Search NASA⌕ Search

SEARCH · Search NASA

Results for “Qualification Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Velocity control propulsion subsystem of the Radio Astronomy Explorer satellite for Goddard Space Flight Center

The Velocity Control Propulsion Subsystem (VCPS) was designed the propulsion required for trajectory and lunar orbit corrections of the spacecraft. A GFE clamp assembly physically attaches the VCPS to the spacecraft and the unit is ejected after completing the required corrections. The VCPS is physically and functionally separated from the spacecraft except for the electrical and telemetry interfaces. A GFE transtage provides the superstructure on which the VCPS is assembled. The subsystem consists of two 5 foot pound rocket engine assemblies, 4 propellant tanks, 2 latching valves, 2 fill and drain valves, a system filter, pressure transducer, gas and propellant manifolds and electrical heaters and thermostats. The RAE-B VCPS program covered the design, manufacture and qualification of one subsystem. This subsystem was to be manufactured, subjected to qualification tests; and refurbished, if necessary, prior to flight. The VCPS design and test program precluded the need for refurbishing the subsystem and the unit was delivered to GSFC at the conclusion of the program.

Braught, W.↗

A Saturn launched X-ray astronomy experiment. Volume 1: S-027

The S-027 X-Ray Astronomy Experiment originally proposed in early 1966, was developed to detect X-rays in the 2 keV to 10 keV range. Both a prototype unit and flight unit were constructed with the prototype unit also serving as the engineering model, the qualification test unit, and after refurbishment, as the back-up flight unit. Two Ground Support Equipment consoles were built to verify the experiment operation. A photograph of one experiment package with its Ground Support Equipment is shown. The S-027 experiment was scheduled for launch in 1968/69 and although both units were completed and tested to the extent that either would be ready for the scheduled launch, delays in the space program resulted in a launch date slip of several years. When the 1968/69 launch delay became official, provisions were made for storage of the two experiment packages at SCI Electronics in Huntsville, Alabama until a new launch date could be established.

Source record↗

Analysis of Navy radome failure problems

A survey of radome failure problems in military aircraft under actual operating conditions was conducted. The aircraft were operating from aircraft carriers in the Pacific Ocean. Critical problem areas were identified and a plan was developed for failure prevention. The development and application of repair kits for correcting the erosion damage are reported. It is stated that the rain erosion damage survey established a strong justification for qualification testing of all materials and designs which may have questionable life expectancy on the aircraft.

Tatnall, G. J.↗

Skylab food system laboratory support

A summary of support activities performed to ensure the quality and reliability of the Skylab food system design is reported. The qualification test program was conducted to verify crew compartment compatibility, and to certify compliance of the food system with nutrition, preparation, and container requirements. Preflight storage requirements and handling procedures were also determined. Information on Skylab food items was compiled including matters pertaining to serving size, preparation information, and mineral, calorie, and protein content. Accessory hardware and the engraving of food utensils were also considered, and a stowage and orientation list was constructed which takes into account menu use sequences, menu items, and hardware stowage restrictions. A food inventory system was established and food thermal storage tests were conducted. Problems and comments pertaining to specific food items carried onboard the Skylab Workshop were compiled.

Sanford, D.↗

Apollo Telescope Mount (ATM) gimballed star tracker

Design and development of six gimballed star trackers for Skylab's Apollo Telescope Mount, which performed successfully on all three manned Skylab missions and accumulated a total usage time of approximately 3,500 hours, is described in terms of configurations, materials and construction, qualification testing, performance, and reliability characteristics. A brief program history and design changes incorporated during the life of the program are also discussed. Extensive drawings, block diagrams, and photographs are provided.

Lana, J. D.↗

Status of 30 cm mercury ion thruster development

Two engineering model 30-cm ion thrusters were assembled, calibrated, and qualification tested. This paper discusses the thruster design, performance, and power system. Test results include documentation of thrust losses due to doubly charged mercury ions and beam divergence by both direct thrust measurements and beam probes. Diagnostic vibration tests have led to improved designs of the thruster backplate structure, feed system, and harness. Thruster durability is being demonstrated over a thrust range of 97 to 113 mN at a specific impulse of about 2900 seconds. As of August 15, 1974, the thruster has successfully operated for over 4000 hours.

Sovey, J. S.↗

Induction brazing at the Kennedy Space Center

A description of the joint design, materials, equipment, qualification testing, inspection methods, and applications involved in performing induction brazing on hyperbolic propellants tubing at Kennedy Space Center. Induction brazing is a form of brazing in which the energy is transmitted to the workpiece by electrical induction; the eddy currents generated in the metal produce heat by resistance losses. Since induction heating is fast and highly localized, undesirable heat effects are minimized and the resulting braze is of high quality.

Clautice, W. E.↗

Skylab program. Earth resources experiment package. Sensor performance report. Volume 7 (S190B): SL2, SL3 and SL4 evaluations

The S190B Earth Terrain Camera (ETC) operated acceptably for all of its scheduled EREP passes throughout the SL2 mission. The crew reported no problems in unstowing the camera, changing filters, installing the ETC window in the SAL, or installing the camera onto the window. The ETC was operated for a total of seven times with no failures. The clock on the ETC was checked on DOY 170 (June 19, 1973) and was found to be 30 min. and 58 sec. slower than GMT. The change in time was expected since a similar circumstance was experienced during ETC qualification testing for launch vibration. A leak existed in the seal of the spare magazine to the camera vacuum interface. For EREP passes 08 and 10, black-and-white film EK 3414 (roll no. 82) was installed in this spare magazine. Since there was an audible hiss, the vacuum hose was not connected to the camera. This caused the vacuum platen to be inoperable, resulting in some degradation in resolution for this roll of film. The vegetation of the South American jungle areas proved to be much darker than vegetation found in the United States, and was consequently about 1/2 stop underexposed in all cases.

Kenney, G. P.↗

TRW vortex-lattice method subsonic aerodynamic analysis for multiple-lifting-surfaces (N. surface) TRW program number HA010B

The program was designed to provide solutions of engineering accuracy for determining the aerodynamic loads on single- or multiple-lifting-surface configurations that represent vehicles in subsonic flight, e.g., wings, wing-tail, wing-canard, lifting bodies, etc. The preparation is described of the input data, associated input arrangement, and the output format for the program data, including specification of the various operational details of the program such as array sizes, tape numbers utilized, and program dumps. A full description of the underlying theory used in the program development and a review of the program qualification tests are included.

Gomez, A. V.↗

Apollo experience report: Guidance and control systems; lunar module mission programer

A review of the concept, operational requirements, design, and development of the lunar module mission programer is presented, followed by a review of component and subsystem performance during design-feasibility, design-verification, and qualification tests performed in the laboratory. The system was further proved on the unmanned Apollo 5 mission. Several anomalies were detected, and satisfactory solutions were found. These problems are defined and examined, and the corrective action taken is discussed. Suggestions are given for procedural changes to be used if future guidance and control systems of this type are to be developed.

Vernon, J. A.↗

Status of 30 cm mercury ion thruster development

Two engineering model 30-cm ion thrusters have been assembled, calibrated, and qualification tested. This paper discusses the thruster design, performance, and power system. Test results include documentation of thrust losses due to doubly charged mercury ions and beam divergence by both direct thrust measurements and beam probes. Diagnostic vibration tests have led to improved designs of the thruster backplate structure, feed system, and harness. Thruster durability is being demonstrated over a thrust range of 97 to 113 mN at a specific impulse of about 2900 seconds. As of August 15, 1974, the thruster has successfully operated for over 4000 hours.

Sovey, J. S.↗

Electric propulsion system design and development for primary propulsion applications

An electric thrust subsystem technology development program to demonstrate the readiness of primary electric propulsion for flight applications is described. The development program is based on a subsystem design sufficiently flexible to be applicable to a broad range of mission requirements with minimum impact on the subsystem elements or interface designs. The effort includes development and qualification testing of new subsystem elements, the assembly and test of subsystem models to verify the physical and functional interfaces of the subsystem with other spacecraft subsystems, and the investigation of the effects of thrust subsystem operation on all aspects of spacecraft performance. The present status of this effort and some of the results so far obtained are presented.

Kerrisk, D. J.↗

Apollo experience report: Development of the extravehicular mobility unit

The development and performance history of the Apollo extravehicular mobility unit and its major subsystems is described. The three major subsystems, the pressure garment assembly, the portable life-support system, and the oxygen purge system, are defined and described in detail as is the evolutionary process that culminated in each major subsystem component. Descriptions of ground-support equipment and the qualification testing process for component hardware are also presented.

Lutz, C. C.↗

Design definition study of a life/cruise fan technology V/STOL aircraft. Volume 2, addendum 2: Program risk assessment

The results are presented of a risk assessment study conducted on two technology aircraft. The aircraft system components were reviewed and assessed for risk based on: (1) complexity relative to state-of-the-art, (2) manufacturing and qualification testing, (3) availability and delays, and (4) cost/schedule impact. These assessments were based on five risk nomenclatures: low, minor, moderate, high, and extreme. Each aircraft system was assigned an overall risk rating depending upon its contribution to the capability of the aircraft to achieve the performance goals. The slightly lower Sabreliner performance margin is due to the restricted flight envelope, the fixed landing gear, and internal fuel capacity. The Sabreliner with retractable gear and allowed to fly at its best speed and altitude would reflect performance margins similar to the New Airframe. These significant margins, inherent with the MCAIR three gas generator/three fan propulsion system, are major modifiers to risk assessment of both aircraft. The estimated risk and the associated key system and performance areas are tabulated.

Source record↗

Cost benefit analysis of space communications technology: Volume 1: Executive summary

The questions of (1) whether or not NASA should support the further development of space communications technology, and, if so, (2) which technology's support should be given the highest priority are addressed. Insofar as the issues deal principally with resource allocation, an economics perspective is adopted. The resultant cost benefit methodology utilizes the net present value concept in three distinct analysis stages to evaluate and rank those technologies which pass a qualification test based upon probable (private sector) market failure. User-preference and technology state-of-the-art surveys were conducted (in 1975) to form a data base for the technology evaluation. The program encompassed near-future technologies in space communications earth stations and satellites, including the noncommunication subsystems of the satellite (station keeping, electrical power system, etc.). Results of the research program include confirmation of the applicability of the methodology as well as a list of space communications technologies ranked according to the estimated net present value of their support (development) by NASA.

Holland, L. D.↗

Development of thermal control methods for specialized components and scientific instruments at very low temperatures (follow-on)

Many payloads currently proposed to be flown by the space shuttle system require long-duration cooling in the 3 to 200 K temperature range. Common requirements also exist for certain DOD payloads. Parametric design and optimization studies are reported for multistage and diode heat pipe radiator systems designed to operate in this temperature range. Also optimized are ground test systems for two long-life passive thermal control concepts operating under specified space environmental conditions. The ground test systems evaluated are ultimately intended to evolve into flight test qualification prototypes for early shuttle flights.

Wright, J. P.↗

Design study of the deepsky ultraviolet survey telescope

Preliminary mechanical design and specifications are presented for a wide field ultraviolet telescope and detector to be carried as a Spacelab payload. Topics discussed include support structure stiffness (torsional and bending), mirror assembly, thermal control, optical alignment, attachment to the instrument pointing pallet, control and display, power requirements, acceptance and qualification test plans, cost analysis and scheduling. Drawings are included.

Page, N. A.↗