Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Station Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

In-Space Networking On NASA's SCaN Testbed

The NASA Space Communications and Navigation (SCaN) Testbed, an external payload onboard the International Space Station, is equipped with three software defined radios (SDRs) and a programmable flight computer. The purpose of the Testbed is to conduct inspace research in the areas of communication, navigation, and networking in support of NASA missions and communication infrastructure. Multiple reprogrammable elements in the end to end system, along with several communication paths and a semi-operational environment, provides a unique opportunity to explore networking concepts and protocols envisioned for the future Solar System Internet (SSI). This paper will provide a general description of the system's design and the networking protocols implemented and characterized on the testbed, including Encapsulation, IP over CCSDS, and Delay-Tolerant Networking (DTN). Due to the research nature of the implementation, flexibility and robustness are considered in the design to enable expansion for future adaptive and cognitive techniques. Following a detailed design discussion, lessons learned and suggestions for future missions and communication infrastructure elements will be provided. Plans for the evolving research on SCaN Testbed as it moves towards a more adaptive, autonomous system will be discussed.

space networks↗

Adaptive Coding and Modulation Experiment With NASA's Space Communication and Navigation Testbed

National Aeronautics and Space Administration (NASA)'s Space Communication and Navigation Testbed is an advanced integrated communication payload on the International Space Station. This paper presents results from an adaptive coding and modulation (ACM) experiment over S-band using a direct-to-earth link between the SCaN Testbed and the Glenn Research Center. The testing leverages the established Digital Video Broadcasting Second Generation (DVB-S2) standard to provide various modulation and coding options, and uses the Space Data Link Protocol (Consultative Committee for Space Data Systems (CCSDS) standard) for the uplink and downlink data framing. The experiment was con- ducted in a challenging environment due to the multipath and shadowing caused by the International Space Station structure. Several approaches for improving the ACM system are presented, including predictive and learning techniques to accommodate signal fades. Performance of the system is evaluated as a function of end-to-end system latency (round- trip delay), and compared to the capacity of the link. Finally, improvements over standard NASA waveforms are presented.

waveforms↗

In-Space Networking on NASA's SCAN Testbed

The NASA Space Communications and Navigation (SCaN) Testbed, an external payload onboard the International Space Station, is equipped with three software defined radios and a flight computer for supporting in-space communication research. New technologies being studied using the SCaN Testbed include advanced networking, coding, and modulation protocols designed to support the transition of NASAs mission systems from primarily point to point data links and preplanned routes towards adaptive, autonomous internetworked operations needed to meet future mission objectives. Networking protocols implemented on the SCaN Testbed include the Advanced Orbiting Systems (AOS) link-layer protocol, Consultative Committee for Space Data Systems (CCSDS) Encapsulation Packets, Internet Protocol (IP), Space Link Extension (SLE), CCSDS File Delivery Protocol (CFDP), and Delay-Tolerant Networking (DTN) protocols including the Bundle Protocol (BP) and Licklider Transmission Protocol (LTP). The SCaN Testbed end-to-end system provides three S-band data links and one Ka-band data link to exchange space and ground data through NASAs Tracking Data Relay Satellite System or a direct-to-ground link to ground stations. The multiple data links and nodes provide several upgradable elements on both the space and ground systems. This paper will provide a general description of the testbeds system design and capabilities, discuss in detail the design and lessons learned in the implementation of the network protocols, and describe future plans for continuing research to meet the communication needs for evolving global space systems.

space networks↗

Adaptive Coding and Modulation Experiment With NASA's Space Communication and Navigation Testbed

National Aeronautics and Space Administration (NASA)'s Space Communication and Navigation Testbed is an advanced integrated communication payload on the International Space Station. This paper presents results from an adaptive coding and modulation (ACM) experiment over S-band using a direct-to-earth link between the SCaN Testbed and the Glenn Research Center. The testing leverages the established Digital Video Broadcasting Second Generation (DVB-S2) standard to provide various modulation and coding options, and uses the Space Data Link Protocol (Consultative Committee for Space Data Systems (CCSDS) standard) for the uplink and downlink data framing. The experiment was conducted in a challenging environment due to the multipath and shadowing caused by the International Space Station structure. Several approaches for improving the ACM system are presented, including predictive and learning techniques to accommodate signal fades. Performance of the system is evaluated as a function of end-to-end system latency (round-trip delay), and compared to the capacity of the link. Finally, improvements over standard NASA waveforms are presented.

waveforms↗

DVB-S2 Experiment over NASA's Space Network

The commercial DVB-S2 standard was successfully demonstrated over NASAs Space Network (SN) and the Tracking Data and Relay Satellite System (TDRSS) during testing conducted September 20-22nd, 2016. This test was a joint effort between NASA Glenn Research Center (GRC) and Goddard Space Flight Center (GSFC) to evaluate the performance of DVB-S2 as an alternative to traditional NASA SN waveforms. Two distinct sets of tests were conducted: one was sourced from the Space Communication and Navigation (SCaN) Testbed, an external payload on the International Space Station, and the other was sourced from GRCs S-band ground station to emulate a Space Network user through TDRSS. In both cases, a commercial off-the-shelf (COTS) receiver made by Newtec was used to receive the signal at White Sands Complex. Using SCaN Testbed, peak data rates of 5.7 Mbps were demonstrated. Peak data rates of 33 Mbps were demonstrated over the GRC S-band ground station through a 10MHz channel over TDRSS, using 32-amplitude phase shift keying (APSK) and a rate 89 low density parity check (LDPC) code. Advanced features of the DVB-S2 standard were evaluated, including variable and adaptive coding and modulation (VCMACM), as well as an adaptive digital pre-distortion (DPD) algorithm. These features provided additional data throughput and increased link performance reliability. This testing has shown that commercial standards are a viable, low-cost alternative for future Space Network users.

waveforms↗

Total and Spectral Solar Irradiance Sensor (TSIS) Project Status

TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).

TSIS↗

Robotic Refueling Mission-3 An Overview

Robotic Refueling Mission-3 (RRM3) is an external payload on the International Space Station (ISS) to demonstrate the techniques for storing and transferring a cryogenic fuel on orbit. RRM3 was designed and built at the National Aeronautics and Space Administration/Goddard Space Flight Center (NASA/GSFC). Initial testing was performed at GSFC using liquid nitrogen and liquid argon. Final testing and flight fill of methane was performed at the NASA Kennedy Space Center (KSC) to take advantage of KSC's facilities and expertise for handling a combustible cryogen.

Robotic Transfer↗

NASA-STD-7012 Leak Test Requirements: Potential Reference for ASNT Nondestructive Testing Handbook for Leak Testing

Developed in 2018-2019, NASA-STD-7012 Leak Test Requirements, has been drafted based mostly on the NASA technical requirement documents applicable to the International Space Station (ISS) hardware and payloads that were developed over the years taking into consideration many known references such as Leakage Testing Handbook prepared by General Electric for the Jet Propulsion Laboratory, the ASTM International standards for leak testing, and last, but not least, the ASNT Nondestructive Testing Handbook for Leak Testing. Thus, NASA-STD-7012 has a reference to the above-mentioned handbook in the leak test method/technique descriptions. However, there are some technical details that are described differently in NASA standard and ASNT Handbook. Those technical details are mostly related to the classification of the leak test methods/techniques, and also to tracer gas to working fluid (gas or liquid) leakage rate conversion methodology, and to some definitions used in the text of both NASA standard and ASNT Handbook. Those differences are going to be briefly described in this paper to let ASNT leak test experts decide if they want to refer to NASA-STD-7012 while working on the next edition of the ASNT Handbook, Volume 2 for Leak Testing.

Lvovsky, Oleg M.↗

TPSAS-NF1676L-31567-DND

The Stratospheric Aerosol and Gas Experiment (SAGE) III is an external payload on the International Space Station (ISS) launched on SpaceX CRS-10 on 19 February 2017 and robotically installed on ExPRESS Logistics Carrier-4 (ELC-4). First light was acquired on 17 March 2017.

Amy Rowell↗

High-precision x-ray timing of three millisecond pulsars with NICER: Stability estimates and comparison with radio

The Neutron Star Interior Composition Explorer (NICER) is an X-ray astrophysics payload on the International Space Station. It enables unprecedented high-precision timing of millisecond pulsars (MSPs) without the pulse broadening and delays due to dispersion and scattering within the interstellar medium that plague radio timing. We present initial timing results from a year of data on the MSPs PSR B1937+21 and PSR J0218+4232, and nine months of data on PSR B1821−24. NICER time-of-arrival uncertainties for the three pulsars are consistent with theoretical lower bounds and simulations based on their pulse shape templates and average source and background photon count rates. To estimate timing stability, we use the σz measure, which is based on the average of the cubic coefficients of polynomial fits to subsets of timing residuals. So far we are achieving timing stabilities σz≈3×10−14 for PSR B1937+21 and on the order of 10−12 for PSRs B1821−24 and J0218+4232. Within the span of our NICER data we do not yet see the characteristic break point in the slope of σz; detection of such a break would indicate that further improvement in the cumulative root-mean-square timing residual is limited by timing noise. We see this break point in our comparison radio data sets for PSR B1821−24 and PSR B1937+21 on timescales of >2 yr.

Pulsars↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool the majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit for the ammonia leak was the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high-definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Darnell Cowan↗

SERFE Ground Unit EVA Series After Three Year Spacesuit Stowage Period

NASA’s spacesuit government reference design for returning to the Moon is called the Exploration Extravehicular Mobility Unit (xEMU). The xEMU subassembly that provides life support, such as oxygen and thermal control, is the Portable Life Support System (PLSS). Inside the PLSS is a new technology that NASA wanted to test to provide cooling to the crew during EVAs (ExtraVehicular Activity). This technology is called the Spacesuit Water Membrane Evaporator (SWME). In order to test SWME in an improved thermal control loop (TCL) both on Earth and in Space, the Spacesuit Evaporation Rejection Flight Experiment (SERFE) was created. The Ground unit, or testbed at Johnson Space Center (JSC), tested the cooling technology in Earth’s gravity, while the Flight unit, or payload on the International Space Station (ISS), tested the cooling technology in micro-gravity. Since fluids flow differently in micro-gravity, testing in both environments would provide important data for improving cooling performance during EVAs. Both units completed 25 simulated EVAs with the same settings so SWME performance on the ground could be compared to the ISS. The Flight unit was completed first and performed EVAs on the ISS between 2020 and 2022. The Ground unit performed EVAs between 2021 and 2022. When the Flight unit came back from the ISS, it was taken apart for analysis. This analysis looked at how well SWME was able to maintain its heat rejection capability after various dwell times, such as a 90 day Airlock Coolant Loop Recovery (ALCLR) cycle, when the Extravehicular Mobility Unit (EMU) currently on the ISS would normally need maintenance. After a three year simulated spacesuit dwell, the Ground unit performed another EVA series in 2025 to test SWME’s shelf life. The results from this test series will inform mission planning as NASA plans to go back to the Moon and beyond.

Michael Lewandowski↗

SERFE Ground Unit EVA Series After Three Year Spacesuit Stowage Period

NASA’s spacesuit government reference design for returning to the Moon is called the Exploration Extravehicular Mobility Unit (xEMU). The xEMU subassembly that provides life support, such as oxygen and thermal control, is the Portable Life Support System (PLSS). Inside the PLSS is a new technology that NASA wanted to test to provide cooling to the crew during EVAs (ExtraVehicular Activity). This technology is called the Spacesuit Water Membrane Evaporator (SWME). In order to test SWME in an improved thermal control loop (TCL) both on Earth and in Space, the Spacesuit Evaporation Rejection Flight Experiment (SERFE) was created. The Ground unit, or testbed at Johnson Space Center (JSC), tested the cooling technology in Earth’s gravity, while the Flight unit, or payload on the International Space Station (ISS), tested the cooling technology in micro-gravity. Since fluids flow differently in micro-gravity, testing in both environments would provide important data for improving cooling performance during EVAs. Both units completed 25 simulated EVAs with the same settings so SWME performance on the ground could be compared to the ISS. The Flight unit was completed first and performed EVAs on the ISS between 2020 and 2022. The Ground unit performed EVAs between 2021 and 2022. When the Flight unit came back from the ISS, it was taken apart for analysis. This analysis looked at how well SWME was able to maintain its heat rejection capability after various dwell times, such as a 90 day Airlock Coolant Loop Recovery (ALCLR) cycle, when the Extravehicular Mobility Unit (EMU) currently on the ISS would normally need maintenance. After a three year simulated spacesuit dwell, the Ground unit performed another EVA series in 2025 to test SWME’s shelf life. The results from this test series will inform mission planning as NASA plans to go back to the Moon and beyond.

SWME↗

ISS Science Payload Command & Data Handling

For decades, the International Space Station (ISS) has provided a distinctive platform in low Earth orbit for experimental research. In support of this platform is a family of avionics systems that enables reliable data distribution of the many science payloads installed, and future internal and external payloads. This poster provides an update to the ISS avionics hardware system architecture, including design change successes, test bed architecture, and performance upgrades in the operation of all ISS avionics. We conclude with an outlook on future avionics system enhancements required to support additional modules and payload expansions taking place on the ISS, and how these avionics systems translate to a lunar gateway.

1553↗

International Space Station Earth Observations Working Group

The multilateral Earth Observations Working Group (EOWG) was chartered in May 2012 in order to improve coordination and collaboration of Earth observing payloads, research, and applications on the International Space Station (ISS). The EOWG derives its authority from the ISS Program Science Forum, and a NASA representative serves as a permanent co-chair. A rotating co-chair position can be occupied by any of the international partners, following concurrence by the other partners; a JAXA representative is the current co-chair. Primary functions of the EOWG include, 1) the exchange of information on plans for payloads, from science and application objectives to instrument development, data collection, distribution and research; 2) recognition and facilitation of opportunities for international collaboration in order to optimize benefits from different instruments; and 3) provide a formal ISS Program interface for collection and application of remotely sensed data collected in response to natural disasters through the International Charter, Space and Major Disasters. Recent examples of EOWG activities include coordination of bilateral data sharing protocols between NASA and TsNIIMash for use of crew time and instruments in support of ATV5 reentry imaging activities; discussion of continued use and support of the Nightpod camera mount system by NASA and ESA; and review and revision of international partner contributions on Earth observations to the ISS Program Benefits to Humanity publication.

Stefanov, William L.↗

Canadian Space Agency Space Station Freedom utilization plans

Under the terms of the NASA/CSA Memorandum of Understanding, Canada will contribute the Mobile Servicing System and be entitled to use 3 percent of all Space Station utilization resources and user accommodations over the 30 year life of the Station. Equally importantly Canada, like NASA, can begin to exploit these benefits as soon as the Man-Tended Capability (MTC) phase begins, in early 1997. Canada has been preparing its scientific community to fully utilize the Space Station for the past five years; most specifically by encouraging, and providing funding, in the area of Materials Science and Applications, and in the area of Space Life Sciences. The goal has been to develop potential applications and an experienced and proficient Canadian community able to effectively utilize microgravity environment facilities such as Space Station Freedom. In addition, CSA is currently supporting four facilities; a Laser Test System, a Large Motion Isolation Mount, a Canadian Float Zone Furnace, and a Canadian Protein Crystallization Apparatus. In late April of this year CSA sent out a Solicitation of Interest (SOI) to potential Canadian user from universities, industry, and government. The intent of the SOI was to determine who was interested, and the type of payloads which the community at large intended to propose. The SOI will be followed by the release of an Announcement of Opportunity (AO) following governmental approval of the Long Term Space plan later this year, or early next year. Responses to the AO will be evaluated and prioritized in a fair and impartial payload selection process, within the guidelines set by our international partners and the Canadian Government. Payload selection is relatively simple compared to the development and qualification process. An end-to-end user support program is therefore also being defined. Much of this support will be provided at the new headquarters currently being built in St. Hubert, Quebec. It is recognized that utilizing the Space Station could be expensive for users; costing in many cases millions of dollars to get a payload from conception to retrieval. It is also recognized that some of the potential users cannot or will not invest a lot of money or effort into Space Station utilization, unless there is a perceived significant commercial potential. How best to fund Space Station payloads is under study. Space Station Freedom will provide the first opportunity for Canada to conduct experiments in a long-duration microgravity environment. CSA have been developing and funding potential users for some time, and considerable interest has been shown by the response to our SOI earlier this year. Canada can be one of the two earliest users for the Space Station, along with NASA. We hope to take full advantage of this opportunity.

Faulkner, James↗