Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONSOLES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Evaluation of Usability and Workload with Paper Strips as Compared to Virtual Flight Strips Used for Ramp Operations

This paper describes an experiment designed to compare the use of paper strips with the use of a new user interface, the Ramp Traffic Console (RTC), designed for use by ramp controllers to be used in place of paper strips. A Human-In-the-Loop (HITL) experiment was performed as the fifth study in a series of six HITL simulation experiments designed to evaluate a concept that provided advisories to the users. The RTC was designed to be used as a Decision Support Tool (DST) that provided advisories to ramp controllers regarding metering or pushback such that most of the delay was taken at the gate to save fuel and emissions. In addition to being a DST, an added benefit of the RTC is that it can provide real-time updates of flight data, airport and airspace status to the controller including Traffic Management Initiatives (TMI). The RTC was designed as new user interface that displays virtual strips on a terminal map drawn on a 27-inch touch screen monitor. The RTC was used in some conditions of the experiment by ramp controllers in place of paper strips and paper maps in the HITL environment. In other conditions the controllers were given paper strips and paper maps similar to what they currently use at Charlotte Douglas International Airport (CLT). The study described here, evaluated the use of the virtual strips displayed on the RTC as compared to the use of paper strips and paper map, using current ramp tower controllers at CLT as participants. The research question being asked was - How does management of ramp traffic affect user workload and usability ratings while using RTC to manage traffic in the ramp verses using paper strips? Workload for our purposes is defined by four components of the NASA-TLX (Task Load Index). Usability was assessed with two sets of usability questions - One set of usability questions addressed traffic management performance and the other set addressed issues of resources and efficiency. Both Post Run and Post Study questionnaire responses were gathered and the results were analyzed to assess controller workload and usability ratings under both conditions, virtual strips shown on RTC and Paper Strips. The results indicate that controllers perceived lower workload while using virtual strips displayed on RTC to manage ramp traffic. Usability ratings for Traffic management performance questions are lower in the virtual strip/RTC condition than in the paper strip condition showing a preference for RTC over Paper. Usability ratings for Resources and efficiency questions show mixed results. Additionally, the Post Study Questions show preference for RTC over paper strips. Results of this data analysis will be presented in this paper. This DST evaluation was an important step in researching and improving the tool, which was planned to be deployed in the field.

Aviation Decision Support Tools↗

Airspace Technology Demonstration II (ATD-2): American Airlines CLT Ramp Training RTC/RMTC: Baseline Integrated Arrival/ Departure/Surface (IADS) - ATD-2 Tech Transfer 1 - Phase 1

This training material was created to train CLT (Charlotte Douglas International Airport) ramp controllers on the ATD-2 (Airspace Technology Demonstration-2) system. It includes an overview of ATD-2 and the RTC/RMTC (Ramp Traffic Console/Ramp Manager Traffic Console). It discusses many interface details, data exchange and integration, metering modes, and scheduler advisories. It concludes with interactive exercises on all topics of the training course.

RTC/RMTC↗

Evaluation of Usability and Workload Associated with Paper Strips as Compared to Virtual Flight Strips Used for Ramp Operations

This paper describes a study comparing the use of paper strips with virtual flight strips depicted on a new user interface, the Ramp Traffic Console (RTC), designed for use by ramp controllers to be used in place of paper strips. A Human-In-the-Loop (HITL) experiment was performed as the fifth in a series of six HITL simulation studies designed to evaluate a pushback Decision Support Tool (DST) concept for Charlotte Douglas International Airport (CLT). Workload and usability were assessed in post-run and post-study questionnaires. In the RTC virtual flight strip condition, post-run questionnaire results show lower workload ratings across all aspects of workload; additionally a trend is found toward increased usability ratings. Post-study questionnaire results indicate a preference for RTC over paper strips. Additional research is suggested with more training runs and a greater number of participants to increase statistical power. It is also suggested that this new technology be re-evaluated as a part of the ATD-2 (Airspace Technology Demonstration 2) field testing activities.

Human Factors↗

ATD-2 Integrated Arrival/Departure/Surface (IADS) System Software Version 3.1.x Releases and Notes

This document summarizes the change reports for the ATD-2 V3.1.x series of software releases to Charlotte-Douglas International Airport (CLT). These list all the changes since the previous release. The Release Notes for Distribution are meant to be more readable by stakeholders. [Includes updates to changes for RTC (Ramp Traffic Console), Scheduler, STBO (Surface Trajectory-Based Operations), and Surface Metering Display (graphical-user interface, GUI) clients.]

RTC↗

Columbus IFHX Ammonia Leak Analysis

After the Columbus Moderate Temperature Loop (MTL) InterFace Heat eXchanger (IFHX) low temperature event of GMT 345-2013, NASA investigated relevant transient scenarios involving IFHX rupture after water freezing and subsequent thawing. NASA recommended development of a Fault Detection Isolation and Recovery (FDIR) plan that would, in the event of a heat exchanger freeze event, close the Water On/Off Valves (WOOVs) to isolate the heat exchanger and prevent ammonia from the external flow loops from spreading into the cabin. NASA performed a preliminary simplified analysis for the reference case of IFHX rupture, but for a deeper understanding TAS developed detailed SINDA-FLUINT models of the Columbus ITCS that were built and run through the SINAPS GUI. This allowed simulation of the ammonia leakage physics including the variation of environmental parameters, thus providing more accurate and specific input to the FDIR under development. The result was finalization of the IFHX WOOVs closure sequence and wait times to contain the ammonia propagation to Columbus and allow identification of the leaking IFHX. In addition, the analysis results provided reference pressure profiles to be used on console and by the Engineering as support for the telemetry data assessment in case of failure.This paper gives an overview on the issue and focuses on the analytical aspects of the multiphase fluid dynamics involved.

Tilloca, A.↗

Human Systems Integration (HSI) for Safety- Critical Range Operations at Wallops Flight Facility (WFF)

The NASA Engineering and Safety Center (NESC) Human Factors (HF) Technical Discipline Team (TDT) funded a preliminary study in 2017 that was narrowly focused within the Range Data Display System (RDDS) scope of display design requirements based on schedule and resources. Wallops Flight Facility (WFF) personnel involved in the previous study asked for a broader Human Systems Integration (HSI) involvement that would span both the RDDS and Flight Termination System (FTS) projects and assist with identifying HSI best practices, via appropriate standards and guidelines, that if properly implemented should result in a more effective and efficient Range Safety Operations. WFF Range Safety Operations has expressed a need to assess the roles, responsibilities, and functions of the various personnel on console during launches to identify existing and potential efficiencies and incorporate them in the new system design. This assessment addresses that need.

Cynthia H Null↗

What Can We Learn from One Billion Ground System Log Messages?

Shortage of log-based data in a ground system they have traditionally been the under achievers in a satellite ground system. This is due to several factors: Once log messages scroll out of view on the TTC event console window they are soon forgotten. Application and system log files are scattered across directories within a system, across a multitude of servers, and across one or more databases making access cumbersome. Typical tools to perform log file content searching are generally crude and typically only employed as part of trouble-shooting exercises.As we move towards satellite constellations and fleets and add even more status information, the number of messages keeps growing. One mission now estimates that they could generate 3,000,000 messages per day 1 billion per year - for the life of their mission. What to do with those 1 billion messages? That is the challenge. With the recent technological advances in the management of large data sets, text-based processing, and data analytics, there are now capabilities that we can provide to the ground system engineers and satellite operators to address what we postulate are missed opportunities. Advanced real-time log analysis can allow us to be less reactionary in favor of being more proactive. Analytics goals include the ability to: Identify root cause of unexpected events, failures or error conditions enabled by correlating disparate data. Detect security breaches attempts before they are successful. Help admins ensure IT resources continue running optimally. Identify trends and patterns that may indicate impending failures or error conditions for valuable assets before they happen. Compare satellites in a fleet or constellation in terms of number of alarms, number of command sent to them, etc.. Answer questions like "Are the operations support needs increasing over the past year?" or "Have we seen this combination of alarm conditions before?" But really, once the tools are readily available the users will start realizing what can be done with their new powers. In this presentation we will show the results of analyzing millions of actual mission operations log messages, how the results can be displayed to the user, and how new products now available as open source can be applied to the challenges of large scale time-tagged text-based mission operations messages. Flight operations team members believe that this is a powerful new option for how they assess overall system and space asset health. Technical descriptions of the design, tools, and storage will be provided. One billion messages? Bring'em on!

Orsborne, Sharon↗

Automated Software for Manned Spacecraft - Bridging the Gap from Sci Fi to Reality

With a voice command or a few taps on the console, the spacecraft pivots on a dime at high velocity and gently docks to an orbiting space platform. This is the image most people have of the complex software computations and integrated hardware performance necessary for a spacecraft to successfully perform an automated launch, rendezvous, and docking. Today’s reality is that while computer operations are advancing rapidly, science fiction over-simplifies and over-sells current capabilities. This paper discusses the integration of spacecraft computer automation into the operation of one of the United States’ new Commercial Crew vehicles - the Boeing CST-100 Starliner. Lessons learned by the Boeing Mission Operations team, a private-public partnership with NASA, from conceptual design through real-time operation of the first test flight will be discussed. Focus will center on how operations has learned to use the automated software to their advantage while also knowing how to adjust the automation in response to spacecraft or mission anomalies. One goal of advanced spacecraft automation is the ability to reduce both the crew workload and the ground control footprint while at the same time increasing spacecraft and mission flexibility. Historically, crewed spacecraft required a large number of operators on the ground to use a plethora of tools to compute nominal and contingency mission trajectories. Moving those sophisticated software tools to being onboard the vehicle can reduce the need for such complex ground support. Given that today’s spacecraft software is not yet as capable or as flexible in all circumstances as the computers depicted in movies, there is usually a trade-off between software automation cost and the flexibility of that software resulting in a trade-off between what is performed on the spacecraft and what is left to onboard crew or ground control. For missions that go beyond the Moon, software that autonomously controls nearly every aspect of a crewed mission will become a necessity given the long time delays between the spacecraft and Earth’s ground control teams. The lessons learned by Boeing and its Mission Operations team, through the design and implementation of Starliner’s hardware and software automation, will be able to inform future public and private spacecraft design. As the technologies and capabilities evolve, incorporating lessons learned in successful low Earth orbit commercial crew vehicle missions, spacecraft designs will continue to improve and be able to better enable safe execution of human missions to the Moon and beyond.

Robert C Dempsey↗

Remote Support of ISS Payload Operations During the COVID19 Pandemic

As part of the Human Health and Performance Contract (HHPC) with the NASA Johnson Space Center, the Human Research Program’s (HRP) Research Operations and Integration (ROI) element conducts the planning, implementation, and closing of human research operations on-board the International Space Station (ISS). These operations are supported out of the Telescience Support Center (TSC) located in the Mission Control Center at Houston’s Johnson Space Center (MCC-H). HRP ROI has an Emergency Response Plan in place to allow for remote operations to be completed in the case of inclement weather or other natural disaster; however, nominally, the remote support is only expected to last one to two weeks. In response to the COVID-19 global pandemic, HRP ROI was challenged to complete a quick transition to supporting on-orbit operations remotely and distanced for an indefinite amount of time. This shift in ground support required close collaboration with various external groups as well as the implementation or adaptation of various technologies and tools to ensure no loss of science data. Operational adjustments were put into place for ground commanding, telemetry monitoring, personnel staffing and private and public audio and video with the ISS. Adjustments were also put in place for communication and collaboration with MCC-H, the Payload Operation and Integration Center (POIC) at Marshall Space Flight Center (MSFC), as well as between the various HRP ROI console team members spread across Houston, TX. The ability to successfully support a variety of on-orbit operations from any remote location is more in demand as the commercialization of low Earth orbit is expanding.

Operations↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

Command and Control System Automated Testing

To support the National Aeronautics and Space Administration’s (NASA) Space Launch System (SLS) rocket, Kennedy Space Center (KSC) has developed the Spaceport Command and Control System (SCCS) to monitor and control the pre-launch and launch operations. Within SCCS, the Launch Control System (LCS) is designed to allow console engineers to control and monitor the status of the launch and flight hardware, as well as issue commands to ground control systems and launch vehicles. The display software of the LCS is responsible for visualizing the various data that can be received from the hardware and software components of the LCS. Since this system is providing critical information to engineers in the firing room, the visualization of data across the system must be easy to understand, but also reliable and accurate.

Software↗

Command and Control System Automated Testing

To support the National Aeronautics and Space Administration’s (NASA) Space Launch System (SLS) rocket and the Orion capsule, designed to take humans back to the moon in 2024, Kennedy Space Center (KSC) has developed the Spaceport Command and Control System (SCCS) to monitor and control the launch. Within SCCS, the Launch Control System (LCS) is designed to allow console engineers to control and monitor the status of the launch and flight hardware, as well as issue commands to ground control systems and launch vehicles. The messaging software of LCS is responsible for handling the various data types that can be sent between the hardware and software components of the LCS. Since this system is interacting with numerous devices, controllers, and viewports in real time, the distribution of data across the system must be fast, but also reliable and accurate. To verify the accuracy and reliability of the system, developers on the project have created a set of tests to be performed that covers all operations allowed by the system. Given the extensive Application Programming Interface(API) provided by the messaging software, these unit tests are rather time-consuming and costly (in terms of man-hours) to perform. Therefore, an automated testing framework is used to perform supplemental tests automatically when updates are made to the code base.

Rebecca McFadden↗

Telemetry Anomaly Detection System using Machine Learning to Streamline Mission Operations

Spacecraft housekeeping telemetry is monitored at flight control centers by the operations engineers using tools that can perform limit checking or simple trend analysis. Recent developments in machine learning techniques for anomaly detection enables the implementation of more sophisticated systems that aim to augment current state-of-theart mission tools to provide valuable decision support for the spacecraft operators, assisting in anomaly detection and potentially saving console time for the engineers. We will show some results of the implementation of an anomaly detection tool for the NASA Mars Science Laboratory mission.

Weber, Romann↗

Automated Software for Manned Spacecraft - Bridging the Gap from Sci Fi to Reality

With a voice command or a few taps on the console, the spacecraft pivots on a dime at high velocity and gently docks to an orbiting space platform. This is the image most people have of the complex software computations and integrated hardware performance necessary for a spacecraft to successfully perform an automated launch, rendezvous, and docking. Today’s reality is that while computer operations are advancing rapidly, science fiction over-simplifies and over-sells current capabilities. This paper discusses the integration of spacecraft computer automation into the operation of one of the United States’ new Commercial Crew vehicles - the Boeing CST-100 Starliner. Lessons learned by the Boeing Mission Operations team, a private-public partnership with NASA, from conceptual design through real-time operation of the first test flight will be discussed. Focus will center on how operations has learned to use the automated software to their advantage while also knowing how to adjust the automation in response to spacecraft or mission anomalies. One goal of advanced spacecraft automation is the ability to reduce both the crew workload and the ground control footprint while at the same time increasing spacecraft and mission flexibility. Historically, crewed spacecraft required a large number of operators on the ground to use a plethora of tools to compute nominal and contingency mission trajectories. Moving those sophisticated software tools to being onboard the vehicle can reduce the need for such complex ground support. Given that today’s spacecraft software is not yet as capable or as flexible in all circumstances as the computers depicted in movies, there is usually a trade-off between software automation cost and the flexibility of that software resulting in a trade-off between what is performed on the spacecraft and what is left to onboard crew or ground control. For missions that go beyond the Moon, software that autonomously controls nearly every aspect of a crewed mission will become a necessity given the long time delays between the spacecraft and Earth’s ground control teams. The lessons learned by Boeing and its Mission Operations team, through the design and implementation of Starliner’s hardware and software automation, will be able to inform future public and private spacecraft design. As the technologies and capabilities evolve, incorporating lessons learned in successful low Earth orbit commercial crew vehicle missions, spacecraft designs will continue to improve and be able to better enable safe execution of human missions to the Moon and beyond.

Robert C. Dempsey↗

Ground Segment Operations Concept for the Orion Artemis-2 Optical Communications System

The ACCESS Project (formerly Space Network) will implement an optical communications ground segment to support the Orion Artemis II Optical Communications (O2O) demonstration as part of the next manned human spaceflight mission to the moon, Artemis II. O2O implements laser communication (lasercomm) technology for operational use on the Orion series of spacecraft, as a development test objective (DTO), in order to demonstrate the feasibility and operational utility of lasercomm for human spaceflight missions. O2O consists of three segments: Space Segment, Ground Segment, and Operations Segment. The Space Segment consists of the Space Terminal Element and the Orion spacecraft. The Space Terminal Element effort is managed by the GSFC Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) project in collaboration with MIT Lincoln Laboratory. The Ground Segment consists of an optical ground terminal (GT) at the White Sands Complex (WSC), which is being developed in collaboration with MIT Lincoln Laboratory, the Ground Segment Operations and Analysis (GSOA) element and Ground Data Element (GDE), and a second optical GT in the Optical Communications Telescope Laboratory (OCTL) at the JPL Table Mountain Facility. The Operations Segment consists of the Artemis II Mission Control Center (MCC), the Lasercomm Space Terminal Console (LSTC), and the Lasercomm Link Planning & Analysis Center (LPAC), all located at the Johnson Space Center (JSC). O2O utilizes pulse-position modulation (PPM) direct-to-earth services resulting in an 80 Mbps downlink data rate from lunar orbit. The O2O concept of operations is to provide optical services for a minimum of 1 hour per day for each day of the Artemis II mission. O2O will utilize a 10-20 Mbps uplink data rate and 40-260 Mbps downlink data rate, depending on the Artemis II mission phase. The ACCESS project will also provide a centralized mission data interface for user data distribution and storage to the MCC and perform planning and scheduling of services in coordination with the Operations Segment for the O2O Ground Segment. The O2O Ground Segment will support the following O2O mission phases: Pre-Mission Planning; Daily Operations Planning; Event Execution; and Post-Pass Reporting. O2O will be used to exchange data files between Orion and the MCC and to distribute real-time video through the optical downlink service to the MCC; which would not be possible without the high-bandwidth link that O2O will provide to Orion. In this paper, I will discuss the O2O Ground Segment development approach and how it will support these critical O2O functions: plan and schedule the contact; acquire and track the optical link; flow information bidirectionally; distribute information; and control and accommodate the system.

optical communications↗

Automated Software for Crewed Spacecraft - Bridging the Gap from Sci Fi to Reality

With a voice command or a few taps on the console, the spacecraft pivots on a dime at high velocity and gently docks to an orbiting space platform. This is the image most people have of the complex software computations and integrated hardware performance necessary for a spacecraft to successfully perform an automated launch, rendezvous, and docking. Today’s reality is that while computer operations are advancing rapidly, science fiction over-simplifies and over-sells current capabilities. This paper discusses the integration of spacecraft computer automation into the operation of one of the United States’ new Commercial Crew vehicles - the Boeing CST-100 Starliner. Lessons learned by the Boeing Mission Operations team, a private-public partnership with NASA, from conceptual design through real-time operation of the first test flight will be discussed. Focus will center on how operations has learned to use the automated software to their advantage while also knowing how to adjust the automation in response to spacecraft or mission anomalies. One goal of advanced spacecraft automation is the ability to reduce both the crew workload and the ground control footprint while at the same time increasing spacecraft and mission flexibility. Historically, crewed spacecraft required a large number of operators on the ground to use a plethora of tools to compute nominal and contingency mission trajectories. Moving those sophisticated software tools to being onboard the vehicle can reduce the need for such complex ground support. Given that today’s spacecraft software is not yet as capable or as flexible in all circumstances as the computers depicted in movies, there is usually a trade-off between software automation cost and the flexibility of that software resulting in a trade-off between what is performed on the spacecraft and what is left to onboard crew or ground control. For missions that go beyond the Moon, software that autonomously controls nearly every aspect of a crewed mission will become a necessity given the long time delays between the spacecraft and Earth’s ground control teams. The lessons learned by Boeing and its Mission Operations team, through the design and implementation of Starliner’s hardware and software automation, will be able to inform future public and private spacecraft design. As the technologies and capabilities evolve, incorporating lessons learned in successful low Earth orbit commercial crew vehicle missions, spacecraft designs will continue to improve and be able to better enable safe execution of human missions to the Moon and beyond.

Robert C Dempsey↗

Automated Software for Crewed Spacecraft - Bridging the Gap from Sci Fi to Reality

With a voice command or a few taps on the console, the spacecraft pivots on a dime at high velocity and gently docks to an orbiting space platform. This is the image most people have of the complex software computations and integrated hardware performance necessary for a spacecraft to successfully perform an automated launch, rendezvous, and docking. Today’s reality is that while computer operations are advancing rapidly, science fiction over-simplifies and over-sells current capabilities. This paper discusses the integration of spacecraft computer automation into the operation of one of the United States’ new Commercial Crew vehicles - the Boeing CST-100 Starliner. Lessons learned by the Boeing Mission Operations team, a unique private-public partnership with NASA, from conceptual design through real-time operation of the first test flight will be discussed along with evolution of the system in preparation for the second uncrewed test flight. Focus will center on how operations has learned to use the automated software to their advantage while also knowing how to adjust the automation in response to spacecraft or mission anomalies.

Robert C. Dempsey↗

Practical Operational Readiness Gambits: Operations Training Simulations for the Curiosity Rover

The Mars Science Laboratory team had been puttingin effort to make a Training Venue to allow for parallel shadowtactical operations for trainees to actively work alongside theprime tactical operations personnel without affecting operations,since staffing constraints and shortened operations timelineswere straining the tactical process in supporting operationstrainees in the traditional way. The COVID- 19 Pandemic presentedfurther challenges in continuing on-console training forMSL operations trainees. The MSL operations team switched tofully remote operations, thus hampering the direct mentorshipa trainee would normally receive while on site at JPL. TheMars 2020 training team had developed a concept for roveroperations training simulations based on Johnson Space Center’sextensive simulations training program for astronauts andflight controllers. The MSL team borrowed this idea, and implementedthese training simulations which are called PracticalOperational Readiness Gambits (PORGs). The PORGs so farhave focused on the Science Planner and Rover Planner roles,which are two crucial roles in tactical operations that engagein key interactions throughout a shift. PORGs are based onactual sol scenarios that have occurred on Mars and follow thetactical operations process and timeline as closely as possible.However, unlike an operations shift, PORGs can slow down orpause to allow for more mentoring time. PORGs can focus onparticular skills to test the trainees on their understanding ofa concept. PORGs increase in complexity with each scenario toease the trainees into more typical tactical operations workloads.As more trainees join the MSL operations team, more roles arebeing incorporated into PORGs. There are plans to incorporatecertified operations personnel into PORGs to practice anomalyresponse situations. PORGs have become an essential part of theMSL operations training program and will continue even afterthe return to on-site operations at JPL.

Gajeway, Jocelyn↗