; 13) Loss of Control Mitigations; 14) FAA Access; 15) NASA PBMA Website Link; 16) FAR Reference Search; 17) Record Field Search; 18) Keyword Search; and 19) Results of FAR Reference Search.

Henwood, Bart↗

Exploring Aristarchus Plateau as a Potential Lunar Base Site

As part the exploration strategy, NASA has been studying the feasibility of a low cost human return to the Moon. The currently planned mission has a dual focus on the advancement of lunar science and the use of in situ resources. Thus far, our space exploration plans have relied almost exclusively on equipment and supplies transported from Earth. This may be appropriate for operations in Earth orbit, or for short duration stays on the lunar surface. However, the ability to "live off the land," will prove vital for long term habitation of the Moon and planets. This study takes a close look at the Aristarchus Plateau, one of the primary candidate sites for human lunar exploration. Based on this synthesis study, we recommend two sites on the Aristarchus Plateau that will maximize science return and provide a convincing demonstration of the use of in situ resources and which may be a viable future lunar base site.

Coombs, Cassandra R.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Automated Data Assimilation and Flight Planning for Multi-Platform Observation Missions

This is a progress report on an effort in which our goal is to demonstrate the effectiveness of automated data mining and planning for the daily management of Earth Science missions. Currently, data mining and machine learning technologies are being used by scientists at research labs for validating Earth science models. However, few if any of these advanced techniques are currently being integrated into daily mission operations. Consequently, there are significant gaps in the knowledge that can be derived from the models and data that are used each day for guiding mission activities. The result can be sub-optimal observation plans, lack of useful data, and wasteful use of resources. Recent advances in data mining, machine learning, and planning make it feasible to migrate these technologies into the daily mission planning cycle. We describe the design of a closed loop system for data acquisition, processing, and flight planning that integrates the results of machine learning into the flight planning process.

Oza, Nikunj↗

Remote sensing for rural development planning in Africa

Multilevel remote-sensing techniques were combined to provide land resource and land-use information for rural development planning in Arusha Region, Tanzania. Enhanced Landsat imagery, supplemented by low-level aerial survey data, slope angle data from topographic sheets, and existing reports on vegetation and soil conditions, was used jointly by image analysts and district-level land-management officials to divide the region's six districts into land-planning units. District-planning officials selected a number of these land-planning units for priority planning and development activities. For the priority areas, natural color aerial photographs provided detailed information for land-use planning discussions between district officials and villagers. Consideration of the efficiency of this remote sensing approach leads to general recommendations for similar applications. The technology and timing of data collection and interpretation activities should allow maximum participation by intended users of the information.

Dunford, C.↗

A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

Numerous automated and semi-automated planning & scheduling systems have been developed for space applications. Most of these systems are model-based in that they encode domain knowledge necessary to predict spacecraft state and resources based on initial conditions and a proposed activity plan. The spacecraft state and resources as often modeled as a series of timelines, with a timeline or set of timelines to represent a state or resource key in the operations of the spacecraft. In this paper, we first describe a basic timeline representation that can represent a set of state, resource, timing, and transition constraints. We describe a number of planning and scheduling systems designed for space applications (and in many cases deployed for use of ongoing missions) and describe how they do and do not map onto this timeline model.

Chien, Steve A.↗

Kennedy Space Center Florida Scrub-Jay Compensation Plan

Many organizations have interest in using NASA property on KSC. The purpose of this document is to consolidate the goals of ecosystem management associated with Florida Scrub-Jays and compliance with the Endangered Species Act (ESA) in order to streamline and reduce the costs of facility planning, impact assessment, and impact minimization. This will simplify the process and reduce regulatory uncertainty.However, the resulting process must be consistent with the Merritt Island National Wildlife Refuge (MINWR) Comprehensive Conservation Plan (CCP). In addition, this document considers anticipated construction impacts on KSC during the next 10 years and summarizes priorities in a spatially explicit manner. The document describes anticipated compensation requirements to facilitate restoration of degraded habitat in areas most important to the KSC Scrub-Jay population through resources provided to MINWR. The plan assumes that all construction on KSC is compensated on KSC.

Compensation Plan↗

Mission activities planning for a Hermes mission by means of AI-technology

Mission Activities Planning is a complex task to be performed by mission control centers. AI technology can offer attractive solutions to the planning problem. This paper presents the use of a new AI-based Mission Planning System for crew activity planning. Based on a HERMES servicing mission to the COLUMBUS Man Tended Free Flyer (MTFF) with complex time and resource constraints, approximately 2000 activities with 50 different resources have been generated, processed, and planned with parametric variation of operationally sensitive parameters. The architecture, as well as the performance of the mission planning system, is discussed. An outlook to future planning scenarios, the requirements, and how a system like MARS can fulfill those requirements is given.

Pape, U.↗

Ground data systems resource allocation process

The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.

Berner, Carol A.↗

A dynamic case-based planning system for space station application

We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).

Oppacher, F.↗