Status and performance of the GlueX DIRC
In support of the future physics program at Ce+BAF, we propose a prototype positron target. The prototype target consists of a tungsten disk mounted on a water-cooled copper support structure to enhance heat removal. The primary goals of this work are to benchmark CFD simulations, ensure vacuum integrity at the 10^-6 Pa level, achieve stable target rotation up to 10 Hz, and implement efficient water-based cooling for sustained high-power operation. To manage the thermal load, the target is designed to rotate, allowing the deposited heat to spread over a larger region, and thereby reducing localized thermal stress while maintaining the maximum temperature below 1000 K. To experimentally evaluate the thermal performance and structural stability of the target, we plan to conduct high-power laser heating tests at Laser Lab 5, LERF Building, JLab. These tests will serve as a stepping-stone for the positron production target at CEBAF.