Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pilots”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Heavy Oil Polymer EOR in the Challenging Alaskan Arctic - It Works!

Under co-sponsorship of the US Department of Energy and Hilcorp Alaska LLC the first ever polymer field pilot commenced on 8/28/2018 in the Schrader Bluff heavy oil reservoir at the Milne Point Field on Alaska North Slope (ANS). The primary objective of the pilot is to prove the efficacy of polymer Enhanced Oil Recovery (EOR) to unlock the vast heavy oil resources on ANS. More than two and half years after startup, the polymer injection, supporting laboratory experiments and simulation studies steadily continue. The pilot started injecting hydrolyzed polyacrylamide (HPAM), at a concentration of 1,750 ppm to achieve a target viscosity of 45 cP, into the two horizontal injectors in the flood pattern. Production is monitored in the two horizontal producers. Based on laboratory measurements of polymer viscosity at reservoir conditions, the team decided to reduce polymer concentration to 1,200 ppm since July 2020 in an effort to control injection pressure and optimize polymer utilization. Quality control (QC) on the field ensures uniform polymer solution properties. Representative rock and fluid systems and test conditions are utilized in the corefloods on polymer retention, effect of injection water salinity, polymer loading, and their combinations on oil recovery. A history matched reservoir simulation model for forecasting oil recovery was developed on the basis of all the available field data. Field concerns related to the post-polymer breakthrough impact on flow assurance is addressed via specialized laboratory tests. Notwithstanding early operational disruptions and hydration issues, continuous polymer injection in both injectors has been achieved. To date, 950,000 lbs of polymer or 2 million barrels of polymer solution, equating to 13% of total pore volume (PV), has been placed in the flood pattern, serving as an effective indicator of adequate polymer injectivity. So far, the success of polymer EOR is evident from drastically reduced water cut in the producers, an estimated incremental 1,000 bopd over waterflood, and a favorable polymer utilization of 1.7 lbs/barrel of incremental oil. Polymer breakthrough was observed 26 months after the start of polymer injection. Main observations from corefloods are unusually high polymer retention values in some cases and a positive response to low salinity water. Although the heterogeneity in the flood pattern and exceptionally low water cut pose some challenges, persistent novel and justifiable simulation approaches have resulted in a robust history matched model. Experimental results on produced fluids treatment provide operational guidance for improved oil-water separation and mitigation of heater tube fouling. The ongoing success of the pilot is a key indicator of bringing the team ever closer to meeting the project’s primary objective. The encouraging results of the pilot is one of the drivers that has provided the impetus to apply polymer EOR throughout the Milne Point Field, which would increase oil recovery and extend the economic life of the Trans Alaska Pipeline System. The scientific knowledge, including the many lessons learned from this pilot also has referential value for other potential heavy oil EOR projects throughout the world. The collected data, operational lessons learned, and the overall success of the pilot are summarized in the paper.

None, None↗

Dual-Fuel Ammonia Equivalence Ratio Sweep Data

Ammonia (NH3) has garnered significant interest as an alternative fuel for meeting international emissions reduction mandates in sectors with high weight and distance requirements, such as shipping. Technical barriers and unanswered questions remain on the combustion strategies that can maximize ammonia utilization and minimize emissions. Prior research studies at the US Department of Energy’s Oak Ridge National Laboratory have shown strong performance with NH3 under dual-fuel mode using conventional diesel combustion (CDC) manifold air pressure settings. Diesel airflow was initially used to simplify retrofitting (no turbocharger modification), which resulted in air-fuel equivalence ratios (λ) greater than 1.5. To characterize potential improvements in dual-fuel NH3 combustion performance at richer in-cylinder conditions, a global λ sweep compared the use of early (E-pilot) and late (L-pilot) single diesel injections. The experiments were conducted at 1200 RPM and 12.8 ± 0.2 bar (75 % load), and λ was varied by decreasing the commanded air flow to the engine at greater than 90 % ammonia energy substitution level. A diesel injection timing sweep was conducted for both the injection strategies at fixed λ, and the timing with the lowest engine-out N2O emissions was identified. The results indicated an optimal balance between CO2,eq and thermal efficiency benefits both E-pilot and L-pilot injection strategy cases compared with CDC at a λ of 1.4. The indicated nitrogen-based emissions exhibited a strong correlation to the ratio of CA5–50 and ignition delay for L-pilot, but no apparent trend emerged for the E-pilot injection strategy at the tested boundary conditions. This dataset includes the raw experimental data and documentation of the experiment conditions and methods.

30 DIRECT ENERGY CONVERSION↗

Demonstration of Scaled-Production of Rare Earth Oxides and Critical Materials from U. S. Coal-Based Sources (Final Report)

The project objective was to demonstrate scaled production of high purity rare earth oxides (REO), nominally exceeding 90% grade, from coal refuse sources using innovative technologies that reduce cost and improve environmental outcomes relative to traditional rare earth processing technologies. The project utilized a critical material pilot plant constructed and tested as part of a previous U.S. Department of Energy project. Target performance criteria was a 50% reduction in production cost based on previous optimum values, 150% increase in recovery and greater than 2% concentrates of rare earth oxides, cobalt and manganese. Concentrate production goals were to produce a rare earth mix oxide product at a rate of 200 grams per day having a minimum purity of 50% as well as products of cobalt and manganese having a minimum purity of 2%. A previous pilot plant investigation identified acid cost as the major contributor to an operating cost that made the recovery of rare earth and other critical metals from bituminous coal sources economically challenging. As such, acid cost reduction was a major target using bio-oxidation reactors to produce sulfuric acid from naturally occurring coal pyrite. Based on laboratory data, a bio-oxidation circuit was designed for the pilot plant to produce 7.5 l/min of acid using two 11-m3 (3000 gallon) reactors equipped with 40 hp aerators for air dispersion. The pilot-scale tests revealed that acid concentration equivalent to as high as 1.0 M sulfuric acid could be continuously produced. However, the bio-acid contained exceptionally high iron concentrations, which complicated downstream processing of the pregnant leach solution (PLS). A TEA of the bio-oxidation circuit showed that production cost was approximately $0.13 per kg acid equivalent if produced using a four-day retention time in the reactors. This value represents a 48% reduction from that of purchased bulk sulfuric acid. Calcination (or roasting) studies were conducted on coarse refuse from West Kentucky No. 13 and Fire Clay coal seam sources. The test results revealed the potential to increase recovery by nearly 100% using temperatures between 500°C to 700°C with light REE recovery value being the most improved. Acid baking of the calcined products using sulfuric acid at 250°C increased heavy rare earth recovery from around 40% to 80% while decreasing the acid requirements by over 50%. The existing pilot plant was upgraded for the pilot scale demonstration of REE and CM recovery. The primary feedstocks were West Kentucky No.13 and heap leach pregnant leach solution (PLS) while a secondary feedstock was a lignite waste material from a construction sand operation. The pilot scale operation started with PLS generation through leaching followed by iron and aluminum removal, nominally at 3.3 and 4.5 pH, respectively. Leaching lixiviants used for the test were industrial grade sulfuric acid or bio-acid generated at the pilot scale facility. For most of the tests, the solid feed rate was 200 lb/hr whereas lixiviant was added at 2 gpm to provide an optimal residence time of 45 minutes. Following the contaminant removal step, several different process schematics were tested with the goal of maximizing REE recovery and purity. In the first test, direct processing of aluminum precipitation raffinate for REE recovery using oxalic acid at pH 1.5 was investigated. Overall REE recovery was approximately 45%. Unfortunately, elevated calcium content in the PLS significantly impacted the RE-Oxide product grade. Similarly, high calcium content decreased both the product purity and grades of CM products. As such, a new flowsheet was tested with the same initial process schematic but different precipitation stages for REEs and CMs at pH 6.0 and 9.0, respectively. It was noted that the overlapping precipitation behavior of Co, Ni and Zn with REEs limited the applicability of this process schematic. While this change increased the RE-Oxide grade from 36% in the first test to 87%, the loss of critical metals to the REE cake and bypass of the REEs to the CM cake significantly impacted the recovery of both REEs and CMs. Therefore, the modified process flowsheet combined oxalic acid precipitation stage raffinate and redissolved CM cake filtrate to maximize both the recovery and purity of the products. Consequently, a RE-Oxide product with 85% purity and CM cakes with over 19% Co, 38% Ni, 14% Zn and 9% Mn content were generated with significantly higher recoveries. While the modified process flowsheet improved recoveries and grades, elemental losses observed in separate precipitation and redissolution losses inspired the adaptation of a single precipitation stage at pH 9.0 for both REEs and CMs. This change was anticipated to maximize the REE recovery while minimizing the costs associated with separated redissolution and processing stages. As expected, REE recovery in this new circuit arrangement was over 56% with a product grade of over 87% RE-Oxide content. Similarly, Co, Ni, Mn, and Zn recoveries of 54%, 40%, 67%, and 66%, respectively, were achieved. Unfortunately, the elevated calcium content present in the solution due to its precipitation at pH 9.0 caused a decrease in the CM cake quality. Therefore, the final process flowsheet involved the addition of calcium oxalate precipitation following the oxalic acid precipitation stage, which effectively eliminated calcium contamination of the CM products. Finally, the pilot scale experiments conducted using bio-acid achieved comparable REE leaching recoveries to the conventional sulfuric acid leaching. Elevated iron concentration in the solution caused the co-precipitation of REEs with the iron and aluminum cake, resulting in the REE losses. Furthermore, elevated iron content bypassing the iron and aluminum precipitation stages contaminated the metal sulfide and manganese cake, respectively. A techno-economic analysis was performed based on a commercial facility capable of treating 500 tph of coal-based material. The production cost for West Kentucky No. 13 coarse refuse material ranged from approximately $500-$700/kg of total rare earth oxide whereas the lignite source had significantly lower production cost of $100-$300/kg. The significant difference in cost was due to the easier leaching characteristics of the lignite material and the higher feed concentrations. All process scenarios resulted in a negative net present value (NPV). For the lignite feedstock, laboratory REE leach recovery values were about 30% higher than the pilot plant data. Using the lab leach results, a positive net present value was achieved and the production cost decreased from $100-$300 $/kg to less than $150/kg of total REO.

01 COAL, LIGNITE, AND PEAT↗

Distributed fiber sensing systems for 3D combustion temperature field monitoring in coal-fired boilers using optically generated acoustic waves (Final Report)

In this project, we have developed and tested three kinds of fiber optic sensing systems for real time monitoring of temperature variations within an industrial scale boiler furnace. The fiber optic sensing systems target spatial and temporal distributions of high temperature profiles in a boiler furnace in fossil power plants. The reconstructed temperature profile will provide critical input for the control mechanisms to optimize the combustion process. This temperature profile will address the essential problem for fossil power plants in achieving higher efficiency and fewer pollutant emissions. Acoustic pyrometer systems have been used to reconstruct temperature field of power plant boilers based on measuring TOF (times-of-flight) of sound waves along some straight paths in a 2D cross-section of the boiler. In this project, optically generated acoustic signals from a fiber optic sensing system have replaced the acoustic signals generated from an electrical transducer. A 3D reconstruction algorithm replaced the previous 2D model. In this project, three kinds of fiber optic sensing systems have been developed and tested. They are fiber optic sensing system I, fiber optic sensing system II (Distributed Sensing System I) and fiber optic sensing system III (Distributed Sensing System II). For fiber optic sensing system I, the fiber optic ultrasound generator acts as a signal generator. A microphone, hydrophone or other electronic devices serve as a signal receiver. In this system, there are one generator and one receiver. Distance test, water temperature test, air temperature test, air temperature reconstruction, and GE ISBF pilot test were performed by Fiber optic sensing system I. The fiber optic sensing system I successfully detected temperature in all these tests. We got 2D temperature reconstruction results by using the fiber optic sensing system I and it matched the reference data. The fiber optic sensing system I successfully survived in GE ISBF boiler environment (480 °F). For fiber optic sensing system II (Distributed Sensing System I), it is an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Fiber Bragg Grating (FBG) and Fabry-Perot (FP) sensor act as a signal receiver. In this system, there is one generator and one receiver. Aluminum plate temperature test, furnace high temperature test, and GE ISBF pilot test were performed by the fiber optic sensing system II. Fiber optic sensing system II successfully detected the temperature in all these tests. The fiber optic sensing system II successfully survived at up to 700 °C furnace environment and 320 °C GE ISBF boiler environment. For fiber optic sensing system III (Distributed Sensing System II), it is also an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Multiple FP fiber sensors act as signal receivers. In this system, there is one generator and three receivers. Three GE ISBF pilot tests were performed by fiber optic sensing system III. The fiber optic sensing system III survived in the cold flow tests in GE’s ISBF pilot test facility. However, we didn’t get high temperature data by using this system since the nanosecond laser issues. During the period of the project, test trials, data simulation and algorithm optimization was performed successfully. For real time temperature field construction, the sampling rate must be fast enough to capture the field variations. The technology of Code-division multiple access (CDMA) is well studied which could allow parallel multiplexing, even if signals overlap in time or frequencies. Moreover, it has been known that extending the length of signal significantly improves SNR. For acoustic signals, these multiplexing techniques have also been widely used, mainly for sonar and acoustic communications. The CDMA modulation technique has been proposed and studied to guarantee high network throughput, low channel access delay and low energy consumption. We have studied the temperature field reconstruction using Gaussian Radial Basis Functions (GRBF)-based approximation approach. Reconstruction of 3D temperature field using Neural Networks with measured TOF and known propagation paths is feasible. 2D and 3D temperature field reconstruction simulation results are achieved. The milestone status is shown in Table 1. We finished milestone 1-8 and milestone 10. For milestone 9, we did three pilot tests by using the fiber optic sensing system III (Distributed Sensing System II) at GE Power. However, due to the failure of the ns laser, we did not get the temperature results. We conducted some additional tasks that were not originally proposed: 1) We fabricated a fiber optic sensing system I and did a pilot test based on this system. 2) In the proposal, we proposed two pilot tests at GE Power. In reality, we finished at least seven pilot tests at GE Power. GE Power has made a lot of efforts for supporting the pilot tests. 3) We got a simulation results based on CDMA. In summary, most of the tasks have been accomplished. The outcome of this project removed a few barriers that hinder the achievement of the final product of the distributed sensing systems. With the successful accomplishment of this project, a prototype of the fiber optic sensing system can be fabricated to attract more interests from companies and other funding agencies.

47 OTHER INSTRUMENTATION↗

Activating Opportunity Zones for Rapid Solar+Storage Deployment in Low Income Communities (Final Report)

Millions of Texans choose their own power provider, giving them the option to have low-cost and even renewable energy delivered through their retail electric plan. However, Texans with less disposable income often pay more for electricity and have limited access to green energy and emergency backup power even though the costs of solar and wind power are at record lows and continue to decline. The Powered for Good initiative aimed to help deliver clean, affordable, 100% renewable electricity to low-income households in Texas’s Competitive Retail Areas, where households can choose their electricity provider. Objectives: The primary goal of this project was to develop and validate one or more affordable solar+storage products (i.e., priced less than of $0.14/kWh) that Retail Electricity Providers (REP) can offer to LI households. The team achieved three objectives: 1. Investigate how to best reduce electricity costs and increase availability of emergency power for LI customers; 2. Build momentum for, and facilitate an approach to, a Texas-based pilot deployment of such solar+storage products, with a goal of greatly expanding this approach to a large segment of the LI population in Texas; 3. Provide the structural framework, finance model, and roadmap to potentially increase investment of solar+storage projects in LI communities across U.S. states when modified to meet their state-specific laws and regulations. The team evaluated the market of viable solutions for low-income Texans through interviews and focus groups with professionals and residents with lived experience. The team then piloted a low-cost retail electric product. Following the pilot, the team developed educational materials, including fact sheets, a Go Green Save Green interactive guide, and an Electricity Bill Analysis Tool. The team is now working to increase power resilience and reduce energy insecurity with micro solar and storage in partnership with local entities in the Harris County area. Key Findings: Informed by Powered for Good research, including the experiences on Texas residents and electricity system experts, the Powered for Good team developed a pilot that was implemented by Energy Well Texas, a new company formed in late 2020. The pilot featured a combination of a 100% clean residential energy offering delivered through the electrical grid plus a selection of batteries, lights and a solar panel that provided participants with varying levels of backup power. For the 8 customers who submitted previous bills, the Energy Well Texas pilot reduced energy bills by about 30%. In Houston, residents earning less than 30% of Area median Income (AMI) spend an average 13% of their income on energy or about $1,555 per year. Repeating the pilot results for these residents could yield $466 in savings per customer or about 4% of their income. While this will not end energy poverty, it is a big step toward that goal. The Powered for Good and Energy Well Texas teams are currently planning their post-pilot phase of service offerings.

14 SOLAR ENERGY↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

MODELING AND TESTING OF A NOVEL ULTRA-LOW TEMPERATURE SCO2 OPPOSING PISTON EXPANDER

The Flameless Pressurized Oxy-Combustion (FPO) cycle, a novel flexible fuel technology, is being developed into a large pilot. This effort seeks to complete the preliminary engineering and planning of a 25 MWth Pilot Plant that will demonstrate the technology for scale-up to a commercial unit. The technology, pioneered by ITEA at the 5 MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. The 25 MWth pilot cycle was optimized for cost and technology development and demonstration. Preliminary drawings, layouts, and plans were defined. Process flow diagrams were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. The 25 MWth FPO pilot is assessed for environmental performance. A test campaign is developed to assess the type of test and number of hours required for pilot demonstration. The environmental performance is compared against projected performance at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this effort was to bring all of the core cycle components to the same level of design maturity. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Yield, Economical and Environmentally Benign Production of Rare Earth Elements from Coal Ash (Phase II Final Summary Report)

Fly ash stored in landfills and ponds across the United States is an attractive, abundant domestic resource for the cost-effective recovery of rare earth elements (REE) and other critical minerals (CM). Physical Sciences Inc. (PSI) and its team members, Winner Water Services (WWS) and University of Kentucky/Center for Applied Energy Research (UK/CAER) successfully executed a multiphase program that developed technologies and their implementation in a pilot plant. We demonstrated plant operations for cost-effective and environmentally-friendly production of rare earth element oxide (REO) concentrates, and the critical minerals scandium and aluminum (in the forms of salts or oxide products), from coal ash. We also constructed and demonstrated a research-scale (0.5 kg/day) micropilot facility to validate the key physical and chemical processing operations, predict yields, and troubleshoot process bottlenecks. The project team then designed, constructed and operated two decoupled pilot plants: (1) an operational pilot plant for physical separation processes with capacity of 0.4 metric tons per day (tpd), where we optimized processes to produce selected ash fractions as the feedstock for chemical processing and as valuable byproducts such as cenospheres, magnetic ash, and secondary fuel carbon, and (2) an operational pilot plant for chemical ash processing with a capacity of 0.5 tpd that developed optimized processes for the production of: (a) REO concentrates, (b) critical minerals (Sc, Al), and (c) beneficiated ash as a valuable byproduct suitable for cement applications. In Phase I, the project team (with Equinox Chemicals in place of WWS) developed and demonstrated the feasibility of the physical and chemical separation processes, developed the design of a pilot plant, and began the development of a preliminary techno-economic model. In the baseline (initial) Phase II program, the project team developed and demonstrated the above pilot scale plant, producing salable REE concentrates, including Y and Sc (REYSc), plus commercially viable byproducts, using environmentally safe and high-yield physical and chemical enrichment processes. The team successfully demonstrated chemical pilot design, construction, shakedown, and operations of the plant. We produced the Phase II deliverable REYSc concentrate ((50 g of >60 wt.% purity REYSc salts on elemental basis), generated the feed for the Phase II follow-on program, identified processing challenges for future optimizations, and refined the techno-economic model. In the Phase II follow-on program, the project team: (1) developed and demonstrated processes to increase the REE amount by 3X (content basis) and convert the Phase II REE salt mixture to an oxide mixture, (2) produced/delivered >38 g of REO mixture with >85 wt.% purity (elemental basis); (3) developed processes to recover critical minerals scandium and aluminum from intermediate streams; (4) produced/delivered > 1 g of scandium salt mixture with >85 wt. % purity (elemental basis); (5) produced/delivered > 100 g of aluminum oxide type material with >70% wt. purity (elemental basis); and (6) updated the techno-economic model from the baseline Phase II program to assess CAPEX and OPEX of a commercial operation. This program has developed extensive databases on process chemistry, unit operations, plant engineering, and techno-economics that will enable further scale-up toward commercial plant design. Specific future developments will be focused on achieving dramatic savings in energy, reagent usage, and operating costs. The combined results will contribute significantly for maturing the technologies of REE recovery from coal byproducts and promote the establishment of domestic REE and CM supply chains.

01 COAL, LIGNITE, AND PEAT↗

Experimental investigation of air-fuel equivalence ratio effects on advanced dual-fuel ammonia/diesel combustion on a single-cylinder medium-duty diesel engine at high load

Ammonia (NH 3 ) has garnered significant interest as an alternative fuel for meeting international emissions reduction mandates in sectors with high weight and distance requirements, such as shipping. Technical barriers and unanswered questions remain on the combustion strategies that can maximize ammonia utilization and minimize emissions. Prior research studies at the US Department of Energy’s Oak Ridge National Laboratory have shown strong performance with NH 3 under dual-fuel mode using conventional diesel combustion (CDC) manifold air pressure settings. Diesel airflow was initially used to simplify retrofitting (no turbocharger modification), which resulted in air-fuel equivalence ratios (λ) greater than 1.5. To characterize potential improvements in dual-fuel NH 3 combustion performance at richer in-cylinder conditions, a global λ sweep compared the use of early (E-pilot) and late (L-pilot) single diesel injections. The experiments were conducted at 1200 RPM and 12.8 ± 0.2 bar (75 % load), and λ was varied by decreasing the commanded air flow to the engine at greater than 90 % ammonia energy substitution level. A diesel injection timing sweep was conducted for both the injection strategies at fixed λ, and the timing with the lowest engine-out N 2 O emissions was identified. The results indicated an optimal balance between CO 2,eq and thermal efficiency benefits both E-pilot and l-pilot injection strategy cases compared with CDC at a λ of 1.4. In conclusion, the indicated nitrogen-based emissions exhibited a strong correlation to the ratio of CA5–50 and ignition delay for l-pilot, but no apparent trend emerged for the E-pilot injection strategy at the tested boundary conditions.

Ammonia↗

Bike and Scoot to Transit

In this project, we developed a micromobility first-mile service for customers to access public transit. We launched this service as a pilot in the Seattle area that incentivized transit customers to bike or scoot to transit. The objective was to learn how to integrate different micromobility services and provide a unified reward program. Our pilot was called “Bike and Scoot to Transit” and ran from November 2022 to September 2023. More than a dozen locations were selected near transit hubs and light rail/train stations as preferred parking locations. Trips ending at those locations were partially funded. The pilot supported 19,226 qualified trips and distributed $73,000 in total benefits for the participants of the pilot. This dataset was collected from our pilot, which includes the following: - Monthly data: Monthly trip and funding summaries. - Data summary: Data broken down based on the micromobility service provider and equipment. - Trip data: List of all trips recorded during the pilot. - Pricing models: Fees charged by micromobility service providers. ![bike to transit](bike-transit.png)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗