Search NASA⌕ Search

SEARCH · Search NASA

Results for “Completion Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

The James Webb Space Telescope: Mission Overview and Status

The James Webb Space Telescope (JWST) is the Infrared successor to the Hubble Space Telescope. It is a cryogenic infrared space observatory with a 25 sq m aperture (6 m class) telescope yielding diffraction limited angular resolution at a wave1ength of 2 micron. The science instrument payload includes three passively cooled near-infrared instruments providing broad- and narrow-band imagery, coronagraphy, as well as multi-object and integral-field spectroscopy over the 0.6 <lambda < 5.0 micron spectrum. An actively cooled mid-infrared instrument provides broad-band imagery, coronagraphy, and integral-field spectroscopy over the 5.0 < lambda < 29 micron spectrum. The JWST is being developed by NASA, in partnership with the European and Canadian Space Agencies, as a general user facility with science observations to be proposed by the international astronomical community in a manner similar to the Hubble Space Telescope. Technology development and mission design are complete, and construction is underway in all areas of the program.

Greenhouse, Matthew A.↗

The James Webb Space Telescope

The James Webb Space Telescope is the scientific successor to the Hubble and Spitzer Space Telescopes. It will be a large (6.6m) cold (SDK) telescope launched into orbit around the second Earth-Sun Lagrange point. It is a partnership of NASA with the European and Canadian Space Agencies. The science goals for JWST include the formation of the first stars and galaxies in the early universe; the chemical, morphological and dynamical buildup of galaxies and the formation of stars and planetary systems. Recently, the goals have expanded to include studies of dark energy, dark matter, active galactic nuclei, exoplanets and Solar System objects. Webb will have four instruments: The Near-Infrared Camera, the Near-Infrared multi-object Spectrograph, and the Near-Infrared Imager and Slitless Spectrograph will cover the wavelength range 0.6 to S microns, while the Mid-Infrared Instrument will do both imaging and spectroscopy from 5 to 28.5 microns. The observatory is confirmed for launch in 2018; the design is complete and it is in its construction phase. Recent progress includes the completion of the mirrors, the delivery of the first flight instruments and the start of the integration and test phase.

Gardner, Jonathan P.↗

Interplanetary Electric Propulsion Uranus Mission Trades Supporting the Decadal Survey

The Decadal Survey Committee was tasked to develop a comprehensive science and mission strategy for planetary science that updates and extends the National Academies Space Studies Board s current solar system exploration decadal survey. A Uranus orbiter mission has been evaluated as a part of this 2013-2022 Planetary Science Decadal Survey. A comprehensive Uranus orbiter mission design was completed, including a broad search of interplanetary electric propulsion transfer options. The scope of interplanetary trades was limited to electric propulsion concepts, both solar and radioisotope powered. Solar electric propulsion offers significant payloads to Uranus. Inserted mass into the initial science orbit due is highly sensitive to transfer time due to arrival velocities. The recommended baseline trajectory is a 13 year transfer with an Atlas 551, a 1+1 NEXT stage with 15 kW of power using an EEJU trajectory and a 1,000km EGA flyby altitude constraint. This baseline delivers over 2,000kg into the initial science orbit. Interplanetary trajectory trades and sensitivity analyses are presented herein.

Dankanich, John W.↗

The Functional Breakdown Structure (FBS) and Its Relationship to Life Cycle Cost

The Functional Breakdown Structure (FBS) is a structured, modular breakdown of every function that must be addressed to perform a generic mission. It is also usable for any subset of the mission. Unlike a Work Breakdown Structure (WBS), the FBS is a function-oriented tree, not a product-oriented tree. The FBS details not products, but operations or activities that should be performed. The FBS is not tied to any particular architectural implementation because it is a listing of the needed functions, not the elements, of the architecture. The FBS for Space Transportation Systems provides a universal hierarchy of required functions, which include ground and space operations as well as infrastructure - it provides total visibility of the entire mission. By approaching the systems engineering problem from the functional view, instead of the element or hardware view, the SPST has created an exhaustive list of potential requirements which the architecture designers can use to evaluate the completeness of their designs. This is a new approach that will provide full accountability of all functions required to perform the planned mission. It serves as a giant check list to be sure that no functions are omitted, especially in the early architectural design phase. A significant characteristic of a FBS is that if architecture options are compared using this approach, then any missing or redundant elements of each option will be ' identified. Consequently, valid Life Cycle Costs (LCC) comparisons can be made. For example, one architecture option might not need a particular function while another option does. One option may have individual elements to perform each of three functions while another option needs only one element to perform the three functions. Once an architecture has been selected, the FBS will serve as a guide in development of the work breakdown structure, provide visibility of those technologies that need to be further developed to perform required functions, and help identify the personnel skills required to develop and operate the architecture. It also wifi allow the systems engineering activities to totally integrate each discipline to the maximum extent possible and optimize at the total system level, thus avoiding optimizing at the element level (stove-piping). In addition, it furnishes a framework that wifi help prevent over or under specifying requirements because all functions are identified and all elements are aligned to functions.

DeHoff, Bryan↗

Robotics for Human Exploration

Robots can do a variety of work to increase the productivity of human explorers. Robots can perform tasks that are tedious, highly repetitive or long-duration. Robots can perform precursor tasks, such as reconnaissance, which help prepare for future human activity. Robots can work in support of astronauts, assisting or performing tasks in parallel. Robots can also perform "follow-up" work, completing tasks designated or started by humans. In this paper, we summarize the development and testing of robots designed to improve future human exploration of space.

human-robot interaction↗

FPGA Flash Memory High Speed Data Acquisition

The purpose of this research is to design and implement a VHDL ONFI Controller module for a Modular Instrumentation System. The goal of the Modular Instrumentation System will be to have a low power device that will store data and send the data at a low speed to a processor. The benefit of such a system will give an advantage over other purchased binary IP due to the capability of allowing NASA to re-use and modify the memory controller module. To accomplish the performance criteria of a low power system, an in house auxiliary board (Flash/ADC board), FPGA development kit, debug board, and modular instrumentation board will be jointly used for the data acquisition. The Flash/ADC board contains four, 1 MSPS, input channel signals and an Open NAND Flash memory module with an analog to digital converter. The ADC, data bits, and control line signals from the board are sent to an Microsemi/Actel FPGA development kit for VHDL programming of the flash memory WRITE, READ, READ STATUS, ERASE, and RESET operation waveforms using Libero software. The debug board will be used for verification of the analog input signal and be able to communicate via serial interface with the module instrumentation. The scope of the new controller module was to find and develop an ONFI controller with the debug board layout designed and completed for manufacture. Successful flash memory operation waveform test routines were completed, simulated, and tested to work on the FPGA board. Through connection of the Flash/ADC board with the FPGA, it was found that the device specifications were not being meet with Vdd reaching half of its voltage. Further testing showed that it was the manufactured Flash/ADC board that contained a misalignment with the ONFI memory module traces. The errors proved to be too great to fix in the time limit set for the project.

Gonzalez, April↗

The Advancing State of AF-M315E Technology

The culmination of twenty years of applied research in hydroxyl ammonium nitrate (HAN)-based monopropellants, the NASA Space Technology mission Directorate's (STMD) Green Propellant Infusion Mission (GPIM) will achieve the first on-orbit demonstration of an operational AF-M315E green propellant propulsion system by the end of 2015. Following an contextual overview of the completed flight design of the GPIM propellant storage and feed system, results of first operation of a flight-representative heavyweight 20-N engineering model thruster (to be conducted in mid-2014) are presented with performance comparisons to prior lab model (heavyweight) test articles.

Masse, Robert↗

Power System Overview for the Small RPS Centaur Flyby and the Mars Polar Hard Lander NASA COMPASS Studies

The NASA Glenn Research Center (GRC) Radioisotope Power System Program Office (RPSPO) sponsored two studies lead by their mission analysis team. The studies were performed by NASA GRCs Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team. Typically a complete toplevel design reference mission (DRM) is performed assessing conceptual spacecraft design, launch mass, trajectory, science strategy and sub-system design such as, power, propulsion, structure and thermal.

Space Missions↗

High Output Maximum Efficiency Resonator (HOMER) Laser for NASA's Global Ecosystem Dynamics Investigation (GEDI) Lidar Mission

The Global Ecosystems Dynamics Investigation (GEDI) is a planned mission sending a LIDAR instrument to the International Space Station that will employ three NASA laser transmitters. This instrument will produce parallel tracks on the Earth's surface that will provide global 3D vegetation canopy measurements. To meet the mission goals a total of 5 High Output Maximum Efficiency Resonator lasers will to be built (1 ETU + 3 Flight + 1 spare) in-house at NASA-GSFC. This presentation will summarize the HOMER design, the testing the design has completed in the past, and the plans to successfully build the units needed for the GEDI mission.

soil↗

And the Humans Save the Day or Maybe They Ruin It: The Importance of Humans in the Loop

Flying a mission in space requires a massive commitment of resources, and without the talent and commitment of the people involved in this effort we would never leave the atmosphere of Earth. When we use the phrase "humans in the loop", it could apply to almost any endeavor since everything starts with humans developing a concept, completing the design process, building or implementing a product and using the product to achieve a goal or purpose. Narrowing the focus to spaceflights, there are a variety of individuals involved throughout the preparations for flight and the flight itself. All of the humans involved add value and support for program success. The purpose of this paper focuses on how a Probabilistic Risk Assessment (PRA) accounts for the human in the loop for potential missions using a technique called Human Reliability Analysis (HRA). Human actions can increase or decrease the overall risk via initiating events or mitigating them, thus removing the human from the loop doesn't always lower the risk.

DeMott, Diana↗

The JWST Science Instrument Payload: Mission Context and Status

The James Webb Space Telescope (JWST) is the scientific successor to the Hubble Space Telescope. It is a cryogenic infrared space observatory with a 25 sq m aperture (6 m class) telescope that will achieve diffraction limited angular resolution at a wavelength of 2 micrometers. The science instrument payload includes four passively cooled near-infrared instruments providing broad- and narrow-band imagery, coronography, as well as multi-object and integral-field spectroscopy over the 0.6 is less than lambda is less than 5.0 micrometers spectrum. An actively cooled mid-infrared instrument provides broad-band imagery, coronography, and integral-field spectroscopy over the 5.0 is less than lambda is less than 29 micrometers spectrum. The JWST is being developed by NASA, in partnership with the European and Canadian Space Agencies, as a general user facility with science observations proposed by the international astronomical community in a manner similar to the Hubble Space Telescope. Technology development and mission design are complete. The science instrument payload is in the final stage of testing ahead of delivery for integration with the telescope during early 2016. The JWST is on schedule for launch during 2018.

narrow-band imagery↗

The JWST Science Instrument Payload: Mission Context and Status

The James Webb Space Telescope (JWST) is the scientific successor to the Hubble Space Telescope. It is a cryogenic infrared space observatory with a 25 sq m aperture (6 m class) telescope that will achieve diffraction limited angular resolution at a wavelength of 2 microns. The science instrument payload includes four passively cooled near-infrared instruments providing broad- and narrow-band imagery, coronography, as well as multi-object and integral-field spectroscopy over the 0.6 < lambda < 5.0 microns spectrum. An actively cooled mid-infrared instrument provides broad-band imagery, coronography, and integral-field spectroscopy over the 5.0 < lambda < 29 microns spectrum. The JWST is being developed by NASA, in partnership with the European and Canadian Space Agencies, as a general user facility with science observations to be proposed by the international astronomical community in a manner similar to the Hubble Space Telescope. Technology development and mission design are complete. Construction, integration and verification testing is underway in all areas of the program. The JWST is on schedule for launch during 2018.

cryogenic infrared space observatory↗

And the Human Saves the Day or Maybe They Ruin It, The Importance of Humans in the Loop

Flying a mission in space requires a massive commitment of resources, and without the talent and commitment of the people involved in this effort we would never leave the atmosphere of Earth as safely as we have. When we use the phrase "humans in the loop", it could apply to almost any endeavor since everything starts with humans developing a concept, completing the design process, building or implementing a product and using the product to achieve a goal or purpose. Narrowing the focus to spaceflight, there are a variety of individuals involved throughout the preparations for flight and the flight itself. All of the humans involved add value and support for program success. The paper discusses the concepts of human involvement in technological programs, how a Probabilistic Risk Assessment (PRA) accounts for the human in the loop for potential missions using a technique called Human Reliability Analysis (HRA) and the tradeoffs between having a human in the loop or not. Human actions can increase or decrease the overall risk via initiating events or mitigating them, thus removing the human from the loop doesn't always lowers the risk.

DeMott, Diana L.↗

One Giant Leap to Protect All Mankind: An Overview of the Lunar Receiving Laboratory

Motivation. In 1961, President John F. Kennedy charged the nation "to land a man on the moon and return him safely to Earth." Eight years later, the Apollo 11 astronauts splashed down in the Pacific Ocean after this first 8-day journey to the moon. As humans had never ventured to another extraterrestrial body, the U.S. government noted the great uncertainty associated with the unknown exposures related to this historic mission. Overview. With this uncertainty in mind, a newly formed Interagency Committee on Back Contamination (ICBC) was established to review the potential for lunar contaminants and establish the prevention of their escape into the biosphere during crew and sample recovery operations from the floating command module to the mobile quarantine facility on the recovery ship and return to the Johnson Space Center. Significance. As a result of the ICBC recommendations, in 1966 NASA planned and built the Lunar Receiving Laboratory (LRL) at the Johnson Space Center in Houston, Texas. The LRL served a great role in service of human space exploration to quarantine Apollo crewmembers, their space vehicles, and the lunar samples collected. Almost an afterthought in the space race to the Moon, the 83,000-square-foot LRL was designed and completed in 1967 for $7.8 million. The core purpose of the LRL was "to protect the public's health, agriculture, and other living resources; to provide lunar sample distribution to approved scientific investigators; and to preserve the scientific integrity of the lunar samples at all times." Its layout was comprised of three major zones: a quarantined Crew Area, a separate but also quarantined Sample Operations Area, and a Support and Administration Area outside the controlled biological barrier. This facility required trained personnel to live and perform within it for several weeks post-flight, to include astronaut crewmembers, flight surgeons, scientists, and vehicle recovery engineers. The LRL holds memories of these historic events but has since been repurposed for NASA's medical and environmental sciences activities, in what is now known as Building 37. As we approach its 50th anniversary, the LRL story will end in demolition as NASA advances its facilities for the next steps in human exploration of space. Learning Objectives: 1. To capture the historical relevance of the NASA Lunar Receiving Laboratory 2. To understand the requirements of receiving crew and samples from the moon for the first time 3. To describe the facility capabilities in protection of public health.

Hayes, Judith↗

Engineering Design Tools for Shape Memory Alloy Actuators: CASMART Collaborative Best Practices and Case Studies

The primary goal of the Consortium for the Advancement of Shape Memory Alloy Research and Technology (CASMART) is to enable the design of revolutionary applications based on shape memory alloy (SMA) technology. In order to help realize this goal and reduce the development time and required experience for the fabrication of SMA actuation systems, several modeling tools have been developed for common actuator types and are discussed herein along with case studies, which highlight the capabilities and limitations of these tools. Due to their ability to sustain high stresses and recover large deformations, SMAs have many potential applications as reliable, lightweight, solid-state actuators. Their advantage over classical actuators can also be further improved when the actuator geometry is modified to fit the specific application. In this paper, three common actuator designs are studied: wires, which are lightweight, low-profile, and easily implemented; springs, which offer actuation strokes upwards of 200 at reduced mechanical loads; and torque tubes, which can provide large actuation forces in small volumes and develop a repeatable zero-load actuation response (known as the two-way shape memory effect). The modeling frameworks, which have been implemented in the design tools, are developed for each of these frequently used SMA actuator types. In order to demonstrate the versatility and flexibility of the presented design tools, as well as validate their modeling framework, several design challenges were completed. These case studies include the design and development of an active hinge for the deployment of a solar array or foldable space structure, an adaptive solar array deployment and positioning system, a passive air temperature controller for regulation flow temperatures inside of a jet engine, and a redesign of the Corvette active hatch, which allows for pressure equalization of the car interior. For each of the presented case studies, a prototype or proof-of-concept was fabricated and the experimental results and lessons learned are discussed. This analysis presents a collection of CASMART collaborative best practices in order to allow readers to utilize the available design tools and understand their modeling principles. These design tools, which are based on engineering models, can provide first-order optimal designs and are a basic and efficient method for either demonstrating design feasibility or refining design parameters. Although the design and integration of an SMA-based actuation system always requires application- and environment-specific engineering considerations, common modeling tools can significantly reduce the investment required for actuation system development and provide valuable engineering insight.

Design tools↗

NASA's Space Launch System Takes Shape

Significant hardware and software for NASA's Space Launch System (SLS) began rolling off assembly lines in 2016, setting the stage for critical testing in 2017 and the launch of new capability for deep-space human exploration. (Figure 1) At NASA's Michoud Assembly Facility (MAF) near New Orleans, LA, full-scale test articles are being joined by flight hardware. Structural test stands are nearing completion at NASA's Marshall Space Flight Center (MSFC), Huntsville, AL. An SLS booster solid rocket motor underwent test firing, while flight motor segments were cast. An RS-25 and Engine Control Unit (ECU) for early SLS flights were tested at NASA's Stennis Space Center (SSC). The upper stage for the first flight was completed, and NASA completed Preliminary Design Review (PDR) for a new, powerful upper stage. The pace of production and testing is expected to increase in 2017. This paper will discuss the technical and programmatic highlights and challenges of 2016 and look ahead to plans for 2017.

Askins, Bruce R.↗

NASA's Space Launch System Takes Shape

Major hardware and software for NASA's Space Launch System (SLS) began rolling off assembly lines in 2016, setting the stage for critical testing in 2017 and the launch of a major new capability for deep space human exploration. SLS continues to pursue a 2018 first launch of Exploration Mission 1 (EM-1). At NASA's Michoud Assembly Facility near New Orleans, LA, Boeing completed welding of structural test and flight liquid hydrogen tanks, and engine sections. Test stands for core stage structural tests at NASA's Marshall Space Flight Center, Huntsville, AL. neared completion. The B2 test stand at NASA's Stennis Space Center, MS, completed major structural renovation to support core stage green run testing in 2018. Orbital ATK successfully test fired its second qualification solid rocket motor in the Utah desert and began casting the motor segments for EM-1. Aerojet Rocketdyne completed its series of test firings to adapt the heritage RS-25 engine to SLS performance requirements. Production is under way on the first five new engine controllers. NASA also signed a contract with Aerojet Rocketdyne for propulsion of the RL10 engines for the Exploration Upper Stage. United Launch Alliance delivered the structural test article for the Interim Cryogenic Propulsion Stage to MSFC for tests and construction was under way on the flight stage. Flight software testing at MSFC, including power quality and command and data handling, was completed. Substantial progress is planned for 2017. Liquid oxygen tank production will be completed at Michoud. Structural testing at Marshall will get under way. RS-25 hotfire testing will verify the new engine controllers. Core stage horizontal integration will begin. The core stage pathfinder mockup will arrive at the B2 test stand for fit checks and tests. EUS will complete preliminary design review. This paper will discuss the technical and programmatic successes and challenges of 2016 and look ahead to plans for 2017.

Askins, Bruce↗