Search NASA⌕ Search

SEARCH · Search NASA

Results for “SERVICE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Mechanical features of the shuttle rotating service structure

With the development of the space shuttle launching facilities, it became mandatory to develop a shuttle rotating service structure to provide for the insertion and/or removal of payloads at the launch pads. The rotating service structure is a welded tubular steel space frame 189 feet high, 65 feet wide, and weighing 2100 tons. At the pivot column the structure is supported on a 30 inch diameter hemispherical bearing. At the opposite terminus the structure is supported on two truck assemblies each having eight 36 inch diameter double flanged wheels. The following features of the rotating service structure are discussed: (1) thermal expansion and contraction; (2) hurricane tie downs; (3) payload changeout room; (4) payload ground handling mechanism; (5) payload and orbiter access platforms; and (6) orbiter cargo bay access.

Crump, J. M.↗

Space based OTV servicing

Space based servicing of an orbit transfer vehicle (OTV) was previously outlined in sufficient detail to arrive at OTV and support system servicing requirements. Needed space station facilities and their functional requirements were identified. The impact of logistics and space serviceable design on the OTV design is detailed herein. RL10 derivative rocket engine inspection task times are enumerated.

Mcallister, J. G.↗

Tradeoff analysis of technology needs for public service helicopters

The design requirements for a family or type of Public Service Helicopter (PSH) is examined which will satisfy the needs of municipal and state governments in the following mission areas: Emergency Medical Service--Airborne Rescue Squad; Law Enforcement; Search and Rescue; and Environmental Control (Fire Fighting, Pollution, Resource Management). The report compares both design and performance requirements as specified by the PSH user's group against current technological capabilities, RTOPS and US Army LHX design requirements. The study explores various design trade-offs and options available to the aircraft designer/manufacturer in order to meet the several criteria specified by the PSH user's group. In addition, the report includes a brief assessment of the feasibility of employing certain advanced rotorcraft designs to meet the stringent combination of operational capabilities desired by the Public Service Helicopter Users.

Bauchspies, J. S.↗

The role of service areas in the optimization of FSS orbital and frequency assignments

A relationship is derived, on a single-entry interference basis, for the minimum allowable spacing between two satellites as a function of electrical parameters and service-area geometries. For circular beams, universal curves relate the topocentric satellite spacing angle to the service-area separation angle measured at the satellite. The corresponding geocentric spacing depends only weakly on the mean longitude of the two satellites, and this is true also for alliptical antenna beams. As a consequence, if frequency channels are preassigned, the orbital assignment synthesis of a satellite system can be formulated as a mixed-integer programming (MIP) problem or approximated by a linear programming (LP) problem, with the interference protection requirements enforced by constraints while some linear function is optimized. Possible objective-function choices are discussed and explicit formulations are presented for the choice of the sum of the absolute deviations of the orbital locations from some prescribed ideal location set. A test problem is posed consisting of six service areas, each served by one satellite, all using elliptical antenna beams and the same frequency channels. Numerical results are given for the three ideal location prescriptions for both the MIP and LP formulations. The resulting scenarios also satisfy reasonable aggregate interference protection requirements.

Levis, C. A.↗

Dust collection on serviceable satellites

One rationale for the Space Shuttle program which was dramatically realized during the repair of the Solar Maximum Mission (SMM) is the efficiency of in-orbit satellite servicing. An unexpected benefit of this repair mission was the return of parts of the Solar Max satellite which had been exposed for four years to the space environment. Studies conducted on these parts have yielded valuable data on the micrometeorite flux and composition at shuttle altitudes during this time period. The scientific results from studies of the cosmic dust component of the observed particle impacts are not yet complete but it is clear from the preliminary data available that such studies will be a valuable adjunct to the studies of cosmic dust particles collected in the atmosphere. The success of the initial studies of particles collected during repairs of the SMM spacecraft on a surface not specifically designed as a particle collector nor retrieved in a manner intended to minimize or eliminate local contamination raises the possibility that even more interesting results might be obtained if serviceable satellites were initially designed with these objectives in mind. All designs for modern satellites utilize some form of thermal blanket material in order to minimize thermal stresses inside the spacecraft. It is proposed that all future satellites be designed with standardized removeable sections of thermal blanket material which could be replaced during on-orbit servicing and returned to earth for detailed study.

Nuth, J. A., III↗

The role of service areas in the optimization of FSS orbital and frequency assignments

An implicit relationship is derived which relates the topocentric separation of two satellites required for a given level of single-entry protection to the separation and orientation of their service areas. The results are presented explicitly for circular beams and topocentric angles. A computational approach is given for elliptical beams and for use with longitude and latitude variables. It is found that the geocentric separation depends primarily on the service area separation, secondarily on a parameter which characterizes the electrical design, and only slightly on the mean orbital position of the satellites. Both linear programming and mixed integer programming algorithms are implemented. Possible objective function choices are discussed, and explicit formulations are presented for the choice of the sum of the absolute deviations of the orbital locations from some prescribed 'ideal' location set. A test problem involving six service areas is examined with results that are encouraging with respect to applying the linear programming procedure to larger scenarios.

Levis, C. A.↗

An optimized bandwidth efficient demand assigned protocol for integrated Mobile Satellite Services

This paper describes the design of a demand assigned protocol based on bandwidth efficiency for integrated services of a Mobile Satellite System (MSS). An MSS provides data (closed-ended) and voice (open-ended) communications services for a large number of mobile users dispersed over a wide geographical area. Each mobile requests its desired service through a designated set of channels to a network management center. Either pure or slotted ALOHA random access scheme can be used to make connection requests, while data and voice communications are demand assigned. All channels have equal bandwidth and can be adaptively used for reservation requests, data connections or voice connections to maximize the bandwidth utilization. In this paper, perfect communications channels are assumed. It has been shown that, for the case considered, using the slotted ALOHA scheme for making connection requests can save about 30 percent on the total number of channels over using the pure ALHOA scheme.

Yan, T.-Y.↗

Polar platform servicing performance limitations

The preferred service mode for space platform equipment repair, change or fluids resupply is to have manned operations via EVA and RMS. This requires that the platform achieve a rendezvous with the STS Orbiter. Because of the performance characteristics of the STS in high-inclination and high-altitude orbits, the orbit maneuvers for rendezvous must be provided by a space platform dedicated propulsion system, or by a separate Orbital Maneuvering Vehicle (OMV). An alternate service mode is to have remote operations at the platform operational altitude using an OMV. The polar platform studies examined the mass performance capability of dedicated propulsion and the OMV for both STS rendezvous and platform operational altitude service modes.

Klemetson, R. W.↗

Satellite servicing mission preliminary cost estimation model

The cost model presented is a preliminary methodology for determining a rough order-of-magnitude cost for implementing a satellite servicing mission. Mission implementation, in this context, encompassess all activities associated with mission design and planning, including both flight and ground crew training and systems integration (payload processing) of servicing hardward with the Shuttle. A basic assumption made in developing this cost model is that a generic set of servicing hardware was developed and flight tested, is inventoried, and is maintained by NASA. This implies that all hardware physical and functional interfaces are well known and therefore recurring CITE testing is not required. The development of the cost model algorithms and examples of their use are discussed.

Source record↗

Human factors in space station architecture 2. EVA access facility: A comparative analysis of 4 concepts for on-orbit space suit servicing

Four concepts for on-orbit spacesuit donning, doffing, servicing, check-out, egress and ingress are presented. These are: the Space Transportation System (STS) Type (shuttle system enlarged), the Transit Airlock (Shuttle Airlock with suit servicing removed from the pump-down chamber), the Suitport (a rear-entry suit mates to a port in the airlock wall), and the Crewlock (a small, individual, conformal airlock). Each of these four concepts is compared through a series of seven steps representing a typical Extra Vehicular Activity (EVA) mission: (1) Predonning suit preparation; (2) Portable Life Support System (PLSS) preparation; (3) Suit Donning and Final Check; (4) Egress/Ingress; (5) Mid-EVA rest period; (6) Post-EVA Securing; (7) Non-Routine Maintenance. The different characteristics of each concept are articulated through this step-by-step approach. Recommendations concerning an approach for further evaluations of airlock geometry, anthropometrics, ergonomics, and functional efficiency are made. The key recommendation is that before any particular airlock can be designed, the full range of spacesuit servicing functions must be considered, including timelines that are most supportive of EVA human productivity.

Cohen, Marc M.↗

Optimization of orbital assignment and specification of service areas in satellite communications

The mathematical nature of the orbital and frequency assignment problem for communications satellites is explored, and it is shown that choosing the correct permutations of the orbit locations and frequency assignments is an important step in arriving at values which satisfy the signal-quality requirements. Two methods are proposed to achieve better spectrum/orbit utilization. The first, called the delta S concept, leads to orbital assignment solutions via either mixed-integer or restricted basis entry linear programming techniques; the method guarantees good single-entry carrier-to-interference ratio results. In the second, a basis for specifying service areas is proposed for the Fixed Satellite Service. It is suggested that service areas should be specified according to the communications-demand density in conjunction with the delta S concept in order to enable the system planner to specify more satellites and provide more communications supply.

Wang, Cou-Way↗

The 737 graphite composite flight spoiler flight service evaluation

The ninth flight service report was prepared in compliance with the requirements of Contract NAS1-11668. It covers the flight service experience of 111 graphite-epoxy spoilers on 737 transport aircraft and related ground-based environmental exposure of graphite epoxy material specimens for the period 1 Jan. 1985 through 31 Dec. 1986. Spoilers have been installed on 28 aircraft representing seven major airlines operating throughout the world. An extended flight service evaluation program of 15 years is presently underway. As of 31 Dec. 1986, a total of 3,339,608 spoiler flight-hours and 3,320,952 spoiler landings had been accumulated by this fleet.

Coggeshall, Randy L.↗

Logistics and operations integration requirements to support Space Station servicing of free flying spacecraft - OMV flight operation

The logistics of OMV free-flyer servicing are examined, with emphasis on integrating the OMV operations into the overall STS-Space Station system. The depletion rate of consumables and lifetimes of free-flyer components are known quantities, which permits definition of a predictable maintenance schedule. Servicing with an OMV will depend on the position and capabilities of the OMV, Shuttle and Station when free-flyer maintenance is needed. Optimized orbital servicing of free-flyers will involve coordination of and resolution of schedule conflicts among STS, the OMV and the Station. The scheduled availability of any of the three components will be predicted in terms of probabilities that any one of the components will not be needed for another mission while performing the mission they are on.

Bell, Jerome A.↗

The space station assembly phase: Flight telerobotic servicer feasibility, volume 1

The question is addressed which was raised by the Critical Evaluation Task Force (CETF) analysis of the space station: if a Flight Telerobotic Servicer (FTS) of a given technical risk could be built for use during space station assembly, could it save significant extravehicular (EVA) resources. Key issues and trade-offs associated with using an FTS to aid in space station assembly phase tasks such as construction and servicing are identified. A methodology is presented that incorporates assessment of candidate assembly phase tasks, telerobotics performance capabilities, development costs, operational constraints (STS and proximity operations), maintenance, attached payloads, and polar platforms. A discussion of the issues is presented with focus on potential FTS roles: (1) as a research-oriented test bed to learn more about space usage of telerobotics; (2) as a research-based test bed with an experimental demonstration orientation and limited assembly and servicing applications; or (3) as an operational system to augment EVA, to aid the construction of the space station, and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations. During the course of the study, the baseline configuration was modified into Phase 1 (a station assembled in 12 flights), and Phase 2 (a station assembled over a 30 flight period) configuration.

Smith, Jeffrey H.↗

Mobile satellite service in the United States

Mobile satellite service (MSS) has been under development in the United States for more than two decades. The service will soon be provided on a commercial basis by a consortium of eight U.S. companies called the American Mobile Satellite Consortium (AMSC). AMSC will build a three-satellite MSS system that will offer superior performance, reliability and cost effectiveness for organizations requiring mobile communications across the U.S. The development and operation of MSS in North America is being coordinated with Telesat Canada and Mexico. AMSC expects NASA to provide launch services in exchange for capacity on the first AMSC satellite for MSAT-X activities and for government demonstrations.

Agnew, Carson E.↗

Design concept for the Flight Telerobotic Servicer (FITS)

NASA has just completed an in-house Phase B Study (one of three studies) for the preliminary definition of a teleoperated robotic device that will be used on the National Space Transportation System (NSTS) and the Space Station to assist the astronauts in the performance of assembly, maintenance, servicing, and inspection tasks. This device, the Flight Telerobotic Servicer (FTS), will become a permanent element on the Space Station. Although it is primarily a teleoperated device, the FTS is being designed to grow and evolve to higher states of autonomy. Eventually, it will be capable of working from the Orbital Maneuvering Vehicle (OMV) to service free-flying spacecraft at great distances from the Space Station. A version of the FTS could also be resident on the large space platforms that are part of the Space Station Program.

Andary, J. F.↗

Advanced information processing system: Input/output system services

The functional requirements and detailed specifications for the Input/Output (I/O) Systems Services of the Advanced Information Processing System (AIPS) are discussed. The introductory section is provided to outline the overall architecture and functional requirements of the AIPS system. Section 1.1 gives a brief overview of the AIPS architecture as well as a detailed description of the AIPS fault tolerant network architecture, while section 1.2 provides an introduction to the AIPS systems software. Sections 2 and 3 describe the functional requirements and design and detailed specifications of the I/O User Interface and Communications Management modules of the I/O System Services, respectively. Section 4 illustrates the use of the I/O System Services, while Section 5 concludes with a summary of results and suggestions for future work in this area.

Masotto, Tom↗

Commercial ELV services and the National Aeronautics and Space Administration - Concord or discord?

In implementation of the U.S. policy to foster and encourage the commercial expendable launch vehicle (ELV) industry, tensions have developed between the industry and U.S. Government agencies in two distinct areas: industry use of government facilities and government purchase of commercial ELV services. The reasons for the tensions and discrete legal problems for each area are identified and discussed. Specifically, in the use of government facilities area, issues of insurance and indemnification for third-party liability and government property, concerns over priority and scheduling, and dispute-resolution procedures are discussed. In the area of government purchase of ELV launch services, a comparison is made between a launch service purchase and prior procurement practice. In all areas, the conclusion is reached that while problems still exist, they generally are understood and great progress has been made toward their resolution.

Frankle, Edward A.↗