Search NASASearch

SEARCH · Search NASA

Results for “Direct Connect Test Facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,245 records · Page 25

Satellite battery testing status

Because of the large numbers of satellite cells currently being tested and anticipated at the Naval Weapons Support Center (NAVWPNSUPPCEN) Crane, Indiana, satellite cell testing is being integrated into the Battery Test Automation Project (BTAP). The BTAP, designed to meet the growing needs for battery testing at the NAVWPNSUPPCEN Crane, will consist of several Automated Test Stations (ATSs) which monitor batteries under test. Each ATS will interface with an Automation Network Controller (ANC) which will collect test data for reduction.

Haag, R.

Test Program

A test program was set up early in the Explorer XIII program to simulate as nearly as possible all expected environmental conditions to which the spacecraft would be subjected during the ascending phase of the trajectory and while in orbit. These tests included spin, acceleration, thermal-vacuum, vibration, and shock. Functional tests were performed on individual modules of the telemeter system. The test procedure started with breadboard construction of telemeter components. Circuits were evaluated in this phase, and components chosen for prototype construction. Prior to the prototype environmental tests, it was found desirable to construct a mock-up structure for preliminary evaluation of the spacecraft hardware.

Explorer XIII Satellite

Life test of NiH2 flight battery

Life cycle tests being run on the 50 A lightweight nickel hydrogen flight battery are discussed and the preliminary results are presented.

Gandel, M. G.

Developmental and Cryogenic Thermal Vacuum (TVAC) Testing Lessons Learned

Developmental thermal vacuum (TVAC) testing is a critical step in maturing hardware designs and validating performance prior to flight qualification. Unlike qualification or acceptance testing, developmental testing provides flexibility to explore design margins, uncover integration challenges, and refine test approaches before formal verification activities begin. This presentation highlights the value of developmental testing while sharing common pitfalls encountered during developmental TVAC campaigns. Lessons learned from hands-on testing experience, including extensive developmental testing at cryogenic temperatures, will be shared in this presentation. Topics include test planning and preparation, instrumentation strategies, contamination control considerations, troubleshooting unexpected anomalies, and approaches for staying on schedule while meeting test objectives. The audience will gain practical insights and best practices that can improve test efficiency, reduce risk, and enhance the overall success of future developmental TVAC efforts.

Mackenzie Byrnes

Research Achievements Review, Volume II

Materials research - diffusion bonding methods, stress corrosion tests, nondestructive testing, material designs for electronic equipment, and nonmetallic material development.

Materials Science

Life test of 50 AH NiH2 battery

Life cycle testing on a battery is reported. The cells were built in 1975, put into battery in 1976, and flown in 1977 in low Earth orbit.

Warnoc, D. H.