Search NASA⌕ Search

SEARCH · Search NASA

Results for “CANADA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Columbia River Treaty History and 2014/2024 Review

The Columbia River, the fourth largest river on the continent as measured by average annual flow, generates more power than any other river in North America. While its headwaters originate in British Columbia, only about 15 percent of the 259,500 square miles of the Columbia River Basin is actually located in Canada. Yet the Canadian waters account for about 38 percent of the average annual volume, and up to 50 percent of the peak flood waters, that flow by The Dalles Dam on the Columbia River between Oregon and Washington. In the 1940s, officials from the United States and Canada began a long process to seek a joint solution to the flooding caused by the unregulated Columbia River and to the postwar demand for greater energy resources. That effort culminated in the Columbia River Treaty, an international agreement between Canada and the United States for the cooperative development of water resources regulation in the upper Columbia River Basin. It was signed in 1961 and implemented in 1964.

power, treaty, history, hydroelectric, Columbia Ri↗

Modeling the Value of Integrated Canadian and U.S. Power Sector Expansion

The United States and Canada power systems are not isolated. Cross-border transmission and coordination of system operation create an interconnected power system, which results in combined imports and exports of electricity of greater than 70 TWh per year [1]. Currently, over 5 GW of new international transmission lines are in various stages of permitting and development. These lines may enable greater integration and coordination of the U.S. and Canada systems, which can in turn reduce challenges associated with integration of high penetrations of variable renewables. Furthermore, low-cost Canadian resources, such as wind and hydro, could contribute to compliance with the EPA's recently released Clean Power Plan. Improving integration and coordination internationally will reduce the costs of accessing these resources. This analysis work build on previous work by Ibanez and Zinaman [2]. In this work we seek to better understand the value of additional interconnection between the U.S. and Canadian power systems. Specifically, we quantify the value of additional interconnection and coordination within the Canadian-US integrated power system under scenarios in which large reductions (>80%) in power sector CO2 emissions are achieved. We explore how the ability to add additional cross-border transmission impacts capacity investment, the generation mix, system costs, and the ability of the system to integrate variable renewable energy into the power system. This analysis uses the Regional Energy Deployment System (ReEDS) capacity expansion model [3], [4] to quantify the value of the integrated power system expansion of the United States and Canada. ReEDS is an optimization model that assesses the deployment and operation (including transmission) of the electricity sector of the contiguous United States and Canadian provinces from 2016 through 2050. It has the ability to model the integration of renewable energy technologies into the grid. ReEDS captures renewable energy resources through the use of 356 individual resource regions and 134 balancing areas across the U.S. and is able to handle renewable energy issues such as variability in wind and solar output, transmission costs and constraints, and ancillary services requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered during remediation. A wide variety of industrial activity on the Pier including extensive foundry operations as well as the industrial nature of the fill used to construct the Pier has resulted in extensive contamination distribution. The Pier structure will require reinforcement to permit both the remediation of the Pier and the adjacent Harbour and remediation techniques will need to be well suited to minimize disruption of wall structures as well as being able to deal with fill ranging from ash to boulders. - Multiple stakeholders are responsible for building demolition, remediation of radiological impacts, remediation of industrial impacts and the use of the site as a staging area for Harbour sediment remediation. The successful remediation of the Centre Pier will require careful negotiation and planning for the various remediation activities noted above. - The depth of contamination on the Pier would result in the complete removal of the Pier if all contamination were to be excavated. Therefore, a Risk Assessment will be conducted to determine the appropriate means for in situ risk management for materials to be left in place below a proposed depth of 1.5 m below current grade. With the concurrence of the property owners and Provincial regulators, the Risk Assessment will be undertaken in accordance with the Provincial requirements that will ensure adequate protection of the environment and future users of the site. - The end use of the Pier has yet to be confirmed by the Municipality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk-based Prioritization of Facility Decommissioning and Environmental Restoration Projects in the National Nuclear Legacy Liabilities Program at the Chalk River Laboratory - 13564

Chalk River Laboratory (CRL), located in Ontario Canada, has a large number of remediation projects currently in the Nuclear Legacy Liabilities Program (NLLP), including hundreds of facility decommissioning projects and over one hundred environmental remediation projects, all to be executed over the next 70 years. Atomic Energy of Canada Limited (AECL) utilized WorleyParsons to prioritize the NLLP projects at the CRL through a risk-based prioritization and ranking process, using the WorleyParsons Sequencing Unit Prioritization and Estimating Risk Model (SUPERmodel). The prioritization project made use of the SUPERmodel which has been previously used for other large-scale site prioritization and sequencing of facilities at nuclear laboratories in the United States. The process included development and vetting of risk parameter matrices as well as confirmation/validation of project risks. Detailed sensitivity studies were also conducted to understand the impacts that risk parameter weighting and scoring had on prioritization. The repeatable prioritization process yielded an objective, risk-based and technically defendable process for prioritization that gained concurrence from all stakeholders, including Natural Resources Canada (NRCan) who is responsible for the oversight of the NLLP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canadian Regulatory Framework for Waste Management and Decommissioning - 19373

The Canadian Nuclear Safety Commission (CNSC) licences, monitors and inspects all nuclear facilities and activities in Canada, including radioactive waste management and decommissioning, in order to assure the protection of the health, safety and security of persons and the environment. This paper will discuss the Canadian regulatory framework as it applies to all radioactive waste management and decommissioning of nuclear facilities. The Government of Canada's Radioactive Waste Policy Framework specifies that the Government of Canada is responsible for developing policy and for regulating and overseeing radioactive waste producers and owners and that, in accordance with the 'polluter pays' principle, waste owners are responsible for the funding, organization, management and operation of the facilities required to safely manage their wastes over the short- and long-terms. The CNSC's regulatory approach for radioactive waste stems from the Nuclear Safety and Control Act (NSCA) and identifies the need for long-term management of radioactive and hazardous waste arising from licensed activities and indicates that, when making regulatory decisions about the management of radioactive waste, the CNSC will seek to achieve its objectives by considering certain key principles in the context of the facts and circumstances of each case. These principles cover the concepts of waste minimization in all phases of a facility's life cycle, hazard assessment, future impacts of the waste, and transborder effects. As a facility life cycle regulator, all nuclear facilities are required to keep decommissioning plans up to date throughout the life cycle of a licensed activity. In addition, the CNSC requires that all licensees implement financial guarantees to cover the cost of decommissioning work resulting from the licensed activities. A preliminary decommissioning plan must be filed with the CNSC as early as possible in the life cycle of the activity or facility and must be reviewed and updated at a minimum every five years. Under the CNSC's non-prescriptive approach to regulation, the applicant proposes a waste management or decommissioning approach, supported by scientifically defensible benchmarks. The CNSC then assesses the proposal against existing regulatory requirements to ensure the health, safety and security of the public and the protection of the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact assessment: Eroding benefits through streamlining?

This paper argues that Governments have sought to streamline impact assessment in recent years (defined as the last five years) to counter concerns over the costs and potential for delays to economic development. We hypothesise that this has had some adverse consequences on the benefits that subsequently accrue from the assessments. This hypothesis is tested using a framework developed from arguments for the benefits brought by Environmental Impact Assessment made in 1982 in the face of the UK Government opposition to its implementation in a time of economic recession. The particular benefits investigated are ‘consistency and fairness’, ‘early warning’, ‘environment and development’, and ‘public involvement’. Canada, South Africa, the United Kingdom and Western Australia are the jurisdictions tested using this framework. The conclusions indicate that significant streamlining has been undertaken which has had direct adverse effects on some of the benefits that impact assessment should deliver, particularly in Canada and the UK. The research has not examined whether streamlining has had implications for the effectiveness of impact assessment, but the causal link between streamlining and benefits does sound warning bells that merit further investigation. -- Highlights: • Investigation of the extent to which government has streamlined IA. • Evaluation framework was developed based on benefits of impact assessment. • Canada, South Africa, the United Kingdom, and Western Australia were examined. • Trajectory in last five years is attrition of benefits of impact assessment.

54 ENVIRONMENTAL SCIENCES↗

Insights for Canadian electricity generation planning from an integrated assessment model: Should we be more cautious about hydropower cost overruns?

Hydropower accounts for approximately 60% of electricity generation in Canada, with growth expected in the coming decades as part of renewable energy transitions; however, frequent cost overruns threaten the viability of this growth. Here, using the integrated assessment model GCAM, we develop an endogenous representation of hydropower for Canada that accounts for market dynamics, thus permitting analysis of hydropower competition with other electricity generation technologies, both with and without cost overruns. Results show that modelling hydropower resources endogenously increases Canadian hydropower deployment relative to an assumption of fixed hydropower production, from 417 to 495 TWh annually by 2050. In scenarios that apply cost overruns at historical levels, hydropower loses market share to more easily scalable technologies like wind power. When including high cost overrun assumptions, the model determines that hydropower falls from about 73% to 65% of Canadian electricity generation by 2050, while wind power increases from about 8% to 11%. Countries may be better able to achieve electrification and renewable energy targets at lower cost by avoiding large-scale, overrun-prone hydropower and nuclear generation projects. Model results support that cost overruns are important considerations for policy decisions related to electricity sector development in Canada and elsewhere.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrating risk assessment methods for carbon storage: A case study for the quest carbon capture and storage facility

This paper documents how tools developed by the National Risk Assessment Partnership (NRAP) complement the Bowtie risk assessment approach through the demonstration of a risk-based Area of Review (AoR) determination for the Quest Carbon Capture and Storage (CCS) facility near Edmonton, Alberta with the NRAP Open-Source Integrated Assessment Model (NRAP Open-IAM). The Bowtie risk assessment for the Quest CCS site was developed by Shell Canada Ltd., who operates the asset on behalf of the Athabasca Oil Sand Project — a joint venture, owned by Canadian Natural Resources Ltd, Chevron Canada and Shell Canada Ltd. The Quest Bowtie treats site risk comprehensively – considering a large set of technical and project risks (e.g., operational risks, above ground infrastructure, public perception, etc.). NRAP tools, methods, and analyses are focused on quantitative assessment of subsurface technical risks. NRAP-Open-IAM was used to evaluate potential groundwater impacts at the Quest site, i.e., a sufficient change above background groundwater quality levels to be measurable, should CO 2 and/or brine leak from the reservoir via a faulty and/or compromised wellbore. Our results show there is a low potential for groundwater impact and support a further reduction (from ~460 to 100 km 2 ) to the established AoR for the Quest site. Integrating both approaches early in the site characterization period could significantly benefit commercial-scale projects by drastically reducing the region over which leakage risks (e.g., legacy wells) need to be evaluated, i.e., the AoR. This is especially true for brownfield sites, which could contain hundreds to thousands of legacy wells. Further, basing monitoring network design on those regions where impacts are most likely to occur has the potential to facilitate more efficient deployment of monitoring technologies and improve the likelihood of detecting a leak should one occur.

58 GEOSCIENCES↗

Further Investigation of Surface Velocity Measurements for Material Characterization in Laser Shockwave Experiments

Further investigation of surface velocity measurements for material characterization in laser shockwave experiments James A. Smith, Jeffrey M. Lacy, Clark L. Scott, Bradley C. Benefiel Idaho National Laboratory, Idaho Falls ID Daniel Levesque, Jean-Pierre Monchalin and Martin Lord, National Research Council Canada, Boucherville, QC, Canada ---As part of the US High Performance Research Reactor program, a laser shockwave system is being developed by the Idaho National Laboratory (INL) to characterize interface strength in innovative plate fuel for research reactors around the world. The INL has been working with National Research Council Canada (NRC) on this project for the last five years. One of the concerns is the difficulty of calibrating and standardizing the laser shock technique. The generation of a stress wave by the laser impinging on the plate surface is dependent on the surface preparation, temporal and spatial power distribution of the laser spot, and material properties of the plate. Thus the resulting back surface velocity used to measure the time-varying stress field within the plate is difficult to reproduce across different measurement systems. ---A recent analytical study and testing support the use of the Hugoniot Elastic Limit (HEL) in materials as a robust and simple benchmark to compare stresses generated by different laser shock systems [1]. Using a non-contact laser velocimeter based on a solid Fabry-Perot etalon, the systems at NRC and INL showed that the velocity reached at the HEL is consistent, independent of the laser power used. In this work, the laser velocimeter of the NRC system is tested against a fast rotating wheel to verify accuracy and determine best operating conditions. A round robin test between the two laser shock systems on plates of different Al alloys is presented that shows the correct classification of the Al alloys based on the HEL as well as determining the bias between the systems. Also the effects of some setup parameters on other characteristics of the surface velocity and corresponding stress wave are discussed. 1. J.A. Smith, J.M. Lacy, D. Levesque, J.-P. Monchalin and M. Lord, "Use of the Hugoniot elastic limit in laser shockwave experiments to relate velocity measurements, 42nd Annual Review of Progress in Quantitative Nondestructive Evaluation, AIP Conf. Proc. 1706, pp. 080005-1-080005-10, 2016.

36 MATERIALS SCIENCE↗

Potassic, High-Silica Hadean Crust.

Understanding Hadean(>4 Ga) Earth requires knowledge of its crust. The composition of the crust and volatiles migrating through it directly influence the makeup of the atmosphere, the composition of seawater, and nutrient availability. Despite its importance, there is little known and less agreed upon regarding the nature of the Hadean crust. By analyzing the Sr-87/Sr-86 ratio of apatite inclusions in Archean zircons from Nuvvuagittuq, Canada, we show that its protolith had formed a high (>1) Rb/Sr ratio reservoir by at least 4.2 Ga. This result implies that the early crust had a broad range of igneous rocks, extending from mafic to highly silicic compositions

early Earth↗

A NEW MILKY WAY HALO STAR CLUSTER IN THE SOUTHERN GALACTIC SKY

We report on the discovery of a new Milky Way (MW) companion stellar system located at ({alpha}{sub J2000,}{delta}{sub J2000}) = (22{sup h}10{sup m}43{sup s}.15, 14 Degree-Sign 56 Prime 58 Double-Prime .8). The discovery was made using the eighth data release of SDSS after applying an automated method to search for overdensities in the Baryon Oscillation Spectroscopic Survey footprint. Follow-up observations were performed using Canada-France-Hawaii-Telescope/MegaCam, which reveal that this system is comprised of an old stellar population, located at a distance of 31.9{sup +1.0}{sub -1.6} kpc, with a half-light radius of r{sub h}= 7.24{sup +1.94}{sub -1.29} pc and a concentration parameter of c = log{sub 10}(r{sub t} /r{sub c} ) = 1.55. A systematic isochrone fit to its color-magnitude diagram resulted in log (age yr{sup -1}) = 10.07{sup +0.05}{sub -0.03} and [Fe/H] = -1.58{sup +0.08}{sub -0.13}. These quantities are typical of globular clusters in the MW halo. The newly found object is of low stellar mass, whose observed excess relative to the background is caused by 95 {+-} 6 stars. The direct integration of its background decontaminated luminosity function leads to an absolute magnitude of M{sub V} = -1.21 {+-} 0.66. The resulting surface brightness is {mu}{sub V} = 25.90 mag arcsec{sup -2}. Its position in the M{sub V} versus r{sub h} diagram lies close to AM4 and Koposov 1, which are identified as star clusters. The object is most likely a very faint star cluster-one of the faintest and lowest mass systems yet identified.

79 ASTRONOMY AND ASTROPHYSICS↗

Volcanic Imprints in Last-Millennium Land Summer Temperatures in the Circum-North Atlantic Area

Summer cooling is one of the most direct consequences of explosive volcanic eruptions that can affect ecosystems and human societies. Recent studies revealed a multiyear cooling impact on hemispheric and global summer temperatures after tropical eruptions, yet the volcanic responses appear to vary on regional scales. Here, in this work, we revisit volcano-induced summer cooling in eastern Canada and northern and central Europe by applying superposed epoch analysis on CMIP6-PMIP4 simulations and millennial temperature reconstructions based on tree-ring density. We then examine potential causes modulating region-specific volcanic impact. While confirming that, on average, tropical eruptions over the last millennium have induced a longer cooling (>4 yr) than eruptions from extratropical Northern Hemisphere in all three North Atlantic regions, we show that the peak magnitude of cooling is stronger in eastern Canada. We also find that the detected volcanic temperature anomalies can be strongly affected by the selection and number of volcanic events and nonvolcanic signals embedded in the climate time series. This study highlights the risks of using highly noisy proxy records to investigate volcanic impacts, especially in regions with strong unforced climate variability. The CMIP6-PMIP4 simulations generally agree with the three reconstructions on the average response to tropical eruptions, but their performance is poorer regarding the production of significant cooling after extratropical eruptions. Our results further suggest that the particular sensitivity to tropical eruptions in eastern Canada is likely related to increased sea ice surrounding Quebec–Labrador associated with the positive Arctic Oscillation and North Atlantic Oscillation formed during the first posteruption winter.

54 ENVIRONMENTAL SCIENCES↗

Integrated pre-feasibility study for CO 2 geological storage in the Cascadia Basin, offshore Washington State, British Columbia

The Cascadia CarbonSAFE project conducted a pre-feasibility study to evaluate technical and nontechnical aspects of storing 50 million metric tons (MMT) of carbon dioxide in a safe, ocean basalt reservoir offshore Washington State and British Columbia. Sub-seafloor basalts are very common on Earth and enable geological mineralization as a long-term storage mechanism, permanently sequestering the carbon in solid rock form. This project evaluated the offshore storage complex, developed potential industrial source/transport scenarios, built an inventory of existing geophysical/geological data and environmental monitoring capabilities, conducted laboratory studies and reservoir modeling to determine storage capacity, and analyzed economic factors, regulatory requirements, and project management risks. Our team included researchers at Columbia University in New York, Pacific Northwest National Laboratory (PNNL) in Washington, University of Victoria in British Columbia, University of California at Santa Cruz, and GHG Underground in Maine, as well as collaborators at University of Iceland in Reykjavik and University of Washington in Saint Louis. In the study region, large emitters (>100,000 MT/year) generate a total of approximately 40 MMT annually from stationary sources, such as power plants, refineries, ammonia production, and mineral processing plants. Five potential industry source/transport scenarios were identified (three in U.SA S. and two in Canada) to potentially provide 50 MMT of carbon dioxide to the offshore reservoir. One scenario included net carbon-negative sources that would reduce atmospheric levels. The inventory of existing data illustrated that basalt properties in the region are potentially beneficial for long-term storage. Permeability is on the order of 0.1 to 1 Darcies within the uppermost 600 m of ocean crust and density-derived porosity reaches 10–20% in thin layers that provide act as flow channels and provide access to porous and permeable basalt. Fine-grained sediments overlying basalt provide a low-permeability barrier separating the storage reservoir from the overlying ocean. Subsurface monitoring of the storage complex benefits from a unique opportunity close proximity of to the nearby NEPTUNE cabled seafloor observatory, which actively transmits data to shore and could be used to monitor reservoir properties. Injection pressure changes, reservoir chemistry, seismicity, well head corrosion, and potential leakage monitoring would be feasible in real time. Using existing data and published models, the STOMP-CO 2 modeling code developed at PNNL was used to simulate carbon dioxide injection, storage, and mineralization in the reservoir. Preliminary simulations indicate that a 50 MMT carbon dioxide plume injected over a 20-year period remains well within the reservoir area, both laterally and vertically, for at least a 50-year period of post-injection monitoring. Laboratory studies on core samples from Cascadia measured dissolution rates in CO 2 –basalt–seawater mixtures and indicated large variability in rates with the potential for complete mineralization. Compared to published data, the dissolution rate measured in these samples is faster, decreasing the time until full conversion to carbonate minerals would occur. Adding geochemical reactivity in the STOMP-CO 2 model indicates that carbon dioxide would be fully converted to carbonate minerals in 135 years or less after injection ceases. The project assessed the viability and costs for the five scenarios using either dedicated offshore pipelines or shipping vessels. Carbon dioxide capture costs were not considered. Shipping incurred lower upfront CAPEX costs, and because most viable sources were located near the shore and waterways, shipping is preferred; no dedicated carbon dioxide pipelines exist in the region. The project also considered potential risks from mixed-use impacts on surrounding lands and ocean areas, such as active use by commercial and recreational fisherman, and other community considerations in planning for public engagement in the future. Other project risks were identified, including project management, permitting and compliance, and financing, as well as technical issues such as long-term instrumentation, plume migration, and model development. Geological concerns like reservoir permeability, seal, and induced seismicity held relatively low risk. The regulatory framework for offshore storage in the U.S. and Canada may be covered by general legal/regulatory programs, but is not yet fully defined. Existing programs appear to restrict the transportation of carbon dioxide across national boundaries (e.g., Canada to U.S.) and its sub-seabed disposal in some circumstances. Our assessment suggests that developing specific and separate pilot projects will help to advance the technical feasibility and regulatory requirements in each country, and lessons learned from such activities may be transferable elsewhere around the globe.

42 ENGINEERING↗

Automated High Power Permanent Borehole Seismic Source Systems for Long-Term Monitoring of Subsurface CO2 Containment and Storage

The geologic storage of CO2 emitted from fixed sources, such as coal or gas power plants, is currently considered one of the prime technologies for short term (~50 year) mitigation of greenhouse gas emissions. The subsurface storage of CO2 for greenhouse gas mitigation will require monitoring to verify that CO2 remains effectively trapped underground, thus permanent seismic sources are needed to provide 24/7 monitoring. GPUSA Inc. has developed and successfully demonstrated numerous prototype vibratory seismic sources with power and performance far beyond any available on the market. The primary objective of this project was to validate in an operational field environment GPUSA’s powerful, low cost, automated borehole seismic source systems for the CO2 storage monitoring application. GPUSA originally proposed the building and testing of two types of permanent sources but ended up building and delivering three types of permanent seismic sources. These sources were delivered to the field test site (Carbon Management Canada’s Containment and Monitoring site near Calgary), however, only two of the systems were able to be tested before the contract ended (despite two contract extensions). The reasons for the delay were primarily weather related both at the US preliminary field test site and Carbon Management Canada site. But in the end, based upon the preliminary field testing in the US and the limited testing that was completed at the Carbon Management Canada site, the results were very impressive, and in some cases far exceeding expectations.

02 PETROLEUM↗

Methodology for Development of Geologic Storage Estimates for Carbon Dioxide

This document is an update to the 2006 “Methodology for Development of Carbon Sequestration Capacity Estimates” published in the 2007 Carbon Sequestration Atlas of the United States and Canada (Atlas I). This document describes the methodologies being used to produce the geologic resource estimates for carbon dioxide (CO 2 ) storage in the 2008 Carbon Sequestration Atlas of the United States and Canada (Atlas II) – in development. The rationales presented are used to simplify assumptions for estimating the amount of CO 2 that can be stored in subsurface geologic environments of the United States and parts of Canada. The primary focus of this update is to add additional basins and formations to the CO 2 storage portfolio, document procedures completely, and provide definitions of CO 2 resource that reflect the uncertainty of geologic resource estimates for CO 2 .

54 ENVIRONMENTAL SCIENCES↗

Project Centaur

The National Aeronautics and Space Administration (NASA) and the Canada Centre for Space Science, National Research Council of Canada (NRCC), conducted a cooperative sounding rocket campaign in the Canadian Arctic during November/December 1981. The objective of the campaign was to investigate the earth's dayside magnetic cleft region. The project was named CENTAUR for Cleft Energetics Transport and Ultraviolet Radiation. Remote launch support facilities were established at Cape Parry, NWT, Canada (70 deg 10 min N latitude, 124 deg 40 min W longitude). The cleft region is accessible from this location when launched poleward during reasonably quiet magnetic activity. Five large sounding rockets were launched (3 NASA, 2 NRCC). About 30 scientific experiments were launched, and an extensive array of ground based experiments was established at Cape Parry and at Sachs Harbour, Banks Island, 130 miles poleward. This paper discusses the unique organization, planning, facilities, instrumentation, and operation required to support the campaign, and looks briefly at the results.

Brence, W. A.↗

Review of Canadian mobile satellite systems institutional arrangements policy

Development of institutional arrangements policy for maritime, land, and aeronautical mobile satellite systems (MSS) is an integral part of the Canadian telecommunications policy process. An ongoing activity in that process is fitting of MSS institutional arrangements policy within the confines of the 1987 Canadian Telecom Policy Framework. Making sure the fit is correct is a major task at present because technology seems to be driving service demand at rapid growth rates, particularly in the case of land MSS. This growth is stimulating policy and regulatory development efforts to keep pace. In Canada, this is happening in four planned MSS applications areas: Canada-US transborder (immediate), aeronautical MSS (1990/94), Telesat Mobile Inc. EMDS via INMARSAT (1990), and MSAT (1993/94). The need for an up-to-date MSS policy in these areas is emphasized by related developments in the US and elsewhere. It arises because of the growing number of market initiatives proposing North American rather than Canada-only or US-only coverage, such as INMARSAT, Geostar, OmniTRACS, and Starlink.

Gilvary, David↗