Selection of a surface tension propellant management system for the Viking 75 Orbiter.
Discussion of the propellant management system requirements derived for the Viking 75 mission, and review of a series of surface tension propellant management system design concepts. The chosen concept is identified and its mission operation described. The ullage bubble and bulk liquid positioning characteristics are presented, along with propellant dynamic considerations entailed by thrust initiation/termination. Pressurization design considerations, required to assure minimum disturbance to the bulk propellant, are introduced as well as those of the tank ullage vent. Design provisions to assure liquid communication between tank ends are discussed. Results of a preliminary design study are presented, including mechanical testing requirements to assure structural integrity, propellant compatibility, and proper installation.