Search NASA⌕ Search

SEARCH · Search NASA

Results for “Multi - threaded programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

New architectural paradigms for multi-petabyte distributed storage systems

In the not too distant future, programs such as NASA's Earth Observing System, NSF/ARPA/NASA's Digital Libraries Initiative and Intelligence Community's (NSA, CIA, NRO, etc.) mass storage system upgrades will all require multi-petabyte (petabyte: 1015 bytes of bitfile data) (or larger) distributed storage solutions. None of these requirements, as currently defined, will meet their objectives utilizing either today's architectural paradigms or storage solutions. Radically new approaches will be required to not only store and manage veritable 'mountain ranges of data', but to make the cost of ownership affordable, much less practical in today's (and certainly the future's) austere budget environment! Within this paper we will explore new architectural paradigms and project systems performance benefits and dollars per petabyte of information stored. We will discuss essential 'top down' approaches to achieving an overall systems level performance capability sufficient to meet the challenges of these major programs.

Lee, Richard R.↗

Development Of FIAT-Based Thermal Protection System Mass Estimating Relationships For NASA's Multi-Mission Earth Entry Concept

Mass Estimating Relationships (MERs) have been developed for use in the Program to Optimize Simulated Trajectories II (POST2) as part of NASA's multi-mission Earth Entry Vehicle (MMEEV) concept. MERs have been developed for the thermal protection systems of PICA and of Carbon Phenolic atop Advanced Carbon-Carbon on the forebody and for SIRCA and Acusil II on the backshell. How these MERs were developed, the resulting equations, model limitations, and model accuracy are discussed herein.

Sepka, Steven↗

Development of FIAT-based Thermal Protection System Mass Estimating Relationships for NASA's Multi-Mission Earth Entry Concep

Mass Estimating Relationships (MERs) have been developed for use in the Program to Optimize Simulated Trajectories II (POST2) as part of NASA's multi-mission Earth Entry Vehicle (MMEEV) concept. MERs have been developed for the thermal protection systems of PICA and of Carbon Phenolic atop Advanced Carbon-Carbon on the forebody and for SIRCA and Acusil II on the backshell. How these MERs were developed, the resulting equations, model limitations, and model accuracy are discussed herein.

MER↗

Experimental Results of the First Two Stages of an Advanced Transonic Core Compressor Under Isolated and Multi-Stage Conditions

NASA's Environmentally Responsible Aviation (ERA) Program calls for investigation of the technology barriers associated with improved fuel efficiency of large gas turbine engines. Under ERA the task for a High Pressure Ratio Core Technology program calls for a higher overall pressure ratio of 60 to 70. This mean that the HPC would have to almost double in pressure ratio and keep its high level of efficiency. The challenge is how to match the corrected mass flow rate of the front two supersonic high reaction and high corrected tip speed stages with a total pressure ratio of 3.5. NASA and GE teamed to address this challenge by using the initial geometry of an advanced GE compressor design to meet the requirements of the first 2 stages of the very high pressure ratio core compressor. The rig was configured to run as a 2 stage machine, with Strut and IGV, Rotor 1 and Stator 1 run as independent tests which were then followed by adding the second stage. The goal is to fully understand the stage performances under isolated and multi-stage conditions and fully understand any differences and provide a detailed aerodynamic data set for CFD validation. Full use was made of steady and unsteady measurement methods to isolate fluid dynamics loss source mechanisms due to interaction and endwalls. The paper will present the description of the compressor test article, its predicted performance and operability, and the experimental results for both the single stage and two stage configurations. We focus the detailed measurements on 97 and 100 of design speed at 3 vane setting angles.

turbomachinery↗

Exprimental Results of the First Two Stages of an Advanced Transonic Core Compressor Under Isolated and Multi-Stage Conditions.

NASA's Environmentally Responsible Aviation (ERA) Program calls for investigation of the technology barriers associated with improved fuel efficiency for large gas turbine engines. Under ERA, the highly loaded core compressor technology program attempts to realize the fuel burn reduction goal by increasing overall pressure ratio of the compressor to increase thermal efficiency of the engine. Study engines with overall pressure ratio of 60 to 70 are now being investigated. This means that the high pressure compressor would have to almost double in pressure ratio while keeping a high level of efficiency. NASA and GE teamed to address this challenge by testing the first two stages of an advanced GE compressor designed to meet the requirements of a very high pressure ratio core compressor. Previous test experience of a compressor which included these front two stages indicated a performance deficit relative to design intent. Therefore, the current rig was designed to run in 1-stage and 2-stage configurations in two separate tests to assess whether the bow shock of the second rotor interacting with the upstream stage contributed to the unpredicted performance deficit, or if the culprit was due to interaction of rotor 1 and stator 1. Thus, the goal was to fully understand the stage 1 performance under isolated and multi-stage conditions, and additionally to provide a detailed aerodynamic data set for CFD validation. Full use was made of steady and unsteady measurement methods to understand fluid dynamics loss source mechanisms due to rotor shock interaction and endwall losses. This paper will present the description of the compressor test article and its measured performance and operability, for both the single stage and two stage configurations. We focus the paper on measurements at 97% corrected speed with design intent vane setting angles.

transonic compressors↗

Aerocapture Design Study for a Titan Polar Orbiter

In 2014 a team at NASA Goddard Space Flight Center (GSFC) studied the feasibility of using active aerocapture to reduce the chemical Delta V requirements for inserting a small scientific satellite into Titan polar orbit. The scientific goals of the mission would be multi-spectral imaging and active radar mapping of Titan's surface and subsurface. The study objectives were to: (i) identify and select from launch window opportunities and refine the trajectory to Titan; (ii) study the aerocapture flight path and refine the entry corridor; (iii) design a carrier spacecraft and systems architecture; (iv) develop a scientific and engineering plan for the orbital portion of the mission. Study results include: (i) a launch in October 2021 on an Atlas V vehicle, using gravity assists from Earth and Venus to arrive at Titan in January 2031; (ii) initial aerocapture via an 8-km wide entry corridor to reach an initial 350X6000 km orbit, followed by aerobraking to reach a 350X1500 km orbit, and a periapse raise maneuver to reach a final 1500 km circular orbit; (iii) a three-part spacecraft system consisting of a cruise stage, radiator module, and orbiter inside a heat shield; (iv) a 22-month mission including station keeping to prevent orbital decay due to Saturn perturbations, with 240 Gb of compressed data returned. High-level issues identified include: (i) downlink capability - realistic downlink rates preclude the desired multi-spectral, global coverage of Titan's surface; (ii) power - demise of the NASA ASRG (Advanced Stirling Radioisotope Generator) program, and limited availability at present of MMRTGs (Multi-Mission Radioisotope Generators) needed for competed outer planet missions; (iii) thermal - external radiators must be carried to remove 4 kW of waste heat from MMRTGs inside the aeroshell, requiring heat pipes that pass through the aeroshell lid, compromising shielding ability; (iv) optical navigation to reach the entry corridor; (v) the NASA requirement of continuous critical event coverage for the orbiter, especially during the peak heating of the aerocapture when the radio link will be broken. In conclusion, although Titan aerocapture allows for considerable savings in propellant mass, this comes at a cost of increased mission complexity. Further architecture study and refinement is required to reduce high-level mission risks and to elucidate the optimum architecture.

Nixon, Conor A.↗

Geographic analysis of multiple sensor data from the NASA/USGS earth resources program

Qualitative and quantitative analyses were made of multi-sensor data acquired during aircraft missions. While the principal analysis effort was concentrated on imagery taken over test sites in Southern California, data were also studied from records acquired on missions over test sites at Phoenix, Chicago, Asheville, and New Orleans. The objectives of the analyses were: (1) to determine the capabilities of ten remote sensors in identifying the elements of information necessary in conducting geographic investigations in land use analysis, urban problems, surface energy budget, and soil moisture; (2) to determine the feasibility of using these sensors for these purposes at orbital altitudes; and (3) to collate and analyze ground and air data previously collected and assemble it in a format useful in the accomplishment of cost effectiveness studies.

Pascucci, R. F.↗

Mutual downwash interference effects on the normal force and roll driving coefficients of multi-stage rockets

For several years, the TAD2 computer program has been used to calculate the aerodynamic properties of sounding rockets. This program was limited, however, in that a maximum of two fin sets could be accommodated analytically. In addition, the roll moment coefficients did not consider downwash effects. Techniques are developed and equations derived for the expansion of capability to include three fin sets. The effects of downwash on the roll moment coefficients are also treated analytically for two and three stage rockets.

Ward, P. R.↗

Pratt and Whitney Overview and Advanced Health Management Program

Hardware Development Activity: Design and Test Custom Multi-layer Circuit Boards for use in the Fault Emulation Unit; Logic design performed using VHDL; Layout power system for lab hardware; Work lab issues with software developers and software testers; Interface with Engine Systems personnel with performance of Engine hardware components; Perform off nominal testing with new engine hardware.

Inabinett, Calvin↗

Use of Heritage Hardware on MPCV Exploration Flight Test One

Due to an aggressive schedule for the first orbital test flight of an unmanned Orion capsule, known as Exploration Flight Test One (EFT1), combined with severe programmatic funding constraints, an effort was made to identify heritage hardware, i.e., already existing, flight-certified components from previous manned space programs, which might be available for use on EFT1. With the end of the Space Shuttle Program, no current means exists to launch Multi Purpose Logistics Modules (MPLMs) to the International Space Station (ISS), and so the inventory of many flight-certified Shuttle and MPLM components are available for other purposes. Two of these items are the Shuttle Ground Support Equipment Heat Exchanger (GSE Hx) and the MPLM cabin Positive Pressure Relief Assembly (PPRA). In preparation for the utilization of these components by the Orion Program, analyses and testing of the hardware were performed. The PPRA had to be analyzed to determine its susceptibility to pyrotechnic shock, and vibration testing had to be performed, since those environments are predicted to be significantly more severe during an Orion mission than those the hardware was originally designed to accommodate. The GSE Hx had to be tested for performance with the Orion thermal working fluids, which are different from those used by the Space Shuttle. This paper summarizes the certification of the use of heritage hardware for EFT1.

Rains, George Edward↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Composite Materials Research and Technology at NASA/MSFC

The utilization of composite materials in the Space Shuttle and Advanced Space Transportation Programs is reviewed. Topics include goals and challenges, descriptions of multi-generational launch vehicles, and an overview of composite materials research and technologies that support program objectives. A brief discussion of planned composite materials research and technology concludes the presentation.

Ledbetter, Frank E., III↗

Flight test validation of a design procedure for digital autopilots

Commercially available general aviation autopilots are currently in transition from an analogue circuit system to a computer implemented digital flight control system. Well known advantages of the digital autopilot include enhanced modes, self-test capacity, fault detection, and greater computational capacity. A digital autopilot's computational capacity can be used to full advantage by increasing the sophistication of the digital autopilot's chief function, stability and control. NASA's Langley Research Center has been pursuing the development of direct digital design tools for aircraft stabilization systems for several years. This effort has most recently been directed towards the development and realization of multi-mode digital autopilots for GA aircraft, conducted under a SPIFR-related program called the General Aviation Terminal Operations Research (GATOR) Program. This presentation focuses on the implementation and testing of a candidate multi-mode autopilot designed using these newly developed tools.

Bryant, W. H.↗

History of the Animal Care Program at Johnson Space Center

NASA has a rich history of scientific research that has been conducted throughout our numerous manned spaceflight programs. This scientific research has included animal test subjects participating in various spaceflight missions, including most recently, Space Shuttle mission STS-131. The Animal Care Program at Johnson Space Center (JSC) in Houston, Texas is multi-faceted and unique in scope compared to other centers within the agency. The animal care program at JSC has evolved from strictly research to include a Longhorn facility and the Houston Zoo's Attwater Prairie Chicken refuge, which is used to help repopulate this endangered species. JSC is home to more than 300 species of animals including home of hundreds of white-tailed deer that roam freely throughout the center which pose unique issues in regards to population control and safety of NASA workers, visitors and tourists. We will give a broad overview of our day to day operations, animal research, community outreach and protection of animals at NASA Johnson Space Center.

Khan-Mayberry, Noreen↗

Re-engineering NASA's space communications to remain viable in a constrained fiscal environment

Along with the Red and Blue Teams commissioned by the NASA Administrator in 1992, NASA's Associate Administrator for Space Communications commissioned a Blue Team to review the Office of Space Communications (Code O) Core Program and determine how the program could be conducted faster, better, and cheaper. Since there was no corresponding Red Team for the Code O Blue Team, the Blue Team assumed a Red Team independent attitude and challenged the status quo, including current work processes, functional distinctions, interfaces, and information flow, as well as traditional management and system development practices. The Blue Team's unconstrained, non-parochial, and imaginative look at NASA's space communications program produced a simplified representation of the space communications infrastructure that transcends organizational and functional boundaries, in addition to existing systems and facilities. Further, the Blue Team adapted the 'faster, better, cheaper' charter to be relevant to the multi-mission, continuous nature of the space communications program and to serve as a gauge for improving customer services concurrent with achieving more efficient operations and infrastructure life cycle economies. This simplified representation, together with the adapted metrics, offers a future view and process model for reengineering NASA's space communications to remain viable in a constrained fiscal environment. Code O remains firm in its commitment to improve productivity, effectiveness, and efficiency. In October 1992, the Associate Administrator reconstituted the Blue Team as the Code O Success Team (COST) to serve as a catalyst for change. In this paper, the COST presents the chronicle and significance of the simplified representation and adapted metrics, and their application during the FY 1993-1994 activities.

Hornstein, Rhoda Shaller↗

Eleven Countries, an Integrated Spacecraft: the Story of International Collaboration that Built the Orion Spacecraft and Powered the Success of the Artemis I Mission

The quest to return humans to the Moon in the next step towards humanity's exploration of space is more alive than ever. After a great deal of achievements, failures, and lessons learned, the Artemis I mission set o to the Moon on November 16, 2022, with the goal of testing a new rocket, the Space Launch System, and a new spacecraft, Orion: designed, assembled, and tested across two continents, and 11 countries. Behind this mission, decades of experience with the International Space Station, Autonomous Transfer Vehicle operations, and many other program collaborations built the know-how on how to succeed together in the toughest environment | deep space. The Artemis I mission proved to be an incredible success, meeting 161 total mission objectives, including 21 developed during the flight based on outperforming spacecraft. It was also a case-study in international collaboration, given that ESA, NASA, and industry partners Airbus and Lockheed Martin for the first time had to design, build, test, and fly a fully integrated human-rated spacecraft, with most critical functions dependent and interconnected across U.S. and European systems. The U.S.-built Orion Crew Module and Crew Module Adapter and European-built European Service Module (ESM) shared critical interfaces and commodities, from propulsion, avionics, active/passive thermal, electrical power generation, storage and distribution to the software that managed it all. In this paper, we will describe relevant aspects of the integrated spacecraft design, providing context for the challenges that the team faced in all phases required to get Orion ready to fly, and provide a direct account of how the joint team formed, trained, and supported the operations of the successful Artemis I mission. We will also explore the evolution of the partnerships, given that these allow a multi-national e ort to sustain the program production, share costs, leverage a broader base of engineering expertise, and build more diverse capabilities over the long haul to support the Artemis goals and objectives. Lastly, we will cover critical lessons learned and how the Orion Program has implemented these in preparation of the next Artemis missions to repeat the success of Artemis I. The purpose of this paper is to document knowledge we gained and lessons we learned through the development of an integrated Orion spacecraft, since it is imperative we build on this now, at the dawn of the Artemis Program, an international endeavor to push human space exploration.

Deep Space Exploration↗

Alternative to Nitric Acid Passivation

The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC), Florida, has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of NASA and the GSDO Program, the objective of this project is to qualify citric acid as an environmentally-preferable alternative to nitric acid for passivation of stainless steel alloys. This project is a direct follow-on to United Space Alliance (USA) work at KSC to optimize the parameters for the use of citric acid and verify effectiveness. This project will build off of the USA study to further evaluate citric acids effectiveness and suitability for corrosion protection of a number of stainless steels alloys used by NASA, the Department of Defense (DoD), and the European Space Agency (ESA).

stainless steel↗

Environmentally-Preferable Launch Coatings

The Ground Systems Development and Operations (GSDO) Program at NASA Kennedy Space Center (KSC), Florida, has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of NASA and the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion protecting coatings for launch facilities and ground support equipment (GSE). The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. The project compares coating performance of the selected alternatives to existing coating systems or standards.

ground support equipment↗