Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Identity Federation and Its Importance for NASA's Future: The SharePoint Extranet Pilot

My project at Kennedy Space Center (KSC) during the spring 2013 Project Management and Systems Engineering Internship was to functionalJy test and deploy the SharePoint Extranet system and ensure successful completion of the project's various lifecycle milestones as described by NASA Procedural Requirement (NPR) 7 120.7. I worked alongside NASA Project Managers, Systems Integration Engineers, and Information Technology (IT) Professionals to pilot this collaboration capability between NASA and its External Partners. The use of identity federation allows NASA to leverage externally-issued credentials of other federal agencies and private aerospace and defense companies, versus the traditional process of granting and maintaining full NASA identities for these individuals. This is the first system of its kind at NASA and it will serve as a pilot for the Federal Government. Recognizing the novelty of this service, NASA's initial approach for deployment included a pilot period where nearby employees of Patrick Air Force Base would assist in testing and deployment. By utilizing a credential registration process, Air Force users mapped their Air Force-issued Common Access Cards (CAC) to a NASA identity for access to the External SharePoint. Once the Air Force stands up an Active Directory Federation Services (ADFS) instance within their Data Center and establishes a direct trust with NASA, true identity federation can be established. The next partner NASA is targeting for collaboration is Lockheed Martin (LMCO), since they collaborate frequently for the ORION Program. Through the use of Exostar as an identity hub, LMCO employees will be able to access NASA data on a need to know basis, with NASA ultimately managing access. In a time when every dollar and resource is being scrutinized, this capability is an exciting new way for NASA to continue its collaboration efforts in a cost and resource effective manner.

Baturin, Rebecca R.↗

Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology Into Human Exploration and Operations Mission Directorate Projects for 2016

This report is intended to help NASA program and project managers incorporate Small Business Innovation Research Small Business Technology Transfer (SBIR/STTR) technologies into NASA Human Exploration and Operations Mission Directorate (HEOMD) projects. Other Government and commercial projects managers can also find this useful. Space Transportation; Life Support and Habitation Systems; Extra-Vehicular Activity; High EfficiencySpace Power; Human Exploration and Operations Mission,

Space Transportation; Life Support and Habitation ↗

Improving Effectiveness of Waste Management Processes with Information and Communications Technology (ICT) - 19524

Improving the effectiveness of waste estimation, tracking, management and disposal processes is a key objective for Waste Management. Project Teams face common challenges producing waste estimates that are accurately accounted for in the project plan, tracking and reporting waste record actuals against the estimate, and communicating the status of waste through the organization. These challenges impact the effectiveness of waste management from a cost and schedule perspective, which can have a significant impact on the bottom line and on future business. By leveraging information and communications technology (ICT) waste management project teams can create a mobile workforce that closes the gaps between creating estimates and tracking actuals against estimates by gathering real time data at each step in the process. This results in significant gains on schedule and cost, improved communication and visibility across the project team, and an improvement in the overall effectiveness of waste processing and disposal procedures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scale-Up of Coal-Based Supercritical CO 2 cycle technology

The Allam Cycle is a transformational technology that enables a step change in the performance, efficiency, and cost of electricity for electrical generating units by using supercritical CO 2 (sCO 2 ) as the working fluid in the turbine for power generation. The objectives of this Phase I effort were to select a host site for a large pilot system through a process of down selection, develop a conceptual design, and conduct a pre-front-end engineering design (pre-FEED) study for a sCO 2 cycle pilot plant that uses domestic coal reserves as the primary feedstock, thereby furthering technology development of the coal-based Allam Cycle. The project was divided into four main tasks: 1) Project Management and Planning; 2) Conceptual Pilot Plant Definition and Host Site Selection; 3) Preliminary Design, Cost, and Schedule Development; and 4) Commitments and Environmental Information Volume (EIV). All project management activities occurred in Task 1. Host site selection was conducted in Task 2, while conceptual design and pre-FEED activities took place under Task 3. Task 4 enhanced the project by securing commitments for the next phase of the program and completing an initial EIV. The Great Plains Synfuels Plant (GPSP) has been selected as the host site for the large-scale pilot, and its owner, Dakota Gasification Company (DGC), is a committed partner. GPSP was compared to two other host site candidates during Phase I: the existing natural gas Allam Cycle facility in La Porte, Texas, and the Energy & Environmental Research Center’s (EERC) high-bay demonstration facility in Grand Forks, North Dakota. Costs for hosting the pilot plant were estimated for each facility, and those costs are shown in Table ES-1. Based on these estimates, the DGC site was clearly shown to be the lowest cost option and was selected as the host site for the project.

01 COAL, LIGNITE, AND PEAT↗

Project resources planning and control

This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

Sibbers, C. W.↗

Integrated Traction Drive Thermal Management: Keystone Project 3

The presentation represents a report of accomplishments during FY 2024 and is prepared for 2024 DOE VTO Annual Merit Review. The project goal is identifying pathways enabling high-performance, compact, and reliable integrated electric drives and facilitation of achieving DOE 2025 target of 33 kW/L system power density for an electric traction drive through support of other EDT consortium members in design and development of thermal management systems for their respective integrated drive concepts. Specific objectives are: 1) research and evaluation of motor-integrated power electronics packaging technologies and thermal management approaches; 2) explore novel materials and manufacturing options (3D printing with thermally enhanced polymers or ceramic materials) for key thermal management system components; 3) develop thermal management system and its sub-components to enable integrated electric drive DOE power density targets in collaboration with project partners; 4) support activities of DOE's Electric Drive Technologies (EDT) consortium members, Oak Ridge National Laboratory (ORNL), University of Wisconsin and Georgia Tech research teams in thermal management component design and thermal modeling of their integrated traction drives.

ADVANCED PROPULSION SYSTEMS↗

NASA EVM Overview and Case Study

The presentation gives an overview of the National Aeronautics and Space Administration (NASA) Earned Value Management (EVM) structure. We briefly talk about the current EVM high-level policies within NASA and the EVM governing structure. It touches on the roles and responsibilities of EVM Focal Points within the Agency. We will also discuss the approach that MSFC followed in implementing EVM and better data analysis within the Habitat Holding Racks (HHR) Project. We will address the approach used at the Marshall Space Flight Center (MSFC) to effectively equip and support MSFC projects in applying a sound EVM and data analysis process. In addition, we will show metrics associated with the HHR project before and after the implementation of EVM on the project. We will discuss the monthly report, using sample data, that the project manager used each month to assess the performance of the project. The data received from EVM helped create a solid method for assessing the project s performance. The use of EVM data analysis can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces. EVM provides project managers with information that can be used in the decision making process.

Kerby, Jerald G.↗

Case Study of "Engineering Peer Meetings" in JPL's ST-6 Project

This design process error-proofing case study describes a design review practice implemented by a project manager at NASA Jet Propulsion Laboratory. There are many types of reviews at NASA: required and not, formalized and informal, programmatic and technical. Standing project formal reviews such as the Preliminary Design Review (PDR) and Critical Design Review (CDR) are a required part of every project and mission development. However, the engineering peer reviews that support teams technical work on such projects are often informal, ad hoc, and inconsistent across the organization. This case study discusses issues and innovations identified by a project manager at JPL and implemented in "engineering peer meetings" for his group.

Tumer, Irem Y.↗

Case Study of 'Engineering Peer Meetings' in JPL's ST-6 Project

This design process error-proofing case study describes a design review practice implemented by a project manager at NASA Jet Propulsion Laboratory. There are many types of reviews at NASA: required and not, formalized and informal, programmatic and technical. Standing project formal reviews such as the Preliminary Design Review (PDR) and Critical Design Review (CDR) are a required part of every project and mission development. However, the engineering peer reviews that support teams technical work on such projects are often informal, ad hoc, and inconsistent across the organization. This case study discusses issues and innovations identified by a project manager at JPL and implemented in 'engineering peer meetings' for his group.

Chao, Lawrence P.↗

Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry

Earned value management (EVM) is a project management approach that can enhance the probability of project success. It is applied widely across different industry sectors (e.g., energy, aerospace, construction, defense, and manufacturing), generally through the use of an earned value management system (EVMS). A holistic and up-to-date literature review on EVM and EVMS does not exist. A literature review can provide a comprehensive perspective on the topic, identifying and summarizing the existing body of knowledge, as a foundation to advance the state of practice of EVM/EVMS. Therefore, the objective of this paper is to investigate the EVM/EVMS state of the art by critically reviewing academic and industry publications, with a specific focus on the maturity of EVMS and the environment surrounding its implementation. By performing a systematic literature review, the authors identified 600 publications since the inception of the EVM concept in 1962, and then narrowed down this list to 160 relevant publications from the last decade for closer review. The findings include the discovery of eight emergent themes. Of these themes, “forecasting/prediction” constitutes the largest portion of the recent literature, followed by “application of EVMS.” One interesting finding is that EVMS maturity, although being a critical topic, is only discussed in one publication. Publications focused on EVM/EVMS have increased in the last decade and significant differences were found between academia and industry literature in terms of the limitations and extensions of EVM/EVMS, EVMS environment, and compliance. A key finding is that designing a reliable EVMS should combine both technical and social aspects of implementation. This forward-looking paper provides a state-of-the-art review while highlighting gaps in the existing EVM/EVMS body of knowledge and introducing new perspectives to support EVMS research and application.

42 ENGINEERING↗

IACMI Project 4.10: Blade Finishing Automation (Final Report)

IACMI Project 4.10, the Innovative Wind Turbine Blade Finishing with Advanced Automated Technology project, performed research addressing the challenges and opportunities associated with automating wind turbine blade finishing operations, including blade trimming and grinding. These activities, developed and conducted in close cooperation with wind industry partners, included: • The development of new automation technology and systems; • The integration of automation technology and components; • The improvements of sensor technology and their deployment in automation systems • The elimination of extensive manual programing for the automation of wind blade finishing; • The rethinking of the approach to specific work tasks for automation systems; • The demonstration at scale of innovative wind turbine blade finishing automations systems. The IACMI Wind TA team worked with GE Renewable Energy and LM Wind Power to establish the metrics of the automated blade finishing system developed in the project. In addition, the project team helped to integrate the advanced automated systems into wind turbine blade production facilities. This project was divided into two phases. Phase I provided project management, preliminary techno-economic model development, early US wind turbine industry outreach, and early research into robotic solutions for automated wind blade finishing. This second phase continued with project management, as well as final techno-economic model development, advanced research into robotic solutions for automated wind blade finishing, as well as specifications and procurement of a robotic system for automated wind blade finishing. The 4.10 project leveraged the capabilities and facilities established through the Institute for Advanced Composites Manufacturing Innovation (IACMI), the Colorado Office of Economic Development and International Trade (OEDIT) and the National Renewable Energy Laboratory (NREL). The IACMI Wind Technology Area (TA) designed and prepared for deployment a robotic automated wind turbine blade finishing system at the NREL/IACMI Composites Manufacturing Education and Technology (CoMET) facility. The results of this project led to follow-on funding to build upon and expand research in automated wind turbine blade finishing.

17 WIND ENERGY↗

Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology Into Science Mission Directorate Projects at Glenn Research Center for 2015

This report is intended to help NASA program and project managers incorporate Glenn ResearchCenter Small Business Innovation Research/Small Business Technology Transfer (SBIR)/(STTR)technologies into NASA Science Mission Directorate (SMD) programs/projects. Other Government and commercial project managers can also find this useful.

Spacecraft and Platform Subsystems↗

Putting EVM to the Test

IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.

Kerby, Jerald↗

Microsystems Fabrication Laboratory-New Class 100 Cleanroom Completed and Certified

A new Microsystems Fabrication Laboratory (MFL), a Class 100 cleanroom fabrication facility, was completed and certified in 2002 at the NASA Glenn Research Center. This facility, to be used by Glenn's Instrumentation and Controls Division, was designed and built as part of the NASA Construction of Facilities Program. The design, construction, and certification phases were managed by personnel from Glenn s Facilities and Test Engineering Division. Because of time constraints and the need for specialized cleanroom expertise, this 1000 ft2 laboratory was completed using a design-build procurement. Facility Planning & Resources (Pittsburgh, PA) was selected as the prime contractor and provided the architectural design and project management. A major subcontractor, AdvanceTEC, LLC (Richmond, VA), provided the mechanical and electrical design and performed the construction services. Throughout this fast-track project, Facilities and Test Engineering Division personnel provided overall project management and worked closely with the contractors to ensure that the customers needs were addressed and that the impact of the project implementation was minimized.

Borato, Frances M.↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Earned Value Management Software Projects

JPL has been attempting to apply EVM techniques for the last 15 years with mixed success, especially when applied to software tasks. One of the main causes is that software presents particular challenges that were not considered during the genesis of EVM. A small number of tasks have been able to use EVM effectively and derive great benefits. This paper discusses challenges specific to software management and how they can be successfully addressed. Specifically, it details lessons learned from the $28 million dollar Next Generation Navigation Software Project that replaced NASA’s deep space navigation software for operations. The project was able to successfully use EVM techniques during a four year period, producing 12 releases on their promised delivery dates and projects actual costs that were within 0.3% of the planned budget (under), in contrast to performance before the techniques were put into practice.

Hanna, Robert A.↗

Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology into NASA Programs Associated with the Science Mission Directorate

This report is intended to help NASA program and project managers incorporate Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) technologies that have gone through Phase II of the SBIR program into NASA Science Mission Directorate (SMD) programs. Other Government and commercial project managers can also find this information useful.

earth science↗

2024 Nasa Lunabotics University Competition: Site Preparation With Bulk Regolith

Introduction: Lunabotics provides accredited institutions of higher learning students (vocational-technical, college, university) an opportunity to apply the NASA systems engineering process to design and build a prototype robot. This robot would be capable of performing the proposed operations on the Lunar surface in support of future Artemis mission goals. Lunabotics features a systems engineering design challenge to engage students in the next phase of hu-man space exploration supporting the Artemis missions. This two-semester event encourages students to design and build an autonomous or telerobotic robot designed to traverse the simulated Lunar surface and complete the assigned construction tasks. The number of teams accepted into this challenge is not predetermined but is based on the scores and overall quality of the Project Management Plans received and other factors. The culmination of the Lunabotics virtual challenge will be the design, build and operation of a functional prototype Lunar robot. Teams are required to submit the following: (1) Project Management Plan, (2) Systems Engineering Paper, a (3) STEM Engage-ment Report, and a (4) Proof of Life Video. This is an optional item, but to qualify for the grand prize a team must also submit a: (5) Presentation and Demonstration. Background: The NASA Lunabotics University Competition was first held in 2010 as a follow on to the NASA Regolith Excavation Challenge [1]. The high level of interest and participation from over 50 universities each year has led to a sustained annual competi-ion cadence: it has been held every May for the past 14 years [2,3]. Over 6,000 students have participated and been inspired to pursue Science, Technology, En-gineering and Mathematics careers (STEM). 2024 Competition: The necessary lunar surface tasks are evolving to meet the NASA Artemis Mission requirements. In the past Lunabotics challenges we gathered data to support Lunar mining for consuma-bles in the Lunar regolith. Now, in 2024, the task is to gather data on Lunar site preparation and construction by designing and building a robot that will traverse the chaotic Lunar terrain and construct a regolith-based berm. The goal is to build a berm structure which would be useful to the Artemis Mission for blast and ejecta protection during lunar landings and launches, shading cryogenic propellant tank farms, providing radiation protection around a nuclear power plant and other mission critical uses. Lunabotics will consist of three separate events this year. The first event is NASA’s Lunabotics Project Development Challenge, where teams submit various deliverables to be scored by judges. The second event will be the University of Central Florida (UCF) Lunabotics Qualification challenge, in the Exolith laboratory, where teams will put their de-signs to the test. The top ten scoring teams from the Qualification challenge are then invited to the third and final event, NASA’s Lunabotics On-Site Challenge at Kennedy Space Center in Florida. This presentation will summarize the results and lessons learned from the NASA Lunabotics University Competition held in May 2024.

Lunabotics↗