Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Commissioning of a modulated pulse-power magnetron sputtering system for depositing niobium thin films

A modulated pulse-power magnetron sputtering system (MPPMS) was commissioned and used to deposit niobium on copper. MPPMS utilizes a modulated pulse train with high peak-to-average energy ratios, thereby increasing the energy density leading to the production of the energetic ions. The MPPMS modulator was designed and constructed based on large voltage/current IGBT modules, which can be externally modulated, produce bi-polar waveforms, and are readily available. A high voltage power supply provides moderate current to the IGBT module to create the precise pulse structure. The MPPMS system was used to deposit ~1 mm thick, niobium film on a copper substrate held at ~77 K to minimize Nb atom surface diffusion and maximize intrinsic film energy. Finally, the Nb film had an average grain size of ~8 nm.

42 ENGINEERING↗

CMS Tier-0 data processing during the detector commissioning in Run 3

The CMS Tier-0 system is responsible for the prompt processing and distribution of the data collected by the CMS Experiment. A number of upgrades were implemented during the long shutdown 2 of the Large Hadron Collider, which improved the performance and reliability of the system. In this report, these upgrades are discussed and a more detailed description of the Tier-0 system is given. The experience of the data taking during Run 3 detector commissioning as well as the performance of the system are highlighted.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning activities and first results from the collective Thomson scattering diagnostic on ASDEX Upgrade (invited)

The collective Thomson scattering (CTS) diagnostic installed on ASDEX Upgrade uses millimeter waves generated by the newly installed 1 MW dual frequency gyrotron as probing radiation at 105 GHz. It measures backscattered radiation with a heterodyne receiver having 50 channels (between 100 and 110 GHz) to resolve the one-dimensional velocity distribution of the confined fast ions. The steerable antennas will allow different scattering geometries to fully explore the anisotropic fast ion distributions at different spatial locations. This paper covers the capabilities and operational limits of the diagnostic. It then describes the commissioning activities carried out to date. These activities include gyrotron studies, transmission line alignment, and beam pattern measurements in the vacuum vessel. Overlap experiments in near perpendicular and near parallel have confirmed the successful alignment of the system. First results in near perpendicular of scattered spectra in a neutral beam injection (NBI) and ion cyclotron resonance heating (ICRH) plasma (minority hydrogen) on ASDEX Upgrade have shown evidence of ICRH heating phase of hydrogen.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design and commissioning of a high magnetic field muon spin relaxation spectrometer at the ISIS pulsed neutron and muon source

The high magnetic field (HiFi) muon instrument at the ISIS pulsed neutron and muon source is a state-of-the-art spectrometer designed to provide applied magnetic fields up to 5 T for muon studies of condensed matter and molecular systems. The spectrometer is optimised for time-differential muon spin relaxation studies at a pulsed muon source. We describe the challenges involved in its design and construction, detailing, in particular, the magnet and detector performance. Commissioning experiments have been conducted and the results are presented to demonstrate the scientific capabilities of the new instrument.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Initial commissioning results with the NSCL Electron Beam Ion Trap

The ReA reaccelerator is being added to the National Superconducting Cyclotron Laboratory (NSCL) fragmentation facility in order to provide exotic rare-isotope beams, not available at the Isotope Separation On-Line facilities, in the several-MeV/u energy range. The first stage of the NSCL reaccelerator complex, consisting of an EBIT charge breeder, a room-temperature radiofrequency quadrupole (RFQ) accelerator, and superconducting linear accelerator modules, has been completed and is being put into operation. Commissioning of the EBIT has started by extracting charge-bred residual gas ions, ions created from a Ne gas jet directed across the EBIT's electron beam and ions captured from an external test ion source. Charge-bred ions from the Ne gas jet have been extracted as a pulse and accelerated through the RFQ and the two cryomodules.

43 PARTICLE ACCELERATORS↗

Commissioning of helium refrigeration system at JLab for 12 GeV upgrade

The new 4.5 K refrigerator system added to the Jefferson Lab (JLab) Central Helium Liquefier (CHL) for the 12 GeV upgrade will double its previous capacity. It includes a 4.5 K cold box system and compressor system with associated oil removal and gas management systems. At its maximum capacity condition, this new system supports an additional 238 g/s 30 K 1.16 bar cold compressor return flow, a 15 g/s 4.5 K liquefaction load and a 12.6 kW 35–55 K shield load. Five more design conditions, ranging from liquefaction to refrigeration and a stand-by/reduced load state, were specified for the sizing and selection of its components. The cold box system is comprised of a 300–60 K vertical cold box that incorporates a liquid nitrogen pre-cooler and a 60–4.5 K horizontal cold box housing seven turbines that are configured in four expansion stages including one Joule-Thompson expander. The helium compression system has five compressors to support three pressure levels in the cold box. This paper will briefly review the salient 4.5 K system design features and discuss the recent commissioning results.

42 ENGINEERING↗

Commissioning of helium compression system for the 12 GeV refrigerator

The compressor system used for the Jefferson Lab (JLab) 12 GeV upgrade, also known as the CHL-2 compressor system, incorporates many design changes to the typical compressor skid design to improve the efficiency, reliability and maintainability from previous systems. These include a considerably smaller bulk oil separator design that does not use coalescing elements/media, automated control of cooling oil injection based on the helium discharge temperature, a helium after-cooler design that is designed for and promotes coalescing of residual oil and a variable speed bearing oil pump to reduce oil bypass. The CHL-2 helium compression system has five compressors configured with four pressure levels that supports the three pressure levels in the cold box. This paper will briefly review several of these improvements and discuss some of the recent commissioning results.

42 ENGINEERING↗

Installation and commissioning of a large area coating system for neutron and X-ray optical devices

A 9 meter long DC/RF sputtering cylindrical coating system which is designed and built indigenously for coating of neutron supermirrors and grazing incidence hard X-ray mirrors on large area substrates has been installed and commissioned recently. The performance of the system has been tested by depositing Ti films on glass substrate of 1500mm X 150mm size. By depositing Ti films on several small area c-Si substrates placed over the length and breadth of the substrate holder, and by subsequent characterization by GIXR measurement, it has been observed that films with bulk-like density and very low surface roughness can be obtained in the above system. The thickness uniformity achieved in the deposited films is within ±3.5% over the 1500mm length and within ±4.8% over the 150mm width.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Report of the International Neutrino Commission: 2014

The International Neutrino Commission met during the conference to review NEUTRINO 2014, to hear proposals, and to discuss the future of conferences in this series, e.g., format, size and sites.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Large aperture Fizeau interferometer commissioning and preliminary measurements of a long x-ray mirror at European X-ray Free Electron Laser

The European XFEL (X-ray Free Electron Laser) is a large facility under construction in Hamburg, Germany. It will provide a transversally fully coherent x-ray radiation with outstanding characteristics: high repetition rate (up to 2700 pulses with a 0.6 ms long pulse train at 10 Hz), short wavelength (down to 0.05 nm), short pulse (in the femtoseconds scale), and high average brilliance (1.6 ⋅ 10{sup 25} (photons s{sup −1} mm{sup −2} mrad{sup −2})/0.1% bandwidth). The beam has very high pulse energy; therefore, it has to be spread out on a relatively long mirror (about 1 m). Due to the very short wavelength, the mirrors need to have a high quality surface on their entire length, and this is considered very challenging even with the most advanced polishing methods. In order to measure the mirrors and to characterize their interaction with the mechanical mount, we equipped a metrology laboratory with a large aperture Fizeau interferometer. The system is a classical 100 mm diameter commercial Fizeau, with an additional expander providing a 300 mm diameter beam. Despite the commercial nature of the system, special care has been taken in the polishing of the reference flats and in the expander quality. We report the first commissioning of the instrument, its calibration, and performance characterization, together with some preliminary results with the measurement of a 950 mm silicon substrate. The intended application is to characterize the final XFEL mirrors with nanometer accuracy.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

DAQ for commissioning and calibration of a multichannel analyzer of scintillation counters

We report the status of the Data Acquisition (DAQ) system for the Coordinate Detector (CDET) module of the Super Bigbite Spectrometer facility at Hall A of Thomas Jefferson Accelerator Facility. Presently, the DAQ is fully assembled and tested with one CDET module. The commissioning of CDET module, that is the goal of the tests presented here, consists essentially in the measures of the amplitude and time-over-threshold of signals from cosmic rays. Hardware checks, the developing of DAQ control and off-line analysis software are ongoing; the module currently seems to work roughly accordingly to expectations. Data presented in this note are still preliminary.

Tortorici, F.↗

DESIGN AND COMMISSIONING OF A THREE-BARREL SHATTERED PELLET INJECTOR FOR DIII-D DISRUPTION MITIGATION STUDIES

Disruptions are sudden unplanned terminations of tokamak plasmas that can lead to high thermal loads and runaway electrons (RE). Unmitigated disruptions in ITER are predicted to dissipate hundreds of MJ of thermal energy and generate multi-MeV runaway electrons. This intense heat and energetic particle beams can cause localized melting of the plasma facing components. Reliable and fast acting disruption mitigation (DM) techniques are therefore a critical requirement for ITER to safeguard the machine from damage. The proven method for DM centers on injecting a large quantity of impurity particles into the plasma to quickly increase density and radiate the thermal energy to mitigate thermal effects. Additionally, if the particle injection can achieve a critical density, it can create collisional drag which suppresses the formation of REs. The particle injection methods attempted have been shell pellet injection, massive gas injection, and shattered pellet injection (SPI). The SPI technique has been successfully used on DIII-D [1] to study thermal mitigation using a single-barrel SPI system that can more efficiently reach the critical density required for successful disruption mitigation than the other injection approaches. Recently, a new three-barrel second SPI (SPI-II) system has been developed for use on DIII-D to study injection effects from multiple toroidal locations and pellet timing. The SPI-II system is a liquid helium cooled pipe gun that has two 7 mm and one 8.5 mm pellet sizes. The pellet sizes are determined by the inner diameter of the pipe gun barrels which can easily be changed for different pellet sizes. The three pellets can be formed and fired individually or simultaneously. The SPI-II has provisions for making and firing pure species pellets with deuterium, neon, or argon and also deuterium layered pellets with a core of neon. The pellets are fired into a bent tube near the plasma edge which shatters them from the impact. This paper will describe the design and commissioning of the SPI-II system. Measured pellet speeds and shattered pellet fragment sizes will be reported.

Meitner, Steven↗

FOUR NEW T DWARFS IDENTIFIED IN Pan-STARRS 1 COMMISSIONING DATA

A complete well-defined sample of ultracool dwarfs is one of the key science programs of the Pan-STARRS 1 optical survey telescope (PS1). Here we combine PS1 commissioning data with the Two Micron All Sky Survey (2MASS) to conduct a proper motion search (0.''1-2.''0 yr{sup -1}) for nearby T dwarfs, using optical+near-IR colors to select objects for spectroscopic follow-up. The addition of sensitive far-red optical imaging from PS1 enables discovery of nearby ultracool dwarfs that cannot be identified from 2MASS data alone. We have searched 3700 deg{sup 2} of PS1 y-band (0.95-1.03 {mu}m) data to y {approx} 19.5 mag (AB) and J {approx} 16.5 mag (Vega) and discovered four previously unknown bright T dwarfs. Three of the objects (with spectral types T1.5, T2, and T3.5) have photometric distances within 25 pc and were missed by previous 2MASS searches due to more restrictive color selection criteria. The fourth object (spectral type T4.5) is more distant than 25 pc and is only a single-band detection in 2MASS. We also examine the potential for completing the census of nearby ultracool objects with the PS1 3{pi} survey.

79 ASTRONOMY AND ASTROPHYSICS↗

The LAMOST survey of background quasars in the vicinity of the Andromeda and Triangulum galaxies. II. Results from the commissioning observations and the pilot surveys

We present new quasars discovered in the vicinity of the Andromeda and Triangulum galaxies with the Large Sky Area Multi-Object Fiber Spectroscopic Telescope, also named the Guoshoujing Telescope, during the 2010 and 2011 observational seasons. Quasar candidates are selected based on the available Sloan Digital Sky Survey, Kitt Peak National Observatory 4 m telescope, Xuyi Schmidt Telescope Photometric Survey optical, and Wide-field Infrared Survey Explorer near-infrared photometric data. We present 509 new quasars discovered in a stripe of ∼135 deg{sup 2} from M31 to M33 along the Giant Stellar Stream in the 2011 pilot survey data sets, and also 17 new quasars discovered in an area of ∼100 deg{sup 2} that covers the central region and the southeastern halo of M31 in the 2010 commissioning data sets. These 526 new quasars have i magnitudes ranging from 15.5 to 20.0, redshifts from 0.1 to 3.2. They represent a significant increase of the number of identified quasars in the vicinity of M31 and M33. There are now 26, 62, and 139 known quasars in this region of the sky with i magnitudes brighter than 17.0, 17.5, and 18.0, respectively, of which 5, 20, and 75 are newly discovered. These bright quasars provide an invaluable collection with which to probe the kinematics and chemistry of the interstellar/intergalactic medium in the Local Group of galaxies. A total of 93 quasars are now known with locations within 2.°5 of M31, of which 73 are newly discovered. Tens of quasars are now known to be located behind the Giant Stellar Stream, and hundreds are behind the extended halo and its associated substructures of M31. The much enlarged sample of known quasars in the vicinity of M31 and M33 can potentially be utilized to construct a perfect astrometric reference frame to measure the minute proper motions (PMs) of M31 and M33, along with the PMs of substructures associated with the Local Group of galaxies. Those PMs are some of the most fundamental properties of the Local Group.

79 ASTRONOMY AND ASTROPHYSICS↗

Commissioning and operation of a real-time multi-point Thomson scattering evaluation system at Wendelstein 7-X

A real-time multi-point Thomson scattering (rtMPTS) evaluation system has recently been installed and commissioned at the Wendelstein 7-X (W7-X) stellarator during the 2024 -2025 operational phases. This system has demonstrated successful evaluation of Thomson scattered spectra on millisecond timescales. We discuss initial results from this system, consisting of a comparison of different evaluation techniques, assessment of system evaluation times, and proof-of-principle control experiments carried out with the W7-X poloidal correlation reflectometer (PCR) system. This diagnostic represents the first step towards the development of a density profile controller at W7-X, which can be leveraged to support steady-state operation.

Mohammed, Ameer [Princeton Plasma Physics Laborato↗

Commissioning of the ArDM experiment at the Canfranc underground laboratory: first steps towards a tonne-scale liquid argon time projection chamber for Dark Matter searches

The Argon Dark Matter (ArDM) experiment consists of a liquid argon (LAr) time projection chamber (TPC) sensitive to nuclear recoils, resulting from scattering of hypothetical Weakly Interacting Massive Particles (WIMPs) on argon targets. With an active target mass of 850 kg ArDM represents an important milestone towards developments for large LAr Dark Matter detectors. Here we present the experimental apparatus currently installed underground at the Laboratorio Subterráneo de Canfranc (LSC), Spain. We show data on gaseous or liquid argon targets recorded in 2015 during the commissioning of ArDM in single phase at zero E-field (ArDM Run I). The data confirms the overall good and stable performance of the ArDM tonne-scale LAr detector.

79 ASTRONOMY AND ASTROPHYSICS↗

Scenario development during commissioning operations on the National Spherical Torus Experiment Upgrade

The National Spherical Torus Experiment Upgrade (NSTX-U) will advance the physics basis required for achieving steady-state, high-beta, and high-confinement conditions in a tokamak by accessing high toroidal field (1 T) and plasma current (1.0 - 2.0 MA) in a low aspect ratio geometry (A = 1.6 - 1.8) with flexible auxiliary heating systems (12 MW NBI, 6 MW HHFW). This paper describes progress in the development of L- and Hmode discharge scenarios and the commissioning of operational tools in the first ten weeks of operation that enable the scientific mission of NSTX-U. Vacuum field calculations completed prior to operations supported the rapid development and optimization of inductive breakdown at different values of ohmic solenoid current. The toroidal magnetic field (BT0 = 0.65 T) exceeded the maximum values achieved on NSTX and novel long-pulse L-mode discharges with regular sawtooth activity exceeded the longest pulses produced on NSTX (tpulse > 1.8s). The increased flux of the central solenoid facilitated the development of stationary L-mode discharges over a range of density and plasma current (Ip). H-mode discharges achieved similar levels of stored energy, confinement (H98y,2 > 1) and stability (βN/βN-nowall > 1) compared to NSTX discharges for Ip ≤ 1 MA. High-performance H-mode scenarios require an L-H transition early in the Ip ramp-up phase in order to obtain low internal inductance (li) throughout the discharge, which is conducive to maintaining vertical stability at high elongation (κ > 2.2) and achieving long periods of MHD quiescent operations. The rapid progress in developing L- and H-mode scenarios in support of the scientific program was enabled by advances in real-time plasma control, efficient error field identification and correction, effective conditioning of the graphite wall and excellent diagnostic availability.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗