Search NASA⌕ Search

SEARCH · Search NASA

Results for “Model Optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Recent developments in DYNSUB: New models, code optimization and parallelization

DYNSUB is a high-fidelity coupled code system consisting of the reactor simulator DYN3D and the sub-channel code SUBCHANFLOW. It describes nuclear reactor core behavior with pin-by-pin resolution for both steady-state and transient scenarios. In the course of the coupled code system's active development, super-homogenization (SPH) and generalized equivalence theory (GET) discontinuity factors may be computed with and employed in DYNSUB to compensate pin level homogenization errors. Because of the largely increased numerical problem size for pin-by-pin simulations, DYNSUB has bene fitted from HPC techniques to improve its numerical performance. DYNSUB's coupling scheme has been structurally revised. Computational bottlenecks have been identified and parallelized for shared memory systems using OpenMP. Comparing the elapsed time for simulating a PWR core with one-eighth symmetry under hot zero power conditions applying the original and the optimized DYNSUB using 8 cores, overall speed up factors greater than 10 have been observed. The corresponding reduction in execution time enables a routine application of DYNSUB to study pin level safety parameters for engineering sized cases in a scientific environment. (authors)

97 MATHEMATICS AND COMPUTING↗

Application of Process Chemical Modeling to Optimize Radioactive Waste Disposal at the Savannah River Site – 24242

The Liquid Waste Program (LWP) managed by Savannah River Mission Completion (SRMC) is responsible for the treatment and disposal of waste at the Savannah River Site (SRS). Radioactive waste at SRS is stored and processed at four key facilities – each with their respective functions to store, blend, grout, or vitrify waste. The tank farm, where waste is stored, consists primarily of legacy waste with new material incoming from the Accelerated Basin De-inventory program (ABD), which is managed by Savannah River Nuclear Solutions (SRNS). System planning is done by SRNS and SRMC to optimize ABD and LWP operations, respectively.

Georgiou, Andreas↗

On Optimal Input Design and Model Selection for Communication Channels

In this paper, the optimal model (structure) selection and input design which minimize the worst case identification error for communication systems are provided. The problem is formulated using metric complexity theory in a Hilbert space setting. It is pointed out that model selection and input design can be handled independently. Kolmogorov n-width is used to characterize the representation error introduced by model selection, while Gel fand and Time n-widths are used to represent the inherent error introduced by input design. After the model is selected, an optimal input which minimizes the worst case identification error is shown to exist. In particular, it is proven that the optimal model for reducing the representation error is a Finite Impulse Response (FIR) model, and the optimal input is an impulse at the start of the observation interval. FIR models are widely popular in communication systems, such as, in Orthogonal Frequency Division Multiplexing (OFDM) systems.

fast identification↗

Photometric redshift estimation of BASS DR3 quasars by machine learning

ABSTRACT Correlating Beijing–Arizona Sky Survey (BASS) data release 3 (DR3) catalogue with the ALLWISE data base, the data from optical and infrared information are obtained. The quasars from Sloan Digital Sky Survey are taken as training and test samples while those from LAMOST are considered as external test sample. We propose two schemes to construct the redshift estimation models with XGBoost, CatBoost, and Random Forest. One scheme (namely one-step model) is to predict photometric redshifts directly based on the optimal models created by these three algorithms; the other scheme (namely two-step model) is to first classify the data into low- and high-redshift data sets, and then predict photometric redshifts of these two data sets separately. For one-step model, the performance of these three algorithms on photometric redshift estimation is compared with different training samples, and CatBoost is superior to XGBoost and Random Forest. For two-step model, the performances of these three algorithms on the classification of low and high redshift subsamples are compared, and CatBoost still shows the best performance. Therefore, CatBoost is regarded as the core algorithm of classification and regression in two-step model. In contrast to one-step model, two-step model is optimal when predicting photometric redshift of quasars, especially for high-redshift quasars. Finally, the two models are applied to predict photometric redshifts of all quasar candidates of BASS DR3. The number of high-redshift quasar candidates is 3938 (redshift ≥3.5) and 121 (redshift ≥4.5) by two-step model. The predicted result will be helpful for quasar research and follow-up observation of high-redshift quasars.

79 ASTRONOMY AND ASTROPHYSICS↗

Comparison of Wind Farm Layout Optimization Results Using a Simple Wake Model and Gradient-Based Optimization to Large-Eddy Simulations: Preprint

Comparison of wind farm layout optimization results with simulations or wind tunnel tests is important because the models used during optimization use simplifying assumptions that can alter the design space. Some of the characteristics of the simple models may negatively influence the resulting layouts. In this paper we perform wind farm layout optimization and compare the resulting improvements to large eddy simulation (LES) results. We begin by describing the models used, including changes specific for use with gradient-based optimization. We then compare our version of the models with the original versions and large eddy simulation LES) data from previous publications. Using the models described, we performed gradient-based wind farm layout optimization, using exact gradients, and compare the results to LES simulations. The models predicted an improvement in annual energy production (AEP) of 7.4%, while the LES reported an AEP improvement of 9:9%. We conclude that the improvements found by optimizing with the simple models are not just an artifact of the models, but are real improvements.

17 WIND ENERGY↗