Search NASA⌕ Search

SEARCH · Search NASA

Results for “wind deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

A Supply Chain Road Map for Offshore Wind Energy in the United States

"A Supply Chain Road Map for Offshore Wind Energy in the United States" identifies pathways to developing a domestic offshore wind supply chain that can manufacture and deploy the major components needed to set the United States on a pathway to installing 30 GW of offshore wind by 2030 and 110 GW by 2050. The report estimates that this supply chain could require an investment of at least $\$$22.7 billion this decade to meet an annual demand for components, ports, and vessels in 2030. Although this is a considerable investment, it could allow the industry to install around $\$$100 billion worth of offshore wind this decade by reducing risk of delays due to global supply chain bottlenecks and creating a robust network of assets that will continue to be effective well beyond 2030. The United States would need at least 34 manufacturing facilities employing 10,000 workers, 39,000 jobs in the supporting supply chain, 10 marshaling ports, 4-6 dedicated wind turbine installation vessels, 4-6 dedicated heavy-lift vessels, and 4-8 U.S.-flagged specialized feeder barges to come online this decade to support an average annual deployment of 4-6 gigawatts offshore wind capacity per year. This supply chain could be developed in 6-9 years, but would require near-term decision making and efficient permitting and planning to strategically develop these resources by 2030. Additional investment and expansion would be required in the 2030s as the sector expands into new regions (such as the Gulf of Mexico) and new technologies (such as larger wind turbines and floating wind energy projects). Furthermore, the planning process needs to meaningfully engage with communities that will be impacted by supply chain expansion to achieve just outcomes and maximize benefits to these stakeholders, which will result in a more equitable and sustainable supply chain. While U.S. offshore wind has made significant progress in recent years, remaining supply chain challenges include uncertainty surrounding deployment and procurement timelines; a lack of port and vessel infrastructure; and limitations in the available workforce, supporting supplier networks, and energy justice best practices. However, many of these problems can be addressed through improved communication between key stakeholder groups, support from federal and state governments, and forward-thinking designs of supply chain assets to accommodate future technology changes for fixed-bottom and floating offshore wind. Although it is a significant task, developing these domestic capabilities represents a once-in-a-generation opportunity to contribute to a decarbonized energy future and also create massive economic benefits that are distributed throughout the country.

17 WIND ENERGY↗

Heliostat Consortium: Gap Analysis on Wind Load for Achieving a Fully Competitive Heliostat Industry

The Heliostat Consortium (HelioCon) Wind Load Subtask was initiated with the aim of bringing research work pertaining to wind load measurement, characterization, and prediction taking place across several tasks, including Advanced Manufacturing, Components and Controls, and Field Deployment. The cross-cutting wind load subtopic in the HelioCon roadmap report [1] highlighted standardized methods and tools that are needed for a more detailed understanding of the static and dynamic loads on a heliostat. This will enable cost reduction of wind-dependent heliostat components to avoid unnecessarily conservative, overly constrained designs and increase field efficiency/reliability, to reduce the risk of component failures due to high-wind events (>15 m/s). Gaps related to heliostat wind load include site characterization for wind measurements, critical load cases for heliostat design, turbulence impacts on heliostat tracking error, testing of heliostat array configurations, understanding spatial variation of maximum loads across the solar field, and heliostat field layout and operating strategies. The recommended highest-priority pathway as first steps taken by HelioCon to address these gaps are to develop site characterization guidelines for heliostat design and field load measurements.

Emes, Matthew (ORCID:0000000341474387)↗

Floating Offshore Wind in Oregon: Potential for Jobs and Economic Impacts from Two Future Scenarios

Construction of the first offshore wind power plant in the United States began in 2015, off the coast of Rhode Island, using fixed platform structures that are appropriate for shallow seafloors, like those located off of the East Coast and mid-Atlantic. However, floating platforms, which have yet to be deployed commercially, will likely need to anchor to the deeper seafloor if deployed off of the West Coast. To analyze the employment and economic potential for floating offshore wind along the West Coast, the Bureau of Ocean Energy Management (BOEM) commissioned the National Renewable Energy Laboratory (NREL) to analyze two hypothetical, large-scale deployment scenarios for Oregon: 5,500 megawatts (MW) of offshore wind deployment in Oregon by 2050 (Scenario A), and 2,900 MW of offshore wind by 2050 (Scenario B). These levels of deployment could power approximately 1,600,000 homes (Scenario A) or 870,000 homes (Scenario B). Offshore wind would contribute to economic development in Oregon in the near future, and more substantially in the long term, especially if equipment and labor are sourced from within the state. According to the analysis, over the 2020-2050 period, Oregon floating offshore wind facilities could support 65,000-97,000 job-years and add $6.8 billion-$9.9 billion to the state GDP (Scenario A).

17 WIND ENERGY↗

Achieving CO 2 reductions in Colombia: Effects of carbon taxes and abatement targets

In this paper we investigate CO 2 emission scenarios for Colombia and the effects of implementing carbon taxes and abatement targets on the energy system. By comparing baseline and policy scenario results from two integrated assessment partial equilibrium models TIAM-ECN and GCAM and two general equilibrium models Phoenix and MEG4C, we provide an indication of future developments and dynamics in the Colombian energy system. Currently, the carbon intensity of the energy system in Colombia is low compared to other countries in Latin America. However, this trend may change given the projected rapid growth of the economy and the potential increase in the use of carbon-based technologies. Climate policy in Colombia is under development and has yet to consider economic instruments such as taxes and abatement targets. This paper shows how taxes or abatement targets can achieve significant CO 2 reductions in Colombia. Though abatement may be achieved through different pathways, taxes and targets promote the entry of cleaner energy sources into the market and reduce final energy demand through energy efficiency improvements and other demand-side responses. The electric power sector plays an important role in achieving CO 2 emission reductions in Colombia, through the increase of hydropower, the introduction of wind technologies, and the deployment of biomass, coal and natural gas with CO 2 capture and storage (CCS). Uncertainty over the prevailing mitigation pathway reinforces the importance of climate policy to guide sectors toward low-carbon technologies. This paper also assesses the economy-wide implications of mitigation policies such as potential losses in GDP and consumption. As a result, an assessment of the legal, institutional, social and environmental barriers to economy-wide mitigation policies is critical yet beyond the scope of this paper.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of the Inertial Response of Variable-Speed Wind Turbines Using Advanced Simulation

In this paper, we focus on the temporary frequency support effect provided by wind turbine generators (WTGs) through the inertial response. With the implemented inertial control methods, the WTG is capable of increasing its active power output by releasing parts of the stored kinetic energy when the frequency excursion occurs. The active power can be boosted temporarily above the maximum power points, but the rotor speed deceleration follows and an active power output deficiency occurs during the restoration of rotor kinetic energy. We evaluate and compare the inertial response induced by two distinct inertial control methods using advanced simulation. In the first stage, the proposed inertial control methods are analyzed in offline simulation. Using an advanced wind turbine simulation program, FAST with TurbSim, the response of the researched wind turbine is comprehensively evaluated under turbulent wind conditions, and the impact on the turbine mechanical components are assessed. In the second stage, the inertial control is deployed on a real 600kW wind turbine - Controls Advanced Research Turbine, 3-bladed (CART3), which further verifies the inertial control through a hardware-in-the-loop (HIL) simulation. Various inertial control methods can be effectively evaluated based on the proposed two-stage simulation platform, which combines the offline simulation and real-time HIL simulation. The simulation results also provide insights in designing inertial control for WTGs.

17 WIND ENERGY↗

Community Wind: Once Again Pushing the Envelope of Project Finance

In the United States, the 'community wind' sector - loosely defined here as consisting of relatively small utility-scale wind power projects that sell power on the wholesale market and that are developed and owned primarily by local investors - has historically served as a 'test bed' or 'proving grounds' for up-and-coming wind turbine manufacturers that are trying to break into the U.S. wind power market. For example, community wind projects - and primarily those located in the state of Minnesota - have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008) and later Emergya Wind Technologies (2010), Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Thus far, one of these turbine manufacturers - Suzlon - has subsequently achieved some success in the broader U.S. wind market as well. Just as it has provided a proving grounds for new turbines, so too has the community wind sector served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the special allocation partnership flip structure (see Figure 1 in Section 2.1) - was first developed by community wind projects in Minnesota more than a decade ago (and is therefore sometimes referred to as the 'Minnesota flip' model) before being adopted by the broader wind market. More recently, a handful of community wind projects built over the past year have been financed via new and creative structures that push the envelope of wind project finance in the U.S. - in many cases, moving beyond the now-standard partnership flip structures involving strategic tax equity investors. These include: (1) a 4.5 MW project in Maine that combines low-cost government debt with local tax equity, (2) a 25.3 MW project in Minnesota using a sale/leaseback structure, (3) a 10.5 MW project in South Dakota financed by an intrastate offering of both debt and equity, (4) a 6 MW project in Washington state that taps into New Markets Tax Credits using an 'inverted' or 'pass-through' lease structure, and (5) a 9 MW project in Oregon that combines a variety of state and federal incentives and loans with unconventional equity from high-net-worth individuals. In most cases, these are first-of-their-kind structures that could serve as useful examples for other projects - both community and commercial wind alike. This report describes each of these innovative new financing structures in some detail, using a case-study approach. The purpose is twofold: (1) to disseminate useful information on these new financial structures, most of which are widely replicable; and (2) to highlight the recent policy changes - many of them temporary unless extended - that have facilitated this innovation. Although the community wind market is currently only a small sub-sector of the U.S. wind market - as defined here, less than 2% of the overall market at the end of 2009 (Wiser and Bolinger 2010) - its small size belies its relevance to the broader market. As such, the information provided in this report has relevance beyond its direct application to the community wind sector. The next two sections of this report briefly summarize how most community wind projects in the U.S. have been financed historically (i.e., prior to this latest wave of innovation) and describe the recent federal policy changes that have enabled a new wave of financial innovation to occur, respectively. Section 4 contains brief case studies of how each of the five projects mentioned above were financed, noting the financial significance of each. Finally, Section 5 concludes by distilling a number of general observations or pertinent lessons learned from the experiences of these five projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Evaluating the Interactions Between Variable Renewable Energy and Diurnal Storage

Cost declines and growing deployment of photovoltaic (PV), wind, and storage have led to increasing interest in the potential interactions of these three technologies as their role in the power system grows. In this work we enhance a national-scale capacity expansion model to evaluate how PV, wind, and storage interact in the evolution of the power system. Importantly, the modeling framework captures interactions in both investments and operations. Through this work we identify significant synergies between PV and storage. Scenarios with more PV always have more storage, and scenarios with more storage always have more PV. This synergy is due to the diurnal alignment of PV generation with 4-8 hour storage, and to the ability of PV to narrow system peaks to allow shorter-duration storage to serve as a peaking resource. Interactions between wind and storage are less pronounced, though we do observe that longer-duration storage resources appear to provide greater value for wind.

14 SOLAR ENERGY↗

Electric Vehicle Charging Management in Smart Energy Communities to Increase Renewable Energy Hosting Capacity

Abnormal climates due to global warming have emerged as a big concern in the global community. To mitigate climate change and achieve sustainability, distributed energy resources (DERs), including solar and wind, have been recently deployed in power systems. As the penetration level of DERs has increased, however, it caused a multitude of issues in the power systems, such as voltage fluctuation in the distribution network limiting renewable hosting capacity. On the other hand, the electric vehicle (EV) industry is rapidly growing to facilitate the transition to a carbon-neutral community, illuminating the potential of EVs as a flexible grid asset to mitigate some of the issues and improve grid operation, if properly exploited. To explore the potential of EVs, this paper proposes an EV scheduling strategy. By using an optimal EV charging scheduling proposed, distribution system operators (DSOs) can minimize their operating costs and stably operate the system with a high level of DERs. To validate the method, a modified IEEE 33-bus system with DERs is developed. The case study shows the proposed scheduling strategizes EV charging to reduce the cost of PV curtailment. In the study, the method outperforms the renewable-only case with curtailment by 4.97% in DSO cost. It also demonstrates its potential to increase the renewable hosting capacity by harmonizing EV charging with renewables.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Numerical Studies of Three-dimensional Breakdown in Trailing Vortex Wakes

Finite element, three dimensional relaxation methods are used to calculate the development of vortex wakes behind aircraft for a considerable downstream distance. The inclusion of a self-induction term in the solution, dependent upon local curvature and vortex core radius, permits calculation of finite lifetimes for systems for which infinite life would be predicted two dimensionally. The associated computer program is described together with single-pair, twin-pair, and multiple-pair studies carried out using it. It is found, in single-pair studies, that there is a lower limit to the wavelengths at which the Crow-type of instability can occur. Below this limit, self-induction effects cause the plane of the disturbance waves to rotate counter to the vortex direction. Self induction in two dimensionally generated twin spiral waves causes an increase in axial length which becomes more marked with decreasing initial wavelength. The time taken for vortex convergence toward the center plane is correspondingly increased. The limited parametric twin-pair study performed suggests that time-to-converge increases with increasing flap span. Limited studies of Boeing 747 configurations show correct qualitative response to removal of the outer flap and to gear deployment, as compared with wind tunnel and flight test experience.

Evans, P. F.↗

Design of a recovery system for a reentry vehicle

Engineers are often required to design decelerator systems which are deployed in cross-wind orientations. If the system is not designed to minimize 'line sail', damage to the parachutes could result. A Reentry Vehicle Analysis Code (RVAC) and an accompanying graphics animation software program (DISPLAY) are presented in this paper. These computer codes allow the user to quickly apply the Purvis line sail modeling technique to any vehicle and then observe the relative motion of the vehicle, nose cap, suspension lines, pilot and drogue bags and canopies on a computer screen. Data files are created which allow plots of velocities, spacial positions, and dynamic pressures versus time to be generated. The code is an important tool for the design engineer because it integrates two degrees of freedom (DOF) line sail equations with a three DOF model of the reentry body and jettisoned nose cap to provide an animated output.

Von Eckroth, Wulf↗

Lake Michigan Offshore Wind Feasibility Assessment

The purpose of this project was to conduct the first comprehensive offshore wind assessment over Lake Michigan and to advance the body of knowledge needed to support future commercial wind energy development on the Great Lakes. The project involved evaluation and selection of emerging wind measurement technology and the permitting, installation and operation of the first mid-lake wind assessment meteorological (MET) facilities in Michigan’s Great Lakes. In addition, the project provided the first opportunity to deploy and field test floating LIDAR and Laser Wind Sensor (LWS) technology, and important research related equipment key to the sitting and permitting of future offshore wind energy development in accordance with public participation guidelines established by the Michigan Great Lakes Wind Council (GLOW). The project created opportunities for public dialogue and community education about offshore wind resource management and continued the dialogue to foster Great Lake wind resource utilization consistent with the focus of the GLOW Council. The technology proved to be effective, affordable, mobile, and the methods of data measurement accurate. The public benefited from a substantial increase in knowledge of the wind resources over Lake Michigan and gained insights about the potential environmental impacts of offshore wind turbine placements in the future. The unique first ever hub height wind resource assessment using LWS technology over water and development of related research data along with the permitting, sitting, and deployment of the WindSentinel MET buoy has captured public attention and has helped to increase awareness of the potential of future offshore wind energy development on the Great Lakes. Specifically, this project supported the acquisition and operation of a WindSentinel (WS) MET wind assessment buoy, and associated research for 549 days over multiple years at three locations on Lake Michigan. Four research objectives were defined for the project including to: 1) test and validate floating LIDAR technology; 2) collect and access offshore wind data; 3) detect and measure bird and bat activity over Lake Michigan; 4) conduct an over water sound propagation study; 5) prepare and offer a college course on offshore energy, and; 6) collect other environmental, bathometric, and atmospheric data. Desk-top research was performed to select anchorage sites and to secure permits to deploy the buoy. The project also collected and analyzed data essential to wind industry investment decision-making including: deploying highly mobile floating equipment to gather offshore wind data; correlating offshore wind data with conventional on-shore MET tower data; and performing studies that can contribute to the advancement and deployment of offshore wind technologies. Related activities included: • Siting, permitting, and deploying an offshore floating MET facility; • Validating the accuracy of floating LWS using near shoreline cup anemometer MET instruments; • Assessment of laser pulse technology (LIDAR) capability to establish hub height measurement of wind conditions at multiple locations on Lake Michigan; • Utilizing an extended-season (9-10 month) strategy to collect hub height wind data and weather conditions on Lake Michigan; • Investigation of technology best suited for wireless data transmission from distant offshore structures; • Conducting field-validated sound propagation study for a hypothetical offshore wind farm from shoreline locations; • Identifying the presence or absence of bird and bat species near wind assessment facilities; • Identifying the presence or absence of benthic and pelagic species near wind assessment facilities; All proposed project activities were completed with the following major findings: • Floating Laser Wind Sensors are capable of high quality measurement and recordings of wind resources. The WindSentinel presented no significant operational or statistical limitations in recording wind data technology at a at a high confidence level as compared to traditional anemometer cup technology. • During storms, mean Turbulent Kinetic Energy (TKE) increases with height above water; • Sufficient wind resources exist over Lake Michigan to generate 7,684 kWh of power using a 850 kW rated turbine at elevations between 90 - 125 meters, a height lower than originally anticipated for optimum power generation; • Based on initial assessments, wind characteristics are not significantly different at distant (thirty-two mile) offshore locations as compared to near-shore (six mile) locations; • Significant cost savings can be achieved in generation wind energy at lower turbine heights and locating closer to shore. • Siting must be sufficiently distant from shore to minimize visual impact and to address public sentiment about offshore wind development; • Project results show that birds and bats do frequent the middle of Lake Michigan, bats more so than birds; • Based on the wind resource assessment and depths of Lake Michigan encountered during the project, future turbine placement will most likely need to incorporate floating or anchored technology; • The most appropriate siting of offshore wind energy locations will enable direct routing of transmission cables to existing generating and transmission facilities located along the Michigan shoreline; • Wind turbine noise propagation from a wind energy generating facility at a five mile offshore location will not be audible at the shoreline over normal background sound levels.

17 WIND ENERGY↗

NREL Innovations Help Drive Wind Industry Transformation [Fact Sheet]

For nearly 30 years, NREL has helped the wind turbine industry through design and research innovations. The comprehensive capabilities of the National Wind Technology Center (NWTC), ranging from specialized computer simulation tools to unique test facilities, has been used to design, develop, and deploy several generations of advanced wind energy technology.

17 WIND ENERGY↗

Grand Challenges Revisited: Wind Energy Research Needs for a Global Energy Transition

Wind will be a foundational energy source in the electricity grid at the heart of a future integrated energy system, replacing traditional electricity generators powered by fossil fuels and providing grid reliability services in addition to energy. Future capabilities and functions of the wind energy sector will evolve apace with the future expansion and needs of global energy infrastructure; however, wind turbines designed today will not be able to provide the services needed to form and stabilize the grid as a majority supplier. In 2017, organizers for the IEA Wind Technical Experts Meeting (TEM) #89 Grand Vision for Wind Energy workshop assembled a group of experts to consider the question of how to enable a future in which wind energy supplies more than 50% of global electricity consumption. More than 70 experts representing 15 countries attended the workshop and provided diverse perspectives for the Grand Vision for Wind Energy. The IEA Wind TEM #109 was a subsequent gathering that was convened Feb. 28-March 1, 2023, in Boulder, Colorado, USA. The IEA Wind TEM #109 meeting aimed to bring together the leaders of all working groups and the IEA Wind Technology Collaboration Programme (TCP) to identify gaps in scientific knowledge, design, and deployment practice as well as identify recommendations for collaborative pathways, initiatives, and prioritized long-term research needs that can be addressed by IEA Wind. This report captures the outcomes of this meeting of international experts: five Grand Challenge areas (The Atmosphere, The Turbine, The Plant and Grid, Environmental Co-Design, and Social Science). In addition, meeting participants identified eight crosscutting topic areas that are discusses within this report (Environment-Turbine, Turbine-Atmosphere, Atmosphere-Grid/Plant, Grid/Plant-Turbine, Grid/Plant-Environment, Atmosphere-Environment, Turbine-Social, and Social-Grid/Plant).

17 WIND ENERGY↗

Science Goals and Mission Objectives of Nasa's Laser Atmospheric Wind Sounder Program

Knowledge of the global wind field is widely recognized as fundamental to advancing our understanding and prediction of the total Earth system. Yet, because wind profiles are primarily measured by land-based rawinsondes, the oceanic areas (covering three quarters of the Earth's surface) and many regions of the less developed southern hemisphere land areas are poorly observed. The gap between our requirements for wind data and their availability continues to widen. For example, as faster computers become available to model the atmosphere with ever increasing resolution and sophistication, our ability to model the atmosphere will be hampered by a lack of data, particularly wind profiles. In order to address this important deficiency in wind observations, NASA plans to construct the Laser Atmospheric Wind Sounder (LAWS) instrument, with deployment tentatively scheduled between 2002 and 2005 as part of NASA's Earth Observing System (EOS) mission. Addressed here is the importance of wind measurements for advancing our understanding and prediction of the total Earth System. The current characteristics of the LAWS instrument under study are also summarized.

Baker, Wayman E.↗

Doppler-Lidar Evaluation of HRRR-Model Skill at Simulating Summertime Wind Regimes in the Columbia River Basin during WFIP2

Complex-terrain locations often have repeatable near-surface wind patterns, such as synoptic gap flows and local thermally forced flows. An example is the Columbia River Valley in east-central Oregon-Washington, a significant wind-energy-generation region and the site of the Second Wind-Forecast Improvement Project (WFIP2). Data from three Doppler lidars deployed during WFIP2 define and characterize summertime wind regimes and their large-scale contexts, and provide insight into NWP model errors by examining differences in the ability of a model [NOAA’s High-Resolution Rapid-Refresh (HRRR-version1)] to forecast wind-speed profiles for different regimes. Seven regimes were identified based on daily time series of the lidar-measured rotor-layer winds, which then suggested two broad categories. First, in three regimes the primary dynamic forcing was the large-scale pressure gradient. Second, in two regimes the dominant forcing was the diurnal heating-cooling cycle (regional sea-breeze-type dynamics), including the marine intrusion previously described, which generates strong nocturnal winds over the region. The other two included a hybrid regime and a non-conforming regime. For the large-scale pressure-gradient regimes, HRRR had wind-speed biases of ~1 m s -1 and RMSEs of 2-3 m s -1 . Errors were much larger for the thermally forced regimes, owing to the premature demise of the strong nocturnal flow in HRRR. Thus, the more dominant the role of surface heating in generating the flow, the larger the errors. Major errors could result from surface heating of the atmosphere, boundary-layer responses to that heating, and associated terrain interactions. Finally, measurement/modeling research programs should be aimed at determining which modeled processes produce the largest errors, so those processes can be improved and errors reduced.

17 WIND ENERGY↗