Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

Delaney, Michael M.↗

ARIES and ADMS Test Bed Overview and Updates

This presentation provides an overview and updates on the National Renewable Energy Laboratory's Advanced Research on Integrated Energy Systems (ARIES) platform and Advanced Distribution Management System (ADMS Test Bed).

ADMS↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗

Power System Modeling for the Study of High Penetration of Distributed Photovoltaic Energy

Many conventional power systems are evolving due to the growth of renewable energy and distributed energy resources (DERs). Modeling the interplay of transmission and distribution systems is critical to analyze how DERs impact a system’s conventional operation and which electric infrastructure improvements are needed to achieve a balance between centralized generation and DERs. This article describes the process, tools, and resources used to model electric power systems with a centralized infrastructure in an isolated context and limited access to actual utility data. Photovoltaic systems installed on residential rooftops were the main design option. This work broadened the typical power system modeling to include planning and social considerations. This integrative engineering-social method allows for interdisciplinary teams to work in the development of a model as part of broader design goals for a renewable-dominant energy system. The Puerto Rico electric power system was used as a case study to demonstrate the process. The integrative engineering-social perspective in developing the model and the actions to manage data limitations are aspects that could be followed in other locations with aggressive renewable energy goals and where utility data are not readily available.

Cuello-Polo, Gustavo↗

Integration and Test for Small Shuttle Payloads

Recommended approaches for shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of small shuttle payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of the NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration, and interface testing; and (7) Postflight operations. This paper is of special interest to those payload projects which have small budgets and few resources: That is, the truly 'faster, cheaper, better' projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Sensorimotor Application of Proposed Methods to Combine the Effects of Multiple Countermeasures for PRisM

Risk associated with human systems is challenging to quantify but is critical for the mission planning and decision making required to enable future Lunar and Martian missions. To address this gap, the Crew Health and Performance-Probabilistic Risk Assessment (CHP-PRA) project is developing an integrated computational model for CHP mission risk. Much like how MEDPRAT is designed to allow medical resource trades informed by medical risk, CHP-PRA will enable analogous trades in human system risks across multiple CHP functions and capabilities. Human performance is one component of the risk intended to be captured by CHP-PRA through the Performance Risk Model (PRisM). The sensorimotor risk area provides a good frame of reference for investigating the structure of a performance model because most tasks that astronauts are expected to perform require input from the sensory system and/or movement/motor control. Additionally, sensorimotor countermeasures are an area of particular concern for NASA’s Human Research Program because of the increased sensorimotor risk associated with surface operations in Lunar and Martian missions. Thus, a tool that can quickly compare risk reductions of potential countermeasures would be beneficial in guiding research and development of effective countermeasures. In this proof of concept, we present a systematic way to combine multiple performance data sets for humans subjected to different countermeasures such that we can predict the countermeasure(s) that optimize astronaut performance on relevant tasks. PRisM assumes that both the tests that are used to measure countermeasure effectiveness (input data) and the tasks we use to represent astronaut performance, can be broken down and represented as a function/vector of the human systems required to perform that test/task. Through mathematical combination, test data are used to predict performance on astronaut tasks that use similar systems. We propose that when combining countermeasures evaluated using the same test, that only one value should be used to represent their combined effectiveness. We start our analysis with the assumption that two countermeasures together will perform better than each countermeasure individually. Our initial implementation of this framework compares various space motion sickness countermeasures and the most up to date analysis will be demonstrated at the IWS.

Caroline R Austin↗

NASA Crew Exploration Vehicle, Thermal Protection System, Lessons Learned

The Orion (CEV) thermal protection system (TPS) advanced development project (ADP) was initiated in late 2006 to reduce developmental risk by significant investment in multiple heat shield architectural solutions that can meet the needs both the Low Earth orbit (LEO) and Lunar return missions. At the same time, the CEV TPS ADP was also charged with developing a preliminary design for the heat shield to meet the PDR requirement and at the time of the PDR, transfer the design to Lockheed- Martin, the prime contractor. We reported on the developmental activities of the first 18 months at the IPPW5 in Bordeaux, France, last summer. In June 08, at the time of the IPPW6, the CEV TPS ADP would have nearly completed the preparation for the Orion PDR and would be close to the original three-year mark. We plan to report on the progress at the Atlanta workshop. In the past year, Orion TPS ADP investment in TPS Technology, especially in PICA ablative Heat-shield design, development, testing and engineering (DDTE) has paid off in enabling MSL mission to switch from SLA 561 V heat shield to PICA heat shield. CEV TPS ADP considered SLA 561 V as a candidate for LEO missions and our testing identified failure modes in SLA and as a result, we dropped SLA for further evaluation. This close synergy between two projects is a highly visible example of how investment in technology areas can and does benefit multiple missions. In addition, CEV TPS ADP has been able to revive the Apollo ablative system namely AVCOAT honeycomb architecture as an alternate to the baseline PICA architecture and we plan to report the progress we have made in AVCOAT. CEV TPS ADP has invested considerable resources in developing analytical models for PICA and AVCOAT, material property measurements that is essential to the design of the heat-shield, in arcjet testing, in understanding the differences between different arc jet facilities, namely NASA Ames, NASA JSC and Air Force's AEDC, and in Non-Destructive Evaluation (NDE), and in integration of and manufacturing heat shield as a system. The capabilities of the two heat shield systems including failure modes via testing and analysis, once established, can serve the Probe Community and future mission designers to inner and outer planetary exploration very well. For example, missions to Venus, Mars and Titan can use either one of the system by selecting the mission design parameters that utilizes the full characteristics of these system to make use of system efficiency that will result in reduced heat shield mass, system robustness that will enhance mission success and cost. We plan to present significant progresses of the past three years and highlight the significant contributions CEV TPS ADP Project has made to advance the state of the art in Thermal Protection System technology that has and will continue to benefit future entry probe missions.

NASA Crew Exploration Vehicle↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.9, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

13 HYDRO ENERGY↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters: Preprint

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗

Life sciences flight experiments program mission science requirements document. The first life sciences dedicated Spacelab mission, part 1

The Mission Science Requirements Document (MSRD) for the First Dedicated Life Sciences Mission (LS-1) represents the culmination of thousands of hours of experiment selection, and science requirement definition activities. NASA life sciences has never before attempted to integrate, both scientifically and operationally, a single mission dedicated to life sciences research, and the complexity of the planning required for such an endeavor should be apparent. This set of requirements completes the first phase of a continual process which will attempt to optimize (within available programmatic and mission resources) the science accomplished on this mission.

Rummel, J. A.↗

Managing a Safe and Successful Multi-User Spaceport

Encouraged by the creation of the Office of Commercial Space Transportation within the U.S. Federal Aviation Administration (FAA) in 1984 and the Commercial Space Act of 1998, the National Aeronautics and Space Administration (NASA) now relies on an extensive network of support from commercial companies and organizations. At NASA's Kennedy Space Center (KSC), this collaboration opens competitive opportunities for launch providers, including repurposing underutilized Shuttle Program resources, constructing new facilities, and utilizing center services and laboratories. The resulting multi-user spaceport fosters diverse activity, though it engenders risk from hazards associated with various spaceflight processing activities. The KSC Safety & Mission Assurance (S&MA) Directorate, in coordination with the center's Spaceport Integration and Center Planning & Development organizations, has developed a novel approach to protect NASA's workforce, critical assets, and the public from hazardous, space-related activity associated with KSC's multi-user spaceport. For NASA KSC S&MA, the transformation to a multi-user spaceport required implementing methods to foster safe and successful commercial activity while resolving challenges involving: Retirement of the Space Shuttle program; Co-location of multiple NASA programs; Relationships between the NASA programs; Complex relationships between NASA programs and commercial partner operations in exclusive-use facilities; Complex relationships between NASA programs and commercial partner operations in shared-use facilities. NASA KSC S&MA challenges were met with long-term planning and solutions involving cooperation with the Spaceport Integration and Services Directorate. This directorate is responsible for managing active commercial partnerships with customer advocacy and services management, providing a dedicated and consistent level of support to a wide array of commercial operations. This paper explores these solutions, their relevance to the current commercial space industry, and the challenges that continue to drive improvement with a focus on areas of safety management and risk assessment that have been crucial in KSC's evolution into a multi-user spaceport. These solutions may be useful to government entities and private companies looking to partner with the commercial space industry.

Range↗

Resource Allocation Planning Helper (RALPH): Lessons learned

The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.

Durham, Ralph↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating deliberative planning in a robot architecture

The role of planning and reactive control in an architecture for autonomous agents is discussed. The postulated architecture seperates the general robot intelligence problem into three interacting pieces: (1) robot reactive skills, i.e., grasping, object tracking, etc.; (2) a sequencing capability to differentially ativate the reactive skills; and (3) a delibrative planning capability to reason in depth about goals, preconditions, resources, and timing constraints. Within the sequencing module, caching techniques are used for handling routine activities. The planning system then builds on these cached solutions to routine tasks to build larger grain sized primitives. This eliminates large numbers of essentially linear planning problems. The architecture will be used in the future to incorporate in robots cognitive capabilites normally associated with intelligent behavior.

Elsaesser, Chris↗

Dispatch Optimization Variable Engine

The Dispatch Optimization Variable Engine (DOVE) is software tool written in python, developed at Idaho National Laboratory (INL) that provides an easily accessible application-programming-interface (API) to performing resource dispatch optimization analysis for integrated energy system (IES) configurations. DOVE is an integral part of the Framework for Optimization of Resources and Economics (FORCE) software suite and is leveraged by codes such as the Holistic Energy Resource Optimization Network (HERON) and the Optimization of Real-Time Capacity Allocation (ORCA). The philosophy behind DOVE is to provide a modular software solution to IES planning and operation by utilizing state-of-the-art algorithms and machine learning. The goal is to accurately capture the dispatching behavior of a complex energy system given varying time-dependent signals for demand and commodity pricing.

McDowell, DylanJ. [Idaho National Laboratory (INL)↗

Downscaled Earth System Model Data for Resilient Energy System Planning

The second-generation Sup3rCC dataset provides high-resolution meteorological data generated through the downscaling of multiple earth system models (ESMs) from the Coupled Model Intercomparison Project Phase 6 (CMIP6). This downscaling is performed through application of a generative machine learning approach called Super-Resolution for Renewable Resource Data (sup3r). This dataset builds on the first-generation Sup3rCC data by applying improved bias correction methods and adding downscaled precipitation to the output variables. In this presentation, we explore the output characteristics of the dataset and various validation analyses. We also present and discuss plans for the integration of this data into power system planning models using a decision-making under deep uncertainty (DMDU) methodology.

97 MATHEMATICS AND COMPUTING↗

Spacelab - A key element in the Space Shuttle Space Transportation System

Spacelab will be a key element in the Space Transportation System (STS) to be initiated with the advent of the first operational flight of Space Shuttle in 1980. Spacelab is an international, cooperative venture between the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA), which is structured to provide the scientific community an earthlike laboratory in space by 1980. The responsibilities of both ESA and NASA are divided into design and development to be accomplished by ESA and the experiment integration and operation with the Space Shuttle by NASA. While the Spacelab is a key element in the STS, it is highly dependent on other elements in the system for its resources and payload support capabilities. This paper presents the relationship of the Spacelab to other elements and the operational planning that NASA is undertaking to make the Spacelab a flexible and efficient laboratory in space.

Lee, T. J.↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗