At least 451 records · Page 25

A Review of PJM Interconnection's April 13, 2018, Response to National Energy Technology Laboratory's Report on Reliability, Resilience and the Oncoming Wave of Retiring Baseload Units

In a March 2018 report entitled Reliability, Resilience and the Oncoming Wave of Retiring Baseload Units , the National Energy Technology Laboratory (NETL) analyzed the fleet performance of market areas impacted by a 13-day storm known colloquially as the “Bomb Cyclone.” Special attention was paid to northeastern areas, as these were most impacted. With respect to PJM Interconnection LLC (PJM), the report found that 1) without coal units, the system would have experienced shortfalls; 2) approximately 25 gigawatts (GW) of heretofore underutilized coal-fired plants provided crucial capacity, lending the system resilience; 3) nearly 28 GW of natural gas-fired capacity did not deploy, due to severe spikes in natural gas prices caused in turn by constrained gas deliverability, in the face of tremendous space heating demand and transmission deliverability constraints on the bulk electric system. In April 2018, PJM issued a response that argued the NETL analysis was misplaced, asserting that gas-fired capacity was available and that it could have been called into service but was not, due to “economics.” This brief represents NETL’s reaction to PJM’s assertions in its April 2018 response.

20 FOSSIL-FUELED POWER PLANTS↗

R&D in Interconnect Technologies and Radiation Damage Studies

The R&D carried out under this proposal will help with the development and construction of radiation-hard tracking detectors aimed at the high-luminosity phase of the LHC (HL-LHC, 2025-35, 3000 fb -1 /experiment). Interconnect issues are an integral part of new assemblies being developed for these next generation trackers because they require conduits for data-flow between different intelligent modules. We also evaluated various thin films and studied their mechanical and thermal properties.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Secondary Networks and Protection: Implications for DER and Microgrid Interconnection

Secondary networks are used to supply power to loads that require very high reliability and are in use around the world, particularly in dense urban downtown areas. The protection of secondary network systems poses unique challenges. The addition of distributed energy resources (DERs) to secondary networks can compound these challenges, and deployment of microgrids on secondary networks will create a new set of challenges and opportunities. This report discusses secondary networks and their protection, the challenges associated with interconnecting DERs to a secondary network, issues expected to be associated with creating microgrids on secondary networks, standards that deal with these challenges and issues, and suggestions for research and development foci that would yield new means for addressing these challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced Distributed Solar Photovoltaic Deployment via Barrier Mitigation or Removal in the Western Interconnection (Final Technical Report)

In 2017, the Western Electricity Coordinating Council (WECC) 2026 Common Case projected that distributed solar PV deployment in the Western U.S. would meet or exceed 16,106 MW of installed capacity by 2026. Of this total, 12,218 MW was projected to be deployed in California and another 3,888 MW was projected to be deployed across Arizona, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. However, WIEB recognized that barriers to distributed solar PV deployment could cause the region to fall short of these projections. WIEB identified three types of perceived barriers that might interfere with the deployment of distributed solar PV generation in the West, including: (1) interconnection barriers; (2) utility rate-design barriers; and (3) reliability barriers.

14 SOLAR ENERGY↗

Event Screening Methods for the Eastern Interconnection Situational Awareness and Monitoring System (ESAMS)

The Eastern Interconnection Situational Awareness and Monitoring System (ESAMS) is a tool developed to explore the applications and advantages of sharing phasor measurement unit (PMU) data among operating entities. An initial conclusion from testing was that detected events required further screening before being reported to ensure that events would be of interest to system operators. The methods described in this report were integrated into ESAMS to meet this need. First, an event is screened for whether the change in voltage angle measurements indicates that the detected disturbance is sufficiently large. Next, an event is classified to determine if it was related to a loss of generation. Finally, a neural network is used to determine if the system’s response to the disturbance is normal or abnormal. These methods were tested with one month of field-measured PMU data. Results indicate that the additional information provided by these additional screening tools will improve selection of events for inclusion in the daily event reports automatically generated by ESAMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Quantum Computing Interconnect Based on Aerosol Jet Printing and Electrochemical Deposition of Rhenium

The electrodeposition of rhenium on to a metal seed layer on flexible substrates is presented as a means to creating superconducting flexible cable connectors in an enabling plug-and-play approach for quantum computing. Cryogenic quantum electronics are currently connected using masses of stainless-steel coaxial cables that are bulky, rigid - both in form and design - and lead to significant joule heating, thermal noise, and cross talk. Here, we present an unprecedented approach to integrate an aerosol jet printed (AJP) metal seed layer with rhenium electrodeposition on a flexible substrate in the advancement of superconducting interconnect technologies. Silver and gold were printed using the ‘Nanojet’ aerosol jet printer on Kapton films. Adhesion of gold was found to be far superior to that of silver and adhesion on roughened Kapton surpassed that of its smooth counterpart. Electrodeposition of rhenium was successful on both silver and gold and an amorphous Re film was confirmed by XRD. Results for both materials are presented however due to the poor adhesion of silver to Kapton it was ruled out as a viable candidate. Composite materials were characterized by profilometry, EDS, XRD and FIBSEM. Electrical measurements of the composite at ambient temperature showed a critical temperature (T c ), where the resistance drops to 0, of 5.8 K, well above 4.2 K, the temperature of liquid helium. Stress-strain tests of the Ag-Re and Au-Re composites on roughened and smooth Kapton were completed. Cyclic flexure testing (200 cycles) to 1.25% strain showed smooth Kapton samples reach a stress of ~16 MPa, while Kapton roughened with sandpaper, reaches ~20MPa of stress for the same 1.25% strain.

36 MATERIALS SCIENCE↗

USAID Colombia Young Leaders Workforce Training Program Action Plans: Regulatory Road Map for Distributed Energy Resource (DER) Interconnection and Interoperability

As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, participants from Colombia's Energy and Gas Regulatory Commission (CREG) leveraged their training and professional experience to develop a regulatory roadmap for the interconnection and interoperability of increasing integration of distributed energy resources (DERs). CREG was one of four teams selected by the training program development team to receive continued technical assistance and strategic advisory support from the USAID-NREL Partnership for action plan development and implementation. This case study provides an overview of the key activities and outcomes of the technical assistance provided by NREL on the CREG Action Plan, and key next steps for implementation of Colombia's DER Integration Regulatory Roadmap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Options for Upgrading Low-Voltage Spot Network Protection to Increase DER Interconnection Capacity

Existing standards and policies for interconnecting distributed energy resources (DERs) into low voltage spot networks severely limits the amount of DER installed on those networks to avoid negative impacts on protection systems. This report investigates options for upgrading the protection systems of spot networks to allow for additional DER installations beyond the normal limits (i.e., no reverse power flows allowed onto the MV system). Eight potential upgrade options are discussed that span various methods for new network protector algorithms, hardware upgrades, and the addition of communication. Each method has tradeoffs in terms of accuracy of detecting faults, requirements to upgrade equipment in the spot networks, need for communication, and sensitivity to false trips—all of which are explored in this report.

42 ENGINEERING↗

Assessment of Regional Interconnections to Meet Southeast Asia's Renewable Energy Targets: Phase I of the Singapore – U.S. Collaboration

This report summarizes the results of a study of long-distance subsea electrical interconnections in Southeast Asia, conducted under the first phase of the Singapore-U.S. collaboration under the Net Zero World Initiative. In Phase 1, the Net Zero World team evaluated the current state of the renewable energy landscape in Southeast Asia; developed an open-source capacity expansion model using GridPath and evaluated several future scenarios including changes in interregional transmission; explored the technical feasibility of regional subsea interconnectors; and estimated socio-economic benefits of expanded regional transmission.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Characterization of Fine-Pitch Interconnects for Long-Lifetime HI Applications

This conference talk discusses optimizing gold-gold and gold-ENIG fine-pitch interconnections for Heterogeneous Integration applications, with a focus on longevity. We first look at electrical data from gold-gold bumps subjected to highly accelerated lifetime testing. Then, we discuss using chemical and physical data as a predictor for ENIG bump flip-chip success.

Humphrey, Nicholas James [Sandia National Laborato↗

Sustainable Energy Solutions Task 1.0: Networked Monitoring and Control of Small Interconnected Wind Energy Systems

This report presents accomplishments, results, and future work for one task of five in the Wichita State University Sustainable Energy Solutions Project: To develop a scale model laboratory distribution system for research into questions that arise from networked control and monitoring of low-wind energy systems connected to the AC distribution system. The lab models developed under this task are located in the Electric Power Quality Lab in the Engineering Research Building on the Wichita State University campus. The lab system consists of four parts: 1. A doubly-fed induction generator 2. A wind turbine emulator 3. A solar photovoltaic emulator, with battery energy storage 4. Distribution transformers, lines, and other components, and wireless and wired communications and control These lab elements will be interconnected and will function together to form a complete testbed for distributed resource monitoring and control strategies and smart grid applications testing. Development of the lab system will continue beyond this project.

17 WIND ENERGY↗

Experimental Validation of a Modular All-Electric Power Take-Off Topology for Wave Energy Converter Enabling Marine Renewable Energy Interconnection

Power electronic converters are an enabling technology for the emerging marine energy applications, such as using ocean waves to produce electricity. This paper outlines the power take-off system and its key components used in a wave energy converter offering modularity and scalability to generate power efficiently. The proposed power take-off system was implemented based on a modular multilevel converter and could be deployed to convert any alternating current electrical energy to a different alternating current for interconnection to grid or non-grid applications. Examples of widespread deployment are supplying electricity to coastal communities or producing clean drinking water. The analysis using both the simulation tests and laboratory experiments verified the design objectives and basic functionality of the developed power take-off system. An acceptable response using a field programmable gate array-based controlled laboratory testbench was achieved, complying with guidelines specified in the prevalent industry standards. Seamless operation during steady-state and transients for the studied wave energy converter was achieved as supported by the obtained results. The key findings of this work were experimentally examined under different load conditions, direct current bus voltage fluctuations, and generator speed–torque regulation. The ability of the power take-off system to generate high-power quality of the waveforms, e.g., against adhering to the IEEE 519-2022 standard for total harmonic distortion limits, is also confirmed.

Engineering↗

Investigation of Failure Modes, Mechanisms and Driving Forces for Electrically Conductive Adhesives as Interconnects in PV Modules

In this work we describe our current progress into investigating the reliability of ECA interconnects for PV modules. Preliminary thermal cycling experiments demonstrated that both cohesive and adhesive failure of the ECA joint are relevant failure modes that result in an increase of the joints electrical resistance. A thorough viscoelastic characterization of the candidate ECA was conducted to enable accurate numerical modeling of the joint’s response to thermal cycling. Combined with critical and subcritical fracture measurements, the numerical model elucidates that an additional fatigue mechanism exists which can result in fracture well below subcritical debonding threshold values. It is also demonstrated that fracture of the ECA is more sensitive to humidity than temperature and subcritical debonding mechanisms do exist which are again more sensitive to humidity.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Modeling the U.S. Western Electric Interconnection to Understand the Consequences of Hydrometeorological Extremes and Options for Risk Mitigation

Electricity grid operators around the world face a dual challenge; withstanding increasingly severe weather and the longer term impacts of climate change, while simultaneously decarbonizing. Extreme weather events such as heat waves and droughts are rising in both severity and frequency, which is threatening the reliability of electricity grids through increased demand, generation capacity losses, and equipment failures. Consequently, incorporating hydrometeorological stressors into computational power systems analysis is becoming an even more critical tool in long term planning and short term operations. However, there is a general lack of open-source customizable grid simulation software capable of exhaustively stress testing the grid under hydrometeorological uncertainty, and/or examining potential risk mitigation pathways. A related, persistent challenge for power system modelers is striking an appropriate balance between model fidelity (e.g. spatial scale and time resolution) and computational tractability (wall clock run-time). In this study, we are proposing a solution to this problem with open-source software that allows users to seamlessly customize the scale and track the accuracy of grid operations models. Our approach allows users to search over numerous model parameters (network topology, mathematical formulation, economic hurdle rates, and transmission line scaling) to identify model instantiations that accommodate experimental design. Further, we use this approach to demonstrate the importance of including extreme weather events in model validation and model selection. Focusing on the occurrence of heatwaves and droughts in the U.S. Western Interconnection, we examine role of extreme events in balancing tradeoffs between model fidelity and run-time at the model design stage.

Economics↗

Extensive site-directed mutagenesis reveals interconnected functional units in the alkaline phosphatase active site

Enzymes enable life by accelerating reaction rates to biological timescales. Conventional studies have focused on identifying the residues that have a direct involvement in an enzymatic reaction, but these so-called ‘catalytic residues’ are embedded in extensive interaction networks. Although fundamental to our understanding of enzyme function, evolution, and engineering, the properties of these networks have yet to be quantitatively and systematically explored. We dissected an interaction network of five residues in the active site of Escherichia coli alkaline phosphatase. Analysis of the complex catalytic interdependence of specific residues identified three energetically independent but structurally interconnected functional units with distinct modes of cooperativity. From an evolutionary perspective, this network is orders of magnitude more probable to arise than a fully cooperative network. From a functional perspective, new catalytic insights emerge. Further, such comprehensive energetic characterization will be necessary to benchmark the algorithms required to rationally engineer highly efficient enzymes.

59 BASIC BIOLOGICAL SCIENCES↗

Free-Space optical interconnects for cable-less readout in particle physics detectors

Particle physics detectors utilize readout data links requiring a complicated network of copper wires or optical fibers. These links are both massive and costly. Upgrades to such detectors may require additional bandwidth to be provisioned with limited space available to route new cables or fibers. In contrast, free-space optical interconnects will offer cable-less readout, thereby resulting in significant reductions of material and labor. A collaborative effort between Fermilab and Vega Wave Systems is pursuing the development of a unique free-space optical link design that utilizes the transparency of silicon at wavelengths including 1310 nm and multiple wavelengths used in standard telecommunications applications such as coarse wavelength division multiplexing (CWDM). The first step in the pursuit of that design is a proof that the concept may be viable. To that end, experiments have been performed to characterize the bit error rate performance of a prototype link over a free-space optical path and through doped silicon at multi-gigabit rates. These experiments have demonstrated that operation within acceptable bit error rates is possible using single and multiple wavelength transmission arrangements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint

Bidirectional power electronics can add vehicle-to-grid (V2G) capability in a plug-in vehicle, which then allows the vehicle to operate as a distributed resource (DR). The uniqueness of the battery-based V2G power electronics requires a test procedure that will not only maintain IEEE interconnection standards, but can also evaluate the electrical performance of the vehicle working as a DR. Theobjective of this paper is to discuss a recently published NREL technical report that provides interim test procedures for V2G vehicles for their integration into the electrical distribution systems and for their performance in terms of continuous output power, efficiency, and losses. Additionally, some other test procedures are discussed that are applicable to a V2G vehicle that desires toprovide power reserve functions. A few sample test results are provided based on testing of prototype V2G vehicles at NREL.

24 POWER TRANSMISSION AND DISTRIBUTION↗