Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Wide-area, real-time monitoring and visualization system

A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nondestructive evaluation and real-time monitoring of laser surface hardening.

An infrared process monitor was used to monitor in real-time the infrared emissions during laser surface hardening of ferrous alloys. The signals from the monitor were correlated with the hardness and case depth of the laser-treated tracks. Test data show that a linear relationship exists between the monitor output DC level voltage and hardness up to the maximum hardness possible and also between the monitor output DC level voltage and case depth. This simple relationship makes it easy to monitor process hardness, case depth and quality of laser heat-treated workpiece. A calibration test on a prototypic material can be used to determine the upper and lower bounds of the voltage signals for a sound quality treatment. In-process monitoring or real-time nondestructive measurement of the hardness and depth of the laser transformation hardened case can then be achieved. The monitor is also capable of tracking changes in surface quality or flatness of the part that is being treated.

36 MATERIALS SCIENCE↗

Idaho National Laboratory Cultural Resource Monitoring Report for 2013

This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during 2013. Throughout the year, thirty-eight cultural resource localities were revisited including: two locations with Native American human remains, one of which is also a cave; fourteen additional caves; seven prehistoric archaeological sites ; four historic archaeological sites; one historic trail; one nuclear resource (Experimental Breeder Reactor-I, a designated National Historic Landmark); and nine historic structures located at the Central Facilities Area. Of the monitored resources, thirty-three were routinely monitored, and five were monitored to assess project compliance with cultural resource recommendations along with the effects of ongoing project activities. On six occasions, ground disturbing activities within the boundaries of the Power Burst Facility/Critical Infrastructure Test Range Complex (PBF/CITRC) were observed by INL CRM staff prepared to respond to any additional finds of Native American human remains. In addition, two resources were visited more than once as part of the routine monitoring schedule or to monitor for additional damage. Throughout the year, most of the cultural resources monitored had no visual adverse changes resulting in Type 1determinations. However, Type 2 impacts were noted at eight sites, indicating that although impacts were noted or that a project was operating outside of culturally cleared limitations, cultural resources retained integrity and noted impacts did not threaten National Register eligibility. No new Type 3 or any Type 4 impacts that adversely impacted cultural resources and threatened National Register eligibility were observed at cultural resources monitored in 2013.

99 GENERAL AND MISCELLANEOUS↗

Ecological Monitoring and Compliance Program 2007 Report

In accordance with U.S. Department of Energy (DOE) Order 450.1, 'Environmental Protection Program', the Office of the Assistant Manager for Environmental Management of the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) requires ecological monitoring and biological compliance support for activities and programs conducted at the Nevada Test Site (NTS). National Security Technologies, LLC (NSTec), Ecological Services has implemented the Ecological Monitoring and Compliance (EMAC) Program to provide this support. EMAC is designed to ensure compliance with applicable laws and regulations, delineate and define NTS ecosystems, and provide ecological information that can be used to predict and evaluate the potential impacts of proposed projects and programs on those ecosystems. This report summarizes the EMAC activities conducted by NSTec during calendar year 2007. Monitoring tasks during 2007 included eight program areas: (a) biological surveys, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) biological monitoring at the Nonproliferation Test and Evaluation Complex (NPTEC). The following sections of this report describe work performed under these eight areas.

54 ENVIRONMENTAL SCIENCES↗

The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

13 HYDRO ENERGY↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗

Geologic CO 2 sequestration monitoring design: A machine learning and uncertainty quantification based approach

Monitoring is a crucial aspect of geologic carbon dioxide (CO 2 ) sequestration risk management. Effective monitoring is critical to ensure CO 2 is safely and permanently stored throughout the life-cycle of a geologic CO 2 sequestration project. Effective monitoring involves deciding: (i) where is the optimal location to place the monitoring well(s), and (ii) what type of data (pressure, temperature, CO 2 saturation, etc.) should be measured taking into consideration the uncertainties at geologic sequestration sites. We have developed a filtering-based data assimilation procedure to design effective monitoring approaches. To reduce the computational cost of the filtering-based data assimilation process, a machine-learning algorithm: Multivariate Adaptive Regression Splines is used to derive computationally effcient reduced order models from results of full-physics numerical simulations of CO 2 injection in saline aquifer and subsequent multi-phase fluid flow. We use example scenarios of CO 2 leakage through legacy wellbore and demonstrate a monitoring strategy can be selected with the aim of reducing uncertainty in metrics related to CO 2 leakage. We demonstrate the proposed framework with two synthetic examples: a simple validation case and a more complicated case including multiple monitoring wells. The examples demonstrate that the proposed approach can be effective in developing monitoring approaches that take into consideration uncertainties.

58 GEOSCIENCES↗

Geophysical Monitoring Methods Evaluation for the FutureGen 2.0 Project

A comprehensive monitoring program will be needed in order to assess the effectiveness of carbon sequestration at the FutureGen 2.0 carbon capture and storage (CCS) field-site. Geophysical monitoring methods are sensitive to subsurface changes that result from injection of CO 2 and will be used for: (1) tracking the spatial extent of the free phase CO 2 plume, (2) monitoring advancement of the pressure front, (3) identifying or mapping areas where induced seismicity occurs, and (4) identifying and mapping regions of increased risk for brine or CO 2 leakage from the reservoir. Site-specific suitability and cost effectiveness were evaluated for a number of geophysical monitoring methods including: passive seismic monitoring, reflection seismic imaging, integrated surface deformation, time-lapse gravity, pulsed neutron capture logging, cross-borehole seismic, electrical resistivity tomography, magnetotellurics and controlled source electromagnetics. The results of this evaluation indicate that CO 2 injection monitoring using reflection seismic methods would likely be difficult at the FutureGen 2.0 site. Electrical methods also exhibited low sensitivity to the expected CO 2 saturation changes and would be affected by metallic infrastructure at the field site. Passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture monitoring were selected for implementation as part of the FutureGen 2.0 storage site monitoring program.

54 ENVIRONMENTAL SCIENCES↗

Economic assessment of seismic monitoring for underground hydrogen storage

Underground hydrogen storage (UHS) plays a key role in the energy landscape. However, like other subsurface engineering technologies, UHS may cause leakage into the groundwater or atmosphere and possibly induce local seismicity. To reduce these risks, seismic monitoring could be a viable technique to track the UHS plume, detect leakages, and locate induced seismicity events. Seismic monitoring has been proposed to safely monitor UHS, but research in this area is still new and requires field studies. Lab and theoretical studies have demonstrated the validity of seismic monitoring for UHS. Therefore, it is imperative to analyze the economic feasibility of seismic monitoring for UHS. Hence, we develop a cost model and open-source Python code for seismic monitoring that considers types of seismometers, comprehensive operational scenarios, detection thresholds, and long-term leakage monitoring. A case study is further provided to validate the cost model on reservoir simulations of UHS. We find that the levelized cost for a 10-year operating UHS site will range on the order of ∼0.003 $\$$/kg. The methods developed in this study could also be applied to the monitoring of groundwater, gas, and/or wastewater injection.

08 HYDROGEN↗

Invited Article: In situ comparison of passive radon-thoron discriminative monitors at subsurface workplaces in Hungary

During a one-year long measurement period, radon and thoron data obtained by two different passive radon-thoron discriminative monitors were compared at subsurface workplaces in Hungary, such as mines (bauxite and manganese ore) and caves (medical and touristic). These workplaces have special environmental conditions, such as, stable and high relative humidity (100%), relatively stable temperature (12°C–21°C), low or high wind speed (max. 2.4 m s{sup −1}) and low or elevated aerosol concentration (130–60 000 particles m{sup −3}). The measured radon and thoron concentrations fluctuated in a wide range among the different workplaces. The respective annual average radon concentrations and their standard deviations (in brackets) measured by the passive radon-thoron discriminative monitor with cellulose filter (CF) and the passive radon-thoron discriminative monitor with sponge filter (SF) were: 350(321) Bq m{sup −3} and 550(497) Bq m{sup −3} in the bauxite mine; 887(604) Bq m{sup −3} and 1258(788) Bq m{sup −3} in the manganese ore mine; 2510(2341) Bq m{sup −3} and 3403(3075) Bq m{sup −3} in the medical cave (Hospital Cave of Tapolca); and 6239(2057) Bq m{sup −3} and 8512(1955) Bq m{sup −3} in the touristic cave (Lake Cave of Tapolca). The respective average thoron concentrations and their standard deviation (in brackets) measured by CF and SF monitors were: 154(210) Bq m{sup −3} and 161(148) Bq m{sup −3} in the bauxite mine; 187(191) Bq m{sup −3} and 117(147) Bq m{sup −3} in the manganese-ore mine; 360(524) Bq m{sup −3} and 371(789) Bq m{sup −3} in the medical cave (Hospital Cave of Tapolca); and 1420(1184) Bq m{sup −3} and 1462(3655) Bq m{sup −3} in the touristic cave (Lake Cave of Tapolca). Under these circumstances, comparison of the radon data for the SF and CF monitors showed the former were consistently 51% higher in the bauxite mine, 38% higher in the manganese ore mine, and 34% higher in the caves. Consequently, correction is required on previously obtained radon data acquired by CF monitors at subsurface workplaces to gain comparable data for SF monitors. In the case of thoron, the data were unreliable and no significant tendency was seen during the comparison therefore comparison of previously obtained thoron data acquired by either CF or SF is doubtful. There was probable influence by relative humidity on the detection response; however, the effects of the high wind speed and elevated aerosol concentration could not be excluded. The results of this study call attention to the importance of calibration under extreme environmental conditions and the need for using reliable radon-thoron monitors for subsurface workplaces.

54 ENVIRONMENTAL SCIENCES↗

Detecting fractures and monitoring hydraulic fracturing processes at the first EGS Collab testbed using borehole DAS ambient noise

Enhanced geothermal systems (EGS) require cost-effective monitoring of fracture networks. We validate the capability of using borehole distributed acoustic sensing (DAS) ambient noise for fracture monitoring using core photos and core logs. The EGS Collab project has conducted 10 m scale field experiments of hydraulic fracture stimulation using 50–60 m deep experimental wells at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. The first EGS Collab testbed is located at 1616.67 m (4850 ft) depth at SURF and consists of one injection well, one production well, and six monitoring wells. All wells are drilled subhorizontally from an access tunnel called a drift. The project uses a single continuous fiber-optic cable installed sequentially in the six monitoring wells to record DAS data for monitoring hydraulic fracturing during stimulation. We analyze 60 s time records of the borehole DAS ambient noise data and compute the noise root-mean-square (rms) amplitude on each channel (points along the fiber cable) to obtain DAS ambient noise rms amplitude depth profiles along the monitoring wellbore. Our noise rms amplitude profiles indicate amplitude peaks at distinct depths. We compare the DAS noise rms amplitude profiles with borehole core photos and core logs and find that the DAS noise rms amplitude peaks correspond to the locations of fractures or lithologic changes indicated in the core photos or core logs. We then compute the hourly DAS noise rms amplitude profiles in two monitoring wells during three stimulation cycles in 72 h and find that the DAS noise rms amplitude profiles vary with time, indicating the fracture opening/growth or closing during the hydraulic stimulation. Our results demonstrate that borehole DAS passive ambient noise can be used to detect fractures and monitor fracturing processes in EGS reservoirs.

58 GEOSCIENCES↗

EGS Collab Experiment 1: Microseismic Monitoring

The U.S. Department of Energy's Enhanced Geothermal System (EGS) Collab project aims to improve our understanding of hydraulic stimulations in crystalline rock for enhanced geothermal energy production through execution of intensely monitored meso-scale experiments. The first experiment is being performed at the 4850 ft level of the Sanford Underground Research Facility (SURF), approximately 1.5 km below the surface at Lead, South Dakota. Here we report on microseismic monitoring of repeated stimulation experiments and subsequent flow tests between two boreholes in the Poorman Formation. Stimulations were performed at several locations in the designated injection borehole at flow rates from 0.1 to 5 L/min over temporal durations from minutes to hours. Microseismic monitoring was performed using a dense 3D sensor array including two cemented hydrophone strings with 12 sensors at 1.75 m spacing accompanied by 18 3-C accelerometers, deployed in 6 monitoring boreholes, completely surrounding the stimulation region. Continuous records were obtained over a two-month period using a novel dual recording system consisting of a conventional 96 channel exploration seismograph and a high-performance 64 channel digitizer sampling sensors at 4 and 100 kHz respectively. Using a standard STA/LTA triggering algorithm, we detected thousands of microseismic events with recorded energy in a frequency range generally above 3 kHz and up to 40 kHz. The locations of these events are consistent with creation of a hydraulic fracture and additional reactivation of pre-existing structures. Using manual pick refinement and double-difference relocation we are able to track the fracture growth to high precision. We estimate the times and locations of the fracture intersecting a monitoring and the production borehole using microseismic events. They are in excellent agreement with independent measurements using distributed temperature sensing, in-situ strain observations and measurements of conductivity changes. This submission includes a microearthquake catalog, raw event files, a subset of the continuous microseismic monitoring data collected during stimulations and flow test activity on 05/22/2018, 05/23/2018, 05/24/2018, 05/25/2018, 06/25/2018, 07/19/2018, 07/20/2018, 12/7/2018, 12/20/2018, and 12/21/2018 (in binary format), and a binary file interpreter to read the continuous microseismic monitoring data. A Stanford Geothermal Workshop paper is also included to describe microseismic monitoring activities at SURF during these periods.

15 GEOTHERMAL ENERGY↗

Annual report of groundwater monitoring at Everest, Kansas, in 2010.

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) began its environmental investigations at Everest, Kansas, in 2000. The work at Everest is implemented on behalf of the CCC/USDA by Argonne National Laboratory, under the oversight of the Kansas Department of Health and Environment (KDHE). The results of the environmental investigations have been reported in detail (Argonne 2001, 2003, 2006a,b). The lateral extent of the carbon tetrachloride in groundwater over the years of investigation has been interpreted as shown in Figure 1.1 (2001-2002 data), Figure 1.2 (2006 data), Figure 1.3 (2008 data), and Figure 1.4 (2009 data). The pattern of groundwater flow and inferred contaminant migration has consistently been to the north-northwest from the former CCC/USDA facility toward the Nigh property, and then west-southwest from the Nigh property (e.g., Figure 1.5 [2008 data] and Figure 1.6 [2009 data]). Both the monitoring data for carbon tetrachloride and the low groundwater flow rates estimated for the Everest aquifer unit (Argonne 2003, 2006a,b, 2008) indicate slow contaminant migration. On the basis of the accumulated findings, in March 2009 the CCC/USDA developed a plan for annual monitoring of the groundwater and surface water. This current monitoring plan (Appendix A in the report of monitoring in 2009 [Argonne 2010]) was approved by the KDHE (2009a). Under this plan, the monitoring wells are sampled by the low-flow procedure, and sample preservation, shipping, and analysis activities are consistent with previous work at Everest. The annual sampling will continue until identified conditions at the site indicate a technical justification for a change. The first annual sampling event under the new monitoring plan took place in April 2009. The results of analyses for volatile organic compounds (VOCs) and water level measurements were consistent with previous observations (Figures 1.1-1.4). No carbon tetrachloride was detected in surface water of the intermittent creek or in tree branch samples collected at 18 locations along the creek banks. The complete results were reported previously (Argonne 2010). This report presents the results of the second annual sampling events, conducted in 2010. Included in the 2010 monitoring were the following: (1) Continued automatic and manual monitoring of groundwater levels. (2) Groundwater sampling on April 8-9, 2010. (3) Surface water sampling on April 8, 2010. (4) Vegetation sampling on July 28, 2010. (5) Indoor air sampling at selected residences on August 11-12, 2010. The activities are described in Section 2, and the results are discussed in Section 3. Conclusions and recommendations are presented in Section 4.

54 ENVIRONMENTAL SCIENCES↗

Hanford 100-D Area Biostimulation Soluble Substrate Field Test: Interim Data Summary for the Substrate Injection and Process Monitoring Phases of the Field Test

Pacific Northwest National Laboratory is conducting a treatability test designed to demonstrate that in situ biostimulation can be applied to help meet cleanup goals in the Hanford Site 100-D Area. The in situ biostimulation technology is intended to provide supplemental treatment upgradient of the In Situ Redox Manipulation (ISRM) barrier by reducing the concentration of the primary oxidizing species in groundwater (i.e., nitrate and dissolved oxygen) and chromate, and thereby increasing the longevity of the ISRM barrier. This report summarizes the initial results from field testing of an in situ biological treatment zone implemented through injection of a soluble substrate. The field test is divided into operational phases that include substrate injection, process monitoring, and performance monitoring. The results summarized herein are for the substrate injection and process monitoring phase encompassing the first approximately three months of field testing. Performance monitoring is ongoing at the time this report was prepared and is planned to extend over approximately 18 months. As such, this report is an interim data summary report for the field test. The treatability testing has multiple objectives focused on evaluating the performance of biostimulation as a reducing barrier for nitrate, oxygen, and chromate. The following conclusions related to these objectives are supported by the data provided in this report. Substrate was successfully distributed to a radius of about 15 m (50 ft) from the injection well. Monitoring data indicate that microbial growth initiated rapidly, and this rapid growth would limit the ability to inject substrate to significantly larger zones from a single injection well. As would be expected, the uniformity of substrate distribution was impacted by subsurface heterogeneity. However, subsequent microbial activity and ability to reduce the targeted species was observed throughout the monitored zone during the process monitoring period, and low nitrate and oxygen concentrations were maintained. Chromate concentrations in the treatment zone began to increase about two months after substrate injection, up to about 30 percent of the background concentration upgradient of the test site. The performance monitoring phase will provide additional data to interpret the performance of the biostimulation process and information for scale-up as a reducing barrier.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada: (CY2017 January 2017–December 2017, Rev. 0)

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2017. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. The 86,000-picocuries-per-liter (pCi/L) tritium concentration in one of the wells is about 12 percent higher than measured in 2016 but is over an order of magnitude less than the peak value measured in the well in 1980. The concentration in the other source/plume well is lower than measured in 2016. The water-level monitoring network includes 16 wells. Depth to water measured in 2017 is generally consistent with recent measurements for most wells. Water-level declines differing from long-term trends were observed in four wells. Three of these (WW-4, WW-4A, and WW-5B) are water-supply wells that experienced increases in pumping during the year. No definitive cause for the sharp decline in the fourth well (ER-5-3-2) in 2016 is known as yet. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada for Calendar Year 2016 (January 2016–December 2016), Revision 1

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2016. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. The tritium concentration in both wells is slowly decreasing. The water-level monitoring network includes 16 wells. Depth to water measured in 2016 in all wells is consistent with recent measurements. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CY2018 Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2018–December 2018, Revision 1)

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2018. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. Tritium concentrations in both of these wells, RNM-2S and UE-5n, remain above the Safe Drinking Water Act maximum contaminant level of 20,000 picocuries per liter but declined in 2018 as compared to measurements in 2017. All other contaminants of concern are below the minimum detection level plus analytical error. The water-level monitoring network includes 16 wells. Depth to water measured in 2018 is generally consistent with recent measurements for all wells. Many wells continue to exhibit a long-term downward trend in water level, despite small increases in measured water levels in 2018. The sharp 2016 decline in water level in Well ER-5-3-2 remains unexplained, with the lower level persisting through 2018. Rising water-level trends continue to be observed in two relatively deep wells (ER-5-3 deep piezometer and ER-5-4-2), and also in former supply Well WW-5A. The current supply wells exhibit relatively erratic water levels associated with pumping activities. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

54 ENVIRONMENTAL SCIENCES↗

Innovative Strategies for Long-Term Monitoring of Complex Groundwater Plumes at DOE’s Legacy Sites (Workshop Report)

Most remaining Department of Energy (DOE) sites will require extended periods of institutional control, especially at complex groundwater sites where attenuation-based strategies have been implemented to facilitate closure. The current practice of monitoring—obtaining and analyzing contaminant concentration in groundwater samples at numerous wells—will account for a large portion of the projected life-cycle at these DOE sites unless a new approach is adopted. State-of-the-art technologies are being developed, including in situ sensors, geophysics, radiation mapping, numerical modeling and AI/ML. These technologies can optimize monitoring strategies in space and time, provide spatially extensive information at vulnerable regions and/or provide more continuous monitoring at lower cost. As part of DOE’s Office of Environmental Management (DOE-EM’s) efforts to advance long-term monitoring systems, an in-person/virtual hybrid workshop was hosted by Savannah River National Laboratory (SRNL) on January 24 and 25, 2023, in Augusta, Georgia. Because DOE-EM’s complex sites will eventually be transferred to DOE’s Office of Legacy Management (DOE-LM), representatives of DOE-LM were important participants in the workshop. The purpose of the workshop was to identify challenges and opportunities for deploying advanced technologies for long-term monitoring at DOE sites. The key questions during the workshop were: 1) the regulatory acceptance of replacing a process that traditionally has used laboratory sampling and analysis of groundwater samples, and 2) the application of this strategy to the southwestern arid sites that include many of the remaining DOE-EM and DOE-LM complex groundwater plumes. Characteristics common to most arid sites present both limitations and opportunities for advanced technologies. DOE-EM has funded a National Laboratory team from SRNL, Lawrence Berkeley National Laboratory (LBNL), and Pacific Northwest National Laboratory (PNNL) to establish the overarching framework of long-term monitoring by systematically combining advanced hardware and software technologies. This project is titled “Advanced Long-Term Environmental Monitoring Systems (ALTEMIS)” and is sponsored by the DOE-EM Technology Development Program. The multi-laboratory team is currently developing and testing innovative monitoring strategies, including the use of in situ groundwater sensors, geophysics, drone/satellite-based remote sensing, reactive transport modeling, and artificial intelligence/machine learning (AI/ML). The project’s demonstration testbed is at the Savannah River Site (SRS) F-Area Seepage Basins, where a well-characterized complex groundwater plume composed of uranium and other radionuclides is in the latter stages of remediation. The workshop included more than 70 participants, presentations, a field visit to F-Area, breakout working groups, and large group discussion. Participants developed recommendations on five topics: in situ sensors, spatially integrative tools, challenges to regulatory acceptance, AI/ML strategies, and transitioning sites to DOE-LM.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗