Search NASA⌕ Search

SEARCH · Search NASA

Results for “Spacecraft instruments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

The University of Chicago cosmic ray electrons and nuclei experiment on the H spacecraft

The University of Chicago instrument on the Heliocentric spacecraft (MEH experiment) will measure the energy spectrum of cosmic electrons in the range 5-400 MeV. In addition, the energy spectra and relative abundances of nuclei from protons to the iron group, with energies ranging from 30 MeV/n to 15 GeV/n, will be determined. Primary scientific objectives involve the study of the long and short term variability of these components as a probe of the structure of the heliosphere. Particles are identified by multiparameter analysis using the pulse height analyzed signals from eight active detectors - silicon solid state, plastic and crystal scintillators are solid and gas Cerenkov counters. Data return is optimized by a three level priority logic scheme.

Meyer, P.↗

A Survey of Radiation Measurements Made Aboard Russian Spacecraft in Low-Earth Orbit

The accurate prediction of ionizing radiation exposure in low-Earth orbit is necessary in order to minimize risks to astronauts, spacecraft and instrumentation. To this end, models of the radiation environment, the AP-8 trapped proton model and the AE-8 trapped electron model, have been developed for use by spacecraft designers and mission planners. It has been widely acknowledged for some time now by the space radiation community that these models possess some major shortcomings. Both models cover only a limited trapped particle energy region and predictions at low altitudes are extrapolated from higher altitude data. With the launch of the first components of the International Space Station with numerous constellations of low-Earth orbit communications satellites now being planned and deployed, the inadequacies of these trapped particle models need to be addressed. Efforts are now underway both in the U.S. and in Europe to refine the AP-8 and AE-8 trapped particle models. This report is an attempt to collect a significant fraction of data for use in validation of trapped radiation models at low altitudes.

Benton, E. R.↗

Near-Earth Object Surveyor Overview

The Near-Earth Object (NEO) Surveyor is designed to detect, categorize and characterize Near-Earth Objects (NEOs) using infrared imaging. The project was approved to enter the preliminary design phase (Phase B) in FY21 after an extended Concept Development Phase (Phase A). The NEO Surveyor project responds to US Public Law 109-155[1], National Research Council’s report “Defending Planet Earth: Near-Earth Object Surveys & Hazard Mitigation Strategies (2010)”[2], the U. S. National Near-Earth Object Preparedness Strategy and Action Plan (June 2018)[3], and the objectives of NASA’s Planetary Defense Coordination Office (PDCO). The goals of the NEO Surveyor project are to: (1) identify impact hazards to the Earth posed by NEOs (defined as asteroids and comets that come within 1.3 AU of the Sun) by performing a comprehensive survey of the NEO population; (2) obtain detailed physical characterization data for individual objects that are likely to pose an impact hazard; (3) characterize the entire population of potentially hazardous NEOs to inform potential mitigation strategies. The mission will make significant progress toward the George E. Brown, Jr. NEO Survey Program objective defined by the U. S. Congress of detecting, tracking, cataloging, and characterizing at least 90% of NEOs equal to or larger than 140 m in diameter. The project is a collaboration between NASA-JPL, the University of Arizona (UA) and industry, with Ball Aerospace notably providing the spacecraft and key instrument elements. This paper will describe the overall NEO Surveyor Project objectives, initial spacecraft and instrument design and development plans and mission concept.

Veto, Michael↗

Comet rendezvous

A Mariner Mark II spacecraft rendezvous mission with comet Kopff has been recommended by NASA's Solar System Exploration Committee, and is scheduled for a Shuttle launch in 1990. The spacecraft, which is scheduled to encounter the comet in 1994, will conduct a series of experiments including the study of the cometary nucleus, coma, and tail during perihelion passage; the determination of the nucleus and coma chemical/isotropic composition; the description of the nucleus's size, mass, rotation period, and pole occultation; distinctions of gas and dust hydrodynamics; and distinctions of solar wind interactions with the coma. The three-axis-stabilized spacecraft will be modular in design, and will incorporate a 490-Newton Insat engine, Viking Orbiter propulsion tanks, an Integrated Platform Pointing and Attitude Control Subsystem, and several scientific instruments. The spacecraft's Radio Frequency Subsystem will only use X-band telemetry with a downlink frequency of 8415 MHz, and an uplink frequency of 7161 MHz. The power sources in the present design include one radioisotope thermoelectric generator, three 3 Ah batteries, and a solar panel of approximately 7 sq m.

Draper, R. F.↗

Implicit Spacecraft Gyro Calibration

This paper presents an implicit algorithm for spacecraft onboard instrument calibration, particularly to onboard gyro calibration. This work is an extension of previous work that was done where an explicit gyro calibration algorithm was applied to the AQUA spacecraft gyros. The algorithm presented in this paper was tested using simulated data and real data that were downloaded from the Microwave Anisotropy Probe (MAP) spacecraft. The calibration tests gave very good results. A comparison between the use of the implicit calibration algorithm used here with the explicit algorithm used for AQUA spacecraft indicates that both provide an excellent estimation of the gyro calibration parameters with similar accuracies.

Harman, Richard↗

Significance of Landsat-7 Spacecraft Level Thermal Balance and Thermal Test for ETM+Instrument

The thermal design and the instrument thermal vacuum (T/V) test of the Landsat-7 Enhanced Thematic Mapper Plus (ETM+) instrument were based on the Landsat-4, 5 and 6 heritage. The ETM+ scanner thermal model was also inherited from Landsat-4, 5 and 6. The temperature predictions of many scanner components in the original thermal model had poor agreement with the spacecraft and instrument integrated sun-pointing safehold (SPSH) thermal balance (T/B) test results. The spacecraft and instrument integrated T/B test led to a change of the Full Aperture Calibrator (FAC) motor stack "solar shield" coating from MIL-C-5541 to multi-layer insulation (MLI) thermal blanket. The temperature predictions of the Auxiliary Electronics Module (AEM) in the thermal model also had poor agreement with the T/B test results. Modifications to the scanner and AEM thermal models were performed to give good agreement between the temperature predictions and the test results. The correlated ETM+ thermal model was used to obtain flight temperature predictions. The flight temperature predictions in the nominal 15-orbit mission profile, plus margins, were used as the yellow limits for most of the ETM+ components. The spacecraft and instrument integrated T/B and TN test also revealed that the standby heater capacity on the Scan Mirror Assembly (SMA) was insufficient when the Earth Background Simulator (EBS) was 1 50C or colder, and the baffle heater possibly caused the coherent noise in the narrow band data when it was on. Also, the cooler cool-down was significantly faster than that in the instrument T/V test, and the coldest Cold Focal Plane Array (CFPA) temperature achieved was colder.

Choi, Michael K.↗

Saturn flight instrumentation.

Flight monitoring and analysis instrumentation for Saturn I, IB and V, discussing automatic preflight checkout

CHECKOUT EQUIPMENT↗

Tracking and data system support for the Pioneer project. Volume 2: Pioneer 11 prelaunch planning through second trajectory correction, to 1 May 1973

The tracking and data system support of the planning, testing, launch, near-earth, and deep space phases of the Pioneer 11 Jupiter Mission are described, including critical phases of spacecraft flight and guidance. Scientific instruments aboard the spacecraft registered information relative to interplanetary particles and fields. Knowledge of the celestial mechanics of the solar system was improved through radiometric data gathering. Network performance, details of network support activity, and special support activities are discussed.

Barton, W. R.↗

Scientific requirements for space science data systems

In the 1990's space plasma physics studies will increasingly involve correlative analysis of observations from multiple instruments and multiple spacecraft. The solar terrestrial physics missions in the 1990's will be designed around simultaneous observations from spacecraft monitoring the solar wind, the polar magnetosphere and the near and distant magnetotail. Within these regions, clusters of spacecraft flying in formation will increasingly involve comparative magnetospheric studies. No single lab will have the expertise to process and analyze all of the different types of data so the data repositories will be distributed. Catalog and browse systems will be required to help select events for study. Data compression techniques may be useful in designing the data bases used for selecting events for study. Data compression onboard the spacecraft will be necessary, since instrument data rates will be much larger than available telemetry rates. However, considerable care will be necessary to avoid losing valuable data when applying data compression algorithms.

Walker, Raymond J.↗

ECLSS Integration Analysis: Advanced ECLSS Subsystem and Instrumentation Technology Study for the Space Exploration Initiative

In his July 1989 space policy speech, President Bush proposed a long range continuing commitment to space exploration and development. Included in his goals were the establishment of permanent lunar and Mars habitats and the development of extended duration space transportation. In both cases, a major issue is the availability of qualified sensor technologies for use in real-time monitoring and control of integrated physical/chemical/biological (p/c/b) Environmental Control and Life Support Systems (ECLSS). The purpose of this study is to determine the most promising instrumentation technologies for future ECLSS applications. The study approach is as follows: 1. Precursor ECLSS Subsystem Technology Trade Study - A database of existing and advanced Atmosphere Revitalization (AR) and Water Recovery and Management (WRM) ECLSS subsystem technologies was created. A trade study was performed to recommend AR and WRM subsystem technologies for future lunar and Mars mission scenarios. The purpose of this trade study was to begin defining future ECLSS instrumentation requirements as a precursor to determining the instrumentation technologies that will be applicable to future ECLS systems. 2. Instrumentation Survey - An instrumentation database of Chemical, Microbial, Conductivity, Humidity, Flowrate, Pressure, and Temperature sensors was created. Each page of the sensor database report contains information for one type of sensor, including a description of the operating principles, specifications, and the reference(s) from which the information was obtained. This section includes a cursory look at the history of instrumentation on U.S. spacecraft. 3. Results and Recommendations - Instrumentation technologies were recommended for further research and optimization based on a consideration of both of the above sections. A sensor or monitor technology was recommended based on its applicability to future ECLS systems, as defined by the ECLSS Trade Study (1), and on whether its characteristics were considered favorable relative to similar instrumentation technologies (competitors), as determined from the Instrumentation Survey (2). The instrumentation technologies recommended by this study show considerable potential for development and promise significant returns if research efforts are invested.

Source record↗

Characterization of Multilayer Piezoelectric Actuators for Use in Active Isolation Mounts

Active mounts are desirable for isolating spacecraft science instruments from on-board vibrational sources such as motors and release mechanisms. Such active isolation mounts typically employ multilayer piezoelectric actuators to cancel these vibrational disturbances. The actuators selected for spacecraft systems must consume minimal power while exhibiting displacements of 5 to 10 micron under load. This report describes a study that compares the power consumption, displacement, and load characteristics of four commercially available multilayer piezoelectric actuators. The results of this study indicate that commercially available actuators exist that meet or exceed the design requirements used in spacecraft isolation mounts.

Wise, Stephanie A.↗

Proven and Robust Ground Support Systems - GSFC Success and Lessons Learned

Over the past fifteen years, Goddard Space Flight Center has developed several successful science missions in-house: the Wilkinson Microwave Anisotropy Probe (WMAP), the Imager for Magnetopause-to-Aurora Global Exploration (IMAGE), the Earth Observing 1 (EO-1) [1], and the Space Technology 5 (ST-5)[2] missions, several Small Explorers, and several balloon missions. Currently in development are the Solar Dynamics Observatory (SDO) [3] and the Lunar Reconnaissance Orbiter (LRO)[4]. What is not well known is that these missions have been supported during spacecraft and/or instrument integration and test, flight software development, and mission operations by two in house satellite Telemetry and Command (T & C) Systems, the Integrated Test and Operations System (ITOS) and the Advanced Spacecraft Integration and System Test (ASIST). The advantages of an in-house satellite Telemetry and Command system are primarily in the flexibility of management and maintenance - the developers are considered a part of the mission team, get involved early in the development process of the spacecraft and mission operations-control center, and provide on-site, on-call support that goes beyond Help Desk and simple software fixes. On the other hand, care must be taken to ensure that the system remains generic enough for cost effective re-use from one mission to the next. The software is designed such that many features are user-configurable. Where user-configurable options were impractical, features were designed so as to be easy for the development team to modify. Adding support for a new ground message header, for example, is a one-day effort because of the software framework on which that code rests. This paper will discuss the many features of the Goddard satellite Telemetry and Command systems that have contributed to the success of the missions listed above. These features include flexible user interfaces, distributed parallel commanding and telemetry decommutation, a procedure language, the interfaces and tools needed for a high degree of automation, and instantly accessible archives of spacecraft telemetry. It will discuss some of the problems overcome during development, including secure commanding over networks or the Internet, constellation support for the three satellites that comprise the ST-5 mission, and geographically distributed telemetry end users.

Pfarr, Barbara↗

Preparing Cassini Uplink Operations for Extended Mission

The Cassini-Huygens Mission to Saturn and Titan, a joint venture between the National Aeronautics and Space Administration, the European Space Agency, and the Italian Space Agency, is conducting a four-year, prime mission exploring the Saturnian system, including its atmosphere, rings, magnetosphere, moons and icy satellites. Launched in 1997, Cassini began its prime mission in 2004. Cassini is now preparing for a new era, a two-year extended mission to revisit many of the highlights and new discoveries made during the prime mission. Because of the light time delay from Earth to Saturn, and the time needed to coordinate the complicated science and engineering activities that take place on the spacecraft, commanding on Cassini is done in approximately 40-day intervals known as sequences. The Cassini Uplink Operations team is responsible for the final development and validation of the pointing profile and instrument and spacecraft commands that are contained in a sequence. During this final analysis prior to uplink to the spacecraft, thorough and exact evaluation is necessary to ensure there are no mistakes during commanding. In order to perform this evaluation, complete and refined processes and procedures are fundamental. The Uplink Operations team is also responsible for anomaly response during sequence execution, a process in which critical decisions often are made in real-time. Recent anomalies on other spacecraft missions have highlighted two major risks in the operations process: (1) personnel turnover and the retirement of critical knowledge and (2) aging, outdated operations procedures. If other missions are a good barometer, the Cassini extended mission will be presented with a high personnel turnover of the Cassini flight team, which could lead to a loss of expertise that has been essential to the success of the prime mission. In order to prepare the Cassini Uplink Operations Team for this possibility and to continue to develop and operate safe science and engineering sequences, a review and major update of the current documentation and operations procedures was needed. This paper will address the changes made to extended mission sequence generation processes primarily due to new restrictions in spacecraft operating capability and lessons learned from prime mission. In addition, it will address the state of the prime mission operations procedures, the philosophy changes and updates that were made to those procedures in response to process improvement, and the validation of those new procedures through the training of current and new personnel. And lastly, it will address the lessons learned throughout prime mission and how the Uplink Operations team chose to incorporate those lessons into the working documentation and team knowledge. This incorporation was necessary to facilitate the success of the extended mission with potentially all new personnel at some point prior to the end of the mission.

Maxwell, Jennifer L.↗