The Project Manager Who Saved His Country

George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

Baniszewski, John↗

Overview of the PLEXIL Plan Execution Technology and its Applications in Autonomous Piloting Projects at NASA

Automated planning is a key Artificial Intelligence technology enabling Unmanned Aerial Systems (UAS) and the eminent reality of Urban Air Mobility (UAM). It produces plans, which formalize procedures often performed by humans. Plans differ from other kinds of computer programs in their ability to react and interact with a dynamically changing environment. Aviation plans must encode the procedural knowledge, reasoning capability, and capacity for multi-tasking held by competent human pilots. Correct execution of these plans (performed by software called an executive) in the dynamic airspace environment is vital to the success of each automated flight, and the safety of the vehicle and all things in its path. In the early 2000s NASA developed a plan representation language and executive called PLEXIL (Plan Execution Interchange Language) that has successfully been applied in several NASA aviation and UAS projects. Autonomy Operating System (AOS), Cockpit Hierarchical Automated Planning and Execution (CHAP-E), and ICAROUS are all projects that have used PLEXIL to help encode and automatically execute flight procedures, some normally performed by human pilots. AOS also automates a subset of pilot/Air Traffic Control communication towards enabling UAS entry into the National Airspace. PLEXIL has been open-source software since 2008 and has seen usage in a wide range of prototypical autonomy applications in academia, government, and industry. In this presentation, we describe PLEXIL and highlight its significant accomplishments in the aviation domain.

Dalal, Michael↗

Pliocene Model Intercomparison Project Phase 3 (PlioMIP3) – Science Plan and Experimental Design

The Pliocene Model Intercomparison Project (PlioMIP) was initiated in 2008. Over two phases PlioMIP has helped co-ordinate the experimental design and publication strategy of the community, which has included an increasing number of climate models and modelling groups from around the world. It has engaged with palaeoenvironmental scientists to foster new data synthesis supporting the construction of new model boundary conditions, as well as to facilitate new data-model comparisons. The work has advanced our understanding of Pliocene climates and environments, enhanced our knowledge regarding the ability of complex climate and Earth System models to accurately simulate climate change, and helped to refine our estimates of how sensitive the climate system is to forcing conditions. In this community protocol paper, we outline the scientific plan for PlioMIP Phase 3 (PlioMIP3). This plan provides the required guidance to participating modelling groups from around the world to successfully set up and perform PlioMIP3 climate model experiments. The project is open to new participants from the scientific community (both from the climate modelling and geosciences communities). In PlioMIP3, we retain the PlioMIP2 Core experiments (Eoi 400 , E 280 ) and extend the Core requirements to include either an experiment focussed on the Early Pliocene or an alternative Late Pliocene simulation (or both). These additions (a) allow a comparison of Early and Late Pliocene warm intervals and help build research connections and synergy with the MioMIP (Miocene Model Intercomparison Project - also known as DeepMIP-Miocene) and PlioMioVAR projects (Pliocene-Miocene Variability Working Group), and (b) create an alternative time slice simulation for 3.205 Ma (MIS KM5c) through removal of some of the largest palaeogeographic differences introduced between PlioMIP1 and 2 resulting in minimal land-sea mask variations from the modern. In addition, we present ten optional experiments designed to enhance our assessment of climate sensitivity and to explore the uncertainty in greenhouse gas-related forcing. For the first time, we introduce orbital sensitivity experiments into the science plan, as well as simulations incorporating dynamic vegetation-climate feedbacks and an experiment designed to examine the potential significance of East Antarctic Ice Sheet boundary condition uncertainty. These changes enhance palaeo-to-future scientific connections and enable an exploration of the significance of palaeogeographic uncertainties on climate simulations.

Climate modelling↗

Grimsel Test Site - A Successful International Underground Research Laboratory for Many Decades - 20429

For more than 35 years, Nagra and its partners from around the world have been conducting underground research projects at the Grimsel Test Site (GTS, www.grimsel.com) to contribute to the development and confirmation of safe geological disposal concepts and for the characterization of suitable host rock formations. Over the years, the results of this internationally recognized research program have been, and continue to be, incorporated directly into exploration programs, modelling, safety, and engineering feasibility studies on options for deep geological repositories. Each project of the GTS program involves field-testing, laboratory studies, design and modelling tasks, and integrates all scientific and technical aspects. Each project phase is planned with a duration of three to five years to facilitate practical and administrative aspects and allow flexibility for updating the overall project plans with the latest findings. Scientific and engineering interaction among the different projects is ensured via an international steering committee meeting. Hosting an IAEA level C radiation- controlled zone, which allows use of radionuclides, including actinides such as thorium, uranium, neptunium, plutonium and americium, in in-situ experiments is one of the reasons why GTS also developed as a center of excellence for work with radioactive tracers under realistic in-situ boundary conditions. Last year, a new five-year program (2019 to 2023) started which includes projects with a planning horizon of decades. The new five-year program includes a new phase of in-situ experiments using radionuclides such as migration experiments in the Colloid Formation and Migration project (CFM), the Long-Term Diffusion experiment (LTD) and the newly established C-14 and I-129 Migration in cement project (CIM). The 'High Temperature effects on Bentonite' (HotBENT) project is starting in the current phase and is studying the effects of elevated temperatures (>175 deg. C) on bentonite materials. As a generic underground research laboratory (URL) it is expected that the GTS will provide in the coming years a platform for international collaboration, knowledge development and knowledge transfer for the next generation of scientists and engineers in the area of radioactive waste disposal and geosciences. A key role regarding knowledge transfer and training is provided by the well-established Grimsel Training Center (GTC), which (beside many URL related issues) also covers many general aspects of radioactive waste management. In this paper we provide an overview of the current program at the GTS, focusing on the experiments that study the migration of radionuclides through engineered barrier materials and the geosphere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Apollo Soyuz Test Project photographic processing control plan

The laboratory controls to be used within the photographic technology division (PTD) for processing original space flight films exposed on the Apollo Soyuz Test Project mission are specified. The sensitometric exposures to be used by PTD for certifying processes, for exposing Houston Controls, and for preflight and postflight exposures on original films as well as procedures for film certification are described. Processing conditions used to achieve each control and processing machine operating parameters are included.

Lockwood, H. E.↗

Storm Water Pollution Prevention Plan for the Facility LAMP Project

A site-specific Stormwater Pollution Prevention Plan (SWPPP) is needed for most construction activities/projects that disturb one (1) acre or more of land to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated With Construction and Land Disturbance Activities (General Permit) issued by the State Water Resources Control Board (State Board). This Order No. 2009-0009- DWQ was adopted by the State Board on September 2, 2009 and became effective July 1, 2010

54 ENVIRONMENTAL SCIENCES↗

The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status

NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.

Clark, John S.↗

Ute Mountain Ute Tribe Community-Scale Solar Project (Final Technical Report)

Deployment of Community-Scale solar power has been a goal of the Ute Mountain Ute Tribe (Tribe) for several years. The 1 MW AC photovoltaic power facility was built to power Tribal facilities in a manner that would allow the Tribe to credit residents’ electric bills and Tribal government electric bills with the dollar equivalent of the power generated. Other accomplished project objectives, in addition to learning the intricacies of such an endeavor, included strengthening the relationship with the local electric cooperative and their primary power provider, analysis of the generation and operations and maintenance during a one-year test phase, workforce development and training, and using the project to plan and drive future community scale solar projects. The Tribe’s vision of a net-zero electrical independence for its communities became a clearer reality with this project.

14 SOLAR ENERGY↗

Mod-2 wind turbine project assessment and cluster test plans

An assessment of the Mod-2 Wind Turbine project is presented based on initial goals and present results. Specifically, the Mod-2 background, project flow, and a chronology of events/results leading to Mod-2 acceptance is presented. After checkout/acceptance of the three operating turbines, NASA/LeRC will continue management of a two year test program performed at the DOE Goodnoe Hills test site. This test program is expected to yield data necessary for the continued development and optimization of wind energy systems. These test activities, the implementation of, and the results to date are also presented.

Gordon, L. H.↗

Mobile VLBI deployment plans of the Crustal Dynamics Project for the western United States and Alaska

Current plans for the Mobile VLBI program are addressed. Present mobile stations and their past activities are summarized, and past and future modes of obtaining data are compared, including the 'burst' and 'leap frog' modes. The observational campaign for Mobile VLBI is described, emphasizing the portions in Canada and Alaska. The extent to which the mobile stations are utilized and the ways in which the site visit yield may be increased are discussed.

Trask, D. W.↗

2024 Nasa Lunabotics University Competition: Site Preparation With Bulk Regolith

Introduction: Lunabotics provides accredited institutions of higher learning students (vocational-technical, college, university) an opportunity to apply the NASA systems engineering process to design and build a prototype robot. This robot would be capable of performing the proposed operations on the Lunar surface in support of future Artemis mission goals. Lunabotics features a systems engineering design challenge to engage students in the next phase of hu-man space exploration supporting the Artemis missions. This two-semester event encourages students to design and build an autonomous or telerobotic robot designed to traverse the simulated Lunar surface and complete the assigned construction tasks. The number of teams accepted into this challenge is not predetermined but is based on the scores and overall quality of the Project Management Plans received and other factors. The culmination of the Lunabotics virtual challenge will be the design, build and operation of a functional prototype Lunar robot. Teams are required to submit the following: (1) Project Management Plan, (2) Systems Engineering Paper, a (3) STEM Engage-ment Report, and a (4) Proof of Life Video. This is an optional item, but to qualify for the grand prize a team must also submit a: (5) Presentation and Demonstration. Background: The NASA Lunabotics University Competition was first held in 2010 as a follow on to the NASA Regolith Excavation Challenge [1]. The high level of interest and participation from over 50 universities each year has led to a sustained annual competi-ion cadence: it has been held every May for the past 14 years [2,3]. Over 6,000 students have participated and been inspired to pursue Science, Technology, En-gineering and Mathematics careers (STEM). 2024 Competition: The necessary lunar surface tasks are evolving to meet the NASA Artemis Mission requirements. In the past Lunabotics challenges we gathered data to support Lunar mining for consuma-bles in the Lunar regolith. Now, in 2024, the task is to gather data on Lunar site preparation and construction by designing and building a robot that will traverse the chaotic Lunar terrain and construct a regolith-based berm. The goal is to build a berm structure which would be useful to the Artemis Mission for blast and ejecta protection during lunar landings and launches, shading cryogenic propellant tank farms, providing radiation protection around a nuclear power plant and other mission critical uses. Lunabotics will consist of three separate events this year. The first event is NASA’s Lunabotics Project Development Challenge, where teams submit various deliverables to be scored by judges. The second event will be the University of Central Florida (UCF) Lunabotics Qualification challenge, in the Exolith laboratory, where teams will put their de-signs to the test. The top ten scoring teams from the Qualification challenge are then invited to the third and final event, NASA’s Lunabotics On-Site Challenge at Kennedy Space Center in Florida. This presentation will summarize the results and lessons learned from the NASA Lunabotics University Competition held in May 2024.

Lunabotics↗

Computer-aided software development process design

The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.

Lin, Chi Y.↗

Review of NASA's Hypersonic Research Engine Project

The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.

Andrews, Earl H.↗

NASA's Hypersonic Research Engine Project: A review

The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.

Andrews, Earl H.↗

Composite Crew Module: Primary Structure

In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center to design, build, and test a full-scale crew module primary structure, using carbon fiber reinforced epoxy based composite materials. The overall goal of the Composite Crew Module project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project's baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. This report discusses the project management aspects of the project including team organization, decision making, independent technical reviews, and cost and schedule management approach.

Kirsch, Michael T.↗

Materials and Process Activities for NASA's Composite Crew Module

In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). The overall goal of the CCM project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project s baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. The materials and process activities were prioritized based on a rapid prototype approach. This approach focused developmental activities on design details with greater risk and uncertainty, such as out-of-autoclave joining, over some of the more traditional lamina and laminate building block levels. While process development and associated building block testing were performed, several anomalies were still observed at the full-scale level due to interactions between process robustness and manufacturing scale-up. This paper describes the process anomalies that were encountered during the CCM development and the subsequent root cause investigations that led to the final design solutions. These investigations highlight the importance of full-scale developmental work early in the schedule of a complex composite design/build project.

Polis, Daniel L.↗

Explanation of Change (EoC) Study: Approach and Findings

This study investigated thirty historical NASA science missions to explain the cost change experienced. The study included investigation of historical milestone and monthly status report documentation followed by interviews with key project personnel. Based on the information collected, the reasons for cost change were binned, at the highest level, into four separate categories: NASA External, Project External, Internal Planning, and Internal Execution. The results identified that roughly a third of the change is outside of the project's control, a third is due to assumptions made in project planning, and a third is due to the inherent difficulty of building highly complex, one-of-a-kind, cutting edge, Earth and space science missions.

Bitten, Robert E.↗